Loading...
HomeMy WebLinkAbout5109 Signal and Lightingx o m w QLL] Jz �C U — I un aw uo >- m o w U w u PROJECT NOTES (THIS SHEET ONLY): ^ v OLC o- -0 F-11 RELOCATE EXISTING TYPE 90 CONTROLLER ASSEMBLY INCLUDING TYPE P CABINET AND APPURTENANT 02 02+03 04 EQUIPMENT° CONTROLLER CABINET AND FOUNDATION TO BE INSTALLED PER CITY STANDARD EQUIPMENT DRAWING b OLB LL] 06 4004° CONNECT SIC TO CONTROLLER PER MANUFACTURER'S REQUIREMENTS° x N F2] RELOCATE EXISTING TYPE III -BF SERVICE EQUIPMENT ENCLOSURE INCLUDING THE FOLLOWING UNLESS OTHERWISE SHOWN. un 120/240 V I PHASE SERVICE WITH 120 V METERED SIGNAL CIRCUIT, 120 V CIRCUIT BREAKER, 30 A 3"C9 1 SIC, 7 , Q w LIGHTING CIRCUIT BREAKER, 30 A LIGHTING CIRCUIT BREAKER, 15 A AUTOSCOPE CIRCUIT BREAKER, 1#8 (G)APPROX , Q z PEC FOR LIGHTING° LOCATE SERVICE ENCLOSURE CABINET A MINIMUM OF 6' FROM THE CONTROLLER 1195' TO O U CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH CABINET° u EB RAMPS z z F-3] RELOCATE EXISTING UNI -DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR AND APPURTENANCES TO o LL NEW SIGNAL MASTARM AS DIRECTED BY THE ENGINEER° SEE MOUNTING DETAIL SHEET E-2° 9 V) 3"C9 1 SIC, 1#8 (G)-' F4] REINSTALL EXISTING AUTO SCOPE CAMERA AND APPURTENANCES ON LUMINAIRE MAST ARM AS DIRECTED z LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAILS, SHEET E-2° o w BY THE ENGINEER° SEE MOUNTING DETAIL SHEET E-2° � o w 5 INSTALL R73-6(CA) SIGN ON MAST ARM PER CALTRANS STD° PLAN ES -7N, DETAIL U° R/Wi ,z 6° w © INSTALL R73-2(CA) SIGN ON MAST ARM PER CALTRANS STD. PLAN ES -7N, DETAIL U. , z ENGINEERING DIVISION PRIOR TO COMMMENCEMENT OF WORK. O ,I F7] INSTALL 1 -SIC CONNECTING FROM CONTROLLER (Sht E-1) TO CONTROLLER AT SE QUAD. OF Rte 10 EB RAMPS (SHEET E-3) (APPROX. 1195'), SIC SHALL NOT BE SPLICED° ' 7° EXISTING LIGHTING AND SIGNAL SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL AND LIGHTING IS o F 8 INSTALL 1 2'' CONDUIT PER SOUTHERN CALIFORNIA EDISON COMPANY REQUIREMENT; CONDUCTORS TO BE DETAIL A B OPERATIONAL PER SPECIFICATIONS° INSTALLED BY SOUTHERN CALIFORNIA EDISON COMPANY. /W x 8 � � 0 6 � , ; Fg-1 INSTALL TYPE II PEDESTRIAN BARRICADE PER ES -7P° 7 /OLB I x o m w QLL] Jz �C U — I un aw uo >- m o w U w u El� O ^ v OLC o- -0 01+08 02 02+03 04 2'�C, 1 6PR#19 (SIC), b OLB LL] 06 06+07 08 N UNLESS OTHERWISE SHOWN. un = Q w NN Q z = O U CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH Q u SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED. z z D o LL o V) CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT o z LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAILS, SHEET E-2° Q ,z 6° ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA z ENGINEERING DIVISION PRIOR TO COMMMENCEMENT OF WORK. O PHASE DIAGRAM GROUP A GROUP B OLA ^ v OLC o- -0 01+08 02 02+03 04 2'�C, 1 6PR#19 (SIC), b OLB 05 06 06+07 08 GENERAL NOTES (THIS SHEET ONLY): YA GA DETAIL A NO SCALE 2"C° 2 #10 (LTG) 2 9 2#14 (G) — — — — — — — — — — — — 06P- - L - - A e 05 6E G 8 OLA f 2"C9 1 6PR#19 (SIC)z_ L /DETAIL A 1#9 --- (G) ------------ --- 4 8 5 I - _ "C" LINE 20+00°06= "S" LINE 20+04.00 2"C, 1 6PR#19 (SIC), 1-8 �_G) - - - — N 1. TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THESE PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, AND THE STATE OF 04 CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 (DATED MAY 2006) AND STANDARD PLANS (DATED MAY 2006), THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC H CONTROL DEVICES FOR STREETS AND HIGHWAYS, DATED JANUARY 21, 2010. 2° LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE° THE CONTRACTOR SHALL J POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE° HAND DIG FOUNDATIONS UNTIL CLEAR OF ANY OBSTRUCTIONS° PHONE UNDERGROUND 5 OVER AVENUE 4P - 1/ O DETAIL A o LEGEND (THIS SHEET ONLY): LL x 10° CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT. rVIDEO DETECTION AREA 0 1 1 ° RS ALL EXISTING POLES, SIGNAL AND PED HEADS, LUMINAIRES° RC ALL EXISTING PULL BOXES, CONDUIT, AND CONDUCTORS. �i THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. cr> BORDER LAST REVISED 7/2/2010 USERNAME => p0099563 RELATIVE BORDER SCALE _ DGN FILE => 846800ua001 odgn IS IN INCHES 31 P fFW� R/W c -DETAIL A 02 05 OL C NF ee 7 s W--- --- - zT U wo � ''S'' "'LIN 2 }+ 5 I 04 3 4 - 04P 01 -P E - - _ --- - - -- fl 3 � � F _ZjB 0 C DETAIL A 2"C9 1 6PR#1 9 (SIC) 1#8 (G) I 11 Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 443 624 09/08/11 ROFEssIo REGISTERED CIVIL EN63INEER DATE=e =q RICHARD E. IVY z 09/08/11 PLANS APPROVAL DATE No, 21570 THE STA TF OF C% L IFOPNIA OR ITS OFFICERS Exp. OR AGENTS SHALL NOT BE RFSPOVSIBL E FOR s CIVIL P 7 -Hf ACCURACY OR COMPLETENESS OF SCANNED �_= of CAL 100 COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 SEE CITY OF FONTANA DRAWING NUMBER 3480 FOR SIC DETAILS° DETAIL A R /W D i z SERVICE ALERT AT (800) 227-2800 TWO (2) WORKING DAYS BEFORE DIGGING° 0 2'�C, 1 6PR#19 (SIC), x a 3° ALL PULL BOXES SHALL BE No. 6 AND ALL NEW CONDUIT SHALL BE 2'' RIGID METAL 1 #8 (G) N UNLESS OTHERWISE SHOWN. O N 0 NN I n un 4° CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH Q SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED. 5° CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT o LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAILS, SHEET E-2° ,z 6° ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMMENCEMENT OF WORK. 7° EXISTING LIGHTING AND SIGNAL SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL AND LIGHTING IS o OPERATIONAL PER SPECIFICATIONS° 8° CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING SPRINKLERS AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER° Q