Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5152-5
`6,211 Pei d' x J M 0p CM) N tzJ L Ln w N \ �N =aW N tn w LLj --v o - -7- fc- 0 I' C) ..I.. 100— Lo CV 34 20 ;ir, N w U Q 7 r t 7_ - REMOVE EXISTING AC PAVEMENT 0 20 40 80 120 - CONSTRUCT NEW ASPHALT PAVEMENT -- - � _-- - •. i - CONSTRUCT NEW PCC SIDEWALK SCALE:1 "=40' V/ /1 71 - GRIND AND OVERLAY •' - CONSTRUCT PCC • IMPROVEMENTS O v� ryn - ! ul A TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. r � r REVISION DESCRIPTION DATE I ENGR. I CITY I DATE SHOULD CONSTRUCION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STAN DAR GS IN EFFECT. ol o QROFE�S/O�r,� * R.C.E. NO. 56155 r ,n Exp. 12-31-14 Q 9�F IV 1�- lrj�`� OF Cm, tz M N w u7 _2~ I O 0 M W c W� Z .J U Prepared Under The Supoervision Of Thieves Engineering, /nC. CML ENG/NEER/NG • UND S>-URWWNG 14349 nRESTONE BOULEWARD LA M/R4LK CSAUFORNM 906U8 PH (7 "p14l-'-417J III D©te :10"A-1 "REINHARD 0' - REINHARD STENZ L RCE: N0. 56155 i { CON3TRUCl10N NOTES' tO SAW—CUT do REMOVE EXISTING ASPHALT PAVEMENT. 2O REMOVE ALL EXISTING TREES/SHRUBS/ TREES STUMPS WITHIN R/W. 3O RELOCATE D(I5L STREET LIGHT PULL BOX PER STREET LIGHT PLANS. 4O EXISTING POWER POLE TO BE REMOVED do UNDERGROUNDED BY OTHERS. 5O EXISTING POWER POLE GUY ANCHOR TO BE REMOVED BY OTHERS. 6O REMOVE EXISTING MAILBOX. 7O REMOVE EXISTING A.C. BERM/DIKE SO REMOVE EXISTING STAND PIPE G CONSTRUCT 5.00" MIN. A.C. OVER 8' AGG. BASE, OVER NATNE IAATERIAL COMPACTED TO 95� 10 REMOVE/RELOCATE EXISTING STREET SIGN PER CIN OF FONTANA SfDS. (D ADJUST EXISTING STORM DRAIN MANHOLE TO GRADE 0 12 REMOVE EXISTING SITE WALL 13 ADJUST EXISTING GAS VALVE TO GRADE G CONSTRUCT 8' ASPHALT BERM PER CITY OF FONTANA STD. PLAN 1007. 15 CONSTRUCT 8' CURB &GUTTER PER CITY OF FONTANA STD. PLAN 1000. 16 CONSTRUCT SIDEWALK PER FONTANA STD. PLAN 1006. 17 CONSTRUCT COMMERCIAL DRIVEWAY PER CIN OF FONTANA STD. PLAN 1002 (MODIFIED PER DETAILS ON SHEET 2). 18 CONSTRUCT PERVIOUS CONCRETE GUTTER ADJACENT TO CONCRETE CURB PER (STREET SPECIFIC) DETAILS ON SHEEP 2. 19 CONSTRUCT CURB RETURN ACCESS RAMP PER CITY OF FONTANA STD. PLAN 1003 (SEE DETAIL ON SHEET 3). 20 COLD PLANE do OVERLAY EXISTING AC PAVEMENT, CAIN. DEPTH 1.5' (WIDTH PER PLAN) SEE DETAIL ON SHEET 2. 21 PROPOSED STREET LIGHT (SEE ST. LIGHTING PLANS). 22 IX. WATER METER AND SERVICE TO BE REMOVED (BY FONTANA WATER COMPANY). 23 PROPOSED NEW FIRE HYDRANT (BY FONTANA WATER COMPANY). @PROPOSED NEW WATER METER (BY FONTANA WATER COMPANY). 25 EXISTING FIRE HYDRANT, SERVICE AND VALVE TO BE REMOVED (BY FONTANA WATER COMPANY). 26 WATER VALVE TO BE ADJUSTED TO GRADE (BY FONTANA WATER COMPANY). 27 PROP. FIRE D.D.CA. TO BE INSTALLED (BY FONTANA WATER COMPANY). 28 CONSTRUCT 8' CURB PER CITY OF FONTANA STD. PLAN 1000. 29 PROPOSED PUBLIC STORM DRAIN (SEE STORM DRAIN PLANS). WD/D# 8-36C370368 DR 14-005 CITY OF FONTANA, CALIFORNIA STREET IMPROVEMENT PLAN DRAWN BY: C ITR U S AVENUE SCALL SHOWN DESIGNED BY. 25+00.00 TO 34+00.00 DATE: CHECKED BY: AP OV D DRAWING NO.: 5 DATE: 5152 CITY ENGINEER"6 c