HomeMy WebLinkAbout5075-1SIERRA CREST
PARK SITE 'A' (4635 CONDOR AVENUE),
CITY OF FONTANA, CALIFORNIA
LCD SE!!A C!:EST, LLC
1156 ountain Avenue
Upland, C ' lifornia 178
( 0 ) 985-0971
atfa Ag" alga OSS atfa Ags
r -Tr -Tr -r) 715 -Tr IP
au_ Aga ass awe aus aiws aus
3c5 r ir -Tr IP
GENERAL NOTES:
City Required Notes:
Occupancy Note: B (Toilet Rooms) Construction Type: V -N
Code Edition: 2010 UBC/2010CBC
Permits for Restroom, Grading, Walls and other structure taller than 42" shall be provided by
City of Fontana Building & Safety.
Fire Sprinkler Note:
Fire sprinklers are required and shall be reviewed and approved by the San Bernardino County Fire Depannent.
Inspections:
1. It is the landscape Contractor's responsibility to contact the
Engineering Division's Landscape inspector
48 hours Prior to desired inspection of an item at (909)350-6649.
2. Prior to release of utilities or maintenance period commencement
following inspections are required:
- Pre construction meeting
- Inspection of irrigation system in open trench condition (prior to backfill).
- Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
- Irrigation coverage tests including initial and final tests.
- Finish grade prior to planting
- Plant materials prior to planting.
- Planting, including street trees. Contact the Parks Planning and Landscape
- Development section Engineering Division, for species and final locations.
3. The Owner's representative and landscape contractor shall be present at each inspection.
Maintenance Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary
for proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good working
condition. -
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering division Landscape Inspection
Staff. The landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
PARK 'A' SUMMARY
ACRES: 1.03
HARDSCAPE AREA : 11,720
DECOMPOSED GRANITE AREA : 1,110
TURF AREA : 12,803
SHRUB/GROUNDCOVER AREA : 15,550
NEW WALL @ S.C.E. EASEMENT BOUNDARY 150
RESTROOM AREA 165
CANOPY AREA 515
CABANA AREA 576
TRELLIS #1: 176
TRELLIS #2: (2 TOTAL) 222
TRELLIS #3: 240
VALUATION OF RESTROOM STRUCTURE : $70,000
VALUATION OF 24' BBQ GAZEBO STRUCTURE : $25,000
AC
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
LN. FT.
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT.
SQ. FT. (EACH)
SQ. FT.
Call Underground Service Alert
Know whirs below.
Call baton you dig.
at least 2 days
before you dig
VICINITY MAP
PROJECT SITE
N.T.S.
SHEET KEY
PARK. 'A'
N.T.S.
CFD Overall Quantity Breakdown
Landscape =
Sidewalk
Fuel Mod =
Hardscape =
132,408 S.F.
38,630 S.F.
282,940 S.F.
23,685 S.F.
TRACT 18820
it'
1 T E S CA PE
Landscape
Architecture
& Planning
aks
3190-B2 Airport Loop Dr.,
Costa Mesa, CA. 92626
Richard Polhamus, License N 2782
SHEET INDEX
T-1 TITLE SHEET
L-1 CONSTRUCTION PLAN @ 20 SCALE
L-2 CONSTRUCTION DETAILS
L-3 CONSTRUCTION DETAILS
L-4 CONSTRUCTION DETAILS
L-5 IRRIGATION DETAILS & LEGEND
L-6 IRRIGATION DETAILS, CALCULATION & SCHEDULE
L-7 IRRIGATION PLAN @ 20 SCALE
L-8 PLANTING DETAILS
L-9 PLANTING PLAN @ 20 SCALE
L-10 SPECIFICATIONS
L-11 SPECIFICATIONS
S-1 STRUCTURAL DETAILS AND NOTES
E-1 SITE PLAN
E -la PHOTOMETRICS PLAN
E-2 SCHEDULE AND SINGLE LINE DIAGRAM
E-3 ELECTRICAL NOTES AND SPECIFICATIONS
COMPLIANCE STATEMENT
1 AGREE TO COMPLY IMM 111E REGIAREMEN7S OF IME MITER Lni(aM LANDSCAPE
AND SUB*tlT A COMPLETE LANDSCAPEAIION PRC7UOE
7 23
AIPOL.FMMUS L42782 EXP. 10/15 Q47E
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER
1
CITY OF FONTANA
LANDSCAPE PLANS
DRAWN DY.
KSlr+ca DY.
CHECKED DT.
SIERRA CREST - PARK SITE 'N
TITLE SHEET
CITY ENGINEER RCE 51151 EXP. DATE
AS SHOWN
DATE.
DVS
5075
aks aks
s
(949) 6449370
FAX (714) 210-3140
•erks aks
SUBMITTALS
APPROVALS
REVISIONS
A 6-4-14 REVISE TOT LOT
La EQUIPMENT, TRELLIS
& BENCH NODES
A
A
A
A
A
JOB NO.
10-031
DATE
5-19-14
LSPC13-000021