HomeMy WebLinkAbout5187-1STREET IMPROVEMENT PLAN
STREET '""TI°"O"L"E ` ' '�` '�$ SULTANA AVENUE
I. ALL IMPROVEMENTS SHALL BE COMPLETED IN ACCORDANCE WITH THIS PLAN AND COMPLY WITH THE LATEST SAN BERNARDINO
COUNTY ROAD PLANNING AND DESIGN STANDARDS MANUAL AS WELL AS THE SAN BERNARDINO COUNTY STANDARDS AND
SPECIFICATIONS.
2. BENCH MARK DATA:
SAN BERNARDINO F.B. 4015 PAGE 982 BENCHMARK 7-15 (00510) DESCRIBED AS FOLLOWS:
FD. GOOD COND. ® S.P.R.R. & FOOTHILL BLVD. PER QUAD 341172.
ELEVATION = 1286.018' (NGVD '29)
3. STREET MARKERS PER SAN BERNARDINO COUNTY STANDARD NO. 303, 304A AND 303B SHALL BE CONSTRUCTED AT EACH
INTERSECTION.
4. STREET MARKERS SHALL BE CONSTRUCTED AT EACH INTERSECTION IN ACCORDANCE WITH APPLICABLE SAN BERNARDINO
COUNTY STANDARDS. ALL SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH COUNTY AND STATE SPECIFICATIONS.
5. A PERMIT WILL BE REQUIRED FROM THE COUNTY OF SAN BERNARDINO DEPARTMENT OF PUBLIC WORKS PRIOR TO ANY
ENCROACHMENT OR CONSTRUCTION WITHIN THE COUNTY OF SAN BERNARDINO EASEMENT OR RIGHTS-OF-WAY.
6. LEAVE 8" X 8" BLOCKOUTS IN SIDEWALKS FOR MAILBOXES, ETC. WHEN SIDEWALK IS PLACED ADJACENT TO CURB.
7. IF ASPHALT CONCRETE IS TO BE PLACED DIRECTLY ON SUBGRADE OF ROAD OR DRAINAGE FACILITIES, A SOIL STERILANT
REGISTERED BY THE E.P.A. FOR USE UNDER A.C. AND P.C.C. SHALL BE UNIFORMLY APPLIED AT THE MANUFACTURER'S
RECOMMENDED RATE FOR THE FULL PAVEMENT WIDTH PRIOR TO PAVING.
8. AT COMPLETION OF ROUGH GRADING, A MATERIALS REPORT AND THE PROPOSED STRUCTURAL SECTIONS SHALL BE SUBMITTED
BY THE ENGINEER TO THE SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS, TRANSPORTATION OPERATIONS DIVISION,
PERMIT SECTION, FOR REVIEW AND EVALUATION BY THE PAVEMENT MANAGEMENT SECTION. THE SUBMITTAL SHALL INCLUDE A
PLAT SHOWING THE LOCATION OF THE SAMPLING, A TABULATION OF SIEVE ANALYSIS AND SAND EQUIVALENT TEST RESULTS, A
STATEMENT OF RECOMMENDED STRUCTURAL SECTION AND TEST DATA SHEETS FOR ALL R -VALUE TESTS PERFORMED, INCLUDING
EXPANSION PRESSURE READINGS. APPROVAL WILL BE GIVEN WHEN ALL STRUCTURAL SECTION REQUIREMENTS HAVE BEEN MET.
9. COMPACTION TESTS OF EMBANKMENT CONSTRUCTION, TRENCH BACKFILL, COMPACTING ORIGINAL GROUND, ALL SUBGRADES
SHALL BE PERFORMED AT NO COST TO SAN BERNARDINO COUNTY. A WRITTEN REPORT WITH THESE COMPACTION TESTS SHALL
BE SUBMITTED TO THE SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS, TRANSPORTATION OPERATIONS DIVISION,
PERMIT SECTION FOR APPROVAL PRIOR TO PLACEMENT OF BASE MATERIALS AND/OR SURFACING.