z 9° CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS° MODIFY SPRINKLER SYSTEMS IF NECESSARY OVER AVENUE 4P - 1/ O DETAIL A o LEGEND (THIS SHEET ONLY): LL x 10° CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT. rVIDEO DETECTION AREA 0 1 1 ° RS ALL EXISTING POLES, SIGNAL AND PED HEADS, LUMINAIRES° RC ALL EXISTING PULL BOXES, CONDUIT, AND CONDUCTORS. �i THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. cr> BORDER LAST REVISED 7/2/2010 USERNAME => p0099563 RELATIVE BORDER SCALE _ DGN FILE => 846800ua001 odgn IS IN INCHES 31 P fFW� R/W c -DETAIL A 02 05 OL C NF ee 7 s W--- --- - zT U wo � ''S'' "'LIN 2 }+ 5 I 04 3 4 - 04P 01 -P E - - _ --- - - -- fl 3 � � F _ZjB 0 C DETAIL A 2"C9 1 6PR#1 9 (SIC) 1#8 (G) I 11 Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 443 624 09/08/11 ROFEssIo REGISTERED CIVIL EN63INEER DATE=e =q RICHARD E. IVY z 09/08/11 PLANS APPROVAL DATE No, 21570 THE STA TF OF C% L IFOPNIA OR ITS OFFICERS Exp. OR AGENTS SHALL NOT BE RFSPOVSIBL E FOR s CIVIL P 7 -Hf ACCURACY OR COMPLETENESS OF SCANNED �_= of CAL 100 COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 SEE CITY OF FONTANA DRAWING NUMBER 3480 FOR SIC DETAILS° DETAIL A R /W D i UNIT 2232 o0 00 W W 00 J J � W W W SIG�NAL AND LIGIMTING& o� (LOCATION 1 — SLOVER AVE — CITY LOCATION) 2 0 L" SCALE: 1 ''=20' 0 E 1 <0 J 0 PROJECT NUMBER & PHASE N O N NN I UNIT 2232 o0 00 W W 00 J J � W W W SIG�NAL AND LIGIMTING& o� (LOCATION 1 — SLOVER AVE — CITY LOCATION) 2 0 L" SCALE: 1 ''=20' 0 E 1 <0 J 0 PROJECT NUMBER & PHASE x x x 91 a w I z w V) z O V) O > C) r Q Y U o w o O LL] un = --1a <w z = O U Q z z O LL O V) z Q O z O z 0 Q 0 w z a w 0 z w a F -- r) w 0 0 f r; i CONDUCTOR SCHEDULE AWG CIRCUIT 1 2 SIGNAL MOUNTING PED PUSH BUTTON RSNS PLACEMENT REMARKS z8 Type 01 VEHICLE - - - 3 3 3 - 3 MESSAGE 02 VEHICLE 5 5 5 5 5 5 - 5 MAT,MAS 03 VEHICLE - - - - - 3 - 3 1-A 04 VEHICLE - - 3 3 3 3 - 3 - 05 VEHICLE 3 3 3 3 3 3 3 3 MAT.MAS,MAS 06 VEHICLE - - - - 5 1 5 5 5 1-A 07 VEHICLE - 3 3 3 3 3 - 3 - 08 VEHICLE - 5 5 5 5 5 - 5 #14 02 PED 2 2 2 2 2 2 - 2 1-A 04 PED - - 2 2 2 2 - 2 - 06 PED - -EE2] © - 2 2 2 2 MAT,MAS,MAS 02 PPB - 2 - 2 2 2 - 2 1-A 04 PPB - - - 2 2 2 - 2 - 06 PPB - - - - - 1 - 1 - PPB COMMON - 1 1 1 1 1 - 2 PPB POST SPARES 3 3 3 3 3 3 3 6 - TOTAL 12 22 25 32 39 44 15 47 AUTOSCOPE 2 2 4 4 6 6 - 8 LUMINAIRE 2 2 2 2 2 2 - - #10 SIGNAL COMMON 1 1 1 1 1 1 1 2 TOTAL 3 3 3 3 3 3 3 2 VIDEO CABLE 1 1 2 2 3 3 - 4 OPTICOM CABLE 1 1 2 2 3 3 - 4 CONDUIT SIZE 3 4 4 4'I 4'I 4'I 3'I 2-4" CONDUIT STATUS N N N N N N N N N - NEW POLE SCHEDULE RUN SOLOPRO CABLE INTO LUMINAIRE ARM AND DOWN POLE. SPLICE SOLOPRO CABLE AT BASE OF POLE. (TERMINAL BLOCK WILL BE PROVIDED BY THE CITY) IMAGE SENSOR UNIT EDGE MOLDING TO REMAIN (PROVIDED IN SHIPPING REMOVE LENS CAP) 3/4" MAX HOLE DRILLED IN LUMINAIRE ARM SOLOPRO CABLE AND LIGHTING CONDUCTORS TO BASE OF POLE Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 444 624 09/08/11 77 717777� REGISTERED CIVIL EN INEER DATE q 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD C) SUITE 200 ONTARIO, CALIFORNIA 91761 MOUNTING DETAIL FOR AUTO SCOPE CAMERA NO SCALE RSNS - REFLECTIVE STREET NAME SIGN BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua002odgn RELATIVE BORDER SCALE IS IN INCHES 0 2 3 UNIT 2232 0 RICHARD Eo IVY z No. 21570 DD Exp. s CIVIL P qTF OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 MOUNTING DETAIL FOR OPTICAL DETECTOR NO SCALE POLE LOCATION DETAIL NO SCALE I(G� NAL AND Ll Gllh HTINU (LOCATION 1 - SLOVER AVE - CITY LOCATION) NO SCALE PROJECT NUMBER & PHASE 0800000744 o� N O o0 00 M Q0 n � 0 I Lv W ~ � I Q 0 a- J Lv W F- 0 O li O O w o O J O STANDARD MASTARMS LUMINAIRE SIGNAL MOUNTING PED PUSH BUTTON RSNS PLACEMENT REMARKS No. Type H SIG LTG HPS MAST ARM POLE PED. PHASE LOCATION MESSAGE A B (A 29A-5-100 35' 50' 15' 250W MAT,MAS SV -1-T - 6 E CHERRY AVE 21' 3' 5 -SECTION HEAD OLA © 1-A 10 - - - - TV -2-T SP -1 - - - 22' 3' 5 -SECTION HEAD OLB © 61A-5-100 35' 65' 15/ 250W MAT.MAS,MAS SV -1 -T SP -1 - - SLOVER AVE - 3' 5 -SECTION HEAD OLC O 1-A 10 - - - - TV -2-T - 2 W - 22' 3' 5 -SECTION HEAD OLA O 26A-4-100 35' 45' 15/ 250W MAT,MAS SV -1 -T SP -1 2 W CHERRY AVE 15/ 2' - O 1-A 10 - - - - TV -2-T SP -1 4 N - 17/ 3' 5 -SECTION HEAD OLC © 61A-5-100 35' 65' 15/ 250W MAT,MAS,MAS SV -1 -T SP -1 - - SLOVER AVE 1 1 08' 703' 5 -SECTION HEAD OLB OH 1-A 10 - - - - TV -2-T SP -1 - - - - 13.5 - OI PPB POST - - - - - - - 4 N - 22' 3' OJ PPB POST - - - - - - - 6 E - 23' 3' RSNS - REFLECTIVE STREET NAME SIGN BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua002odgn RELATIVE BORDER SCALE IS IN INCHES 0 2 3 UNIT 2232 0 RICHARD Eo IVY z No. 21570 DD Exp. s CIVIL P qTF OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 MOUNTING DETAIL FOR OPTICAL DETECTOR NO SCALE POLE LOCATION DETAIL NO SCALE I(G� NAL AND Ll Gllh HTINU (LOCATION 1 - SLOVER AVE - CITY LOCATION) NO SCALE PROJECT NUMBER & PHASE 0800000744 o� N O o0 00 M Q0 n � 0 I Lv W ~ � I Q 0 a- J Lv W F- 0 O li O O w o O J O 185' TO LIMIT LINE .•R3" LINE qg 4I6U CHERRY Ave EB Eg-��I -STEL EXLT RAMP 4I7U n. (T) " 18, (G)DLC, R/W PROJECT NOTES (THIS SHEET ONLY) 0 90' TO LIMIT LINE 2"C, 4 DLC, 1#8 (G) om PROJECT NOTES (SHEETS E-3 AND E-4 ONLY): w F-11 INSTALL TYPE 332 CABINET WITH STATE FURNISHED TYPE 2070 CONTROLLER AND R9 -3B PER ES-7Po x w QLij ASSEMBLY WITH CDMA MODEM. INSTALL STATE FURNISHED x Jz w BATTERY BACKUP SYSTEM ALONG WITH CONTRACTOR FURNISHED CABINET AND O CD BATTERIES. SEE BATTERY BACKUP SYSTEM DETAILS ON SHEETS E-29 TO E-310 U u Ju� F2] INSTALL TYPE III -CF SERVICE 120/240 V SERVICE EQUIPMENT Qw = ELECTRICAL OPERATIONS SHALL BE GRANTED A 7 -DAY NOTICE PRIOR TO U D ENCLOSURE AS PER ES -2C AND ES-2Fo Q SIGNAL ACTIVATION. ADDRESS: 10378 CHERRY AVE, FONTANA, CA CTID: 085401 0001 301 70M w METER ''AI' o = 0 100 A, 240V 2P (MAIN BREAKER) GS -1 30 A, 240V 2P, CB (LIGHTING - UPRR) U 15 A, 120V 1P, CB (LIGHTING CONTROL) w 20 A, 120V 1P, CB (IRRIGATION - CITY) Q U W w � z z Q 0 CTID: 085401 0001 301 70M o METER "B" o o 100 A, 240V 2P, (MAIN BREAKER) TC -1 V) 50 A, 120V 1 P, CB (SIGNAL) F3]INSTALL 1 -SIC CONNECTING FROM CONTROLLER (Sht E-3) TO x CONTROLLER AT NE QUAD. OF WB RAMPS ( SHEET E-5) (APPROX. 