Loading...
HomeMy WebLinkAbout5150-1i�� [� Ai SAI ED AREAS FOR: (ZITS P1 AK1- MWI) RIAI TO PIPFI INF' Tr) RF* NnT1;7117n 4649. Brockton Avenue Riverside, CA 92506 Phone: (951) 369-0100 Fax: (951) 369-4039 www.comworksdg.com Contact: Scott Rice CITY OF FONTANA, CALIF RNIA APPROVED BY: r 4 1 DATE: 1 ti( L -SCI E INE R.C.E.51152 DRAWING NO.: 5150 NORTH NOT TO SCALE kAVIL LNUINLLK: p ALLARD ENGINEERING 0 16866 SEVILLE AVE = f Jw FONTANA, CA 92335 (909) 356-1815 CONTACT: DENNIS ALLARD Know what's below. Call before you dig. NORTHWOODS TRACT 17165 LMD LENNAR HOMES 980 MONTECITO DR,, STE. 302 SOIL MANAGEMENT REPORT NOTES: CORONA CA 92879 ' IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL TITLE SHEET BE COMPLETED BY THE PROJECT APPLICANT; OR HIS/HER DESIGNEE, AS FOLLOWS: IRRIGATION PLAN • SUBMIT SOIL SAMPLES TO A LABORATORY FOR ANALYSIS AND RECOMMENDATIONS.: CONTACT: RYAN COMBE A. SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE WITH LABORATORY PROTOCOL, 951-712-9218 INCLUDING PROTOCOLS REGARDING ADEQUATE SAMPLING DEPTH FOR THE INTENDED PLANTS. PLAN B. THE SOIL ANALYSIS SHALL INCLUDE: PLANTING 1. SOIL TEXTURE; JOB NUMBER: 131244 2. INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE PIAN TABLE; DRAWN BY: KCK 3. PH; LP -5 4. TOTAL SOLUBLE SALTS; CHECKED BY: SJR 5. SODIUM; 6. PERCENT ORGANIC MATTER; AND DATE: 9/4/14 7. RECOMMENDATIONS. • THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING: REVISIONS: A. THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY. 7/6 CITY 1 ST PLAN • THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE INSPECTOR OR CHECK CORRECTIONS INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE 7/6 FIRE PROTECTION INSTALLATION OF ANY PLANT MATERIAL. 2 MODIFICATIONS • THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE 8/12 CITY 2ND PLAN INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL 3 CHECK CORRECTIONS MANAGEMENT REPORT RECOMMENDATIONS. 4 9/4 CITY 3RD PLAN CHECK CORRECTIONS ANDSCAPF SFitt I INDEX: T-1 TITLE SHEET LI -1 IRRIGATION PLAN LI -2 IRRIGATION PLAN LI -3 IRRIGATION PLAN PLANTING PLAN I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. APPLICANT/LANDSCAPE ARCHITECT• DATE• 9,x/14. _ LI -4 IKKICiAIIVN FLAN LI -5 IRRIGATION DETAILS LI -6 IRRIGATION DETAILS/SPECIFICATIONS LP -1 PLANTING PLAN LP -2 PLANTING PLAN LP -3 PLANTING PIAN LP -4 PLANTING PLAN LP -5 PLANTING D ETAI LS/S P EC I F1 CATI 0 N S Will V J 1- �gnature 10/31/15 LpRenewal Date TITLE SHEET SHEET 1 OF