HomeMy WebLinkAbout5150-127
-0 8 11 4 5 Kc
2
0 0
12"
_ I_2III III I t (1 11 SPACING
3 FEI I 1=1 I F:�:I I 111 111-
4
I I �Ei I 1=1 I FEI I 1 12 ;�! = I PER PLAN
5 = 1 11-I i l l l i l �- -III 111 I m Typ.
111 III 110 L.Li
cxq
24" III 1 1EI I I 0
., ,;:0 3
-�=; 117-1 =1IIIEIII I x ,I1 QsQ
6
• EQ. EQ.
9 4 6 6 It f-
7
24 9 10 2x
ROOTBALL 8
2x ROOTBALL 1. TREE PER PLANTING PLAN DIAMETER
2. ROOTBALL CL
3. STAKE PER 'TREE PLANTING' DETAIL
1. TREE PER PLANTING PLAN 4. EARTH WATERING BASIN PER 'TREE PLANTING' DETAIL
2. CINCH TIE (4 �ER TREE) 5. FINISH GRADE
3. (MINIMUM 2) 3 DIA. x 10' LONG LODGE POLE STAKES, 6. DEEP ROOT BARRIER AT EDGE OF HARDSCAPE - 24" DEEP, DIST. FROM HARDSCAPE:
4. PLANT TABLETS PER PLANTING SPECS /NOTES 10' LONG CENTERED ON TRUNK 1 SHRUB PER PLANTING PLAN
5. EARTH WATERING BASIN IN GROUNDCOVER AREAS 7'. TREE PLANTING PIT 2. WOOD MULCH- DEPTH PER PLANTING PLAN EQUAL TO 1/2 THE O.G. SPACIN
6. FINISH GRADE 3. PLANT TABLETS PER PLANTING SPECS / NOTES UNLESS.OTHERWIS5 NOTED.
7. ROOTBALL:- SET CROWN 1"-2" ABOVE FINISH GRADE 8. STREET CURB PER STREET IMPROVEMENT PLANS
8. COMPACT BACKFILL MIX PER PLANTING SPECS /NOTES 9. COMPACTED BACKFILL MIX PER PLANTING SPECS NOTES 4. FINISH GRADE HARDSCAPE-.
9. NATIVE SOIL 10. PLANT TABLETS PER PLANTING SPECS / NOTES 5. EARTH WATERING BASIN (RAKE SMOOTH PRIOR TO PLANTING
10. 2" MINIMUM DEEP MULCH PER PLANTING PLAN 11. MULCH - TYPE & DEPTH PER PLANTING PLAN GROUNDCOVER)
12. CONCRETE PAVING PER PLAN 6. ROOTBALL: SET CROWN SLIGHTLY ABOVE FINISH GRADE
NOTES: 7. COMPACT BACKFILL MIX PER PLANTING SPECS NOTES
NOTE: ROOT BARRIER TO BE PLACED WHEN TREE IS WITHIN 6' OF HARDSCAPE 1. ROOTBARRIER TO EXTEND 6' TO EITHER SIDE OF TREE TRUNK 8. NATIVE SOIL
2. ROOTBARRIER SHALL NOT ENCIRCLE THE TREE ROOTBALL
A Tree Planting N.T. S. B Linear Root Barrier N.T.S. C Shrub Planting N.T.S. D Groundcover S acinq N.T.S.
6 PLANTING NOTES: PLANTING NOTES CONT.
3
31. GENERAL - ALL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL CODES AND 10. FOR BACKFILL AROUND TREES AND SHRUBS, USE THE FORMULA AS INDICATED IN
THESE PLANS. THE SOIL
REP / BACKFILL NOTE. MIXING SHALL BE DONE AT ONE LOCATION.
04 A. THE CONTRACTOR SHALL CAREFULLY INSPECT THE SITE AND VERIFY ALL CONDITIONS
.
AND DIMENSIONS SHOWN ON THE PLANS PRIOR TO COMMENCEMENT OF ANY WORK 11. WEED ABATEMENT TO ALL PLANTING AREAS, AFTER EARTHWORK, INSTALLATION OF
........... 4
UNDER THIS CONTRACT.