760/). z 4❑ INSTALL R3-18 ON PER ES -7N, DETAIL "Ullo Cf)z oF5 INSTALL R61-28(CA) ON PER ES -7N, DETAIL Hull. V) 0 > © INSTALL R73-5(CA) ON PER ES -7N9 DETAIL "Ullo C:) z a <❑7 Y PREFORMED LOOP. U C:) w � ® RR EXISTING GPS TIME SOURCE UNIT z FROM EXISTING CONTROLLER ASSEMBLY INTO NEW CONTROLLER ASSEMBLY. 185' TO LIMIT LINE .•R3" LINE qg 4I6U CHERRY Ave EB Eg-��I -STEL EXLT RAMP 4I7U n. (T) " 18, (G)DLC, R/W PROJECT NOTES (THIS SHEET ONLY) 0 90' TO LIMIT LINE 2"C, 4 DLC, 1#8 (G) om Fq INSTALL TYPE II PEDESTRIAN BARRICADE WITH R9 -3A w m AND R9 -3B PER ES-7Po w QLij o x Jz w AND R9-3B(LT) PER ES-7Po O CD U U u Ju� w Qw = ELECTRICAL OPERATIONS SHALL BE GRANTED A 7 -DAY NOTICE PRIOR TO U D U 185' TO LIMIT LINE .•R3" LINE qg 4I6U CHERRY Ave EB Eg-��I -STEL EXLT RAMP 4I7U n. (T) " 18, (G)DLC, R/W PROJECT NOTES (THIS SHEET ONLY) 0 90' TO LIMIT LINE 2"C, 4 DLC, 1#8 (G) z Fq INSTALL TYPE II PEDESTRIAN BARRICADE WITH R9 -3A I I O AND R9 -3B PER ES-7Po w Fl -oINSTALL TYPE II PEDESTRIAN BARRICADE WITH R9 -3A x _ AND R9-3B(LT) PER ES-7Po DAYS IN ADVANCE OF THE ANTICIPATED WORK COMPLETION° CONFIRM THIS u NUMBER WITH PERMIT ENGINEER AT COMMENCEMENT OF 14 DAY PERIOD° _ ELECTRICAL OPERATIONS SHALL BE GRANTED A 7 -DAY NOTICE PRIOR TO Q SIGNAL ACTIVATION. w Q = z U O � Q U z z o LJ o V) z Q _ z O z 0 x a O z Q 185' TO LIMIT LINE .•R3" LINE qg 4I6U CHERRY Ave EB Eg-��I -STEL EXLT RAMP 4I7U n. (T) " 18, (G)DLC, R/W PROJECT NOTES (THIS SHEET ONLY) 0 90' TO LIMIT LINE 2"C, 4 DLC, 1#8 (G) 0 I Q Z 4-J5L (T) 9 (D L 1#8 # 8G ) D 1#8 (G) MATCH LINE STA 32+52 SEE SHEET E-4 2"C, 4 DLC - 1#8 (G) 1li #8, �G)DLC, 11 18, 8G) DLC — 4t7 L 0,04-to(D /6\ 6P�,, E -3"C, 1 SIC, 1 1.8 (G) Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 445 624 09/08/11 ROFEssIo REGISTERED CIVIL EN6,INEER DATE sae Nq RICHARD E. IVY w 09/08/11 w z z PLANS APPROVAL DATE No. 21 570 OI-- __jTHE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp . OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR s CIVIL P THE ACCURACY OR COMPLETENESS OF SCANNED OF CAS 1F0 COPIES OF THIS RL AN SHEET J PARSONS 3200 EAST GUASTI ROAD SANBAG SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 04 � 04 r L - RC A J AB 3''C9 1 SIC, 1#8 (G) RC RS 06 AB I _i i i :4:] I lfl RC I _ - -- RS AB _- - -- - 02 02 06Pr— AB 1 4 7 AB AB "C" 30+44042= 4 h r L"R3" 694+53000= RS '�R5 694+51093 3 ► C �J _ qg � -- 0 01 RC01 AB 6 06 02 06P 06 PHASE DIAGRAM STEADY DEMAND SEQUENCE 5 "R5 LINE 5] CHERRY Ave EB ENTRANCE RAMP r "—TYPE "D" CABLE TO COMMUNICATIONS SPLICE VAULT SEE SHEET E-230 06 06 _ 6' RS --- 2"C, 9 DLC, 1#8 (G) RS w 3"C, 1 SIC, 1#8 (G) 3"C, 1 SIC, 1#8 (G) >- 1 w 7 2'iC, 2#6 (SIG), 1#6 (G)II I 2 C92#6 (SIG), � �_ AB '� I 1#6 (G) I AB I 2•'C, 5 DLC, 2 C, 2#10 (LTG), 1#8 (G) II I I U Iw 3"C, 1 SIC, 1#8 (G) 2"C, 2#6 (SIG), 1 #6 (G) 2"C, 2#10 (LTG), 1#8 (G)--' 3II C, MT (CONDUCTORS BY SCE) SEE DETAIL A SHEET E-4 FOR SERVICE POINT LOCATION t� z Fq INSTALL TYPE II PEDESTRIAN BARRICADE WITH R9 -3A I I O AND R9 -3B PER ES-7Po Q Fl -oINSTALL TYPE II PEDESTRIAN BARRICADE WITH R9 -3A x Llj AND R9-3B(LT) PER ES-7Po 0 I Q Z 4-J5L (T) 9 (D L 1#8 # 8G ) D 1#8 (G) MATCH LINE STA 32+52 SEE SHEET E-4 2"C, 4 DLC - 1#8 (G) 1li #8, �G)DLC, 11 18, 8G) DLC — 4t7 L 0,04-to(D /6\ 6P�,, E -3"C, 1 SIC, 1 1.8 (G) Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 445 624 09/08/11 ROFEssIo REGISTERED CIVIL EN6,INEER DATE sae Nq RICHARD E. IVY w 09/08/11 w z z PLANS APPROVAL DATE No. 21 570 OI-- __jTHE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp . OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR s CIVIL P THE ACCURACY OR COMPLETENESS OF SCANNED OF CAS 1F0 COPIES OF THIS RL AN SHEET J PARSONS 3200 EAST GUASTI ROAD SANBAG SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 04 � 04 r L - RC A J AB 3''C9 1 SIC, 1#8 (G) RC RS 06 AB I _i i i :4:] I lfl RC I _ - -- RS AB _- - -- - 02 02 06Pr— AB 1 4 7 AB AB "C" 30+44042= 4 h r L"R3" 694+53000= RS '�R5 694+51093 3 ► C �J _ qg � -- 0 01 RC01 AB 6 06 02 06P 06 PHASE DIAGRAM STEADY DEMAND SEQUENCE 5 "R5 LINE 5] CHERRY Ave EB ENTRANCE RAMP r "—TYPE "D" CABLE TO COMMUNICATIONS SPLICE VAULT SEE SHEET E-230 06 06 _ 6' RS --- 2"C, 9 DLC, 1#8 (G) RS w 3"C, 1 SIC, 1#8 (G) 3"C, 1 SIC, 1#8 (G) >- 1 w 7 2'iC, 2#6 (SIG), 1#6 (G)II I 2 C92#6 (SIG), � �_ AB '� I 1#6 (G) I AB I 2•'C, 5 DLC, 2 C, 2#10 (LTG), 1#8 (G) II I I U Iw 3"C, 1 SIC, 1#8 (G) 2"C, 2#6 (SIG), 1 #6 (G) 2"C, 2#10 (LTG), 1#8 (G)--' 3II C, MT (CONDUCTORS BY SCE) SEE DETAIL A SHEET E-4 FOR SERVICE POINT LOCATION t� a �Vcn BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua0O3.dgn 3ttic , 1 SIC, 1#8 (G) APPROX 1 1 95' TO CHERRY/SLOVER SEE SHEET E-1 � I J I 2JI6L GENERAL NOTES (THIS SHEET ONLY): I I O x 1 o ELECTRICAL OPERATIONS (909-383-6427) SHALL BE NOTIFIED AT LEAST 14 DAYS IN ADVANCE OF THE ANTICIPATED WORK COMPLETION° CONFIRM THIS �-- o NUMBER WITH PERMIT ENGINEER AT COMMENCEMENT OF 14 DAY PERIOD° ELECTRICAL OPERATIONS SHALL BE GRANTED A 7 -DAY NOTICE PRIOR TO SIGNAL ACTIVATION. a �Vcn BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua0O3.dgn 