10. AT THE COMPLETION OF PAVING A MATERIALS REPORT SHALL BE SUBMITTED TO THE SAN BERNARDINO COUNTY PUBLIC WORKS
DEPARTMENT, TRANSPORTATION OPERATIONS DIVISION, PERMIT SECTION, LISTING ALL TESTS OR DETERMINATIONS COMPLETED
TO VERIFY:
A. R -VALUE, SIEVE ANALYSIS AND SAND EQUIVALENT OF AGGREGATE BASES
B. STABILITY, OIL CONTENT AND SIEVE ANALYSIS OF ASPHALT SURFACING
II. THE WATER MAINS AND THE GAS MAINS SHALL BE PLACED UNDERGROUND PRIOR TO PAVING CONSTRUCTION. THE SERVICE
LATERALS FOR THE WATER SYSTEM SHALL BE INSTALLED AT A LATER DATE. WHERE IT IS NECESSARY TO CROSS PAVEMENT,
SERVICE LATERALS SHALL BE BORED IN TO PLACE.
12. FILL AND GRADE TO DRAIN ALL LOW AREAS ABUTTING TRACT ROADS TO A MINIMUM OF 1% GRADES.
13. ALL LATERAL CUTS INTO COUNTY MAINTAINED ROADWAYS SHALL BE TESTED TO VERIFY DENSIFICATION TO 90% RELATIVE
COMPACTION (R.C.) AT VARYING DEPTHS TO WITHIN 0.5' OF GRADING PLANE. THE TOP 0.5' SHALL BE DENSIFIED TO 95%.
14. ALL LONGITUDINAL CUTS SHALL BE TESTED IN ACCORDANCE WITH THE SPECIFIED LIMITS AND FREQUENCY AS OUTLINED IN
SECTION 6 OF THE SAN BERNARDINO COUNTY STANDARDS AND SPECIFICATIONS.
15. IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER, THE CONTRACTOR SHALL
DILIGENTLY PURSUE THIS PORTION OF WORK UNTIL COMPLETION.
16. DEPARTMENT OF PUBLIC WORKS APPROVAL DOES NOT INCLUDE WATER SEWER SYSTEM OR ESTIMATE OF QUANTITIES,
17. A PERMIT SHALL BE OBTAINED FROM THE SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS PRIOR TO ANY
CONSTRUCTION ON THIS PROJECT, THAT FALLS WITHIN SAN BERNARDINO COUNTY, ROAD RIGHT-OF-WAY.
18. EXPANSIVE SOILS: IN EXPANSIVE SOIL AREAS, THE SUBGRADE UNDER CURBS, GUTTERS, SIDEWALK AND DRIVEWAY APPROACHES
SHALL BE SCARIFIED TO THE DEPTH OF AT LEAST EIGHT (8) INCHES AND MOISTURE SHALL BE APPLIED TO MAINTAIN FREE WATER
ON THE SURFACE FOR AT LEAST 24 HOURS PRIOR TO PLACING CONCRETE AND THE SUBGRADE SHALL THEN BE PREPARED
WITHOUT COMPACTION EFFORT.
19. CURB & GUTTER, CROSS GUTTER AND SPANDRELS SHALL BE SO CONSTRUCTED THAT A MINIMUM OF PONDING OCCURS; SECTIONS
HAVING GRADIENTS OF 0.5% OR FLATTER SHALL BE WATER TESTED IN THE PRESENCE OF THE INSPECTOR IMMEDIATELY PRIOR TO
ACCEPTANCE. SECTIONS WHICH HAVE WATER PONDING MORE THAN 6' WIDE OR MORE THAN 4' LONG SHALL BE SAW -CUT AND
REMOVED IN LENGTHS NOT LESS THAN 4' AND REPLACED TO REDUCE PONDING TO THE MAXIMUM SPECIFIED.
20. IF DURING CONSTRUCTION, GROUND WATER IS ENCOUNTERED, A SYSTEM APPROVED BY THE SAN BERNARDINO COUNTY
DEPARTMENT OF PUBLIC WORKS SHALL BE INSTALLED TO DEWATER SAID AREA AT THE DIRECTION OF THE SOILS ENGINEER.
21. ALL 0.40% OR LESS CURB GRADE LINES SHALL BE STAKED AT 25' INTERVALS AND FORMS CERTIFIED BY THE ENGINEER BEFORE
POURING CONCRETE.
22. EXISTING COUNTY ROADS THAT WILL REQUIRE RECONSTRUCTION SHALL REMAIN OPEN FOR TRAFFIC AT ALL TIMES WITH ADEQUATE
DETOURS DURING ACTUAL CONSTRUCTION.
