Loading...
HomeMy WebLinkAbout5164-1c FOR TRACT 18657 FONTANA, CALIFORNIA FRONTIER COMMUNITIES - 8300 UTICA AVE. SUITE 300 RANCHO CUCAMONGA, CA PHONE: (909) 354-8014 CONTACT: JUSTIN FRANK INTERSTATE 210 HIGHLAND AVE CITRUS AVE WALNUT ST BASELINE AVE VICINITY MAP N.T.S. PROJECT SITE SHEET 2 SHEET 9 SHEET 17 WALNUT AVENUE re IV BRUNO LANE LOCATION MAP N.T.S. w w z SHEET 3 SHEET 10 SHEET 18 SHEET 4 SHEET 11 SHEET 19 SHEET 5 SHEET 12 SHEET 20 SHEET INDEX SHEET TITLE 1 TITLE SHEET 2 HARDSCAPE PLAN 3 HARDSCAPE PLAN 4 HARDSCAPE PLAN 5 HARDSCAPE PLAN 6 HARDSCAPE DETAILS 7 HARDSCAPE SPECIFICATIONS 8 IRRIGATION MASTER PLAN 9 IRRIGATION PLAN 10 IRRIGATION PLAN 11 IRRIGATION PLAN 12 IRRIGATION PLAN 13 IRRIGATION DETAILS 14 IRRIGATION DETAILS 15 IRRIGATION DETAILS 16 IRRIGATION SPECIFICATIONS 17 PLANTING PLAN 18 PLANTING PLAN 19 PLANTING PLAN 20 PLANTING PLAN 21 PLANTING SPECIFICATIONS SOIL MANAGEMENT PLAN TOTAL LANDSCAPE AREA Upon the completion of the rough grading the landscape contractor shall submit a soils sample to a Laboratory to perform soils tests for agricultural suitability. All results shall be submitted to the Owner & Landscape Architect. Soil amendment specifications shall be modified to reflect the recommendation set forth in the soils report. The soils management report shall be submitted to the City as a part of the certificate of completion prior to the certificate of occupancy. The soils management report shall be made available to the City landscape inspector or inspector designated by the City Engineer. The Landscape Maintenance Contractor shall shall submit a soils sample to a Laboratory to perform soils tests for agricultural suitability once a year and follow all recommendations for fertilization and amendments. LOW = 29,166 SF MEDIUM = 9,666 SF TOTAL = 38,832 SF WATER TYPE: POTABLE STATIC PRESSURE: 70 PSI NOTE: SEE SHEET 13 FOR HYDROZONE TABLE IRRIGATION CONSTRUCTION NOTES: 1. The contractor shall notify the Landscape Architect and the City Inspectors a minimum of 48 hours prior to starting construction. 2. The design is diagrammatic only. All piping, valves, backflow preventors, wiring, etc. shown within paved areas are for design clarification only, and shall be installed in planter areas where ever possible. 3. Do not willfully install the irrigation system as shown on these drawings when it is obvious in the field that obstructions, grade differences or differences in area dimensions exist that might not have been considered in the engineering. Such obstructions or differences shall be brought to the attention of the City's authorized representative. In the event this notification is not performed in writing, the contractor shall assume full responsibility for any revisions necessary. 4. It is the responsibility of the contractor to familiarize themselves with all grade differences, locations of fixtures, utilities, signs, posts, poles, walls and paving. The contractor shall repair or replace all items damaged by their work. They shall coordinate their work with other contractors (if any) for the location and installation of pipe sleeves and laterals through walls, under roadways and under paving, etc. 5. All irrigation equipment shall be installed as per manufacturer's recommendations and specifications. Refer to specifications for additional information. 6. All lateral, mainline piping and control wires under paving shall be installed in separate sleeves. Mainline sleeve size shall be a minimum of twice (2x) the outside diameter of the pipe to be sleeved. Control wire sleeves shall be of sufficient size for the required number of wires under paving. Refer to plan. 7. All sleeves under roadways shall be schedule 80 (new). Existing sleeves shall remain in place, if extensions are required the pipe shall be sch. 80. Lateral line sleeves under paving shall be schedule 40. All sleeves shall be P.V.C. or as noted on plans. 8. Pipe sizes shall conform to those shown on on the plans and details. No substitutions of smaller pipe sizes shall be permitted, but substitutions of larger sizes may be approved. All damaged and rejected pipe shall be removed from the site at the time of said rejection. 9. The contractor shall make the final connection from the electrical source to the controller. 10. The contractor shall flush and adjust all valves for optimum coverage. 