3ttic , 1 SIC, 1#8 (G) APPROX 1 1 95' TO CHERRY/SLOVER SEE SHEET E-1 � I J I 2JI6L TT li 2❑ I � I I I I � I I CSI CV I C9 I I CV CVC I THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE - IS IN INCHES I I I 1#8 (G) o11z 2"C, 5 DLC, �F- 1 #8 (G) J J--"-- 2''C, 4 DLC, w 1#8 (G) Oz J 2'C, 4 DLC, Ln 1 #8 (G) °O > CV UNIT 2232 SIGNAL AND LIGHTING (LOCATION 2 - EB ENTRANCE AND EXIT RAMPS) SCALE: 1 ''=20' PROJECT NUMBER & PHASE E-3 N � o� No o0 o0 li n 00 ww O O J J ww . :2 a o � 0 0 20 'o w 0 Qo J 0 x x x x 0 w I I V) I z w V) z 0 0 > C) Q � U o w o O LL] u _ Q Q w z = O U � Q U z z 0 LL 0 V) z Q z O z 0 Q O r z Q O z w Q F -- r) w 0 04 '01r; i CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE S T D PHASE 1 2 3 4 5 6 7 SIG LTG HPS MAST ARM POLE PED PHASE VEH-PED 12CSC O 6,6P 6P 1 1 1 1 1 5TS 1 1 - 1 1 20OW - 2,4 1 6 1 1 - 3' © © 4 1 1 31 OW MAS,MAS SV -2 -TA - - - 0 1,2 1 1 26A-4-100 35' 40' - 31 OW MAS,MAS 1 ,696P 6P 1 1 - 1 1 CHERRY AVE 1 1 4' OD O 4 65' 15' 31 OW MAS TV -2-T 1 - PPB 3CSC TOTAL 6 2 1 4 2 1 2 2 1 1 1 AWG CIRCUIT 31 OW MAS, MAS SV -1-T SP -1 6 - #10 LIGHTING O 1-A 2 2 2 - 2 #8 - BARE GROUND 2 1 2 1 1 1 1 SIC 2 EVD 3 1 1 1 LOOP DLC PHASE 1 4 4 4 4 PHASE 2 9 9 PHASE 4 7 7 7 7 PHASE 6 7 7 7 7 TOTAL 27 27 18 7 11 CONDUIT SIZE 2-4'I 211 2-4'I 4" 4'I 3 311 CONDUIT FILL % 26% 3% 16% 22% 8% 21% 14% 21 BORDER LAST REVISED 7/2/2010 POLE LOCATION DETAIL NO SCALE USERNAME=>p0099563 DGN FILE => 846800ua004odgn 3lic9 1 SIC9 1#8 (G) APPROX o 760' TO WB RAMPS SEE SHEET E-5 3"C 9 MT ( CONDUCTORS BY SCE) SCE HAND HOLE H983E 3"C9 1 SI( -9 1 #�, MATCH LINE STA 32+52 SEE SHEET E-3 SERVICE POINT LOCATION: w z H U DETAIL "A" POLE SCHEDULE >- w Q= 2'C9 4 DLC9 LLjL 1#8 (G) U QT I I Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 446 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD E. IVY w No. 21570 m c Exp. sT CIVIL ATF of C L 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 RSNS - REFLECTIVE STREET NAME SIGN THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 SIGFJAL Ilk PJD L IGHTING (LOCATION 2 - EB ENTRANCE AND EXIT RAMPS) SCALE: 1 "=20' PROJECT NUMBER & PHASE STANDARD MASTARMS LUMINAIRE SIGNAL MOUNTING PED PUSH BUTTON RSNS PLACEMENT REMARKS No. Type H SIG LTG HPS MAST ARM POLE PED PHASE ARROW MESSAGE A B OA 1 5TS 30' - 15/ 20OW - SV -1-T SP -1 6 - - 3' © 26A-3-100 35' 40' 15' 31 OW MAS,MAS SV -2 -TA - - - I-10 EAST - 3' © 26A-4-100 35' 40' - 31 OW MAS,MAS SV -1-T - - - CHERRY AVE 21' 4' OD 61A-5-100 35' 65' 15' 31 OW MAS TV -2-T - - - - 5' 3' OE 61A-5-100 35' 60' 15' 31 OW MAS, MAS SV -1-T SP -1 6 - O 1-A 10 - - - - TV -1 -T - - - - RSNS - REFLECTIVE STREET NAME SIGN THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 SIGFJAL Ilk PJD L IGHTING (LOCATION 2 - EB ENTRANCE AND EXIT RAMPS) SCALE: 1 "=20' PROJECT NUMBER & PHASE GENERAL NOTES (THIS SHEET ONLY): LLJ0 1 o ELECTRICAL OPERATIONS (909-383-6427) SHALL BE NOTIFIED AT LEAST 14 DAYS IN ADVANCE OF THE ANTICIPATED WORK uLLJ COMPLETION. CONFIRM THIS NUMBER WITH PERMIT ENGINEER AT w COMMENCEMENT OF 14 DAY PERIOD. w � PROJECT NOTES (THIS SHEET ONLY): Fil INSTALL TYPE 332 CABINET WITH STATE -FURNISHED TYPE 2070 x CONTROLLER ASSEMBLY WITH CDMA MODEM. INSTALL STATE FURNISHED BATTERY BACKUP SYSTEM ALONG WITH CONTRACTOR w FURNISHED CABINET AND BATTERIES. SEE BATTERY BACKUP SYSTEM z DETAILS ON SHEETS E-29 TO E-310 0 :2 F2] INSTALL TYPE III -CF SERVICE 120/240 V SERVICE cn 0 EQUIPMENT ENCLOSURE AS PER ES -2C AND ES -2F. o > ADDRESS: 10239 CHERRY AVE, FONTANA, CA a iZ � U CTID: 085401 0001 301 71 M w o METER "A 100 A9 480V 2P, (MAIN BREAKER) TC -1 50 A9 1 20V 1 P9 CB (SIGNAL) o m �- w m CTID: 085401 0001 301 71 M JMETER "B" oCD 100 A9 240V 2P, (MAIN BREAKER) GS -1 �� w 20 A9 120V 1 P9 CB (IRRIGATION - CITY) aw = U C-) U 30 A9 240V 2P9 CB (LIGHTING - CHERRY AVE OC) F3]INSTALL 1 -SIC CONNECTING FROM CONTROLLER (Sht E-5) x o TO CONTROLLER AT SE QUAD. OF CHERRY/VALLEY (SHEET E-7) (APPROX. 850') LLI ® INSTALL R3-18 ON MAST ARM ES -7N, DETAIL "U". Q F5INSTALL R61-13(CA) ON MAST ARM ES -7N, DETAIL "U". Q w z PREFORMED LOOP. u © 0 � Q u z z 0 LL 0 V) z Q z 0 z O x Q 08 02 �n w z a oz o Ln~ 06 z 08 w Q PHASE DIAGRAM LLJ0 STEADY DEMAND SEQUENCE a z O LL x Q U w 0 w a c~r> V R/W 2llC9 4 DLC9 1# 8 (G) 2 C9 5 DLC9 1#8 (G) 6I6U , C III V —i —J �8 Ln I D �o (o Qo QQ 4 B 08 � DETAIL A 08 5 DETAIL A I 08 06 6 6 08 4 DETAIL A V "C'' 36+66.81 = p� R21704+73.86 r 1 ni r lt�R fir, 00 1 2"C, 5 DLC, 1#8 (G) 2'C, 9 DLC, 1#8 (G) O� 4 I I 02 02 I 2' 6(E\3 Lu L z z � W J > Q "C" 36+83035= LLJ w '' 693+56.47 U 41 LINE 4 R LINE GA 3"C9 1 SIC9' �� �j 1#8 (G) 3'C9 1 SIC9 1#8 (G) DETAIL A NO SCALE 2 3"C9 1 SIC9 1#8 (G) 1 2"Co 2 #10 (LTG)9 1#8 (G) 2'Co 2 #6 (SIG)9 1#6 (G) 1 3lic 9 MT ( CONDUCTORS BY SCE) SCE HAND HOLE H142C 90' TO 8 LIMIT LINE � 2 \ 3''C9 1 SIC9 1#8 (G) R/W Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12. 3/1401 447 624 09/08/11 ROFEssIo REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY 09/08/11z PLANS APPROVAL DATE c� No, 21570 � � THE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp. OR AGENTS SHALL NOT BE RFSPONSIBL E FOR s CIVIL P 7 -Hf ACCURACY OR COMPLETENESS OF SCANNED ATE of CALIFo�� COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 185' TO LIMIT LINE — (T) 9 9 2"C9 3 DLC _�— (�I 1 #8 (G) 8L ��)8j 7LIJ I 11 2'1C9 7 DLC9 1 #8 (G) 2lic9 4 DLC9 (T) 1 #8 (G) 3lic9 1 SIC9 1#8 (G) 2"C9 3 DLC9 1#8 (G) �9 1 SIC9 1#8 (G) '9 3 DLC9 1#8 (G) SIC9 1#8 (G) DLC9 1#8 (G) >IC9 1#8 (G) 760' TO EB RAMPS ET E-3 THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. BORDER LAST REVISED 7/2/2010 USERNAME => p0099563 RELATIVE BORDER SCALE DGN FILE => 846800ua005odgn IS IN INCHES 8J9U CHERRY AVE WB EXIT RAMP 695--------------------------- --------------- 3 CHERRY AVE WB LOOP ENTRANCE RAMP 3"C9 1 SIC9 1#8 (G) 3lic9 1 SIC9 1#8 (G) 7 2 UNIT 2232 PROJECT NUMBER &PHASE N � O NLn o0 �N �T) o0 M Q0 n 00 ww 00 J J w w a o � z o 0 0 L �>0 w �0 Qo J 0 III V —i —J 17T M I � GA 3"C9 1 SIC9' �� �j 1#8 (G) 3'C9 1 SIC9 1#8 (G) DETAIL A NO SCALE 2 3"C9 1 SIC9 1#8 (G) 1 2"Co 2 #10 (LTG)9 1#8 (G) 2'Co 2 #6 (SIG)9 1#6 (G) 1 3lic 9 MT ( CONDUCTORS BY SCE) SCE HAND HOLE H142C 90' TO 8 LIMIT LINE � 2 \ 3''C9 1 SIC9 1#8 (G) R/W Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12. 