23. THE PRIVATE ENGINEER IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF WORK HEREON. IN THE EVENT
OF DISCREPANCIES ARISING DURING CONSTRUCTION, THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN
ACCEPTABLE SOLUTION AND REVISE THE PLAN FOR APPROVAL BY THE COUNTY OF SAN BERNARDINO.
24. SHOULD ANY EXISTING STOP SIGN BE LOCATED ON A DEVELOPED CORNER OF AN INTERSECTION, IT MUST BE MAINTAINED IN
PLACE NEXT TO THE EXISTING PAVEMENT UNTIL SUCH TIME AS THE WIDENED ROADWAY IS OPEN FOR TRAFFIC. AT THAT TIME, IT
WILL BE RELOCATED THREE (3) FEET BEHIND THE NEW CURB IN THE VICINITY OF THE BEGINNING OF THE CURB RETURN OR AS
OTHERWISE DIRECTED BY THE ENGINEER.
APN: 0232-051-11,12,26,27& 36 15 F OTHILL BLVD V_
U
CONSTRUCTION NOTES QUANTITYA w v
1O SAW -CUT AND REMOVE EXISTING AC PAVEMENT. 11,615 SF PROP -SffEru
CF R/W ESMT ¢ MERRILL AVE
2O SAWCUT AND REMOVE EXISTING P.C.C. CURB ANDUTTER FROM EXISTING JOINT 167 LF = J
LINE TO EXISTING JOINT LINE (NO MID -SPAN CUTS 12'w RANDALL AVE P
3O REMOVE OR RELOCATE EXISTING SIGN (PER SIGNING AND STRIPING PLAN) 9 EA w
4OCO
REMOVE EXISTING CHAIN LINK FENCE. 265 LF 5 1 f 8 4 SAN BERNARDINO AVE Q
O REMOVE EXISTING TREE. 24 EA o 16 Y R=VARIES
sO REMOVE EXISTING GUARD POST(S). 4 sLo.1/4' PER 4L t' -LEVEL LINE_ 10
1* CF.
O EXISTING POWER POLE (TO BE UNDERGROUND BY OTHERS). 9 EA
O EXISTING GUY ANCHOR FOR POWER POLE (TO BE REMOVED BY OTHERS). 2 EA 14 13
O PROPOSED STREET LIGHT (SEE STREET UGHT PLANS). 6 EA SECTION A -A-
t0 CONSTRUCT 8" CURB & GUTTER PER SAN BERNARDINO COUNTY ROAD DEPARTMENT VICINITY MAP
STANDARD PLAN 115 (MATCH EXISTING CURB). 623 LF STA. 20+92,%9 TO STA, 22+42719
11 REMOVE EXISTING A.C. BERM. 267 LF NOT TO SCALE N.T.S.
12 CONSTRUCT SIDEWALK PER SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT PROP
STANDARD DRAWING NO. 109 TYPE "C". 5,501 SF CF R/W ESMT
13 CONSTRUCT (MODIFIED) COMMERCIAL DRIVEWAY PER SAN BERNARDINO COUNTYI WARP SIDEWALK WARP SIDEWALK
TRANS. DEPARTMENT STANDARD DRAWING NO. 1298, SEE DETAIL ON SHEET 1. 3,736 SF 12' TO MATCH TOP OF A TO MATCH TOP OF
14 SAWCUT & REMOVE 1.00' OF EXISTING A.C. PAVEMENT FOR PROP. CONCRETE FORM CURB AND G.B. LINES w CURB AND G.B. LINES
WORK. AFTER FORM REMOVAL REPAVE WITH FULL DEPTH (PLUS 1") A.C. PAVEMENT. 841 SF 8 4
15 CONSTRUCT _" AC OVER _" BASE PAVEMENT SECTION (SEE GENERAL NOTE NO. 8.) 14,036 SF (LEVEL
z o CF o' CF mZ
16 GRIND & OVERLAY EXISTING AC PAVEMENT, MIN. DEPTH .17' (WIDTH PER PLAN). 2,442 SF 15 SLOPE 1/4- PER Fr. I -LEVEL UNE _ _ _ N+�?? p��' .� .N
O17 CONSTRUCT 8" A.C. DIKE PER SAN BERNARDINO COUNTY ROAD DEPARTMENT 2% 1" CF 8� 2 TYP
31 LF o'• GF O' CF -
STANDARD PLAN 117.Mw-
;FLaW N A '� P.11sr• OR pRop.