IRRIGATION SYSTEM AND SOIL PREPARATION, THE FOLLOWING WEED ABATEMENT
B. THE CONTRACTOR SHALL CARRY ALL WORKER'S COMPENSATION ,� PUBLIC LIABILITY, AND WORK SHALL BE DONE:
4
PROPERTY DAMAGE INSURANCE AS REQUIRED BY OWNER. A. KEEP AREAS MOIST BY REGULAR IRRIGATIONS FOR A PERIOD OF TWO WEEKS
7 c THE CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME.
(MINIMUM) TO GERMINATE EXISTING WEED SEEDS.
<
D. ALL IRRIGATION WORK SHALL HAVE BEEN INSPECTED AND APPROVED BY THE LANDSCAPE B. KILL WEEDS WITH CONTACT WEED KILLER PER LICENSED HERBICIDE AGENCY
to
Is �4 5 ARCHITECT PRIOR TO BEGINNING ANY GROUND COVER PLANTING WORK.
SPECIFICATIONS. AFTER COMPLETE WEED KILL, REMOVE WEED RESIDUE AND TOP
E. THE OWNER'S SUPERINTENDENT AND THE LANDSCAPE ARCHITECT WILL INSPECT THE GROWTH.
PLANTING WORK PRIOR TO STARTING WORK. THE CONTRACTOR! SHALL CONTACT THE
6
,
LANDSCAPE ARCHITECT AND COORDINATE ALL INSPECTIONS. 12. PRE -EMERGENT PROGRAM PRIOR TO INSTALLATION OF GROUND COVER
9
,
F. THE QUALITY OF WORKMANSHIP AND MATERIALS SHALL BE OF THE HIGHEST STANDARDS. CONTRACTOR SHALL INSTALL A PER -EMERGENT HERBICIDE, EPTAM OR EQUAL, TO
<
'
COOPERATION AND FLEXIBILITY IS EXPECTED OF THE CONTRACTOR TOWARD WORKING ALL PROPOSED GROUND COVER AREAS PER MANUFACTURERS RECOMMENDATIONS.
WITH THE OWNER LANDSCAPE ARCHITECT IN PRODUCING THE BEST POSSIBLE PRODUCT.
...........
M1gin' I Ii x M
..........
OTHER
G. CLEAN THE SITE OF ALL ACCUMULATED RUBBISH, DEBRIS, AND EXTRANEOUS THROUGHOUT THE CONTRACT PERIOD. MAINTENANCE SHALL CONSIST OF PROPER
<
UPON COMPLETION OF EACH PHASE OF WORK, THE CONTRACTOR SHALL THOROUGHLY 13. MAINTENANCE THE CONTRACTOR SHALL MAINTAIN ALL PLANTED AREAS
0
WATERING, FERTILIZATION, WEEDING, AND GENERAL CLEAN
-UP. PLANTS SHALL BE
0 MATERIAL.
.. . ....... ......... . -- -------- . ...... . i
KEPT IN A HEALTHY GROWING CONDITION.
.; . ................ ...
SCOPE OFWORK CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR,
2. TRANSPORTATION, EQUIPMENT AND PROPERTY TO COMPLETE THE LANDSCAPING OF THE 14. PLANT ESTABLISHMENT PERIOD THE PLANT ESTABLISHMENT PERIOD SHALL
PLANTING AREAS AS INDICATED ON, OR REASONABLY IMPLIED BY THE DRAWINGS AND OR
COMMENCE UPON THE OWNER'S AND THE LANDSCAPE ARCHITECTS WRITTEN
3X ROOTBALL NOTES. APPROVAL OF ALL PHASES OF PLANTING INSTALLATION AND SHALL BE FOR NINETY
DETAIL NOTES: INCLUDED AS A PART OF THE WORK, BUT NOT NECESSARILY LIMITED BY IT ARE THE (90) CONTINUOUS CALENDAR DAYS. PLANT ESTABLISHMENT WORK SHALL INCLUDE
A. FOLLOWING ITEMS: FINE GRADING OF ALL PLANTING AREAS; PREPARATION OF ALL THREE (3) FERTILIZER APPLICATIONS TO ALL PLANTED AREAS DURING THIRTY (30)
1. FACE OF WALL OR BUILDING 1. 2000 PSI NATURAL GREY CONCRETE WITH LT. PLANTING AND TREE HOLES; FURNISHING AND INSTALLATION OF ALL PLANT MATERIALS; DAY INTERVALS DURING THE PLANT ESTABLISHMENT PERIOD (REFER TO FERTILIZER
2. PROP TOP OF STAKE AGAINST WALL OR BUILDING BROOM FINISH. PROVIDING MAINTENANCE THROUGHOUT THE PROJECT PERIOD; PROVIDING PLANT PROGRAM NOTE FOR TYPE AND APPLICATION RATES).