3/1401 447 624 09/08/11 ROFEssIo REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY 09/08/11z PLANS APPROVAL DATE c� No, 21570 � � THE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp. OR AGENTS SHALL NOT BE RFSPONSIBL E FOR s CIVIL P 7 -Hf ACCURACY OR COMPLETENESS OF SCANNED ATE of CALIFo�� COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 185' TO LIMIT LINE — (T) 9 9 2"C9 3 DLC _�— (�I 1 #8 (G) 8L ��)8j 7LIJ I 11 2'1C9 7 DLC9 1 #8 (G) 2lic9 4 DLC9 (T) 1 #8 (G) 3lic9 1 SIC9 1#8 (G) 2"C9 3 DLC9 1#8 (G) �9 1 SIC9 1#8 (G) '9 3 DLC9 1#8 (G) SIC9 1#8 (G) DLC9 1#8 (G) >IC9 1#8 (G) 760' TO EB RAMPS ET E-3 THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. BORDER LAST REVISED 7/2/2010 USERNAME => p0099563 RELATIVE BORDER SCALE DGN FILE => 846800ua005odgn IS IN INCHES 8J9U CHERRY AVE WB EXIT RAMP 695--------------------------- --------------- 3 CHERRY AVE WB LOOP ENTRANCE RAMP 3"C9 1 SIC9 1#8 (G) 3lic9 1 SIC9 1#8 (G) 7 2 UNIT 2232 PROJECT NUMBER &PHASE N � O NLn o0 �N �T) o0 M Q0 n 00 ww 00 J J w w a o � z o 0 0 L �>0 w �0 Qo J 0 x x x 91 om w m QLL] o Jz w �C U — U w Qw = U 0 U O LL] _ u _ Q Q w z = O_ U � Q u z z O LL O V) z Q _ z O z 0 Q 0 w z Q w 0 z w Q w 0 04 f r; i BORDER LAST REVISED 7/2/2010 CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE S T D PHASE 1 2 3 4 5 6 7 8 9 HPS MAST ARM POLE PED PHASE LOCATION MESSAGE A B VEH-PED 12CSC O 6,8 1 1 1 1 1 1 - - - - © 8 1 1 1 1 1 15/ 31 OW MAS -4C9 MAS -4C SV -1 -T - © 6,8 1 1 1 1 © 1-A 10 - - - 0 2 1 1 - - 37+66054 "C" LINE 3' OD 24A-3-100 35' 0 2,6,8 1 MAS9MAS SV -1 -T - - - 1 1 1 PPB 3CSC OE TOTAL 5 4 3 3 2 1 1 1 1 AWG CIRCUIT 36+74078 "C" LINE 3' #10 LIGHTING 2 2 2 2 2 2 2 2 #8 BARE GROUND 2 1 1 1 1 1 1 1 1 SIC 2 EVD 2 2 1 1 1 1 LOOP DLC PHASE 2 7 7 7 7 PHASE 6 9 9 9 PHASE 8 8 2 6 8 TOTAL 24 9 9 9 13 15 CONDUIT SIZE -4" 2-4 11 4 I' 4 'I 4 'I 3 II 2 'I 3 'I 3 'I 3 'I CONDUIT FILL % 19% 5% 22% 18% 17% 15% 18% 15% 21 % 23% USERNAME=>p0099563 DGN FILE => 846800uc006odgn Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 448 624 POLE LOCATION DETAIL NO SCALE POLE SCHEDULE 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssloNq 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RSNS - REFLECTIVE STREET NAME SIGN RELATIVE BORDER SCALE IS IN INCHES 0 2 3 UNIT 2232 RICHARD Eo IVY z No. 2 570 DD Exp. s CIVIL F of cAL SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 PROJECT NUMBER & PHASE 0800000744 STANDARD MASTARMS LUMINARE SIGNAL MOUNTING PED PUSH BUTTON RSNS PLACEMENT REMARKS No. Type H SIG LTG HPS MAST ARM POLE PED PHASE LOCATION MESSAGE A B OA 26A-3-100 35' 45' 15' 31 OW MAS9MAS SV -2-T - - - - 36+43072 "C" LINE 3' © 19A-3-100 35' 25' 15/ 31 OW MAS -4C9 MAS -4C SV -1 -T - - - CHERRY AVE 37+14.65 "C" LINE 3' © 1-A 10 - - - - TV -2-T - - - - 37+66054 "C" LINE 3' OD 24A-3-100 35' 35' 15/ 31 OW MAS9MAS SV -1 -T - - - - - 3' OE 15TS 30' - 15' 20OW - SV -3-T - - - - 36+74078 "C" LINE 3' RSNS - REFLECTIVE STREET NAME SIGN RELATIVE BORDER SCALE IS IN INCHES 0 2 3 UNIT 2232 RICHARD Eo IVY z No. 2 570 DD Exp. s CIVIL F of cAL SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 PROJECT NUMBER & PHASE 0800000744 PROJECT NOTES (THIS SHEET ONLY): F-11 RELOCATE EXISTING TYPE 90 CONTROLLER ASSEMBLY INCLUDING TYPE P CABINET AND APPURTENANT x EQUIPMENT. CONTROLLER CABINET AND FOUNDATION TO BE INSTALLED PER CITY STANDARD EQUIPMENT DRAWING 4004. CONNECT SIC TO CONTROLLER PER MANUFACTURER'S REQUIREMENTS. x x a a w m i O LL] u _ Q Q w z = O_ U � Q U z z 0 LL 0 V) z Q z O z O a 0 w z a w 0 z w a F -- r) w 0 0 fr ;1 F2]RELOCATE EXISTING TYPE III -BF SERVICE EQUIPMENT ENCLOSURE INCLUDING THE FOLLOWING: 120/240 V I PHASE SERVICE WITH 120 V METERED SIGNAL CIRCUIT, 120 V CIRCUIT BREAKER, 30 A LIGHTING CIRCUIT BREAKER, 30 A LIGHTING CIRCUIT BREAKER, 15 A AUTOSCOPE CIRCUIT BREAKER, PEC FOR LIGHTING° LOCATE SERVICE ENCLOSURE CABINET A MINIMUM OF 6' FROM THE CONTROLLER CABINET° RELOCATE EXISTING UNI -DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR AND APPURTENANCES TO NEW SIGNAL MASTARM AS DIRECTED BY THE ENGINEER, SEE MOUNTING DETAIL SHEET E-80 ®REINSTALL EXISTING AUTO SCOPE CAMERA AND APPURTENANCES ON LUMINAIRE MAST ARM AS DIRE( BY THE ENGINEER° SEE MOUNTING DETAIL SHEET E-20 F5]INSTALL R73-6(CA) SIGN ON MAST ARM PER CALTRANS STD. PLAN ES -7N, DETAIL U. ©REMOVE AND SALVAGE EXISTING R73-3(CA), INSTALL R73-6(CA) SIGN ON MAST ARM PER CALTRANS STD. PLAN ES -7N, DETAIL U. [7] INSTALL 1 2'' CONDUIT PER SOUTHERN CALIFORNIA EDISON COMPANY REQUIREMENT; CONDUCTORS T( INSTALLED BY SOUTHERN CALIFORNIA EDISON COMPANY. R /W PHASE DIAGRAM GROUP A GROUP B v 01 02 03 04 OLA 04+05 06 07 08 *EXISTING PHASING TO REMAIN WE ren DETAIL A NO SCALE GENERAL NOTES (THIS SHEET ONLY): 1. TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THESE PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, AND THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 (DATED MAY 2006) AND STANDARD PLANS (DATED MAY 2006)9 THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, DATED JANUARY 219 2010. 2. LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE° THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2800 TWO (2) WORKING DAYS BEFORE DIGGING° 3. ALL PULL BOXES SHALL BE No. 6 AND ALL NEW CONDUIT SHALL BE 2'' RIGID METAL UNLESS OTHERWISE SHOWN. 4. CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED. 5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT, SEE DETAILS SHEET E-80 6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMMENCEMENT OF WORK. 7. EXISTING LIGHTING AND SIGNAL SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL AND LIGHTING OPERATIONAL PER SPECIFICATIONS° 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING SPRINKLERS AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER° 9. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. MODIFY SPRINKLER SYSTEMS IF NECESSARY. 10. CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT. BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua007.dgn LEGEND (THIS SHEET ONLY): VIDEO DETECTION AREA Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 449 624 09/08/11 REGISTERED CIVIL EN63INEER DATE QROFEssIoNq, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 r^^^T^ ^A ^A THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES L A (No. RICHARD �Eo IVY 21570 cxp. 4. s� CIVIL P ATF OF CAL IF0�� SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 (LTG) UNIT 2232 PROJECT NUMBER & PHASE N � O M NLn o0 M Q0 00 ww F-- F-- 00 --F--O0 J J ww a o � z 0 0 0 '0 w �0 Q0 J 0 x X x 91 a w I z w z O uo O > > 0 Cr a � U D w f■1; CONDUCTOR SCHEDULE AWG CIRCUIT OR POLE 1 2 3 4 5 6 7 8 9 H A - 1/1/01/1/01/1/01/1/01/1/0 MAST ARM POLE PED. PHASE - - 1/1/0 o B 1/1/01/1/01/1/01/1/01/1/01/1/0 61A-5-80 35' 60' 15' 250W - - 1/1/0 o C - - - - - - - 1/1/0 1/1/0 ,=z D - - - - - - - 1/1/0 1/1/0 coo E - - - - - - - - 0/0/1 o00 F - - - - - 1/1/0 - - 1/1/0 z c\j O G - - - - 1/1/01/1/0 O - - 1/1/0 U H - - - 0/0/1 0/0/1 0/0/1 - - 0/0/1 OF TOTAL 1 /1 /02/2/02/2/0 - - 2/2/1 3/3/1 4/4/1 - 2/2/0 6/6/2 #10 LUMINAIRE - 2 2 2 2 2 - 2 - VIDEO VIDEO CABLE - 1 1 1 2 2 - 1 4 DET. VIDEO SVC - 1 1 1 2 2 - 1 4 OPTICOM CABLE - 1 1 1 2 2 - 1 4 CONDUIT SIZE 2�� 3�� 3�� 3�� 4" 4�� - 4�� 2-4" CONDUIT STATUS E E E E N N - N N N - NEW E - EXISTING Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 450 624 JULUI I\U I.HULL HIVV LIV11 I 11VV CONDUCTORS TO BASE OF POLE MOUNTING DETAIL FOR AUTO SCOPE CAMERA NO SCALE POLE LOCATION DETAIL POLE SCHEDULE NO SCALE N - NEW RSNS - REFLECTIVE STREET NAME SIGN BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua008odgn RELATIVE BORDER SCALE IS IN INCHES 0 3 UNIT 2232 If-, 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEsslo�q 09/08/11 PLANS APPROVAL DATE 7_HE STA TF OF C% L IFORNIA OR ITS OFFICERS )R AGENTS SHAL L NOT BF RFSPONSIBL E FOR 7HE ACCURACY OR COMPLETENESS OF SCANNED 110RIFS OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SANBAG SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 O MOUNTING DETAIL FOR OPTICAL DETECTOR NO SCALE PROJECT NUMBER & PHASE 0800000744 iE N � 0 0 N N � oa n ^ Ldwi �F 0 C a- a ww F- 0 O li O O w O O J O STANDARD MASTARMS LUMINAIRE SIGNAL MOUNTING PED PUSH BUTTON RSNS PLACEMENT REMARKS No. Type H SIG LTG HPS MAST ARM POLE PED. PHASE LOCATION MESSAGE A B OA 61A-5-80 35' 60' 15' 250W MAS,MAS,MAS SV -1 -T SP -1 -CS 6 E CHERRY AVE 20' 305' MISSING SNS, (N) © 1-A 10 - - - - TV -2-T SP -1 -CS 8 S - 18' 4' O 26-3-80 30' 45' 15' 250W MAS,MAS SV -1 -T SP -1 -T 8 S VALLEY BLVD 10' 4' OD 1-A 10 - - - - TV -2-T SP -1 -T 2 W - 5' 3' O 29A-5-100 (N) 35' 50' 15' 250W MAT,MAS,MAS SV -1 -T SP -1 2 W CHERRY AVE 17.3' 505' 5 -SECTION HEAD OLA OF 1-A (N) 10 - - - - TV -2-T SP -1 4 N - 22' 3' © 61A-5-80 35' 65' 15' 250W MAS,MAS,MAS SV -1 -T SP -1 -CS 4 N VALLEY BLVD 10' 4' F1 =1 9', F2=24' OH 22 35' - 15' 250W - SV -2 -TA SP -1 -CS 6 E - 10' 4' 3&5 -SECTION HEADS N - NEW RSNS - REFLECTIVE STREET NAME SIGN BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua008odgn RELATIVE BORDER SCALE IS IN INCHES 0 3 UNIT 2232 If-, 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEsslo�q 09/08/11 PLANS APPROVAL DATE 7_HE STA TF OF C% L IFORNIA OR ITS OFFICERS )R AGENTS SHAL L NOT BF RFSPONSIBL E FOR 7HE ACCURACY OR COMPLETENESS OF SCANNED 110RIFS OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SANBAG SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 O MOUNTING DETAIL FOR OPTICAL DETECTOR NO SCALE PROJECT NUMBER & PHASE 0800000744 iE N � 0 0 N N � oa n ^ Ldwi �F 0 C a- a ww F- 0 O li O O w O O J O x x x z w V) z O V) O 0 Cr Q 0 w CONDUCTOR AND CONDUIT SCHEDULE CABLE TYPE CONDUCTOR RUN 1 2 3 4 5 6 7 8 9 10 12 CSC RAMP SIGNAL 2 1 1 1 - - - - - 2 - 3 CSC METER ON - - - - - - - - - - #8 GROUND 1 1 1 1 1 1 1 1 1 1 LOOP WIRES - - - - - - 8 8 - - DEMAND 2 1 1 - 1 - - - 2 - PASSAGE 2 2 1 - - - - - 2 - DLC MAINLINE 16 16 16 16 - 8 8 8 16 - QUEUE - - - - - - - - 2 - COUNT - - - - - - - - - 2 TOTAL 20 19 18 16 1 8 8 8 22 2 CONDUIT SIZE 4" 4" 4" 3" 2" 3" 3" 3" 4" 2" CONDUIT FILL % 20% 15% 15% 17% 4% 9% 10% 10% 21 % 6% PROJECT NOTES (THIS SHEET ONLY).0 > Fil INSTALL RAMP METER SIGNAL PER DETAIL ''A'' ON SHEET E-120 0 F2 SEE SHEET E-12 FOR LOOP INSTALLATION DETAILS° NOTE: 1 o FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE° R /W -C� 6 R�" SINE RAMP ENTRANCE Av E wB CHERR z �o oo,------- 0 0 -6 --- - - ---- - - - _Z7 ------ - --- ---- — ----- "A' LINE .. .. .. . .. . .. Z6� 3 m 4\ s z- -O Q — �I --------------------------- LINE */1 R/W 7 (T) . . . . . . . . . . . . . . . . . . . . . . . . . . ....................... — - -------- -fig �te_10_ � ogn _ — Eg Rte 10— —Ego b r)00 6 o..R3.. LI 3 0 �0�00 