18 REMOVE EXISTING WATER SERVICE COMPLETE. g Eq 13 PER P ° &p � . P.C.C. SIDEWALK
us
19 EXISTING WATER LINE (PROTECT -IN-PLACE). _
20 ADJUST EXISTING WATER VALVE TO GRADE. 6 EA SECTION A-A� Z sawcur ac JOIN Z
21 ADJUST EXISTING TRAFFIC PULLBOX TO GRADE. 1 EA CF
`STA. 31+98"38 TO STA. 33+48.38 a• cF o a m Z A LIP m N � o o "
NOT TO SCALE x N w a w N N
a
22 REMOVE EXISTING TRANSFORMER COMPLETE. 1 EA
23 REMOVE EXISTING TRAFFIC PADDLE. 5 EA PAVEMENT LEQEND o
24 REMOVE EXISTING MAILBOX. 3 EA
- REMOVE EXISTING A.C. PAVEMENT SULTANA AVENUE
25 REMOVE EXISTING DRIVEWAY COMPLETE. 4410 SF
26 EXISTING TELEPHONE PEDESTAL TO BE REMOVED (BY OTHERS). 2 EA -CONSTRUCT NEW ASPHALT PAVEMENT
0 MODIFIED DRIVEWAY APPROACH
27 ADJUST MANHOLE TO GRADE. 1 EA - CONSTRUCT NEW AGGREGATE BASE COUNTY 1 STD• NO. 129B 1 3
28 CONSTRUCT CURB OUTLET STRUCTURE PER SAN BERNARDINO COUNTY ROAD 4 EA NOT To Tc
DEPARTMENT STANDARD 210 (SIZE, TYPE & ANGLE PER PLAN). O - CONSTRUCT NEW 6" PCC PAVEMENT
LE
29 EXISTING FIRE HYDRANT (PROTECT -IN-PLACE). 2 EA OCONSTRUCT NEW PCC SIDEWALK I
30 EXISTING SIGN (PROTECT -IN-PLACE PER SIGNING AND STRIPING PLAN) 2 EA
31 PROPOSED STORM DRAIN AND PARKWAY CULVERT (PER SEPARATE PLAN). -
32 PROPOSED SIGN LOCATION (TO BE VERIFIED PER SIGNING AND STRIPING PLAN) 12 EA
EXIST. EXIST. EXIST. PROP.
W'LY R/W C/L E LY R E'LY R/W
8'
17' 22' 8'
EXIST. R/W
PROP. EXIST. EXIST. EXIST. PROP, PROP.
W'LY R/WW LY R W C/L ELY R E -LY R/W W'LY R/W
8 22' 22' 8' 8r
5'1 25' TO 25' TO 1 51 5'_
6' EXIST. R/W EXIST. R/W
EXIST. EXIST. EXIST. PROP.
W LY R C/L E LY R W E'LY R/W
22' VARIES 22' TO 24' 1 8'
25' TO 25' TO 11 VARIES
EXIST. R/W EXIST. R/W 1 16. 5 TO i
PROP. EXIST. EXIST. EXIST. PROP.