11. The irrigation system shall be fully automatic. Control valves shall be installed per details. HOLD HARMLESS & INDEMNIFICATION CLAUSE Contractor agrees that they shall assume sole responsibility for job site conditions during the course of construction of this project , including safety of all persons and property, that this requirement shall apply continuously and not be limited to normal working hours, and hold the county and the landscape architect harmless from any and all liability real or alleged, in connection with the performance of work on this project, excepting for liability arising from the sole negligence of the owner, or the landscape architect. LANDSCAPE CONSTRUCTION NOTES: 1. The design shown is diagrammatic, the contractor shall review the site conditions prior to bidding. 2. The contractor shall provide for positive drainage away from all structures at a 1% minimum for hardscape areas and a 2% minimum for landscaped areas unless otherwise directed by the civil engineering plans. 3. The contractor must notify the Landscape Architect, (951) 737-1124, 48 hours prior to starting construction. 4. The contractor shall be responsible for obtaining building permits prior to commencing construction. 5. The contractor shall notify the architect if discrepancies exist between existing site conditions and plans. 6. All construction shall meet or exceed local controlling jurisdiction. 7. The contractor shall take great care to protect existing site amenities during the process of construction. Items not specifically identified for protection shall be protected in place. 8. All landscape areas other than turf shall receive a minimum of 3" medium grind bark mulch. 9. The contractor shall be responsible for the removal of all rocks great than 1" in diameter from the top 12" of soil in all landscape areas. DATE 06-02-2014 SUBMITTAL TRACKER 1ST SUBMITTAL G RT TWO W❑RKING DAYS BEFORE YOU DIG DIAL BEFORE YOU DI//) TOLL FREE 811 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT MAINTENANCE SCHEDULE MAINTENANCE ITEM BI -MONTHLY MONTHLY QUARTERLY ANNUALLY 2-3 YEARS 5 YEARS AS -NEEDED DEADHEAD FLOWERING SHRUBS X PRUNE SHRUBS X SHEAR GROUNDCOVER X TRIM GRASSES TO BASE X DIVIDE CLUMPING PLANTS X REMOVE PUPS X REMOVE DEAD/DAMANGED LEAVES X TRIM TREES X X INSPECT IRRIGATION SYSTEM X REPAIR IRRIGATION SYSTEM X ADJUST IRRIGATION SCHEDULE X REPLACE BARK MULCH X FERTILIZE X REMOVE WEEDS X REPLACE DISEASED/DEAD PLANTS X REMOVE TRASH FROM PLANTERS X X PERFORM LANDSCAPE IRRIGATION AUDIT X NOTE: 1. REPAIR ALL IRRIGATION EQUIPMENT WITH ORIGINALLY INSTALLED COMPONENTS. 2. LANDSCAPE IRRIGATION AUDITS SHALL BE CONDUCTED BY CERTIFIED LANDSCAPE IRRIGATION AUDITORS AND BE IN ACCORDANCE WITH THE STATE OF CALIFORNIA LANDSCAPE WATER MANAGEMENT PROGRAM AS DESCRIBED IN THE LANDSCAPE IRRIGATION AUDITOR HANDBOOK REV. REVISION DESCRIPTION DATE ENGR. aTY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT ORDINANCE 1625, SEC. 28-98 "I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE." BAXTER MILLER / LANDSCAPE ARCHITECT: LANDSCAPE ORDINANCE AND SUBMIT DATE: 7/2/14 CITY REQUIRED NOTES: INSPECTIONS: 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6632. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: - PRE -CONSTRUCTION INSPECTION. - INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR CONTINUOUS PERIOD. - IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. - FINISH GRADE PRIOR TO PLANTING - PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION - PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. - COMPLIANCE WITH APPROVED PLANS - FINAL INSPECTION 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT NO UNDERGROUND UTILITIES CONFLICT WITH THE PLAYGROUND EQUIPMENT FOOTINGS LEGAL DESCRIPTION ALL OF LOTS 90, 91, 102, 103, 106, 107, 118 AND THE PORTION OF LOTS 86, 105, 119, 122 AND 123 THAT ARE LAYING NORTH OF THE SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY RIGHT OF WAY, OF THE ETIWANDA VINEYARDS TRACT, AS RECORDED IN BOOK 17 OF MAPS, PAGES 29-30, OFFICIAL RECORDS OF SAID COUNTY. SECTION 1, TOWNSHIP 1 SOUTH, RANGE 6 WEST OF THE SAN BERNARDINO BASE AND MERIDIAN, IN THE CITY OF FONTANA, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA. bmla L ANDSCAPE ARCHITECTURE FRONTIER COMMUNITIES TR 18657 - CFD LANDSCAPE PLANS DRAWN BY: JB, SF DESIGNED BY: SK 310 NORTH JOY STREET 1 CORONA, CA 92879 CHECKED BY: T: 951.737.1124 1 F: 951.737.6551 SK BM TITLE SHEET 2? � IL/D iE: SCALE N.T.S. DATE 06-02-14 DRAWING NO.: 51 G R C E 51152 /21