HomeMy WebLinkAbout5150-1i�� [� Ai SAI ED AREAS
FOR:
(ZITS P1 AK1- MWI) RIAI TO PIPFI INF' Tr) RF* NnT1;7117n
4649. Brockton Avenue
Riverside, CA 92506
Phone: (951) 369-0100
Fax: (951) 369-4039
www.comworksdg.com
Contact: Scott Rice
CITY OF FONTANA, CALIF RNIA
APPROVED BY:
r 4 1 DATE: 1 ti( L
-SCI E INE R.C.E.51152
DRAWING NO.: 5150
NORTH
NOT TO SCALE
kAVIL LNUINLLK: p
ALLARD ENGINEERING 0
16866 SEVILLE AVE = f Jw
FONTANA, CA 92335
(909) 356-1815
CONTACT: DENNIS ALLARD Know what's below.
Call before you dig.
NORTHWOODS
TRACT 17165
LMD
LENNAR HOMES
980 MONTECITO DR,, STE. 302
SOIL MANAGEMENT REPORT NOTES:
CORONA CA 92879
'
IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL
TITLE SHEET
BE COMPLETED BY THE PROJECT APPLICANT; OR HIS/HER DESIGNEE, AS FOLLOWS:
IRRIGATION PLAN
• SUBMIT SOIL SAMPLES TO A LABORATORY FOR ANALYSIS AND RECOMMENDATIONS.:
CONTACT: RYAN COMBE
A. SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE WITH LABORATORY PROTOCOL,
951-712-9218
INCLUDING PROTOCOLS REGARDING ADEQUATE SAMPLING DEPTH FOR THE INTENDED PLANTS.
PLAN
B. THE SOIL ANALYSIS SHALL INCLUDE:
PLANTING
1. SOIL TEXTURE;
JOB NUMBER: 131244
2. INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE
PIAN
TABLE;
DRAWN BY: KCK
3. PH;
LP -5
4. TOTAL SOLUBLE SALTS;
CHECKED BY: SJR
5. SODIUM;
6. PERCENT ORGANIC MATTER; AND
DATE: 9/4/14
7. RECOMMENDATIONS.
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING:
REVISIONS:
A. THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE
COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY.
7/6 CITY 1 ST PLAN
• THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE INSPECTOR OR
CHECK CORRECTIONS
INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE
7/6 FIRE PROTECTION
INSTALLATION OF ANY PLANT MATERIAL.
2
MODIFICATIONS
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE
8/12 CITY 2ND PLAN
INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL
3
CHECK CORRECTIONS
MANAGEMENT REPORT RECOMMENDATIONS.
4
9/4 CITY 3RD PLAN
CHECK CORRECTIONS
ANDSCAPF
SFitt I
INDEX:
T-1
TITLE SHEET
LI -1
IRRIGATION PLAN
LI -2
IRRIGATION PLAN
LI -3
IRRIGATION PLAN
PLANTING
PLAN
I AGREE TO COMPLY WITH THE REQUIREMENTS
OF THE WATER EFFICIENT LANDSCAPE
ORDINANCE AND SUBMIT A COMPLETE
LANDSCAPE DOCUMENTATION PACKAGE.
APPLICANT/LANDSCAPE ARCHITECT•
DATE• 9,x/14. _
LI -4
IKKICiAIIVN
FLAN
LI -5
IRRIGATION
DETAILS
LI -6
IRRIGATION
DETAILS/SPECIFICATIONS
LP -1
PLANTING
PLAN
LP -2
PLANTING
PLAN
LP -3
PLANTING
PIAN
LP -4
PLANTING
PLAN
LP -5
PLANTING
D ETAI LS/S P EC I
F1 CATI 0 N S
Will
V
J 1-
�gnature
10/31/15
LpRenewal Date
TITLE
SHEET
SHEET 1
OF