Loading...
HomeMy WebLinkAbout5075-7NOTE: INSTALL BACKFLOW AND HEALTH DEPT. VERIFY REDUCED PRESSURE BACKFLOW PREVENTER BALL VALVE (2) TOTAL BRASS "Y" STRAINER W/ 60 MESH MONEL SCREEN 8 BRASS PLUG . • f PREVENTER AS REO. BY LOCAL CODES LOCAL REQS. PROR TO INSTALLATION. APPROVED GUARDSHACK ENCLOSURE (GREEN) oo • a •• ilii BRASS NIPPLES BRASS (4" MIN. LENGTH) ( VERIFY W/ LOCAL ( CODES BRASS 90 ELL (TYP.) ( ( BRASS UNION (TYP.) 4" THICK CONCRETE PAD • • 12"X12"X12" CONCRETE . . • FG FROM P.O.C. THRUST BLOCK PVC MAINLINE USE TEFLON TAPE OR TEFLON PIPE DOPE ON ALL PVC TO PVC OR METAL TO PVC MALE PIPE THREADS McKie! # r•4PS-A16-1€3K EXACT COi-t R SHALL sz. ;P£0 uno CY Ei SSR, LFt oancloft 'k'Fns CO R'A"'{L' i R TO ANY 3 sJtC,!!t!iG tom' kaeE ft..X:15) V calorGATIOT: cONT/{ I.. WARD =NON. PRO4OE eccve METER MD St1/2r s c/a x •CP..X7_ RRo.i E P,wasa,RC » ofOKXTER.1 c1tr s TICA:. p oWIE I.tiRKiwl)M CCNhR7114w CAVINET irKRE I :4 'E3 I1�� mow:on gensroi R . a s c £. 0..1.t w y rec.,. VtRrr egfirf 1.0CM104 Asap TEXasAl1044 Rc3, kf =i' s.'. €, co. PACO TO IACKINV CONDOR Arm rOt!NCro1 VIM Me Mr!) ON TA o CCPFCR C0 D CTORI "r.IH$, ' it1:5,3LATIO44, Ural taCES SONG SOX MODEL NO. SS- 24SS/12CW SWEEP 'CCKG;1T FOR Ckl(fliCitEft WIAES ENO VIEW NOTE: ALL POWER RES r..R0&u-D vvflRES ETC, 57 aLL 6E SEPARATE.Y V.UVED AND strut T RoEGH Et CLOsm P#. Wnli SCH 40 RS D CONDUIT ALL SIEVING SHS. et: A MINI MUM cr Is. BELOW FINf:ar4 CRAM. A L L SLr � {G A CRAPkOC PEEPRE$ENTAHON or A WP. INSTALLATION. rSIZE 4F C0 C. SERB r T €+CE 1/ 4 swops Al 12- 4. TYP 4' J.�. PROME 20 !BJP 2 POLE eREAkER roR NEW 1 PS veirRE ,LE tAAVE t3' O. x t2 C. 41 OTTOWLESS CROWD *PM WETH PARIMAN CORP, EIEC WIT?! PEA GRAVEL Gia FOR EXCTRICAL 11 524 ! Z0/240 a .ter 12 cfr } PANEL 3/4'C. 114 POIVVR �- S/ SIXA X 10. ORMA GROUND ROO PC1 s,RTC5 25 -3' OE 1/90 H C RU T£ilFtout r .. COCONMTE MOLIKUNG SLAB wawa FOR K 2EXTRA r City of Fontana Ir igat on Controller Standard For Communities Facilities Districts Toro Sentinel control er installed in an approved stainless stee[ Edison meter box enclosure. Contact Aqua Flow with the following numbers for the City of Fontana meter/controller. Fontana pan # for a 36 station controller ESB3 U2-.MPEA'1661 OK -OB 1 -VRA Fontana part # for a 48 station controller E B4$-I-)2-MPEA161 OK -OB 1 -VRA Available through AQUA FLO Primary Contact: Corey Raden (craden@aquaflo.com Phone (661) 257-0909 Fax (661) 257-9500 Secondary Contacts: Renee Erlenbach (rerlenbach@aquaflo.com) Greg Fay (gfay@aquaflo.com) Sharon Fay Allen President - Aqua -Flo Supply (805) 967-1938 APPROVED VALVE BOX SIZE AS REQUIRED BRASS OR COPPER NIPPLE & UNION PVC MALE ADAPTER TYP. 2 (TWO) PLACES FINISH GRADE MASTER VALVE VALVE APPROVED WATERPROOF CONNECTORS