SOIL L MANAC EME NT REPORT NOTES.•
�.
IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL
=Z<
W
Lr)
`cD
Z
gv�w
Hard
azQ::
>
N
VII�
W
�_
_j
M.
O
2. INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE
Fountain of -1 ruth
t�iChurch
lc ch
_ja�
ntt
4. TOTAL SOLUBLE SALTS;
..;
DI M'
5. so u
LL
Z0�
6. PERCENT ORGANIC MATTER; AND
Fan'ini rsgy .. Fan Faint s
7. RECOMMENDATIONS.
7/6 CITY. 1 ST PLAN-
1 CHECK CORRECTIONS
��U_
p=F—
Y
O
LANDSCAPE AR'CHIT:E�CTURE Contact: Scott Rice
Oma
�00.;
i
TRACT
2 Z d
a �`
TRACT 17165
to
O U •>
O
ZO
V
COo
.:
wwin
^
0 .
Qi
_. Q (a -
r,
(909)356-1815
Know what s ��low.
CD
Er r
0 w_j a:
LL <
._.I
CORONA, CA 92879
SOIL L MANAC EME NT REPORT NOTES.•
�.
IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL
=Z<
BE COMPLETED BY THE PROJECT APPLICANT; OR HIS/HER DESIGNEE, AS FOLLOWS:
Lr)
`cD
Z
gv�w
Hard
U7'
azLL '
INCLUDING PROTOCOLS REGARDING. ADEQUATE SAMPLINGDEPTH FOR THE INTENDED PLANTS.
VII�
B. THE SOIL ANALYSIS SHALL INCLUDE:
LANDSCAPE AR'CHIT:E�CTURE Contact: Scott Rice
SITE PLAN:
VICINITY MAP:
CONSULTANTS:
TRACT
TRACT 17165
CIVIL ENGINEER:
4_0
ALLARD ENGINEERING o� �
INFILTRATION
_ -_
16866 SEVILLE AVE f t
BASIN
FONTANA, CA 92335 �$
■
r,
(909)356-1815
Know what s ��low.
-
LENNAR HOMES
CONTACT: DENNIS ALLARD
Call before you dig..
r
CORONA, CA 92879
SOIL L MANAC EME NT REPORT NOTES.•
�.
IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL
951-712--9218
BE COMPLETED BY THE PROJECT APPLICANT; OR HIS/HER DESIGNEE, AS FOLLOWS:
r .. -
• LABORATORY FOR ANALYSIS AND RECOMMENDATIONS.:
L AMPLES TO A
SUBMIT SOI S
Hard
,
A. SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE WITH LABORATORY PROTOCOL,
, �. admycit �
y
INCLUDING PROTOCOLS REGARDING. ADEQUATE SAMPLINGDEPTH FOR THE INTENDED PLANTS.
r.
B. THE SOIL ANALYSIS SHALL INCLUDE:
DRAWN BY: KCK
1. SOIL TEXTURE;
2. INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE
Fountain of -1 ruth
t�iChurch
lc ch
TABLE;
3. PH;
ntt
4. TOTAL SOLUBLE SALTS;
..;
DI M'
5. so u
REVISIONS:
6. PERCENT ORGANIC MATTER; AND
Fan'ini rsgy .. Fan Faint s
7. RECOMMENDATIONS.
7/6 CITY. 1 ST PLAN-
1 CHECK CORRECTIONS
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING; -
A. THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE
YKl%t Dr p
-
Va 5tr vwooe n
1
ri
INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE
INSTALLATION'OF ANY PLANT MATERIAL.
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE
9/4 CITY 3RD PLAN
4 CHECK CORRECTIONS e
INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL
■ 4 out ED Air Mawters S jsem t
MANAGEMENT REPORT RECOMMENDATIONS.
�
k
# Del `sacci - Fbnlana 9758 �vt►� In
. , .'lwartana �arii ... .
I AGREE TO COMPLY WITH THE REQUIREMENTS
�SUi {3tii i4:' �ilIMr-,.'#itAva SUf mit Ave � � ti.A'``i. .�itisllri�ti.Fkv..
OF THE WATER EFFICIENT LANDSCAPE
BASIN
ORDINANCE AND SUBMIT A COMPLETE
10f31/15
LANDSCAPE DOCUMENTATION PACKAGE.
S�
-
NORTH ,
NOT TO SCALE
CITY REQUIRED NOTES:
t
'�i
INSPECTIONS:
1. IT IS THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISIONS LANDSCAPE INSPECTOR 48 HOURS
_ M
PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909)350-6632.
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED:
�-
PRE -CONSTRUCTION INSPECTION.
INSPECTION OF IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
FINISH GRADE PRIOR TO PLANTING.
0 L'
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION.
1
PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE
DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS.
c� a
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION. -
} G
3..THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION.
C10 '1 r
LZ
SITE PLAN:
NORTH
NOT TO SCALE
i
_.S..: i_
CONSULTANTS:
11
TRACT 17165
CIVIL ENGINEER:
ALLARD ENGINEERING o� �
INFILTRATION
_ -_
16866 SEVILLE AVE f t
BASIN
FONTANA, CA 92335 �$
■
r,
(909)356-1815
Know what s ��low.
-
LENNAR HOMES
CONTACT: DENNIS ALLARD
Call before you dig..
