Loading...
HomeMy WebLinkAbout5164-9LL 0 0 U 8.23 Al \ WAL �T�AVE 12.0 A2 16.3 WALNUT AVE e ALL - WIRE SLEEVE SLEEVE 1 4 WIRE SLEEVE MADISON WAY a NOTES (TYPICAL): 1. 1) WHEN VERTICAL OBSTRUCTIONS (FIRE HYDRANTS, STREET LIGHTS, TREES, ETC.) INTERFERE WITH THE SPRAY PATTERN OF THE SPRINKLER HEADS SO AS TO PREVENT PROPER COVERAGE, THE CONTRACTOR SHALL FIELD ADJUST THE SPRINKLER SYSTEM BY INSTALLING A QUARTER CIRCLE OR HALF CIRCLE SPRINKLER HEAD ON EACH SIDE OF THE OBSTRUCTION SO AS TO PROVIDE PROPER COVERAGE. ALL ADJUSTMENTS SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER. 2. MAINLINE, VALVES, IRRIGATION METERS, ETC., ARE SHOWN ON THE STREET AND/OR SIDEWALK FOR CLARIFICATION ONLY. INSTALL IN PLANTER AREA THROUGHOUT THE SITE. 3. ADJUST ALL SPRINKLERS FOR 100% COVERAGE. 4. AFTER ESTABLISHMENT OF ALL PLANT MATERIAL, CONTROLLERS SHALL BE PROGRAMMED TO IRRIGATE SOLELY DURING EARLY MORNING. DRIP IRRIGATION NOTES: INSTALLATION NOTES 1. PRIOR TO INSTALLATION DRIPLINE AREA IS TO BE RAKED SMOOTH. ALL SHARP OBJECTS AND DEBRIS THAT MAY PUNCTURE TUBING IS TO BE COLLECTED AND DISPOSED OF. 2. INSTALL DRIPLINE AT A DEPTH OF 2". REFER TO IRRIGATION DETAILS FOR LAYOUT INFORMATION. 3. ALL IRRIGATION LATERALS, AND IRRIGATION MAINLINE ARE TO BE SLEEVED UNDER ALL PAVING AREAS. ALL SLEEVES ARE TO BE SCHEDULE 40 AND SIZED AT TWICE THE SIZE OF PIPE TO BE SLEEVED. 4. DRIPLINE IS TO BE LAID OUT WITH ENOUGH 'PLAY' TO ALLOW FOR EXPANSION AND CONTRACTION DUE TO CLIMATIC CONDITIONS. 5. ALL CUTS TO DRIPLINE, LATERAL LINES, AND MAIN LINE ARE TO BE AT 90 DEG TO PIPE AND CLEANED PRIOR TO INSTALLATION. 6. DRIPLINES, IRRIGATION LATERALS AND IRRIGATION MAIN LINES ARE TO BE DEBRIS FREE. 7. PRIOR TO OPERATION OF IRRIGATION SYSTEM OPEN ALL FLUSH VALVES AND RUN WATER TO PURGE SYSTEM OF ALL DEBRIS. 8. DO NOTE USE ANY SOLVENTS OR DETERGENTS ON DRIPLINES. 9. LATERAL LENGTH FOR DRIPLINE NOT TO EXCEED MANUFACTURER'S RECOMMENDATION. WALNUT AVE WIRE SLEEVE .. .. 1• a CRU 2" WIRE SLEEVE "r1 WIRE SLEEVE' w w LL w -■-■-■-■-■-■_■-■_■_■�■.�■�:._s_■ ' LEGENDS AND NOTES: IRRIGATION SCHEDULE SYMBOL MANUFACTURER/MODEUDESCRIPTION PSI RADIUS 115 Rain Bird RWS-B-C, Root Watering System 1402 0.5 gpm 30 1' SYMBOL MANUFACTURER/MODEUDESCRIPTION PSI RADIUS ARC 25 Rain Bird 5006 -SAM -R -NP -SS -MPR Turf Rotor, 6.0" Pop -Up, Stainless Steel Riser, Matched Precipitation Rotor (MPR nozzle). Arc and Radius as per Symbol. With Seal -A -Matic Check Valve, and Non -Potable Purple Cover. Pressure Regulating. 45 25' e.ARC 30 Rain Bird 5006 -SAM -R -NP -SS -MPR Turf Rotor, 6.0" Pop -Up, Stainless Steel Riser, Matched Precipitation Rotor (MPR nozzle). Arc and Radius as per Symbol. With Seal -A -Matic Check Valve, and Non -Potable Purple Cover. Pressure Regulating. 45 30' dRC Rain Bird 5006 -SAM -R -NP -SS -MPR Turf Rotor, 6.0" Pop -Up, Stainless Steel Riser, Matched Precipitation Rotor (MPR nozzle). Arc and Radius as per Symbol. With Seal -A -Matic Check Valve, and Non -Potable Purple Cover. Pressure Regulating. 