EXPANSION LOOP 1' IN TURF AREAS 2" IN SHRUB AREAS 12' MAX. -t • a qo •p,.o.t . ddp.. - BRICK. ONE AT EACH CORNER OF VALVE BOX PRESSURE MAIN UNE ANGLE TO SPECIFIED DEPTH WITH 45 -DEGREE ELBOWS, SIZE PER DRAWINGS. PEA GRAVEL (MIN. 3 CU. FT.) CONTROL AND COMMON WIRES. TAPE WIRES TO MAIN UNE NOTES: 1. PLACE PEA GRAVEL PRIOR TO INSTALLATION OF VALVE BOX. 2. PLACE BOXES AT RIGHT ANGLES TO HARDSCAPE OR STRUCTURES. 3. PIPE UPSTREAM OF VALVE ASSEMBLY IS EQUAL IN DIAMETER TO DOWNSTREAM PIPING OF VALVE ASSEMBLY. IF NECESSARY. ADD REDUCE -BUSHING TO BRING PIPING DIAMETER TO VALVE SIZE 4. MASTER VALVES 4" AND LARGER TO BE PROVIDED WITH FLANGED CONNECTIONS IN UEU OF UNIONS. REDUCED PRESSURE B.F. AUTOMATIC CONTROLLER MASTER VALVE NOTE: PLACE PEA GRAVEL PRIOR TO INSTALLATION OF VALVE BOX APPROVED VALVE BOX 1/2" STAINLESS STEEL HOSE CLAMP. 3 REQUIRED FINISH GRADE QUICK COUPLING VALVE. TOP OF VALVE SHALL BE 2" BELOW VALVE BOX COVER 1" IN TURF AREAS 2" IN SHRUB AREAS 1 PEA GRAVEL. 2 CUBIC FEET MIN. .02 Qo �avoi �.0 BRASS 90 DEGREE ELL PRESSURE SUPPLY LINE BRASS 90 DEGREE STREET ELL 14 REBAR STAKE 36" LONG tt/ i 1 `■ II U'II \\ ■ III •! II=11.1 LFIII • BRASS OR COPPER • NIPPLE LENGTH AS REQUIRED ••°.° •� BRICK SUPPORTS (THREE REQUIRED) ��lll I lnps► PRESSURE UNE FITTING BRASS 90 DEGREE STREET ELL BRASS OR COPPER NIPPLE LENGTH AS REQUI RED APPROVED VALVE BOX FINISH GRADE 12" MAX. GTE VALVE 1 11 BRASS OR COPPER NIPPLE do UNION PRESSURE MAIN UNE ANGLE TO SPECIFIED DEPTH WITH 45 -DEGREE ELBOWS. SIZE PER DRAWINGS. 1' IN LAWN AREAS 2' PLANTER AREAS lk • s • �. • 4 .°• BRICK SUPPORTS (THREE REQUIRED) PVC MALE ADAPTOR TYP. TWO PLACES PEA GRAVEL (MIN. 2 CU.FT) NOTES: 1. GATE VALVES 2 1/2' AND LARGER SHALL BE AWWA APPROVED AND HAVE A 2" SQUARE OPERATING NUT IN UEU OF BRASS HANDWHEEL AND FLANGE CONNECTIONS IN UEU OF UNIONS. 2. GATE VALVES a" AND LARGER SMALL HAVE TRANSIT ADAPTERS. 3. PLACE PEA GRAVEL PRIOR TO INSTALLATION OF VALVE BOX 4. GATE VALVE SHELL BE INSTALLED IN SHRUB AREAS UNLESS OTHERWISE APPROVED VALVE BOX LABELING NOTE: HEAT BRAND ALL VALVE BOX COVERS IN 2" HIGH LETTERS PER EQUIPMENT LOCATED WITHIN VALVE BOXES. LABEL "GV" FOR ALL GATE VALVES LABEL "QCV" FOR ALL QUICK COUPUNG VALVES LABEL "MV" FOR ALL MASTER VALVES LABEL "VALVE STATION" FOR ALL CONTROLL VALVES PLAN VIEW LABEL "FM" FOR ALL FLOW MASTER VALVES LABEL "FV" FOR ALL FLUSH VALVES LABEL "AR" FOR ALL AIR REUEF VALVES 12" LEGEND - USE CARSON VALVE BOXES. 1. 10" DIAMETER CIRCULAR VALVE BOX. 2. EDGE OF LAWN, WALK, FENCE, CURB, ETC. 3. 14" x 19" RECTANGULAR VALVE BOX. 4. 