Loading...
HomeMy WebLinkAbout5116-1:\FONTANA\LYTTLE CITY OF FONTANA STREET IMPROVEMENT NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTIONS ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS b OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTORS SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEERS FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE C/TY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM' TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON - METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL" BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTORS SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO 'BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERM/T FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN /-IAVE BEEN DETERMINED, FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-277-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. • 14. STATIONING,, REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADE(S). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. - ' . A 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE C/TY ENGINEER. • 17. REMOVAL AND REPLACEMENT OR EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR., SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO' THAT TIES, TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT .OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESS AT ALL TIMES. A MINIMUM 12 FOOT LAND SHALL BE• MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES., - 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES., 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT, OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION, FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. , 24. CARE SHOULD BE TAKEN TO PREVENT GRADE. DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES "ENTERING OR LEAVING IMPROVEMENTS. 25. THE FINAL LOCATION AND WIDTH, OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM ` TO THE CITY OF FONTANA STANDARD DETAILS. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM /N GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 27. THE SEWER CONTRACTOR SHALL STAMP, AN "S" IN THE FACE- OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. A 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. • 31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE. MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. • 32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33. ALL MANHOLES, CLEAN OUT FRAMES, COVERS : AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE C/TY TRAFFIC ENGINEER. 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. • A 0O 0.5' P* CITY OF FONTANA STREET IMPROVEME T PLAN PARCEL MAP 19491 LYTLE CREEK ROAD AND CURTIS AVENUE 68' 34' 12' 5.5' 22' • 34' 29 2% 22' 14.8' _ 7.2' 2Z •\\\\\ \\\\\ \\ \ \\\ \\\\\\\\\\\\\\\\\\\ \\\\\\\\ (EXISTING IMPROVEMENT) 12' 2Z 0 0.5' PROPOSED IMPROVEMENT STREET CROSS-SECTION CURTIS AVENUE NOT TO SCALE 78' 34' 4' 12' 22' 2% 32' 13.7' 2Z lor 18.3 (EXISTING IMPROVEMENT) 12' r\ 4 1 �.W 5' 0.5', 2Z PROPOSED IMPROVEMENT STREET CROSS-SECTION LYTLE CREEK ROAD NOT TO SCALE UTILITY CONTACTS ELECTRICITY SOUTHERN CALIFORNIA EIDSON COMPANY 300 N. PEPPER AVE. RIALTO CA. 92376 UNDERGROUND: (909) 357-6233 TRANSMISSION: (909) 875-5100 PIPELINES: (909) 657-1233 DISTRIBUTION: (909) 357-6233 GAS SOUTHERN CALIFORNIA GAS CO. 1981 LUGONIA AVENUE REDLANDS, CA. 92374 ATT'N: JOHN OATES EMERGENCIES: (800) 427-2200 ENGINEER'S NOTE: WATER FONTANA WATER COMPANY 8440 NUEVO AVENUE FONTANA, CA. 92335 ATTN: MICHAEL McGRAW (909) 822-2201 FAX (909) 283-5046 GENERAL TELEPHONE COMPANY 1400 E. PHILLIPS RANCH BLVD. ONTARIO, CA. 91766 ATT'N: STEVE HOCK (800) 422 -4133 SEWER CITY OF FONTANA 8353 SIERRA AVENUE FONTANA, CA. 92335 (909) 350-6632 COMCAST CABLEVISION 1205 DUPONT AVENUE ONTARIO, CA. 91761 ATT'N: JACK HAYES (909) 390-4738 THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR ANY OTHER STRUCTURES SHOWN ON THESE DRAWINGS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO OTHER UTILITIES OR STRUCTURES EXCEPT AS SHOWN ON THESE DRAWINGS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, AND THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY, THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 2% 6" PERVIOUS CONCRETE vvvvvvvvv vvvvvvvv v vvvvvvv vvvvvvv SUMMIT AVE. COOPER AVE. n CITRUS AVE. W /� V W 0 SITE HIGHLAND VICINITY MAP N.T.S. 111 1 111 I 111 11 1 1 \V SEW LYTLE CREEK ROAD SEE SHEET F II 1 CURTIS AVENUE SEE SHEET 3 f I 11 NORTH INDEX MAP NOT TO SCALE 2Z giANXCM PARKWAY CURB AND GUTTER PER CITY STD. 1000 000 • 000000 o0o0o000 ," 00000000000 oo000, 0°0000°0000°0000• 0 00000•_ 00000.11 00000000.; o0o„o„o0.', GEOTECH FILTER FABRIC ON SIDES AND BOTTOM OF THE TRENCH .d_ USING PERVIOUS CONCRETE FOR GUTTER SECTION AS SHOWN 2.83' DEEP 3/4" WASHED CRUSHED AGGREGATE OR EQUIVALENT /67 CLEAN STONE 1.5' WIDE PERVIOUS PAVING SECTION PER APPROVED WOMP BMP NOT TO SCALE SECTION OMITS 8+48.78 TO 9+73.28 LYTLE CREEK RD. 10+66.76 TO 13+22.07 CURTIS AVE. CURB RETURN, L=54.83' LEGEND: FL = FLOWLINE ELEVATION TC = TOP OF CURB ELEVATION (X) = EXISTING ELEVATION TP = TOP OF PAVEMENT W = WATER LINE S = SEWER LINE G = GAS LINE FS = FINISHED SURFACE NG = NATURAL GROUND EP = EDGE OF PAVING CF = CURB FACE EP = EDGE OF PAVING = PCC PAVING = PCC SURFACE 0 0 NEW PAVEMENT SECTION CONSTRUCTION NOTES: 5' MIN. c 1 EX. PAVEMENT GRIND 0.10' MIN. AND OVERLAY 0.10' MIN. LAP JOIN DETAIL NOT TO SCALE CONSTRUCT RESIDENTIAL DRIVEWAY PER CITY STD. NO. 1002, W=AS SHOWN ON PLAN CONSTRUCT MODIFIED 8" P.C.C. CURB AND GUTTER PER CITY STD. NO. 1000 (CURB PER CITY STD. 1000, PERVIOUS GUTTER PER DETAIL HEREON) CONSTRUCT 5' WIDE P.C.C. SIDEWALK PER CITY STD. NO. 1006 CONSTRUCT 4.5" A.C. MIN. OVER 12" MIN. OF 95Z COMPACTED NATIVE SUBGRADE SAW -CUT, REMOVE AND DISPOSE EXISTING A.C. PAVING CONSTRUCT PARKWAY DRAIN PER SPPWC STANDARD NO. 151-2, S=1.5' CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. NO. 1003 RELOCATE EXISTING POWER POLE (BY OTHERS) PROTECT EXISTING ELECTRICAL PULL BOX INSTALL STREET LIGHT (PER STREET LIGHT PLAN) ADJUST TO GRADE EXISTING WATER VALVE REMOVE AND DISPOSE EXISTING CHAIN LINK FENCE REMOVE AND DISPOSE EXISTING INLET RISER 4 CONSTRUCT CATCH BASIN PER CITY STD. NO. 3004, W=4' AND LOCAL DEPRESSION PER STD. NO. 3003, CASE C CONSTRUCT 8" ASPHALT CONCRETE DIKE PER CITY STD. NO. 1007 RELOCATE/REPLACE EXISTING STOP SIGN © EXTEND EXISTING 24" RCP STORM DRAIN LATERAL (1400 D), C.B. CONNECTION PER CITY ® CONSTRUCT PERVIOUS PAVING PER DETAIL HEREON PER APPROVED WQMP BMP 09 CONSTRUCT CONCRETE COLLAR FOR 24" RCP PER CITY STD. NO. 3022 ® EXTEND EXISTING STOP BAR • BENCH MARK: CALTRANS BM 18-17 DESCRIPTION: BRASS CAP IN THE CONCRETE BASE OF THE SOUTH LEG OF THE SCE TOWER 343' NORTH OF HIGHLAND AVE., 0.2 MI. WEST OF SAN SEVAINE RD. 2.65 MI WEST OF SIERRA AVE., ELEV. = 1428.609 ESTIMATED QUANTITIES 635 S.F. 405 L.F. 3,175 S.F. 4,660 S.F. 477 S.F. 1 EACH 1 EACH 1 EACH 1 EACH 1 EACH 1 EACH 405 L.F. 1 EACH 1 EACH 73 L.F. 1 EACH STD. NO. 3005 5 L.F. 608 S.F. 1 EACH 22 L.F. BASIS OF BEARINGS IS THE CENTERLINE OF LYTLE CREEK ROAD BEING NO0'09'00 "E PER RS 81/64 MCN 13-064, TPM 13-007 UNDERGROUND SERVICE ALERT CALL•TOLL FREE 1-800 227-2600 TWO WORKING DAYS BEFORE YOU DIG REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. Prepared Under The Supervision Of: HENRY C. POQUIZ HP ENGINEERING, INC. 1465 CRESTVIEW ROAD REDLANDS, CA. 92374 (909) 79 • • 7.7, FAX (909) 799-1508 HENRY C. POQUIZ, CITY OF FONTANA, CALIFORNIA DATE: 12,55/4 . 37037 STREET IMPROVEMENT PLAN DRAWN BY: CADD PARCEL MAP 19491 DESIGNED BY: HCP ----LYT CREEK ROS• ASD CURTIS AVENUE CHECKED BY: ' PP"OVE Ii :Y• .� %/� HCP DATE` • Z3 CITY ENGINEER '.C.E. 51152 SCALE: AS SHOWN DATE: 7/3/14 DRAWING NO. 5116 3