45 35' SYMBOL MANUFACTURER/MODEUDESCRIPTION V Rain Bird MDCFPCAP Dripline Flush Valve purple cap in compression fitting coupler. For non -potable water use. Rain Bird ARV075 3/4" Air Relief Valve, made of quality rust -proof materials, with a 6.0" drip valve box (SEB 7XB emitter box). Use with installation below soil. The valve will allow air to escape the pipeline, thus preventing water hammer or blockage. Area to Receive Dripline Rain Bird XFS-P-09-18 (18) XFS Sub -Surface Pressure Compensating Landscape Dripline w/Copper Shield Technology. 0.9GPH emitters at 18.0" O.C. Dripline laterals spaced at 18.0" apart, with emitters offset for triangular pattern. Purple Tubing for Non -Potable Water. SYMBOL MANUFACTURER/MODEUDESCRIPTION ® Rain Bird PESBR-PRS-D 1" Durable Chlorine -Resistant Valves for Reclaimed Water Applications. With Scrubber Mechanism Technology, Purple Flow Control Handle, and Pressure Regulator Module. Install with QKCHK-100M Quick Check Basket Filter and Ball Valve. Install in Purple Valve Box. ® Rain Bird PESBR-PRS-D (2) 1", 1-1/2", and 2" Durable Chlorine -Resistant Valves for Reclaimed Water Applications. With Scrubber Mechanism Technology, Purple Flow Control Handle, and Pressure Regulator Module. Install in Purple Valve Box Rain Bird 33 -DNP 3/4" Brass Quick -Coupling Valve, with Corrosion -Resistant Stainless Steel Spring, Locking Thermoplastic Non -Potable Purple Rubber Cover, and 2 -Piece Body. Install in Purple Valve Box. p 1 Ball Valve Watts B -6080 -SS -SH Full Port Brass Ball Valve - Line Size - Install in Purple Valve Box C) Hunter IBV -R 1", 1-1/2", 2", and 3" Brass Electric Master Valve, Globe Configuration, with NPT Threaded Inlet/Outlet, for Commercial/ Municipal Use. With Reclaimed Water ID Purple Tag. Febco 825Y Reduced Pressure Backflow Preventer w/ Recycled Water Tag 7) `� Controller Assembly Toro Sentinel Model # SB12-U2-PS3-S3-VRA Assembly by Turfstar Contact: Doug Dahl (760) 597-6045 X FS Flow Sensor 1" Data Industrial Flow Sensor Badger 735 Series 1" Wire Bundle (as indicated for future use) Purple Round Pull Box for wiring, contractor to install 2 spare wires and 1 common wire in a pull box at all ends of the mainline as shown on plan. Coil wires in valve box, and run continuous wire back to controller. Label each wire with a plastic I.D. tag at the wire bundle and at the controller. CW Water Meter 1" With 1-1/2" Service Line - Install per Civil Plans X Irrigation Lateral Line: PVC Schedule 40 Purple PVC Schedule 40 irrigation pipe. Only lateral transition pipe sizes 1" and above are indicated on the plan, with all others being 3/4" in size. Irrigation Mainline: PVC Class 315 SDR 13.5 Purple Pipe Sleeve: PVC Schedule 40 SITE MAP THIS SHEET WALNUT AVENUE i E, q `,11■ •■V■`I■lam• =�=N iemilNan CADENCE LANE 11.1. �l �]� �'., I it_ 11i. ri !II IIIIIIpa r rill Ell III IMI II � 0.m. 1 .e4e N FIRTI 1 - or -min 'II! 11���-`�� v Eli tni W BRUNO LANE ....--..--44, ��'�Il II��� ��. 1 Q ll s ... LI• SONNET LANE di. . 1 JUNIPER AVE I\ NORTH DATE SUBMITTAL TRACKER 06-02-2014 1ST SUBMITTAL TWO WORKING DAYS BEFORE YOU DIG A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION DATE ENGR. aTY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT NORTH FRONTIER COMMUNITIES TR 18657 - CFD LANDSCAPE PLANS DRAWN BY: JB, SF DESIGNED BY: SK IRRIGATION PLAN SCALE: 1"=10' DATE 06-02-14 CHECKED BY: SK BM ENGINEE DATA " tY DRAWING NO.: Si‘L} 9 21