Loading...
HomeMy WebLinkAbout5077-1TRAFFIC SIGNAL CONSTRUCTION NOTES AND OUANii11ES 0 4 6 v 8 INSTALL CITY FURNISHED TYPE 90 CONTROLLER EQUIPMENT PACKAGE INCLUDING TYPE "R" CABINET, RVP2 VIDEO DETEC11ON SYSTEM, AND APPURTENANT EQUIPMENT. CONTROLLER CABINET AND FOUNDATION SHALL BE INSTALLED PER CITY STANDARD DRAWING 4001. CONTRACTOR SHALL FURNISH AND INSTALL ANY ADDITIONAL ELECT- RONIC EQUIPMENT REQUIRED TO PROVIDE THE SIGNAL OPERATION AS SHOWN ON THE PLAN. INSTALL TYPE IH -BF SERVICE EQUIPMENT ENCLOSURE PER CITY OF FONTANA AND SOUTHERN CALIFORNIA EDISON COMPANY REQUIREMENTS. INSTALL UNI -DIRECTIONAL, SINGLE CHANNEL OPTICOM DETECTOR, (MODEL 711 OR EQUAL), PER DETAIL THIS SHEET AND AS DIRECTED BY THE ENGINEER. INSTALL CITY FURNISHED IMAGE SENSOR UNIT PER CITY STANDARD DRAWING 4004 AND AS DIRECTED BY THE ENGINEER. INSTALL SIGN AND HARDWARE PER CALTRANS DETAIL "U", ES -7N. INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE REQUIREMENTS. COORDINATE SERVICE WITH SCE (PAUL LARSON AT 909-357-6240 AND SCOTT FIELI#ER AT 909-357-6121). VERIFY PHONE NUMBERS AT 11ME OF CONSTRUCTION. CONSTRUCT 4" THICK PCC PAD ON COMPACTED NATIVE AROUND PROPOSED SIGNAL CONTROLLER AND SERVICE CABINETS. FURNISH AND INSTALL SIGN ON SIGNAL POLE AS SHOWN. MOUNTING SHALL BE PER CALTRANS STD. PLANS RS4. TRAFFIC SIGNAL GENERAL NOTES 1. TRAFFlC SIGNAL, SIGNING AND STRIPING, AND UGHTING SHALL CONFORM TO THESE PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, AND THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 (DATED 2010) AND STANDARD PLANS (DATED 2010), THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, 2012 EDITION. 2. LOCATION OF ALL UNDERGROUND FACILJTIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING DAYS BEFORE DIGGING. 3. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID METAL UNLESS OTHERWISE SHOWN. 4. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING WITH SOUTHERN CAUFORNIA EDISON COMPANY FOUR WEEKS IN ADVANCE OF NEED. 5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET. 6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK. 7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. MODIFY SPRINKLERS SYSTEMS IF NECESSARY. g, THE ALIGNMENT OF INTERCONNECT DUCTS SHALL BE AS STRAIGHT AS POSSIBLE. HOWEVER, WHEN CHANGES IN ALIGNMENT ARE NECESSARY, SWEEPS SHALL HAVE MINIMUM RADIUS OF 10 FEET. 10. ALL VEHICLE INDICATIONS SHALL BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES & UTIUZE PEDESTRIAN COUNTDOWN TIMERS PER SPECIAL PROVISIONS. 11. ANY EXISTING TRAFFIC SIGNALS AND UGHTING SHALL REMAIN IN OPERATION UNTIL REPLACED WITH NEW CONSTRUCTION. 12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT AS NOTED CITY FURNISHED OR USTED AS CITY PROVIDED IN THE SPECIAL PROVISIONS. 13. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS FOR THIS PROJECT. 14. WHERE TRAFFIC SIGNAL STREET CROSSING CONDUIT ARE NOT INSTALLED USING THE BORING METHOD, TRENCH REPAIRS SHALL BE PER CITY STANDARD, AND SPECIAL PROVISIONS, SECTION E. 15. TRAFFIC SIGN SIZE SHALL BE FOR CONVENTIONAL ROADWAYS UNLESS OTHERWISE SHOWN ON THE PLANS. SIGN LEGEND: R9 -3a USE 1==> CROSSWALK R9-3b(RT) R3-4 4= USE CROSSWALK R9-3b(LT) 1 EA 1 EA 4EA 4EA 1 EA 1 EA 2 EA 4 EA CITY OF FONTANA TRAFFIC SIGNAL, SLOVER AVENUE PROJECT NO SIGNING AND STRIPING FOR AND BEECH AVENUE . SQ -23 -DE -07-38 V//2 PROJECT SITE LEGEND: <El- PROPOSED SIGNAL EQUIPMENT 6' X 50' VIDEO DETECTION ZONE 6' X 20' VIDEO DETECTION ZONE 6' X 6' VIDEO DETEC11ON ZONE VICINflY MAP NOT TO SCALE INDEX OF SHEETS SHEET 1 SHEET 2 SHEET 3 - TITLE SHEET - TRAFFIC SIGNAL PLAN - SIGNING AND STRIPING PLAN SIGNING AND STRIPING CONSTRUCTION NOTES AND QUANTITIES (j)APPLY 4" DOUBLE YELLOW CENTERLINE PER CALTRANS STD. PLAN A20A, DETAIL. 