Loading...
HomeMy WebLinkAbout5159-1V) W Q 0 N Ld 0 0 GENERAL NOTES TITLE SHEET I. ALL WORK SHALL BE IN ACCORDANCE WITH HESE PLANS, HE SHEET 3 SIERRA AVENUE STA. 18+25.00 TO STA. 27+00.00 CITY OF FONTANA STANDARD PLANS, HE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS 25. HE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHEET 5 CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS SHALL BE APPROVED AT HE TIME OF CONSTRUCTION AND SHALL CONFORM TO HE CITY OF FONTANA STANDARD DETAILS. CROSS SECTIONS AND STANDARDS SHALL BE HE LATEST EDITION UNLESS OTHERWISE CONSTRUCT 8" PCC CURB & GUTTER PER CITY STD. PLAN NO. 1000 1,371 NOTED. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN HE CONTRACT COLOR AND FINISH TO MATCH EXISTING CONCRETE. DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN HE "GREEN BOOK", HE CONTRACTOR 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER THE CURB AT HE LOCATION OF THE SEWER LATERAL. 7,199 FOR RESOLUTION. 28. NO CONCRETE SHALL BE PLACED UNTIL HE FORMS AND REINFORCING 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF HE STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. SLIWIT CITY ENGINEER. 29. ALL UNDERGROUND UTIU77ES SHALL BE INSTALLED, TESTED AND 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM HE CITY OF APPROVED PRIOR TO PAVING OF STREETS. 3,835 FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO HE START OF ANY WORK. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT GRIND EXIST. AC PAVEMENT (MIN. 0.1') AND OVERLAY (MIN. 0.1') INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO PAVEMENT PRIOR TO PLACEMENT. 7 WORKING DAYS PRIOR TO HE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN HE CITY LIMITS. CALL (909) 350-7610. 31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT FA 8 TO REVISION AND APPROVAL OF HE CITY ENGINEER AS DETERMINED 5. HE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. ADJUST MANHOLE FRAME & COVER TO GW40E PER CITY STD. PLAN 2000 POLICIES, METHODS AND PROCEDURES DESCRIBED IN HE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC 32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL 10 EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. FOR STRUCTURAL STREET SECTIONS SHALL. BE RECOMMENDED BY A LF 11 GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. _ CONSTRUCT UNDERSIDEWALK DRAIN PER CITY STD. PLAN NO. 3001 BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES 7. HE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH` UPON COMPLETION OF PAVING. FROM HE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL. RESTORE B. HWALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) ALL - SIGNING, STRIPING, AND OTHER TRAFFIC FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE CONTROL DEVICES TO HE SATISFACTION OF THE CITY TRAFFIC ENGINEER. _..�.�.'. GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAOF THE STATE OF CALIFORNIA FELY 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN .......... SPRINKLERS AND SIDEWALKS AFFECTED BY HE CONSTRUCTION HE POTENTIAL FOR GROUND MOVEMENT EXISTS. TO HE SATISFACTION OF THE CITY ENGINEER. mow_...... 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC 36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO RIGHT-OF-WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS ' THAT PURPOSE. TO HE CITY ENGINEER. 