Loading...
HomeMy WebLinkAbout5149-1CITY OF FONTANA TRAFFIC SIGNAL GENERAL NOTES: 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF WY WORK. INSPECTION COORDINATION SHALL. BE REQUESTED AT LEAST TWO WOKING DAYS PRIOR TO THE START OF ANY WORK IN PUBUC RIGHT—OF—WAY WITHIN THE CITY OMITS. CALL (909) 350-7610. 2. TRAFFIC SIGNAL, SIGNING AND STRIPING, AND UGHTING HALL CONFORM TO THESE PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, AND THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SETION 86 (DATED 2010) AND STANDARD PLANS (DATED 2010), THE CALIFORNIA IANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, 2014 EDITION. 3. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPRO)IMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AID VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800) 227-200, TWO (2) WORKING DAYS BEFORE DIGGING. 4. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL E 3" RIGID METAL UNLESS OTHERWISE SHOWN. ALL SPUCE VAULTS SHALL BE TYPE P48 48.5" x 30.5" x 30" DEEP (INSIDE) FIBERGLASS, HAVE LOCKING UDS, AND BE LABELED COMMUNICATIONS. PULL BOXES AND SPUCE VAULTS SHALL BE INSTALLED II ACCORDANCE WITH THE PROJECT DETAILS FOR PULLBOX AND SPUCE VAULT INSTILLATION. 5. CONTRACTOR SHALL MAKE APPUCATION FOR ELECTRIC SRVICES AND SCHEDUUNG WITH SOUTHERN CALIFORNIA EDISON COMPANY FOUR WEKS IN ADVANCE OF NEED. 6. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THI: SHEET AND SECTION E. 7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATSFACTION OF THE ENGINEER. 8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WAER FROM SPRINKLERS. MODIFY SPRINKLERS SYSTEMS IF NECESSARY. 9. ALL VEHICLE INDICATIONS SHALL BE 12" AND HAVE LE.0 SIGNAL MODULES. ALL PEDESTRIAN HEADS SHALL HAVE LE.D. PEDESTRIAN MODILES & UTIUZE PEDESTRIAN COUNTDOWN TIMERS PER SPECIAL PROVISIONS. 10. ANY EXISTING TRAFFIC SIGNALS AND UGHTING SHALL RE)6JN IN OPERATION UNTIL REPLACED WITH NEW CONSTRUCTION. 11. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AID HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND UGHTING AS SHOWI ON THE PLANS, EXCEPT AS NOTED CITY FURNISHED OR USTED AS CITY PROVIDE( IN THE SPECIAL PROVISIONS. 12. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN TIE EVENT OF A CONFLICT OR POTENTIAL CONFUCT WITH THESE PLANS AND/OR SPICIFICATIONS FOR THIS PROJECT. 13. WHERE TRAFFIC SIGNAL STREET CROSSING CONDUIT ARE VOT INSTALLED USING THE BORING METHOD, TRENCH REPAIRS SHALL BE PER CITY :TANDARD, AND SPECIAL PROVISIONS, SECTION E. 14. AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTFACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AN) ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. Know what's below. Call before you dig. ©04Y � C Eir U V' THE ENTE EF 0 P. LPL/NIIVS SE :4M OF ©OtLJ At ITU itiLMA E w LU —J LU w SLOVER SA NTA ANA SAN BERNARDINO FRWY w LU JURUPA CITY FON AVENUE w AVENUE w J 0 AVENUE OF ANA LOCATION MAP N.T.S. LU w (1) w >>--- U (!) PROJECT LOCATION SHIEET INDEX: Sheet Number 11. Description TITLE SHEET TRAFFIC SIGNAL PLANS CITRUS AVENUE AT SANTA ANA AVENUE 2. TRAFFIC SIGNAL PLAN CITRUS AVENUE AT SANTA ANA AVENUE REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. Prepared Under The Supervision c3 0EPy�y\ No. 69467 Exp. 6/30/16 C/ V \\. /.. Of TJW ENGINEERING, IINC. Traffic Engineering & Transportartion Planning Consultants 540 N. Golden Circle Dr. Suite 1104 Santa Ana, CA 92705 t: (949) 878-3509 f: (949) 878-3593 www.tjwengineering.com THOMAS JOSEPH WHEAT R.C.E. No. 69467 CITY OF FONTANA, CALIFORNIA TRAFFIC SIGNAL TITLE SHEET DRAWN BY: TJW 'DESIGNED BY:TJW CHECKED BY: TJW CITRUS AVENUE SANTA. ANA ,AVENUE DATE: Z ' Sam NONE DAZE 11/23/2014 DRAWING NO.: 1 5149 2 12/12/2014 3:00:58 PM .i 4