3. SET ROOTBALL TIGHT TO FOOTING, REMOVE ALL2• #4 REBAR; LAP BARS 6"' AT SPLICES AND TIEESTABLISHMENT WORK THROUGHOUT THE SPECIFIED PERIOD; CLEAN-UP AND WEEDING
. .
TRASH OR CONCRETE AT PLANTING HOLE " OF ALL LANDSCAPE AREAS; GUARANTEE OF ALL PLANT MATERIAL AND WORKMANSHIP FOR
4. BACKFILL PER PLANTING NOTES/SPECS
I FINISH GRADE PER PLAN (1" BELOW TOP OF CURB) 15. PLANT ESTABLISHMENT PROCEDURES - THE GENERAL CARE AND MAINTENANCE OF
4. FINISH GRADE IN GROUNDCOVER AREAS (2BELOW TOP OF CURB).
5. EARTH WATERING BASIN (RAKE SMOOTH PRIOR TO PLANTING A PERIOD OF ONE (1) YEAR.
ALL AREAS SHALL CONSIST OF PROPER WATERING, FERTILIZATION, WEEDING,
CLEAN-UP, AND AS FOLLOWS:
GROUNDCOVER) 5. UNDISTURBED NATIVE TOPSOIL/SUBGRADE THE CONTRACTOR SHALL REMOVE ALL WEEDS, ROCKS OVER 2"; DIAMETER, DEBRIS AND A. CULTIVATE AND WEED AT NOT LESS THAN TEN (10) WORKING DAY INTERVALS.
6. FINISH GRADE PER PLAN 6. 90% RELATIVE COMPACTED SUBGRADE 3. OTHER EXTRANEOUS MATERIAL FROM THE JOB SITE IN A LEGAL MANNER PRIOR TO B. THREE (3) FERTILIZER APPLICATIONS PER NOTE ABOVE WITH FERTILIZER AT THE
7. WOOD MULCH - DEPTH PER PLANTING PLAN PROCEEDING WITH ANY WORK UNDER THIS CONTRACT.
INSTALL 1/2" PREFORMED EXPANSION JOINTS @15'O.C. RATE AND FORMULA AS INDICATED IN THE SOIL PREP/BACKFILL NOTE.
8. NATIVE SOIL AND AT BEGINNING OF RADIUS. THE OWNER SHALL PROVIDE ROUGH GRADE TO WITHIN 1/10th OF 1 FOOT OF FINISH
C. CONTRACTOR SHALL MAINTAIN THE IRRIGATION SYSTEMS IN A LIKE NEW, OPERATING
!
9-Qk4b-a TAQ5 E�13 E14wilug 4. GRADE, INCLUDING ANY MINOR ADJUSTMENTS TO EARTH BERM AND SLOPE SHAPES. CONDITION, ADJUSTING HEAD HEIGHTS, THROW AND SPRAY ARCS AS NECESSARY.