22 10 15 O2 APPLY WHITE THERMOPLASTIC TYPE IV ARROW PER CALTRANS STD. PLAN A24A. 15 SF @ APPLY WHITE THERMOPLASTIC 12" CHEVRON STRIPES CO 30' C -C SPACING. 225 LF 520 LF 375 LF (7,47 APPLY WHITE THERMOPLASTIC 12" SOUD CROSSWAU< AND/OR UMIT UNE PER PER CALTRANS STD. PLAN A24E. @ APPLY 4" WHITE LANE LINE PER CALTRANS STD. PLAN A20B, DETAIL. 27C 6O REMOVE CONFLICTING STRIPING/ MARKING BY SANDBLASTING. 7O REMOVE AND SALVAGE EXISTING SIGN AND POST TO THE CITY YARD IN A REUSABLE CONDITION. 0 INSTALL NEW ROADSIDE SIGN ON POST PER CITY STD. DWG. 4003 650 LF 480 SF 8 EA 2 EA 9O INSTALL NEW ROADSIDE SIGN ON STREET LIGHT POLE 1 EA SIGNING AND STRIPING GENERAL NOTES 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBUC RIGHT-OF-WAY WITH IN THE CITY LIMITS. CALL (909) 350-7610. 2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CAUFORNIA, DATED 2010, AND THE CALIFORNIA MANUAL OF UNIFORM TRAFFlC CONTROL DEVICES, DATED 2012. 3. IT SHALL BE THE RESPONSIBIUTY OF THE CONTRACTOR TO MAINTAIN TEMPORARY TRAFFlC CONTROL AT ALL TIMES. 4. ALL SIGNS SHALL BE INSTALLED PER CITY STANDARD DETAIL 4003, UNLESS OTHERWISE SHOWN ON THE PLANS. 5. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC UNLESS OTHERWISE NOTED. 6. SUBSTITUTE TYPE "C" RAISED PAVEMENT MARKERS FOR TYPE "G" MARKERS ON DETAIL 38 STRIPING ON ROADWAYS WITH RAISED MEDIANS. 7. STRIPING AND PAVEMENT MARKINGS TO BE REMOVED SHALL BE REMOVED BY SANDBLASTING. 8. CONTROL POINTS OR "CAT TRACKING" SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO APPUCATION OF PAVEMENT STRIPING AND LEGENDS. NOTIFY THE CITY AT LEAST TWO DAYS PRIOR FOR APPROVAL OF "CAT TRACKING." 9. BLUE RAISED PAVEMENT MARKERS SHALL BE INSTALLED AT ALL FIRE HYDRANT LOCATIONS PER CITY STANDARD PLANS. 10. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. LEGEND: REMOVE EXISTING PROPOSED S' TYPE IV (L or R) PAVEMENT ARROW I) I' ROADSIDE SIGN TRAFFIC STRIPE OR MARKING SIGN LEGEND: RIGHT LANE MUST TURN RIGHT R3-7 (RT) W3-3 AUTOCAD FILENAME: M~AAWMWAWA Vi4(7U Y, DIAL BEFORE YOU DIG TOLL FREE � I 1/)TWO WORKING DAYS BEFORE YOU DIG 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION DATE ENCR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. KOA CORPORATION PLANNING & ENGINEERING 3190 C. Shelby Street Ontario, Califomia 91764 Tel: (909) 890-9693 Fax: (909) 890-9694 BENCH MARK: B.M. NO. 346 ELEVATION=1040.78' DESCRIPTION: THE BENCHMARK FOR THIS SURVEY IS CITY OF FONTANA BENCHMARK 346 BEING A RAIL ROAD SPIKE SET IN POLE FOR STANDARD #740088E, 30FT WEST OF CENTERLINE BEECH AVE AND 660.1 FT SOUTH OF CENTERLINE SLOVER AVE. Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA TITLE SHEET DRAWN BY: DESIGNED BY: SLOVER AVENUE AND BEEn-AVENUE CHECKED BY: MING GUAN. R.C.E. 75793 Nt C EN DATE: R R.C.E. 51152 SCALE: As Noted DATE: DRAWING NO.: 5077 SAN BERNARDINO AVE Lu Q CC ~ \-\P F() = La m VALLEY BLVD 10 OLEANDER AVE CYPRESS AVE 10 SLOVER AVE j/i�7 � CHERRY AVE 0-1 HEMLOCK AVE BEECH AVE JURUPA AVE POPLAR AVE Z --1 Z P1 V//2 PROJECT SITE LEGEND: <El- PROPOSED SIGNAL EQUIPMENT 6' X 50' VIDEO DETECTION ZONE 6' X 20' VIDEO DETECTION ZONE 6' X 6' VIDEO DETEC11ON ZONE VICINflY MAP NOT TO SCALE INDEX OF SHEETS SHEET 1 SHEET 2 SHEET 3 - TITLE SHEET - TRAFFIC SIGNAL PLAN - SIGNING AND STRIPING PLAN SIGNING AND STRIPING CONSTRUCTION NOTES AND QUANTITIES (j)APPLY 4" DOUBLE YELLOW CENTERLINE PER CALTRANS STD. PLAN A20A, DETAIL. 22 10 15 O2 APPLY WHITE THERMOPLASTIC TYPE IV ARROW PER CALTRANS STD. PLAN A24A. 15 SF @ APPLY WHITE THERMOPLASTIC 12" CHEVRON STRIPES CO 30' C -C SPACING. 225 LF 520 LF 375 LF (7,47 APPLY WHITE THERMOPLASTIC 12" SOUD CROSSWAU< AND/OR UMIT UNE PER PER CALTRANS STD. PLAN A24E. @ APPLY 4" WHITE LANE LINE PER CALTRANS STD. PLAN A20B, DETAIL. 27C 6O REMOVE CONFLICTING STRIPING/ MARKING BY SANDBLASTING. 7O REMOVE AND SALVAGE EXISTING SIGN AND POST TO THE CITY YARD IN A REUSABLE CONDITION. 0 INSTALL NEW ROADSIDE SIGN ON POST PER CITY STD. DWG. 4003 650 LF 480 SF 8 EA 2 EA 9O INSTALL NEW ROADSIDE SIGN ON STREET LIGHT POLE 1 EA SIGNING AND STRIPING GENERAL NOTES 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBUC RIGHT-OF-WAY WITH IN THE CITY LIMITS. CALL (909) 350-7610. 2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CAUFORNIA, DATED 2010, AND THE CALIFORNIA MANUAL OF UNIFORM TRAFFlC CONTROL DEVICES, DATED 2012. 3. IT SHALL BE THE RESPONSIBIUTY OF THE CONTRACTOR TO MAINTAIN TEMPORARY TRAFFlC CONTROL AT ALL TIMES. 4. ALL SIGNS SHALL BE INSTALLED PER CITY STANDARD DETAIL 4003, UNLESS OTHERWISE SHOWN ON THE PLANS. 5. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC UNLESS OTHERWISE NOTED. 6. SUBSTITUTE TYPE "C" RAISED PAVEMENT MARKERS FOR TYPE "G" MARKERS ON DETAIL 38 STRIPING ON ROADWAYS WITH RAISED MEDIANS. 7. STRIPING AND PAVEMENT MARKINGS TO BE REMOVED SHALL BE REMOVED BY SANDBLASTING. 8. CONTROL POINTS OR "CAT TRACKING" SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO APPUCATION OF PAVEMENT STRIPING AND LEGENDS. NOTIFY THE CITY AT LEAST TWO DAYS PRIOR FOR APPROVAL OF "CAT TRACKING." 9. BLUE RAISED PAVEMENT MARKERS SHALL BE INSTALLED AT ALL FIRE HYDRANT LOCATIONS PER CITY STANDARD PLANS. 10. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. LEGEND: REMOVE EXISTING PROPOSED S' TYPE IV (L or R) PAVEMENT ARROW I) I' ROADSIDE SIGN TRAFFIC STRIPE OR MARKING SIGN LEGEND: RIGHT LANE MUST TURN RIGHT R3-7 (RT) W3-3 AUTOCAD FILENAME: M~AAWMWAWA Vi4(7U Y, DIAL BEFORE YOU DIG TOLL FREE � I 1/)TWO WORKING DAYS BEFORE YOU DIG 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION DATE ENCR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. KOA CORPORATION PLANNING & ENGINEERING 3190 C. Shelby Street Ontario, Califomia 91764 Tel: (909) 890-9693 Fax: (909) 890-9694 BENCH MARK: B.M. NO. 346 ELEVATION=1040.78' DESCRIPTION: THE BENCHMARK FOR THIS SURVEY IS CITY OF FONTANA BENCHMARK 346 BEING A RAIL ROAD SPIKE SET IN POLE FOR STANDARD #740088E, 30FT WEST OF CENTERLINE BEECH AVE AND 660.1 FT SOUTH OF CENTERLINE SLOVER AVE. Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA TITLE SHEET DRAWN BY: DESIGNED BY: SLOVER AVENUE AND BEEn-AVENUE CHECKED BY: MING GUAN. R.C.E. 75793 Nt C EN DATE: R R.C.E. 51152 SCALE: As Noted DATE: DRAWING NO.: 5077