CITY OF FONTANA TRAFFIC SIGNAL GENERAL NOTES:
1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION
COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE
START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITHIN THE CITY LIMITS. CALL
(909) 350-7610.
2. TRAFFIC SIGNAL, SIGNING AND STRIPING, AND LIGHTING SHALL CONFORM TO THESE
PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, AND
THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 (DATED 2010)
AND STANDARD PLANS (DATED 2010), THE CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, 2012 EDITION.
3. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS
ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF ANY OBSTRUCTIONS.
PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING
DAYS BEFORE DIGGING.
4. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 3" RIGID METAL UNLESS
OTHERWISE SHOWN.
5. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICES AND SCHEDULING
WITH SOUTHERN CALIFORNIA EDISON COMPANY FOUR WEEKS IN ADVANCE OF NEED.
6. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT
LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET AND SECTION E.
7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND
SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE
ENGINEER.
8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS.
MODIFY SPRINKLERS SYSTEMS IF NECESSARY.
9. ALL VEHICLE INDICATIONS SHALL BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL
PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES & UTILIZE PEDESTRIAN
COUNTDOWN TIMERS PER SPECIAL PROVISIONS.
10. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL
REPLACED WITH NEW CONSTRUCTION.
11. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO
CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT
AS NOTED CITY FURNISHED OR LISTED AS CITY PROVIDED IN THE SPECIAL
PROVISIONS.
12. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT
OR POTENTIAL CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS
PROJECT.
13. WHERE TRAFFIC SIGNAL STREET CROSSING CONDUIT ARE NOT INSTALLED USING THE
BORING METHOD, TRENCH REPAIRS SHALL BE PER CITY STANDARD, AND SPECIAL
PROVISIONS, SECTION E.
14. AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER
OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD
FILES TO THE CITY ENGINEER.