10 THE ONS OF LITIES SHOWN HAVE RMNED FROM AVAILABLETINFORMATIONI. HOWEVER, IT SHALLBEEN BE HE ER SIPONSIBILITY CRY OF FONTANA, UTILfIY NOTIFICATION LIST OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, HE TRUE' CITY OF FONTANA AT&T LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE HERETO. HE 8353 SIERRA AVE 22311 BROOKHURST ST SUITE 203 CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT FONTANA, CA 92335 HUNTINGTON BEACH, CA 92646 (909) 350-6632 (714) 963-7964 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. SO. CALIF. GAS COMPANY SPRINT 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL 1981 W. LUGONIA AVE 2592 DUPONT DR U71UTY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, REDLANDS, CA 92374 IRVINE, CA 92619 TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, (909) 335-7967 (800) 659-9698 LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, EMERGENCIES: (800) 427-2200 STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY TIME WARNER CABLE COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO SO. CALIF. EDISON COMPANY 1500 AUTO CENTER DR WORK AROUND THEIR FACILITIES. 300 N. PEPPER AVE ONTARIO, CA 91761 RIALTO, CA 92376 (909) 975-3439 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER 909 820-5598 - UNDERGROUND MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. SUNESYS, LLC 909 875-5100 - TRANSMISSION 1325 PICO ST 1106 CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER 213 637-1233 - PIPELINES CORONA, CA 92881 COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 909 357-6505 - DISTRIBUTION (951) 278-0400 13. CURVE DATA REFERS TO THE FACE OF CURB. UNDERGROUND SERVICE ALERT (800) 422-4133 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. FONTANA WATER COMPANY EAST VALLEY WATER DISTRICT 15966 ARROW BOULEVARD 3654 E. HIGHLAND AVENUE 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE FONTANA, CA 92335 SUITE 18 (909) 822-2201 HIGHLAND, ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK CA 9246 TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION LEGEND' CONTROL STAKING DURING CONSTRUCTION. PROPOSED A.C. PAVEMENT 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, - - - CENTERLINE MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. ------- RIGHT-OF-WAY LINE - - - - EXISTING IMPROVEMENTS 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING --'(1}- EXISTING CONTOUR LINE SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE 0-0 STREET LIGHTS BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF f DIRECTION OF FLOW HIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL L.U.A. LIMITED USE AREA NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO L O.C. LENGTH ON CURVE THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER L.O.S. LINE OF SIGHT REPLACEMENT OF THE MONUMENT. P.U.E. PUBLIC UTILITY EASEMENT 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS [20+00.001 FUTURE [1630.201 FUTURE AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR PRIVATE QQNEERPS NOTICE TO CONTRACTOR.• RESIDENTS AND EMERGENCY VEHICLES. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AN%R STRUCTURES 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR, ALL TIMES. SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT-OF-WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. TOLL FREE -qmmmw- 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING HE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONIINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM HE SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL. UNAURMm CHANCES AND USES THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. CITY OF FONTANA SIERRA AVENUE STREET IMPROVEMENT PLANS PARCEL MAP N0. 19431 SUMMIT AVENUE RECORD DaWNC THESE RECORD DRAWINGS HAVE PEEN PREPAR0 BASED ON INFORMATION PROVIDED BY OTHFRS, THE DESivfv PROFESSIONAL HAS NOT VERIF IED THE ACCURACY ANDIOR CO&IFLETENESS OF THIS INFORMATION AND SHALL. NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHIC MAY BE INCORPO TED HEREIN AS A RESULT, DATE AND OVERLAY (MIN. 0.1' THICKNESS) TYPAL PAVEMENT ON DETAIL N.T.S. REV. REVISION DESCRIPTION DATE ENGR. DATE CITY SHOULD CONSTRUCTION OF REQl1'RED IMPROV NOT CO VAENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, HE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PIANS TO KING THEM INTO CONFORMANCE V ITH CONDITIONS AND STANDARDS IN EP XT )PSG' l//�� /�r� A'C L) L)elA VL l % 1167 a J_ • � �� I PREPARED FOR: PACIFIC INDUSTRIAL 6272 E. PACIFIC COAST HIGHWAY, STE. E LONG BEACH, CA 90803 SIERRA AVENUE INDEXy W NOTTO SCALE 00101 iwou i j m1 q ku SHEET 1 TITLE SHEET SHEET 2 SIERRA AVENUE STA. 10+00.00 TO STA. 18+25.0Q SHEET 3 SIERRA AVENUE STA. 18+25.00 TO STA. 27+00.00 SHEET 4 SIERRA AVENUE STA. 27+00.00 TO STA. 30+00.00 SHEET 5 CROSS SECTIONS SHEET 6 CROSS SECTIONS PERVIOUS GUTTER 15% VOIDS A.C. SMALL GRAVEL OR SAND BACKFILL '5X VOIDS CRUS14ED ROCK SURROUNDED WITH FILTER FABRIC 5OX VOIDS NOTE' PERVIOUS GUTTER FOR SIERRA AVE. LENGTH = 275' INFILTRATION RATE = 0.2 VOUAE FRO11m VOLUME = VOL. INFILTRATION + VOL. GUTTER + VOL. COVER + VOL. ROCK = (0.2 x3'x275'x48 HR) + (0.5'x1.5'x275'x15%) + (0.5'x3'x275'x5X) + (2'x3'x275'x50Z) = 7,920 CF + 31 CF + 21 CF + 825 CF = 8,797 CF VOLUME PROVIDED = 8,797 CUBIC FEET DETAIL 'A" PERVIOUS GLgM %CION N.T.S. BENCH"k BRASS CAP IN THE CONCRETE BASE OF THE SOUTH LEG OF AN SCE TOWER 343' NORTH OF HIGHLAND, 0.2 MI WEST OF SAN SEVANNE RD., 2.65 MI WEST OF SIERRA AVE. ELEVAIK)k 142&& BASIS OF BEARINGS: THE BASIS OF BEARINGS ARE BASED ON THE CENTERLINE OF SUMMIT AVENUE AS SHOWN ON RECORD OF SURVEY, RECORDED IN BOOK 35, PAGE 9. BEING: N 89'30'06" E Ell OO 41 DUNCAIV CANYON I ROAD O1 - CONSTRUCT 7 3/4" AC PAVEMENT (MIN) OVER 12" OF 95X COMPACTED NATIVE SOIL 51,460 SF L (SEE GENERAL NOTE 31 & 32) PER SOILS REPORT 2 CONSTRUCT 8" PCC CURB & GUTTER PER CITY STD. PLAN NO. 1000 1,371 LF CASA 0WDE ROAD 275 LF DETAIL "A" ON SHEET 1 3 A 7,199 SF 4 CONSTRUCT MODIFIED PCC DRIVE APPROACH PER CITY STD. PLAN NO. 1002, W=66' 2,533 SF SLIWIT AVENUE 1,917 LF 5A REMOVE EXISTING AC PAVEMENT 3,835 SF 6 GRIND EXIST. AC PAVEMENT (MIN. 0.1') AND OVERLAY (MIN. 0.1') 3,836 SF 7 INSTALL 22,000 LUMEN HPSV (200 WATT, 120) LUMINAIRE (CASE 1) PER CITY STD. PLAN NO. 404 6 FA 8 TO BE REMOVED AND RELOCATED By OTHERS 12 EA 9 ADJUST MANHOLE FRAME & COVER TO GW40E PER CITY STD. PLAN 2000 5 EA 10 INSTALL 8" AC DIKE PER CITY STD. PLAN NO. 1007 245 LF 11 PROTECT IN PLACE 13 FA 12 CONSTRUCT UNDERSIDEWALK DRAIN PER CITY STD. PLAN NO. 3001 1 EA J yiaN11 1 i.11'if NTS THE QUANTITIES SHOWN HEREON ARE ESTIMATES ONLY. THE CONTRACTORS SHALL PREPARE HEIR OWN QUANTITIES AND BID A COMPLETE JOB. CONME - MN NOTES ESTIMATED OUANTI_T_IES O1 - CONSTRUCT 7 3/4" AC PAVEMENT (MIN) OVER 12" OF 95X COMPACTED NATIVE SOIL 51,460 SF (SEE GENERAL NOTE 31 & 32) PER SOILS REPORT 2 CONSTRUCT 8" PCC CURB & GUTTER PER CITY STD. PLAN NO. 1000 1,371 LF 2A CONSTRUCT 8" PCC CURB & GUTTER PER CITY STD. PLAN NO. 1000, MODIFIED PER 275 LF DETAIL "A" ON SHEET 1 3 CONSTRUCT C PCC SIDEWALK PER CITY STD. PLAN NO. 1006, W=6' 7,199 SF 4 CONSTRUCT MODIFIED PCC DRIVE APPROACH PER CITY STD. PLAN NO. 1002, W=66' 2,533 SF 5 SAWCUT 1,917 LF 5A REMOVE EXISTING AC PAVEMENT 3,835 SF 6 GRIND EXIST. AC PAVEMENT (MIN. 0.1') AND OVERLAY (MIN. 0.1') 3,836 SF 7 INSTALL 22,000 LUMEN HPSV (200 WATT, 120) LUMINAIRE (CASE 1) PER CITY STD. PLAN NO. 404 6 FA 8 TO BE REMOVED AND RELOCATED By OTHERS 12 EA 9 ADJUST MANHOLE FRAME & COVER TO GW40E PER CITY STD. PLAN 2000 5 EA 10 INSTALL 8" AC DIKE PER CITY STD. PLAN NO. 1007 245 LF 11 PROTECT IN PLACE 13 FA 12 CONSTRUCT UNDERSIDEWALK DRAIN PER CITY STD. PLAN NO. 3001 1 EA WEST EAST R/W R/W r 132' 66' 66' i 12' I 54' 54' 12' 1 FUTURE IMPROVEMENTS VARIES 13'-25' ' VARIES 12''-25' I --_ FUTURE I MENTS_(D -- L_ ---- ------------ ------------ r - - E MEDIAN SUM AVENUE -132' 91W NTS QRpFESS/ON �O Np J. 4 '9l DRAWN BY. No. 36052 rn Z HMG Exp. 6/30/16 DESIGNED BY.HMG ��qTF O I v k ��\P CHECKED BY: OF CAl �F 11 CITY OF FONTANA, CALFORNIA STREET kk"ON T� fLE ET SCALE: AS NOTED SIERRA AVENUE DATE: September, 2014 DRAWING NO.: RJA --4 CITY ENGINEER R.C.E. 51'M 5159 6 Filename: I:\Pacific Industrial\Sierra Industrial Property\OWG'S\FINAL DESIGN\ STREETS\ SIERRA AVENUE\SHEET 1.dwg