W'LY R/W W LY R C/L ELY R E -LY R/W
8 22' 24' 8'
5' 25' TO 25' TO 7'
6• EXIST. R/W EXIST. R/W 6'
1 1.50' v 1.50' 15 1.50'vI I v yI 1
' .50 1, I 150' 15 1,50 v5 RL F 1R=1.5
R=2.0%
10 12 12 10 10 12 12 10 10 12 12 10 10
R= -RATE OF GRADE
B.C.R. -BEGINNING OF CURVE
E.C.R. -END OF CURVE
L.P. -LOW POINT TYPICAL SECTION TYPICAL SECTION TYPICAL SECTION TYPICAL SECTION
S.W. -STEM WALL STA. 31+98.38 TO STA. 32+97.36 STA. 33+63.55 TO STA. 33+88.65 STA. 33+88.65 TO STA. 34+08.55 STA. 34+08.55 TO STA. 35+33.80
T.O.P. -TOP OF PIPE
B.O.P. -BOTTOM OF PIPE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE
R -RATE OF GRADE
T.F. -TOP OF FOOTING
T.W. -TOP OF WALL
C.M.B. -CRUSHED MISC. BASE
S.F. SQUARE FEET
(0.00) -EXISTING ELEVATION
B.O.W. BOTTOM OF WALL
T.G. -TOP OF GRATE
N.G. -NATURAL GRADE
TOP -TOP OF SLOPE
TOE -TOE OF SLOPE
E.P. -EDGE OF PAVEMENT NOTE: BOARD OF SUPERVISORS RESOLUTION APPROVAL REQUIRED PRIOR TO
C.L.F.-CHAIN LI KO FENCE INSTALLATION/REMOVAL OF TRAFFIC CONTROL DEVICES-
CONC. -CONCRETE
PKWY DRAIN -PARKWAY DRAIN THIS PROJECT INCLUDES INSTALLATION AND REMOVAL OF NO PARKING SIGNS, REMOVAL OF RESTRICTION FOR VEHICLES OVER 14,000 POUNDS GROSS
H.C. -HANDICAP WEIGHT FROM ENTERING SULTANA AVE AT FOOTHILL BLVD AND REQUIRES APPROVAL BY RESOLUTION(S) FROM THE COUNTY OF SAN BERNARDINO BOAR
EXIST. -EXISTING SHEET INDEX OF SUPERVISORS PRIOR TO INSTALLATION OR REMOVAL. THE CONTRACTOR/APPLICANT SHALL NOTIFY TRAFFIC DIVISION AT 909-387-8186 AT THE TIME
TRANS PAD -TRANSFORMER PAD ROAD ENCROACHMENT PERMIT IS APPLIED FOR IN ORDER TO PROCESS APPROPRIATE RESOLUTION(S). PLEASE ALLOW A MINIMUM OF 8 WEEKS IN
BLDG -BUILDING SHEET I: TITLE SHEET ORDER TO OBTAIN APPROVAL OF REQUIRED RESOLUTIONS FROM THE BOARD OF SUPERVISORS. THE APPROVAL OF ANY REQUIRED BOARD
M.H. MANHOLE SHEET 2: PLAN AND PROFILE STA. 19+00 TO 28+00 RESOLUnON(S) MAY PREVENT APPLICANT FROM OBTAINING OCCUPANCY.
T.B. -TOP OF BERM SHEET 3: PLAN AND PROFILE STA. 28+00 TO 36+35
Underground Service Alert BENCHMARK PREPARED BY: MARK REVISIONS APPR DATE
p(tOFESS/q1,q COUNTY OF SAN BERNARDINO TITLE SHEET ROAD No.
F°vE y� SAN BERNARD/NO F.B. 4015 PAGE 982 O ���`���pRD ST�F DEPARTMENT OF PUBLIC WORKS 776100
0 7-15 (00510) ThieneS En�iClee�ing, Inc. F� y
Q
Call: TOLL FREE ELEVATION: 1286.018' Q CIVIL ENGINEERING •LAND SURVEYING " r' �" � RECOMMENDED BY: FILE No.
� � � z 1
DESCRIBED AS FOLLOWS: FD. GOOD COND. ® S.P.R.R. & FOOTHILL BLVD. 14349 FIRESTONE L70ULEVARD * R.C.E. NO. 56155r k �11� �� 14 SULTANA AVEN U E
1-800-227-2600 PER QUAD 341172. Q LA MIRADA, CA ORNIA 90638 MOHAMMAD SIDDIQUI DATE ' 081-084
H. -48 1 (714)521-4173 JSP• 12-31-14 \Q ENGINEER, TRAFFIC DIVISION APN: 0232-051-11,12,26,27&36
/o zz-ly 9TF �Iv�� �o�� qA]
11/ /I COUNTYOF
TWO WORKING DAYS BEFORE YOU DIG ELEVATION = 1286.018' (NGI�O 29) R HARD STENZEL R.C. 56155 EXP. 12%31/14 DATE OFC A0� MOHAMMAD QURESHI SAMEH BASTA D SAN BERNARDINOSHEET 1 OF 3
TRAFFIC DIVISION CHIEFLAND DEVELOPMENT MANAGER
5187-1
12
-PROPERTY LINE
R/W
-RIGHT OF WAY
PWATE ENCdINEER'S NOTE TO CONTRACTOR
q
-CENTERLINE
ARCH.
-ARCHITECTURAL
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS,
T.C.
-TOP OF CURB
OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE
F.L.
-FLOW LINE
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING
F.S.
