1. ALL WORK SHAH. BE IN ACCORDANCE WITH THESE PLANS, THE
CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS
AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION ('GREEN BOOK'). ALL REFERENCE SPECIFICATIONS
AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE
NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT
DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
PRECEDENCE PROVISIONS IN THE 'GREEN BOOK', THE CONTRACTOR
SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER
FOR RESOLUTION.
3. ALL MATERIALS AND MEQ ARE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING
DIVISION PRIOR TO THE START OF ANY WORK.
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO
WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL
POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF
CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC
EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. R SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION
OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH
FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5)
FEET IN DEPTH SHAM BE GUARDED BY SHORING, SLOPING OF THE
GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS
OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
THE POTENTIAL FOR GROUND MOVEMENT EXISTS.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC
RIGHT-OF-WAY WT ROUT OBTAINING A SEPARATE PERMIT FOR
THAT PURPOSE
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM
AVAILABLE INFORMATION. HOWEVER, If SHALL BE THE RESPONSIBILITY
OF THE CONTRACTOR TO DETERMIN& IN THE FIELD, THE TRUE
LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO
EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE
CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT
1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL
UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS,
TELEPHONE, ELECTRIC, CABLE -TELEVISION, LANDSCAPING,
LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
STORM DRAIN, FLOOD CONTROL AND CALTRANNS. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO
WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER
MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHOIRIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER
COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT
WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE
ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK
TO THE PLAN GRADES. THE CONTRACTOR SHALL. BE RESPONSIBLE
FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION
CONTROL STAKING DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS,
MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO
THE C17Y ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING
SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE
BY A REED CML EMNEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF
THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO
THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER
REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHAM MAINTAIN ACCESS FOR LOCAL RESIDENTS
AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL -
BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR
RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE
MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT
ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED
WIND VELOCITIES EXCEED 25 MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD,
SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT-OF-WAY DURING CONSTRUCTION WITHOUT
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL
OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION.
FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWAIL S
FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-EROQABL E
SWALES ENTERING OR LEAVING IMPROVEMENTS.
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS
SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL
CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADL:,
COLOR AND FlNISFI TO MATCH EXISTING CONCRETE
27. THE SEWER CONTRACTOR SHALL STAMP AN IT IN THE FACE OF
THE CURB AT THE LOCATION OF THE SEWER LATERAL
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING
STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL. BE INSTALLED, TESTED AND
APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT
PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT
TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED
- BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BIOSE COURSE MATERIAL
FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A
GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA
FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLE'S, CLEANOUT FRAMES, COVERS AND VALVE LOXES
SHALL BE REUSED TO FINISHED GRADE BY THE PAVING CONTRACTOR
UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC
CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING,
SPRINKLERS, FENCING AND SIDEWALKS AFFECTED BY THE CONSTRUCTION
TO THE SATISFACTION OF THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO
THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS
TO THE CITY ENGINEER.
CITY OF RWAM UMff NOTMWN UST:
CITY OF FONTANA
S.B.C. INC.
ATTN: BRIAN WREN
3939 E (ORONADO STREET
8353 SIERRA AVENUE
ANAHEIM, CA 92807
FONTANA, CA 92335
(714) 666-5500
(909) 350-6632
END VERTICAL CURVE
LP
UNDERGROUND SERVICE ALERT
S0. CALIF. GAS COMPANY
( ) 422-4133
1981 W. LUGONIA AVENUE
POINT OF INTERSECTION
REDLANDS, CA 92374
COMCAST (CABL.E N )
909) 335-7547
1205 DUPONT AVE
EMERGENCIES: (800) 427-2200
ONTARIO, CA 91761
SO. CALIF. EDISON COMPANY
(909) 390-4738
300 N. PEPPER AVENUE
RIALTO, CA 92376
VERIZON
- UNDERGROUND
1400 E PHILIPS BLVD.
9ml820-5598
09 875-5100 - TRANSMISSION
ONTARIO, CA 91766
() 422-4133
213 637-1233 - PIPELINES
909 357-6505 - DISTRIBUTION
800 422-4133
FONTANA WATER COMPANY
ATTN: MICHAEL. J. McGRAW
ADELPHA
8440 NUEVO AVENUE
1500 S. AUTO CENTER DRIVE
FONTANA CA 92235
ONTARIO, CA 91761
(909) 822-2201
(714) 666-5500
FAX.- (909) 823-5046
CRAWFORD CANYON MUTUAL WATER CO.
ATTN: BASIL J. FABRIZIO
(909) 463-9580
MGNM IV07U TO COWMCM
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AND/OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS.
THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR,
SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE
OF THE PROPOSED IMPROVEMENT., THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER
LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE DESIGN PROFESSIONAL
UNWOmm mANCES AND tM
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE
FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE
PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
CITY OF FONTANA
MARYGOLD AVENUE
STREET IMPROVEMENT PLANS
L s _L -1
w
I'a
REVISION DESCRIPTION
SFI" CONSTRUCRON OF REQUIRED. _---MOMOM NOTcommmaW1TH1N
TWO YE4RS OF i DATE OF .. •
• -__-
BRING isW INTOI CONFORMANCE
CONDITIONS AND STANDARDS IN SHCT
SHEET INDU
TITLE SHEET
MARYGOLD AVENUE
SHEET 1
SHEET 2
SEE SHEEP 2
LEGEND:
INDICATES REMOVE do REPLACE EXISTING A.C. PAVEMENT
INDICATES GRIND & OVERLAY EXISTING AC. PAVEMENT
r'7-7,77, INDICATES R&R EXISTING DRIVWAY
INDICATES CENTERLINE
INDICATES RIGHT-OF-WAY UNE
-
INDICATES EXISTING IMPROVEMENTS
--{1300}-- INDICATES EXISTING CONTOUR UNE
#-- STREET LIGHTS
DIRECTION OF FLOW
FIRE HYDRANT
CO
CATCH BASIN
FL
FLOW UNE
Rii
RIGHT OF WAY
BVC
BEGIN VERTICAL CURVE
EVC
END VERTICAL CURVE
LP
LOW POINT
LOC
LENGTH OF CURVE
PI
POINT OF INTERSECTION
TC
TOP of CURB
FS
FINISH SURFACE
EC
END CURVE
BC
BEGIN CURVE
BCR
BEGIN CURB RETURN
ECR
END CURB RETURN
MOC
MIDDLE OF CURVE
PRC
POINT OF REV. CURVE
BASIS OF BEARING
THE BASIS OF BEARINGS FOR THIS PLAN WAS TAKEN
FROM THE CENTERLINE OF MARYGOLD AVENUE AS
SHOWN ON TRACT 13773, M.B. 266179-81,
M.B. 304/38-44, BEING N89'34'14 E
SITE BENCHMARK
1 I.P. AT THE INTERSECTION OF MARYGOLD AVE.
AND ALDER AVE PER CITY OF FONTANA SEWER PLAN
DRAWING NO. 2745 (SHEET 4).
ELE1/ATIOM
Q�pF ESS /O
P. CASp
- Z
ul No. 78044 m
1� j Exp. 9/30/15 j -y
V I LJ
I
UNION PACIFIC RR
VICINITY MAP
N.T.S.
RAN DALL AVE
SAN BERNARDINO AVE
PROSECT
LOCATION
RIW LT RIW RT
63'-66'
30'-33' 33'
I
4.5' 18'-22' 22' 11'
5' MIN. 5' MIN.
3 2
IL VARIS.
'• �i-IIF=�II-i 1 1. All
j
MARYGOLD AVENUE - VAR. WIDTH RNV
TMM SECTION
NTS
CONSTRUCTION NOTES. ESTIMATE OF QUANTMES
THE QUANTITIES SHOWN HEREON ARE ESTIMATES ONLY. THE CONTRACTORS SHALL PREPARE THBR
OWN QUANTITIES AND BID A COMPLETE JOB.
�1 - CONSTRUCT 4* AC PAVEMENT (MIN) OVER 1Y OF 95X COMPACTED NATIVE SOIL .............................. 110 TONS
(SEE GENERAL NOTE 31 do 32�
Q- CONSTRUCT 8' PCC CURS do GUTTER PER CITY STD. DWG. N0. 1000 .........................................532 LF.
O3-
CONSTRUCT' 4 PCC SIDEWALK PER C11Y SPD. DWG. N0. 1006. WIDTH dt TYPE AS SHOWN ON PIAN.......... 1794 S.F.
4o- CONSTRUCT CURB ACCESS RAMP PER CITY STD. PLAN N0. 1004 .............................................2 EA
5�-
CONSTRUCT PCC DRIVE APPROACH PEI? CITY STD. DWG. N0. 1002. W=12' UNLESS NOTED OTHERWISE .......683 S.F.
(SEE GENERAL NOTE 25)
6a- SAWCUi AND REMOVE IXfSTING AC PAVING TO A CLEAN STRAIGHT UNE .................. (675 LF SAW CUT) 3571 S.F. REMOVHi.
7o- REMOVE AND RE -INSTALL EXISTING STREET SIGNS PER CITY STD. DWG. N0. 4003 ............................ 3 EA.
(SEE GENERAL NOTE 34)
0- ADJUST WATER VALVE COVER TO GRADE PFJt CITY SPD. DWG. N0. 6000 ...................................... 5 FA
(SEE GENERA!. NOTE 33)
O9 -REMOVE DOSfING CURB AND GUTTER .........................................................................127 LF.
10
REMOVE EXISTING SIDEWALK..................................................................................155 S.F.
11 GRIND 0.10' ADN, 5.0' WIDE AND OVERLAY ...................................................................3,320 S.F. GRIND
12 REMOVE EXISTING FENCING do REPLACE WITH NEW LIKE KIND FENCING WITH SIMILAR FOUNL1AilONS, ..........600 LF.
DIMENSIONS, FINISH AND COLORS (SEE GENERAL NOTE 35)
13 REl10VE DfISTiNG CROSS GUTTER h RECONSTRUCT PER CITY SPD. PLAN N0. 403 ............................ 1 EA.
14 REMOVE AND REPLACE IXISTING DRIVEWAY (APPROX. 10 LF.) TO THE SATISFACTION OF THE CITY ENGINEEIt .. 4 EA
15 COORDINATE WITH SAN GABRIAI. VALLEY WATER FOR THE RELOCATION OF WATER METERS BEHIND SIDEWALKS.. 5 EA.
PER CITY STANDARDS.
Prepared Under The Supervision oh
Noel A Castillo, R.C.E 78044
(Expires 9/30/15)
-713,011-41
DRAWN 13Y.-
MW
Y:MW
DESIGNED BY:
MW
CHECKED BY:
MW
CRY OF FONTANA, CALIFORNIA
STREET IMPOVEMENT PLANS
MARYGOLD AVENUE
BARDYAVE •ALDER AVE
\ DATE:
7 -3/ -
CITY
-3l'CITY ENGINEER R.C.E 51152
SCALE-
AS
CALEAS NOTED
DATE--
JULY,
ATEJULY, 2014
DRAWING NO.: �
5084