980 MNTE !TO DR. STE. 302 -
CORONA, CA 92879
SOIL L MANAC EME NT REPORT NOTES.•
CONTACT. RYAN COMBE
IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL
951-712--9218
BE COMPLETED BY THE PROJECT APPLICANT; OR HIS/HER DESIGNEE, AS FOLLOWS:
• LABORATORY FOR ANALYSIS AND RECOMMENDATIONS.:
L AMPLES TO A
SUBMIT SOI S
■
,
A. SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE WITH LABORATORY PROTOCOL,
JOB NUMBER: 131244
INCLUDING PROTOCOLS REGARDING. ADEQUATE SAMPLINGDEPTH FOR THE INTENDED PLANTS.
B. THE SOIL ANALYSIS SHALL INCLUDE:
DRAWN BY: KCK
1. SOIL TEXTURE;
2. INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE
CHECKED BY: SJR
TABLE;
3. PH;
DATE: 9/4/14
_
4. TOTAL SOLUBLE SALTS;
DI M'
5. so u
REVISIONS:
6. PERCENT ORGANIC MATTER; AND
7. RECOMMENDATIONS.
7/6 CITY. 1 ST PLAN-
1 CHECK CORRECTIONS
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING; -
A. THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE
7/6 FIRE PROTECTION
COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY.
2 MODIFICATIONS
• THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE INSPECTOR OR
8/12 CITY. 2ND PLAN
3 CHECK CORRECTIONS
INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE
INSTALLATION'OF ANY PLANT MATERIAL.
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE
9/4 CITY 3RD PLAN
4 CHECK CORRECTIONS e
INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL
MANAGEMENT REPORT RECOMMENDATIONS.
�
- \' PApSCgp�
c`O VLONEr
I AGREE TO COMPLY WITH THE REQUIREMENTS
r
OF THE WATER EFFICIENT LANDSCAPE
—'
ignature
*
ORDINANCE AND SUBMIT A COMPLETE
10f31/15
LANDSCAPE DOCUMENTATION PACKAGE.
S�
9� Date
OF
t
NORTH
NOT TO SCALE
i
_.S..: i_
CONSULTANTS:
NORTHWOODS.
TRACT 17165
CIVIL ENGINEER:
ALLARD ENGINEERING o� �
INFILTRATION
_ -_
16866 SEVILLE AVE f t
BASIN
FONTANA, CA 92335 �$
r,
(909)356-1815
Know what s ��low.
-
LENNAR HOMES
CONTACT: DENNIS ALLARD
Call before you dig..
980 MNTE !TO DR. STE. 302 -
CORONA, CA 92879
SOIL L MANAC EME NT REPORT NOTES.•
CONTACT. RYAN COMBE
IN ORDER TO REDUCE RUNOFF AND ENCOURAGE HEALTHY PLANT GROWTH, A SOIL MANAGEMENT REPORT SHALL
951-712--9218
BE COMPLETED BY THE PROJECT APPLICANT; OR HIS/HER DESIGNEE, AS FOLLOWS:
• LABORATORY FOR ANALYSIS AND RECOMMENDATIONS.:
L AMPLES TO A
SUBMIT SOI S
,
A. SOIL SAMPLING SHALL BE CONDUCTED IN ACCORDANCE WITH LABORATORY PROTOCOL,
JOB NUMBER: 131244
INCLUDING PROTOCOLS REGARDING. ADEQUATE SAMPLINGDEPTH FOR THE INTENDED PLANTS.
B. THE SOIL ANALYSIS SHALL INCLUDE:
DRAWN BY: KCK
1. SOIL TEXTURE;
2. INFILTRATION RATE DETERMINED BY LABORATORY TEST OR SOIL TEXTURE INFILTRATION RATE
CHECKED BY: SJR
TABLE;
3. PH;
DATE: 9/4/14
_
4. TOTAL SOLUBLE SALTS;
DI M'
5. so u
REVISIONS:
6. PERCENT ORGANIC MATTER; AND
7. RECOMMENDATIONS.
7/6 CITY. 1 ST PLAN-
1 CHECK CORRECTIONS
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING; -
A. THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE
7/6 FIRE PROTECTION
COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY.
2 MODIFICATIONS
• THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE INSPECTOR OR
8/12 CITY. 2ND PLAN
3 CHECK CORRECTIONS
INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE
INSTALLATION'OF ANY PLANT MATERIAL.
• THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE
9/4 CITY 3RD PLAN
4 CHECK CORRECTIONS e
INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL
MANAGEMENT REPORT RECOMMENDATIONS.
�
- \' PApSCgp�
c`O VLONEr
I AGREE TO COMPLY WITH THE REQUIREMENTS
r
OF THE WATER EFFICIENT LANDSCAPE
—'
ignature
*
ORDINANCE AND SUBMIT A COMPLETE
10f31/15
LANDSCAPE DOCUMENTATION PACKAGE.
al Date \Q
J'Renew4/14
9� Date
OF
SHEET INDEX:
I
T-1:.TITLE SHEET
LI4 IRRIGATION PLAN
LI -2 IRRIGATION DETAILS
LI -3 IRRIGATION DETAILS
I -
LI -4 IRRIGATION SPECIFICATIONS
LP -1 PLANTING PLAN
LP -2 PLANTING DETAILS/SPECIFICATIONS
LP -3 CONSTRUCTION DETAILS
i.
APPLICANT/LANDSCAPE ARCHITECT:
DATE: _ 9.Z4 / 14 _
TITLE
SHEET