FINISH SURFACE
UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED
T.S.
-TOP OF CONCRETE SLAB
TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON
H.P.
-HIGH POINT
THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND
F.F.
FINISH FLOOR
RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN ON
THESE DRAWINGS.
R.D.
-ROOF DRAIN
R.C.P.
REINFORCED CONCRETE PIPE
CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
INV.
-INVERT
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT,
S =
-SLOPE
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL
F.G.
-FINISH GRADE
APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT
S.D.
-STORM DRAIN
THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE COUNTY OF SAN
T. R.
-TOP OF RAIL
BERNARDINO, THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY,
ST.LT.
-STREET LIGHT
REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT,
G.B.
-GRADE BREAK
EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
H
-HEIGHT OF RETAINING
ENGINEER.
C.F.
-CURB FACE
B.W.
-BACK OF WALK
L.S.
LANDSCAPING
A.B.
AGGREGATE BASE
P.V.C.
-POLYVINYLCHLORIDE
C.I.P.
-CAST IRON PIPE
F.H.
-FIRE HYDRANT
P.P.
-POWER POLE
C.B.
-CATCH BASIN
APN: 0232-051-11,12,26,27& 36 15 F OTHILL BLVD V_
U
CONSTRUCTION NOTES QUANTITYA w v
1O SAW -CUT AND REMOVE EXISTING AC PAVEMENT. 11,615 SF PROP -SffEru
CF R/W ESMT ¢ MERRILL AVE
2O SAWCUT AND REMOVE EXISTING P.C.C. CURB ANDUTTER FROM EXISTING JOINT 167 LF = J
LINE TO EXISTING JOINT LINE (NO MID -SPAN CUTS 12'w RANDALL AVE P
3O REMOVE OR RELOCATE EXISTING SIGN (PER SIGNING AND STRIPING PLAN) 9 EA w
4OCO
REMOVE EXISTING CHAIN LINK FENCE. 265 LF 5 1 f 8 4 SAN BERNARDINO AVE Q
O REMOVE EXISTING TREE. 24 EA o 16 Y R=VARIES
sO REMOVE EXISTING GUARD POST(S). 4 sLo.1/4' PER 4L t' -LEVEL LINE_ 10
1* CF.
O EXISTING POWER POLE (TO BE UNDERGROUND BY OTHERS). 9 EA
O EXISTING GUY ANCHOR FOR POWER POLE (TO BE REMOVED BY OTHERS). 2 EA 14 13
O PROPOSED STREET LIGHT (SEE STREET UGHT PLANS). 6 EA SECTION A -A-
t0 CONSTRUCT 8" CURB & GUTTER PER SAN BERNARDINO COUNTY ROAD DEPARTMENT VICINITY MAP
STANDARD PLAN 115 (MATCH EXISTING CURB). 623 LF STA. 20+92,%9 TO STA, 22+42719
11 REMOVE EXISTING A.C. BERM. 267 LF NOT TO SCALE N.T.S.
12 CONSTRUCT SIDEWALK PER SAN BERNARDINO COUNTY TRANSPORTATION DEPARTMENT PROP
STANDARD DRAWING NO. 109 TYPE "C". 5,501 SF CF R/W ESMT
13 CONSTRUCT (MODIFIED) COMMERCIAL DRIVEWAY PER SAN BERNARDINO COUNTYI WARP SIDEWALK WARP SIDEWALK
TRANS. DEPARTMENT STANDARD DRAWING NO. 1298, SEE DETAIL ON SHEET 1. 3,736 SF 12' TO MATCH TOP OF A TO MATCH TOP OF
14 SAWCUT & REMOVE 1.00' OF EXISTING A.C. PAVEMENT FOR PROP. CONCRETE FORM CURB AND G.B. LINES w CURB AND G.B. LINES
WORK. AFTER FORM REMOVAL REPAVE WITH FULL DEPTH (PLUS 1") A.C. PAVEMENT. 841 SF 8 4
15 CONSTRUCT _" AC OVER _" BASE PAVEMENT SECTION (SEE GENERAL NOTE NO. 8.) 14,036 SF (LEVEL
z o CF o' CF mZ
16 GRIND & OVERLAY EXISTING AC PAVEMENT, MIN. DEPTH .17' (WIDTH PER PLAN). 2,442 SF 15 SLOPE 1/4- PER Fr. I -LEVEL UNE _ _ _ N+�?? p��' .� .N
O17 CONSTRUCT 8" A.C. DIKE PER SAN BERNARDINO COUNTY ROAD DEPARTMENT 2% 1" CF 8� 2 TYP
31 LF o'• GF O' CF -
STANDARD PLAN 117.Mw-
;FLaW N A '� P.11sr• OR pRop.