■ bLALL: D. THE CONTRACTOR IS RESPONSIBLE FOR PROPER WATERING OF ALL PLANTED
PROVIDE FINISH GRADE IN PLANTING AREAS TO 1 % MINIMUM FLOW. FINISH GRADES
ff=11 SHALL BE 2" BELOW ADJACENT WALKS, CURBS, DRIVEWAYS, ETC. IN GROUND COVER AREAS, AND SHALL REPLACE ANY MATERIAL DAMAGED DUE TO IMPROPER MOISTURE.
E Vine On Wall Planti c N.T.S. F DINGurb 6 ANY CONCENTRATED DEVELOPMENT OF WEED GROWTH THAT MAY APPEAR IN
AREAS AND 1" BELOW IN TURF. PLANTING AREAS DURING PLANT ESTABLISHMENT PERIOD SHALL BE REMOVED AT
PLANTING TABLETS: ALL TREES AND SHRUBS SHALL BE -PLANTED PER THESE NOTE z S AND AS DETAILED. THIRTY (30) DAY INTERVALS. THE CONTRACTOR MAY ELECT TO REMOVE SUCH
FERTILIZER PROGRAM. i CONCENTRATIONS OF WEEDS MANUALLY OR BY AN APPROVED HERBICIDE PROGRAM.
5. ALL PLANT MATERIAL SHALL BE OF THE HIGHEST QUALITY AND ;LARGEST REASONABLE
E. DURING THE COURSE OF THE MAINTENANCE WORK, THE CONTRACTOR SHALL
SIZE AVAILABLE FOR THE SPECIFIED CONTAINER SIZE (WITHOUT; ROOT BOUND).
TIGHTLY COMPRESSED LONG-LASTING, 12 MONTH SLOW-RELEASE FERTILIZER REMOVE SURPLUS MATERIALS AND DEBRIS FROM THE SITE AND SHALL KEEP THE
THREE (3) FERTILIZER APPLICATIONS ARE TO BE APPLIED TO ALL PLANTING AREAS AT THIRTY SHRUB MATERIALS SHALL BE VIGOROUSLY GROWING, HEALTHY PLANT MATERIAL, FULL
TABLETS WEIGHING 7 GRAMS, AND HAVING AN ANALYSIS OF 12-8-8 PREMISES IN A NEAT AND CLEAN CONDITION AT ALL TIMES.
(30) DAY INTERVALS USING THE FOLLOWING FORMULA: AND BUSHY; OF HINES WHOLESALE NURSERY / MONROVIA NURSERY COMPANY QUALITY DURING THE PLANT ESTABLISHMENT PERIOD, THE CONTRACTOR SHALL BE
DERIVED FROM THE SOURCES LISTED IN THE FOLLOWING GUARANTEED OR EQUAL. THE LANDSCAPE ARCHITECT WILL APPROVE ALL PLANT MATERIAL WHEN F. RESPONSIBLE FOR MAINTAINING ADEQUATE PROTECTION FOR ALL PLANTING AREAS.
5 LBS. 16-16-16 COMMERCIAL FERTILIZER PER 1000 SQ. FT. ANALYSIS: SPOTTED FOR PLANTING, AND WILL NOT HESITATE TO REJECT ANY MATERIAL OF ANY DAMAGED AREAS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
QUESTIONABLE QUALITY, OR OF LESS THAN THE LARGEST REASONABLE SIZE MATERIAL
AFTER ALL SITE GRADING HAS BEEN COMPLETED, THE CONTRACTOR SHALL OBTAIN, AT HIS AVAILABLE. ALL SPECIMEN MATERIAL TAGGED BY THE LANDSCAPE ARCHITECT FOR THIS
EXPENSE, AN AGRONOMIC SOILS TEST. THE TEST SHALL BE PERFORMED BY AN APPROVED TOTAL NITROGEN(N) ................................... 12% PROJECT WILL BE AVAILABLE AT VALLEY CREST NURSERY, MOON VALLEY NURSERY, OR
SOIL LAB AND SHALL INCLUDE ALL OF THE ABOVE INFORMATION. THE RECOMMENDATIONS OF DERIVED FROM UREA FORMALDEHYDE OTHER SOURCE EQUAL IN QUALITY. CONTRACTOR SHALL PURCHASE TAGGED MATERIAL,
7.0% WATER SOLUBLE NITROGEN ARRANGE DELIVERY, PAY FOR SAME, AND INSTALL PER PLAN.