00 0 86 CL -IPPV nv[: FR FYTT RAMP — Q z O x Q U l� O � *INSTALL CONDUIT IN BARRIER a cn BORDER LAST REVISED 7/2/2010 R /W USERNAME=>p0099563 DGN FILE => 846800ua009odgn 1 IMF NOOK AM- • 2 T I I I l- i l ilI l i i i 1— 9A 9A (T) 9A R /W */l ov */l 6 THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE UNIT 2232 IS IN INCHES O a. (-n w 0 Ld r- w z + w J 0-) C9 LO w Q � lzzl- CV O rn a w u')w w w z = -� w = w U cn Q Q w O w O z + w �—+ LLJ J rn = U LTJ I Q Ld I� Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 451 624 09/08/11 E ROFssIo REGISTERED CIVIL EN INFER DATE �a e Nq<' RICHARD Eo IVY 09/08/11z PLANS APPROVAL DATE c� No, 21570 � � THE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp. OR AGENTS SHALL NOT BF RFSPOVSIBL E FOR s CIVIL P 7 -Hf ACCURACY OR COMPLETENESS OF SCANNED ATE of cAL JF COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 RAMP METERING SYSTEM (LOCATION 1) SCALE: 1 "=50' PROJECT NUMBER & PHASE N � 0 N 0 o0 o0 II II 00 ww F- 0 0 J J w w F- 0 O 0 0 I 'O w �O � I QO J 0 ON x x 91 a w I I V) I z O a O w z a O z w Q F -- r) w 0 0 f r; i 3-1 MATCH LINE STA 30+67 SEE SHEET E-11 NOTE: 3"C MT ( CONDUCTORS BY SCE) — SCE HAND HOLE Hl 42C 1 o FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua010odgn PROJECT NOTES (THIS SHEET ONLY) ❑1 INSTALL RAMP METER SIGNAL PER DETAIL "A" ON SHEET E-120 MINSTALL STATE FURNISHED MODEL 170 CONTROLLER ASSEMBLY WITH MODEL 334 CABINET AND FOUNDATION AS PER ES -3C, IS TO BE LOCATED 30' MINIMUM FROM EDGE OF TRAVELED WAY. F3]INSTALL STATE FURNISHED MODEL 170 CONTROLLER ASSEMBLY WITH MODEL 334 CABINET AND FOUNDATION AS PER ES -3C. E SEE SHEET E-12 FOR LOOP INSTALLATION DETAILS° ❑5 INTERNALLY ILLUMINATED ''METER ON's SIGN PER DETAIL CASE 1 ON SHEET E-12 Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 1 10 1203/1401 452 624 09/08/11 QRoFES- 10, REGISTERED CIVIL EN INEER DATE q, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 PROJECT NOTES (THIS SHEET ONLY): F6] INSTALL TYPE III -CF SERVICE 120/240 V SERVICE EQUIPMENT ENCLOSURE AS PER ES -2C AND ES -2F. ADDRESS: 10237 CHERRY AVE, FONTANA, CA SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 CTID: 085401 0001 3.1 68M CONDUCTOR RUN 1 METER "A": 3 4 5 6 100 A, 240V 2P (MAIN BREAKER) LS -3 30 A, 240V 2P, CB (LIGHTING - WB ENTRANCE RAMP) 30 A, 240V 2P, CB (LIGHTING - WB LOOP ENTRANCE RAMP) 30 A, 240V 2P, CB (LIGHTING - WB EXIT RAMP) 30 A, 240V 2P, CB (SIGN ILLUMINATION - WB EXIT RAMP) 30 A, 240V 2P, CB (SIGN ILLUMINATION - WB MAINLINE) 15 A, 120V 1 P, CB (LIGHTING CONTROL) 15 A, 120V 1 P, CB (SIGN CONTROL) 15 A, 1 P, TEST - SWITCH (SIGN ILLUMINATION) CTID: 085401 0001 3.1 68M METER "B 100 A, 240V 2P, (MAIN BREAKER) TC -1 20 A, 120V 1 P, CB (WB - RAMP METERING) 20 A, 120V 1 P, CB (WB LOOP - RAMP METERING) F7]INSTALL TYPE III -BF SERVICE 120/240 V SERVICE EQUIPMENT ENCLOSURE AS PER ES -2C AND ES-2Eo ADDRESS: 10235 CHERRY AVE, FONTANA, CA CTID: 085401 00013.172M 100 A, 240V 2P, (MAIN BREAKER) GS -1 20 A, 1 20V 1 P, CB ( IRRIGATION) CONDUCTOR AND CONDUIT SCHEDULE CABLE TYPE CONDUCTOR RUN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 12 CSC RAMP SIGNAL 2 - - 2 - - - - - 1 1 - - 2 2 3 CSC METER ON 1 - 1 - 1 - - - - - - - - - 1 #6 SERVICE 2 2 - - - - - - - - - - - - 2 #6 GROUND 1 1 - - - - - - - - - - - - 1 #8 GROUND 1 - 1 1 1 1 1 1 1 1 1 1 1 1 1 LOOP WIRES - - - - - - - - - - - 8 - - - DEMAND 2 - - 2 - - - - - 1 1 - - 2 2 PASSAGE 2 - - 2 - - - 1 - 1 1 - 1 2 2 DLC MAINLINE 8 - - 16 - - 8 8 8 - 8 - - 8 16 QUEUE 2 - 2 2 - - - - - - - - - - 2 COUNT 2 - 2 - - 2 - - - - - - - - - TOTAL 16 - 4 22 - 2 8 9 8 2 10 - 1 12 22 CONDUIT SIZE 2-311 211 2" 4" 21' 211 211 2'I 3" 2" 31' 31' 2" 4" 2-3" CONDUIT FILL % 9% 7% 14% 21% 6% 6% 19% 21% 9% 21% 17% 2% 4% 15% 10% * INSTALL CONDUIT IN BARRIER THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES RAMP METERING (LOCATION 2) SCALE: 1 "=50' UNIT 2232 1 PROJECT NUMBER & PHASE SYSTEM N � O 03 NN o0 03 o0 n ^ II �� 00 LULU F-- 00 J J a- a - LU w F - 0 O 00 'O w �O QO J 0 ON x 0 w I I V) W I 0 x o m w Jz QLL]CD O U — I un aw uo �- m o w U w = u � 0 3 4 5 6 7 8 9 10 11 12 13 LL] (MAIN BREAKER) LS -3 30 A, 12 CSC RAMP SIGNAL 2 - u _ - 2 Q 1 Qw z = - O_ U 3 CSC � Q 2 v - - z z - - o - LL O #6 SERVICE V) - - 2 - z - - Q - - - - #6 GROUND 1 - - 1 - - - - z - - O - #8 GROUND 1 CONDUCTOR AND CONDUIT SCHEDULE CABLE TYPE CONDUCTOR RUN 1 2 3 4 5 6 7 8 9 10 11 12 13 2P (MAIN BREAKER) LS -3 30 A, 12 CSC RAMP SIGNAL 2 - - - - 2 2 1 - - - - - 3 CSC METER ON 2 2 2 - - - - - - - - - - #6 SERVICE 2 - - 2 - - - - - - - - - #6 GROUND 1 - - 1 - - - - - - - - - #8 GROUND 1 1 1 - 1 1 1 1 1 1 1 1 1 LOOP WIRES - - - - - - - - - - 8 - 8 DEMAND 2 - - - - 2 1 1 1 - - - - DLC PASSAGE 2 - - - - 2 2 1 - - - - - MAINLINE 16 - - - - 16 16 16 - 16 8 8 8 QUEUE 2 2 1 - - - - - - - - - - - COUNT 2 2 2 - 2 - - - - - - - - TOTAL 24 4 2 - 2 20 19 18 1 16 8 8 8 CONDUIT SIZE 2-3" 2" 2" 2" 2" 4" 4" 4" 2" 3" 3" 3'I 3" CONDUIT FILL % 11% 1 8% 10% 7% 67. 20% 19% 15% 47. 