18 REMOVE EXISTING WATER SERVICE COMPLETE. g Eq 13 PER P ° &p � . P.C.C. SIDEWALK
us
19 EXISTING WATER LINE (PROTECT -IN-PLACE). _
20 ADJUST EXISTING WATER VALVE TO GRADE. 6 EA SECTION A-A� Z sawcur ac JOIN Z
21 ADJUST EXISTING TRAFFIC PULLBOX TO GRADE. 1 EA CF
`STA. 31+98"38 TO STA. 33+48.38 a• cF o a m Z A LIP m N � o o "
NOT TO SCALE x N w a w N N
a
22 REMOVE EXISTING TRANSFORMER COMPLETE. 1 EA
23 REMOVE EXISTING TRAFFIC PADDLE. 5 EA PAVEMENT LEQEND o
24 REMOVE EXISTING MAILBOX. 3 EA
- REMOVE EXISTING A.C. PAVEMENT SULTANA AVENUE
25 REMOVE EXISTING DRIVEWAY COMPLETE. 4410 SF
26 EXISTING TELEPHONE PEDESTAL TO BE REMOVED (BY OTHERS). 2 EA -CONSTRUCT NEW ASPHALT PAVEMENT
0 MODIFIED DRIVEWAY APPROACH
27 ADJUST MANHOLE TO GRADE. 1 EA - CONSTRUCT NEW AGGREGATE BASE COUNTY 1 STD• NO. 129B 1 3
28 CONSTRUCT CURB OUTLET STRUCTURE PER SAN BERNARDINO COUNTY ROAD 4 EA NOT To Tc
DEPARTMENT STANDARD 210 (SIZE, TYPE & ANGLE PER PLAN). O - CONSTRUCT NEW 6" PCC PAVEMENT
LE
29 EXISTING FIRE HYDRANT (PROTECT -IN-PLACE). 2 EA OCONSTRUCT NEW PCC SIDEWALK I
30 EXISTING SIGN (PROTECT -IN-PLACE PER SIGNING AND STRIPING PLAN) 2 EA
31 PROPOSED STORM DRAIN AND PARKWAY CULVERT (PER SEPARATE PLAN). -
32 PROPOSED SIGN LOCATION (TO BE VERIFIED PER SIGNING AND STRIPING PLAN) 12 EA
EXIST. EXIST. EXIST. PROP.
W'LY R/W C/L E LY R E'LY R/W
8'
17' 22' 8'
EXIST. R/W
PROP. EXIST. EXIST. EXIST. PROP, PROP.
W'LY R/WW LY R W C/L ELY R E -LY R/W W'LY R/W
8 22' 22' 8' 8r
5'1 25' TO 25' TO 1 51 5'_
6' EXIST. R/W EXIST. R/W
EXIST. EXIST. EXIST. PROP.
W LY R C/L E LY R W E'LY R/W
22' VARIES 22' TO 24' 1 8'
25' TO 25' TO 11 VARIES
EXIST. R/W EXIST. R/W 1 16. 5 TO i
PROP. EXIST. EXIST. EXIST. PROP.