20" x 30" RECTANGULAR VALVE BOX. NOTES A. CENTER VALVE BOX OVER VALVE TO FACIUTATE SERVICING OF VALVE. B. SET VALVE BOXES 2" MAXIMUM ABOVE GRADE IN MULCH COVER OR GROUNDCOVER/SHRUB AREAS - SET FLUSH WITH FINISH GRADE IN TURF AREAS. C. SET VALVE BOX AND VALVE ASSEMBLY IN GROUND- COVER/SHRUB AREA WHERE POSSIBLE - INSTALL IN TURF ONLY IF THERE IS NO ADJACENT GROUND - COVER. D. SET VALVE BOXES PARALLEL TO ONE ANOTHER AND PERPENDICULAR TO EDGE. E. AVOID HEAVY COMPACTION OF SOIL AROUND VALVE BOXES TO PREVENT THEIR DEFORMATION/COLLAPSE. NOTE: CONTRACTOR TO USE PURPLE LIDS WHEN NON -POTABLE WATER WATER SOURCE IS USED (SEE PLAN) 24" 4 v FINISH GRADE HIGH POP-UP HEAD 4,►' ► I 1 ► ;I► 1 II�I�IIII IIIIiI 1111 STREET OR NON -PERMEABLE PAVING ADJACENT TO STREET LATERAL UNE, SIZE PER DRAWINGS PVC SC. 40 STREET ELBOW L 1 41, r III rla ! 11 12" MIN. PVC SCH. 80 NIPPLE, SIZE AND LENGTH AS REQUIRED TYPICAL TWO PLACES PVC SCH. 40 ELBOW PVC TEE (SXSXT) OR ELBOW PVC SC. 40 STREET ELBOW NOTES: 1. LOCATE HEADS 6" FROM SIDE WALK, CURB ETC. 2. INSTALL HEADS FLUSH WITH TOP OF HARDSCAPE AT INTERSECTIONS AND CORNERS. 3. USE TEFLON TAPE ON ALL MALE THREADED FITTINGS EXCEPT HEAD. 4. WHERE NOTED CPIECK VALVE SHALL BE INSTALLED UNDER HEAD USING SCHEDULE 80 NIPPLE. FINISH GRADE NOTES: 1. BELOW PAVED AREAS A MINIMUM OF 6" LAYER OF CLEAN FILL SAN SHALL BE INSTALLED ABOVE AND BELOW PIPING. 2. PROVIDE MINIMUM COVER OF 24" ON PRESSURE SUPPLY UNES 3' AND LARGER. 3. WHEN USING RECLAIMED WATER . MAINTAIN MINIMUM 10' HORIZONTAL SEPARATION BETWEEN POTABLE AND RECLAIMED PRESSURE LINES. WHERE UNES CROSS, PROVIDE PVC SLEEVE FOR POTABLE UNE MINIMUM 5' EACH SIDE OF RECLAIMED WATER UNE QUICK COUPLING VALVE BALL/GATE VALVE VALVE BOX INSTALLATION HIGH POP-UP HEAD TYPICAL TRENCHING m OD 0 0 0 0 0 Gall Underground Service Alert at least 2 days before you dig Know what's below. CaII before you dig. 4 -INCH GRATE (INCLUDED) BUBBLER: SEE IRRIGATION LEGEND (INCLUDED) ROOT WATERING SYSTEM: FINISH GRADE OPTIONAL PEA GRAVEL OR RWS SAND SOCK (RWS-SOCK) FOR SANDY SOILS 1/2 -INCH PVC SCH 80 NIPPLE (INCLUDED) 1/2 -INCH 90 -DEGREE ELBOW (INCLUDED) 12 -INCH SWING ASSEMBLY (INCLUDED) 1/2 -INCH MALE NPT INLET (INCLUDED) PVC SCH 40 TEE OR EL LATERAL PIPE 4 -INCH BASKET WEAVE CANISTER (INCLUDED) TREE C?) TREE BUBBLER Sierra Crest Park 'A' Fontana, CA Irrigation Schedule and Calculations For Landscapes under AB 1881 guidelines Data Reference Evapotranspiration (Eto) Amounts: Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 2.50 1 2.90 l 4.20 I 5.30 1 5.90 _ 6.60 I 7.20 6.90 5.40 1 4.10 I 2.90 2.50 Total Yearly Eto: 56.40 inches Irrigation System Information: .................................. Station Plant Factor Irr Type sq ft areal ppt Efficiency GPM Run Days" Cycle/Day Al 0.5 Rotator 3,800 0.39 85% 16.00 5 2 A2 0.5 Drip - 18 300 0.435 90% 1 .50 Oct 2 A3 0.8 Rotator 2,37085 0.39 0 /0 12.00 5 2 A4 0.5 D rip - 18"in,90 2 330 0.43 0 /o 11.70 5 