THIS REPORT SHALL TAKE PRECEDENT OVER THE ABOVE QUANTITIES ONLY WHEN THEY
EXCEED THE SPECIFIED MINIMUMS. 13.0% WATER INSOLUBLE NITROGEN
THE LANDSCAPE ARCHITECT SHALL APPROVE THE LOCATION OF.ALL OF THE ONE
6. GALLON, FIVE GALLON, AND FIFTEEN GALLON PLANT MATERIAL AS APPROXIMATELY
AVAILABLE PHOSPHORIC ACID (P205) ............................................................ 8% SPOTTED IN THE FIELD BY THE CONTRACTOR. ALL BOXED MATERIAL SHALL BE STAKED
PHOSPHATE FOR LOCATION APPROVAL PRIOR TO PLANT PIT EXCAVATION. PRIOR TO PLANTING, THE
SOIL PREPARATION DERIVED FROM TRIPLE SUPER BACKFILL NOTE: OWNER'S REPRESENTATIVE WILL SELECT THE BEST SIDE AND FACE ALL SPECIMEN TREES.
TO ALL NEW PLANTING AREAS (SHRUB AND GROUND COVER), ROTOTILL THE FOLLOWING SOLUBLE POTASH (K20) ............................ ......... .......... 8% TREE TIES SHALL BE "TWIST -BRACE" AVAILABLE FROM 'V.I.T. COMPANY' OF ESCONDIDO,
AMENDMENTS: CA (619) 480-6702. INSTALL PER MANUFACTURER'S SPECIFICATIONS. USE WOOD
COMBINED SULFUR (S) ............................ 7. SCREWS ONLY FOR WOOD STAKES, USE THRU BOLT FOR METAL STAKES.
'NITROMULCH' SOIL AMENDMENT - 3 CU. YDS. PER 1000 SQ. Fr. DERIVED FROM FERROUS AND POTASSIUM SULPHATES
16-16-16 COMMERCIAL FERTILIZER - 12 LBS. PER 1000 SQ. FT. ALL GROUND COVER AS NOTED IN THE LEGEND SHALL BE ROOTED TIP CUTTINGS FROM
FLATS OR LINERS UNLESS OTHERWISE SPECIFIED, AND SHALL BE PLANTED IN
BACKFILL MIX FOR TREES, SHRUBS, AND VINES SHALL BE AS FOLLOWS: IRON (EXPRESSED AS ELEMENTAL FE) .........................................................2.0% 8. STAGGERED ROWS CONTINUOUSLY UNDER ALL TREES AND SHRUBS IN THE AREAS AS
DERIVED FROM FERROUS SULPHATE DESIGNATED ON THE PLANS AND AT THE SPACING INDICATED IN THE LEGEND. ALL
6 PARTS BY VOLUME ON-SITE SOIL GROUND COVER AND SHRUB AREAS SHALL HAVE A MINIMUM DEPTH OF 3" MULCH, TYPE
4 PARTS BY VOLUME ORGANIC AMENDMENT AS ABOVE PER PLAN (WOOD MULCH TO BE MAX. 1 - IN DIAMETER).
1 LB. 16-16-16 COMMERCIAL FERTILIZER PER CU. YD. OF MIX
TO ALL PLANTING AREAS AND PRIOR TO IRRIGATION SYSTEM INSTALLATION, CROSS RIP
2 LBS. IRON SULFATE PER CU. YD. OF MIX
OR OTHERWISE TILL 12" DEEP. AFTER CROSS RIPPING, ROTO'TILL SOIL PREP
9. AMENDMENTS 6" DEEP (SEE SOIL PREP BACKFILL NOTE).
'NITROMULCH' SOIL AMENDMENT AVAILABLE FROM 'KELLOG SUPPLY, INC.' (800) 232-2322
G Soil Prep Fertilizer N/A H -Plantinc Tablets I N/A
N/A Planting Notes