W'LY R/W W LY R C/L ELY R E -LY R/W
8 22' 24' 8'
5' 25' TO 25' TO 7'
6• EXIST. R/W EXIST. R/W 6'
1 1.50' v 1.50' 15 1.50'vI I v yI 1
' .50 1, I 150' 15 1,50 v5 RL F 1R=1.5
R=2.0%
10 12 12 10 10 12 12 10 10 12 12 10 10
R= -RATE OF GRADE
B.C.R. -BEGINNING OF CURVE
E.C.R. -END OF CURVE
L.P. -LOW POINT TYPICAL SECTION TYPICAL SECTION TYPICAL SECTION TYPICAL SECTION
S.W. -STEM WALL STA. 31+98.38 TO STA. 32+97.36 STA. 33+63.55 TO STA. 33+88.65 STA. 33+88.65 TO STA. 34+08.55 STA. 34+08.55 TO STA. 35+33.80
T.O.P. -TOP OF PIPE
B.O.P. -BOTTOM OF PIPE NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE
R -RATE OF GRADE
T.F. -TOP OF FOOTING
T.W. -TOP OF WALL
C.M.B. -CRUSHED MISC. BASE
S.F. SQUARE FEET
(0.00) -EXISTING ELEVATION
B.O.W. BOTTOM OF WALL
T.G. -TOP OF GRATE
N.G. -NATURAL GRADE
TOP -TOP OF SLOPE
TOE -TOE OF SLOPE
E.P. -EDGE OF PAVEMENT NOTE: BOARD OF SUPERVISORS RESOLUTION APPROVAL REQUIRED PRIOR TO
C.L.F.-CHAIN LI KO FENCE INSTALLATION/REMOVAL OF TRAFFIC CONTROL DEVICES-
CONC. -CONCRETE
PKWY DRAIN -PARKWAY DRAIN THIS PROJECT INCLUDES INSTALLATION AND REMOVAL OF NO PARKING SIGNS, REMOVAL OF RESTRICTION FOR VEHICLES OVER 14,000 POUNDS GROSS
H.C. -HANDICAP WEIGHT FROM ENTERING SULTANA AVE AT FOOTHILL BLVD AND REQUIRES APPROVAL BY RESOLUTION(S) FROM THE COUNTY OF SAN BERNARDINO BOAR
EXIST. -EXISTING SHEET INDEX OF SUPERVISORS PRIOR TO INSTALLATION OR REMOVAL. THE CONTRACTOR/APPLICANT SHALL NOTIFY TRAFFIC DIVISION AT 909-387-8186 AT THE TIME
TRANS PAD -TRANSFORMER PAD ROAD ENCROACHMENT PERMIT IS APPLIED FOR IN ORDER TO PROCESS APPROPRIATE RESOLUTION(S). PLEASE ALLOW A MINIMUM OF 8 WEEKS IN
BLDG -BUILDING SHEET I: TITLE SHEET ORDER TO OBTAIN APPROVAL OF REQUIRED RESOLUTIONS FROM THE BOARD OF SUPERVISORS. THE APPROVAL OF ANY REQUIRED BOARD
M.H. MANHOLE SHEET 2: PLAN AND PROFILE STA. 19+00 TO 28+00 RESOLUnON(S) MAY PREVENT APPLICANT FROM OBTAINING OCCUPANCY.
T.B. -TOP OF BERM SHEET 3: PLAN AND PROFILE STA. 28+00 TO 36+35
Underground Service Alert BENCHMARK PREPARED BY: MARK REVISIONS APPR DATE
p(tOFESS/q1,q COUNTY OF SAN BERNARDINO TITLE SHEET ROAD No.
F°vE y� SAN BERNARD/NO F.B. 4015 PAGE 982 O ���`���pRD ST�F DEPARTMENT OF PUBLIC WORKS 776100
0 7-15 (00510) ThieneS En�iClee�ing, Inc. F� y
Q
Call: TOLL FREE ELEVATION: 1286.018' Q CIVIL ENGINEERING •LAND SURVEYING " r' �" � RECOMMENDED BY: FILE No.
� � � z 1
DESCRIBED AS FOLLOWS: FD. GOOD COND. ® S.P.R.R. & FOOTHILL BLVD. 14349 FIRESTONE L70ULEVARD * R.C.E. NO. 56155r k �11� �� 14 SULTANA AVEN U E
1-800-227-2600 PER QUAD 341172. Q LA MIRADA, CA ORNIA 90638 MOHAMMAD SIDDIQUI DATE ' 081-084
H. -48 1 (714)521-4173 JSP• 12-31-14 \Q ENGINEER, TRAFFIC DIVISION APN: 0232-051-11,12,26,27&36
/o zz-ly 9TF �Iv�� �o�� qA]
11/ /I COUNTYOF
TWO WORKING DAYS BEFORE YOU DIG ELEVATION = 1286.018' (NGI�O 29) R HARD STENZEL R.C. 56155 EXP. 12%31/14 DATE OFC A0� MOHAMMAD QURESHI SAMEH BASTA D SAN BERNARDINOSHEET 1 OF 3
TRAFFIC DIVISION CHIEFLAND DEVELOPMENT MANAGER
5187-1