2 A5 0.5 Rotator 2,680 0.39 85% 16.00 5 2 A6 0.5 Drip - 18" 600 0.43 90% 3.00 5 2 A7 0.8 Rotator 2,040 _ 0.39 85% 13.00 5 2 A8 0.8 Rotator 4,300 0.39 85% 23.00 5 2 A9 0.5 Rotator 4,440 0.39 85% 24.00 5 2 A10 0.5 Bubbler 3 1.00 90% 1.50 5 2 All 0.8 Drip - 12" 200 0.96 90% 1.40 5 2 Al2 0.8 Rotator _ 2,680 0.39 85% _ 16.00 5 2 A13 0.5 Drip - 18" 1,260 __ 0.43 90% 6.30 5 _ 2 THE MAXIMUM APPLIED WATER ALLOWANCE (MAWA) Calculations Formula per AB 1881: MAWA =(Eto)(0.62){(0.7)(LA)+(0.3)(SLA) Eto: 56.40 27003 MAWA = 780,45429 SLA: 11,390 ESTIMATED TOTAL WATER USE Formula per AB 1881: ETWU hydrozone) = (Eto) (PF)[ (HA) (0.62) / (IE)+SLA] Eto is the evapotransiration rate per year (not month). ................................... .....P F is.......th....e.......p...la.....n....t ...fa....c....t...o....r fo....r p....l...a:.:.:.:.n:.:....ts......:.:.w.....a....t...e....re....d....:.:.:.b...y.::.:...this station(..:hydrozone). HA is area in square feet watered by Non -SLA irriation station (hydrozone ._. ... ................................................................................. . fE is the irtigaiton efficiency of this station (hydrazone). SLA is the Special Landscape Area as defined in AB 1881 Station Eto PF HA IE SubTotal Al 56.40 0.5 3,800 85% 78,164 A2 56.40 0.5 300 90% 5,828 A3 56.40 0.8 2,370 85% 77.999 A4 56.40 0.5 2,330 90% 45.264 A5 56.40 0.5 2,680 85% 55.126 A6 56.40 0.5 600 90% 11.656 A7 56.40 0.8 2,040 85% 67 139 A8 56.40 0.8 4,300 85% 141,518 A9 56.40 0.5 All 56.40 0.8 3 200 VI 85% 90% 91,328 58 6,217 Al2 56.40 0.8 2,680 85% 88,202 1,260 90% 24,478 Fet'nnual EWU using AB1881 Formula: 692,975 gallons Establishment Irrigation Schedule Station Run Days per week Cycles (Start times) L6 of 17 Minutes per Cycle Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Dec Al 5 2 6 7 10 12 13 15 16 16 12 9 7 6 A2 5 2 5 6 8 10 11 13 14 13 10 7 6 A3 5 2 11 13 18 23 26 29 31 30 23 18 13 11 7 11 - 4. 7 18 13 11 Established Irrigation Schedule Station Run Days per week Cycles (Start times) L6 of 17 Minutes per Cycle Jan Feb Mar Apr May June July Aug Sept Oct Dec Al 5 2 6 7 10 12 13 15 16 16 12 9 7 6 A2 5 2 5 6 8 10 11 13 14 13 10 8 6 5 CITY OF FONTANA LANDSCAPE PLANS DRAWN Vs DESIGNED SYs CHECKED Iffs SIERRA CREST - PARK SITE 'A' IRRIGATION DETAILS APPRIPIES scALEJ AS SHOWN DATEs /IA.,/ DWG. NCLs 5075 CITY MINCER R.C.E. S1152 EXP. DATE Y17 SITESCAPES Landscape Architecture and Planning 3190-B2 Airport Loop Drive Costa Mesa. CA 92626 Richard Polhamus. Uconse CA -I2782 (949) 644-9370 (714) 210-3140 FAX NO. REVISION 6-4-14 REVISE TOT LOT EQUIP.. TREWS AND BENCH RODE 0 cc 00 00 c.) p4 'E,;5 1156 N. Mountain Avenue Upland, California 91786 (909) 985-0971 CONTENTS • ci) o z r: E-4 DATE 5-19-14- L6 of 17