Loading...
HomeMy WebLinkAbout5214-1T FO VALLEY B C TY OF PO\TA �AFFIC SC\AL THE \TES OLPVA A\ \A DLAS TON DOPL OF A� AVF\ TRAFFIC SIGNAL GENERAL NOTES: 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FON-TANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. It SPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITH IN THE CI1TY LIMITS. CALL (909) 350-7610. 2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL. SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFIICATIONS, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA, DATED 2010, AND THE CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVCICES, DATED 2014. 3. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATINS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800)1 227-2600, TWO (2) WORKING DAYS BEFORE DIGGING. 4. CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS, AND HARDW/ARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT ANY CITY FURNISHED OR PROVIDED AS NOTED IN SECTION E. 5. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 3" RIGID METAL UNLESS OTHERWISE SHOWN. 6. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING WITH SOUTHERN CALIFORNIA EDISON COMPANY FOUR WEEKS IN ADVANCE OF NEED. 7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET AND SECTION E. 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINIKLERS, AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 9. CONTROLLER AND SERVICE CABINETS SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. CONTRACTOR SHALL MODIFY SPRINKLERS SYSTEMS AS NECESSARY. 10. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL REPLACED WITH NEW TRAFFIC SIGNALS AND LIGHTING. 11. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS FOR THIS PROJECT. 12. TRENCH REPAIRS SHALL BE PER SPECIAL PROVISIONS, SECTION E AND CITY STANDARD PLAN 1008. 13. AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. DIAL BEFORE YOU DIG TOLL FREE iTWO WORKING DAYS BEFORE YOU DIG i') 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION DATE ENGR. aTY DATE SHOULD CONSTRUCTIOV OF THE REQUIRED IMPROVEMENTS NOT CO4MENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. Prepared Under The Superwision Of : CITY OF FONTANA, CALIFORNIA TRAFFIC SIGNAL AND LIGHTING PLAN DRAWN BY: DT DESIGNED BY: DT Date : 1-/Mit5 CHECKED BY: Noel Castillo, R.C.E. 78044 DH VALLEY BOULEVARD 1:20 & POP �R AVENUE DATE: DRAWING NO.: 1 5214 2