17% 10% 9% 10% PROJECT NOTES (THIS SHEET ONLY) F6] INSTALL TYPE III -CF SERVICE 120/240 V SERVICE EQUIPMENT ENCLOSURE AS PER ES -2C AND ES -2F. ADDRESS: 10352 CHERRY AVE, FONTANA, CA CTID: 085401 0001 301 69M (THIS SHEET ONLY) Exp. METER "A" o THE STA TF OF C% L IFORNIA OR ITS OFFICERS -4 C I V I L El INSTALL RAMP METER 100 A, 240V 2P (MAIN BREAKER) LS -3 30 A, 240V 2P, CB (LIGHTING - EB ENTRANCE RAMP) WITH MODEL 30 A, 240V 2P, CB (LIGHTING - EB EXIT RAMP) 30 A, 240V 2P, CB (SIGN ILLUMINATION) 15 A, 120V 1 P, CB (LIGHTING CONTROL) 15 A, 120V 1 P, CB (SIGN CONTROL) 15 A, 1 P, TEST SWITCH (SIGN ILLUMINATION) CTID: 085401 0001 301 69M METER "B" o 100 A, 240V 2P, (MAIN BREAKER) TC -1 20 A, 120V 1 P, CB (RAMP METERING) 15 A, 1 20V 1 P, CB (CCTV) BORDER LAST REVISED 7/2/2010 MATCH LINE STA 30+67 SEE SHEET E-10 4 69 w O � o rn a w U) w w w z = H J w w Q 1 o FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE° Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 453 624 09/08/11 ROFESSIo REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY 09/08/111 PLANS APPROVAL DATE c� No, 21570 PROJECT NOTES (THIS SHEET ONLY) Exp. THE STA TF OF C% L IFORNIA OR ITS OFFICERS -4 C I V I L El INSTALL RAMP METER SIGNAL PER DETAIL "A" ON SHEET OR AGENTS SHALL NOT BE RESPONSIBLE FOR s� 7 -Hf ACCURACY OR COMR�ETENESS OF SCANNEo OF 1F0 E-12. COIFS OF THIS RZ AN SHEET CAL PARSONS 3200 EAST GUASTI ROAD SANBAG Efl INSTALL STATE FURNISHED MODEL 170 CONTROLLER ASSEMBLY WITH MODEL 334 CABINET AND FOUNDATION AS PER ES-3Co SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 ❑3 SEE SHEET E-12 FOR LOOP INSTALLATION DETAILS° ®INTERNALLY ILLUMINATED ''METER ON'' SIGN PER DETAIL "B" CASE 2 ON SHEET E-120 F5] SEE SHEETS E-13, E-23, AND E-25 FOR RMS FIBER OPTIC COMMUNICATION DETAILS° R/W Rq �, INFO ---------------- — 6— — — — - - CHERRY AVE WB EXIT RAMP "A" LINE - WB Rte 10 — 3 —� _ 9A 01 E---------------- e - ---------------- �B�� LINE -9-1 X00- — — — 8- T-10 LINE o I . 6 '� 7 "R 5' S L I E 8 Cr �Lli -r U 4 s USERNAME=>p0099563 DGN FILE => 846800ua011odgn CHERRY AVE 1 THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES (T) wwwwAvIkirm -13 — — — — — — — — — — — — — — - 9A 12 4- _ — U — — - — — - -�-- 1 1 795 — — —77— — — — no T (T) (T) 3 1 7 UNIT 2232 I 7 R /W RAMP METERING SYSTEM (LOCATION 3) SCALE: 1 "=50' PROJECT NUMBER & PHASE N � 000 N -I- 0 O o0 n � II �� 00 ww 0 0 J J ww a o � z O 00 'O w O Q O J 0 ON x x 91 0 w m 1 (1) O o > 0 LL o TI om w m �o Q W J z W U �z U U J u/ W Q W = U 0 U O LL] u/ _ __1 Q Q W z = O U � Q U z z 0 LL 0 z V) Q z O z 0 Q 0 r z Q 0 z W Q r W 0 0 ,r;i RAMP METER SIGNAL NOTES (THIS SHEET ONLY)OD 1_11 TYPE 1-A SIGNAL STANDARD. [2] 3 -SECTION 12" SIGNAL HEAD (RED, YELLOW, GREEN), 12 FULL CIRCLE VISORS. F3]2 -SECTION 8" SIGNAL HEAD (RED, GREEN), 8" FULL CIRCLE VISORS° 14-1BACKPLATE. [5]"R89 (CA)" AND "R10-6" SIGNS MOUNTED ON POLE. ATTACH WITH GALVANIZED 1/4'' 0 x 3/4 BOLTS, HEX NUTS, PLAIN AND LOCK WASHERS. SEE SIGN PLANS. © 1 -SECTION 8" SIGNAL HEAD (RED), 8" FULL CIRCLE VISOR. [7]FOUNDATION - SEE RSP ES -7B. T KITr r1AI"'_LT ILI I IA A T K I A Tr(l _N MES SHEET CASE 1 TP DETAIL "B" CASE 2 RAMP METER ON SIGN DETAIL 16 11 DETAIL "B" INTERNALLY ILLUMINATED METER ON SIGN MESSAGE DETAIL BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua012odgn Elev EP T \ / - 0 - T DETAIL "A" RAMP METER SIGNAL DETAIL r r r f l A A A I- l k A r T r f l I v VVIV I r\IJLLCl1 JI_I— I\/-11V1I IVIL I LI\ CABINET SIGNAL DETAIL "A", THIS SHEET DETAIL "C" 2 LANE RAMP LOOP INSTALLATION DEATIL THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES \RALLEL TO THE NCE OF THE ROADWAY) Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 454 624 09/08/11 QROFEssIoN REGISTERED CIVIL EN63INEER DATE q, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 20/-0" RICHARD E. IVY w No. 215DD 70 m Exp. s CIVIL P F of CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 -d LL J I /-11VLJ/-\I \u I L/-11 V L J Ju I VI \ APPROPIATE TERMINATION AND JOINT DETAIL DETAIL "D" MAINLINE LOOP INSTALLATION DETAIL UNIT 2232 ANS AVEL) PROJECT NUMBER & PHASE E-12 N � O � N � � o0 Ln O n II II D p W W 00 J J � W W W a o� z O 0 0 I O w O � I QO J 0 x x x x KI z w U) z O cn O Cr > U Q H w o M / W LLJ M LLJ Q LL] 01 J Lu CD U U J u/ W Q W = U 0 U O LL] un = Q Q w z = O_ U � Q U z z O LL O V) z Q z O f r; i CAT 5E CABLE CAT 5E CABLE BORDER LAST REVISED 7/2/2010 334 CABINET 334 CABINET \1H I JL I -HULL RAMP METERING SYSTEM LOCATION 1 TYPE ''D" C/ TO SPLICE VAULT (SEE SHEET E-25 FOR DETAILS) USERNAME=>p0099563 DGN FILE => 846800ua013odgn RAMP METERING SYSTEM LOCATION 2 334 CABINET RAMP METERING SYSTEM LOCATION 3 FIBER OPTIC JUMPER CAT 5E CABLE POWER STRIP I�ETWORK TO SERIAL ADAPTOR CARD FIBER OPTIC JUMPER CAT 5E CABLE POWER STRIP ETWORK TO ERIAL ADAPTOR ,ARD THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES lAprowl, Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 455 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN' 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS RICHARD E. IVY z w No. 21570 m DD Exp. s CIVIL P F OF CAL 1F0 3200 EAST GUASTI ROAD SANBAG SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 I r rt U I.H0Lt FROM SPLICE VAULT MODEL 170 CONTROLLER INTERFACE LOCATIONS 2 AND 3 _E 1TION PANEL RCONNECT AND JNIT RAMP METERING SYSTEM COMMUNICATION SYSTEM DETAILS NO SCALE UNIT 2232 PROJECT NUMBER & PHASE E-13 N � o03 N� o0 O 00 ww 0 0 J J ww a o � z O 0 0 'O w O QO -J 0 x x x 0 a w I i V) I z O Q 0 r Z Q Li 0 Z W R- Q F -- r) W 0 0 '01r; 1 PROJECT NOTES (THIS SHEET ONLY ) Fl LIGHTING (CITY STREET); ELECTROLIERS AND CONDUCTORS TO BE INSTALLED BY SCE. CONDUIT AND PULL BOXES TO BE INSTALLED BY CONTRACTOR. 1 2"C9 2#6 (ICC), 1#8 (G) — CITY Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 456 624 09/08/11 QRoFESS10" REGISTERED CIVIL EN INEER DATE 4, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 �(No � RICHARD �� Eo IVY z w _ 21570 cxp. sT CIVIL ATF OF CAL SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua014.dgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES M ODIFY L IG HTING AND SIGN ILLUMINATION (CITY LOCATION) SCALE: 1 ''=50' UNIT 2232 1 PROJECT NUMBER & PHASE E-14 N � N � � o0 Q0 O n � 0 I Ld W Q 0 ww F- 0 O O O w O O J O * INSTALL CONDUIT IN BARRIER 0 w > w lij W 1/2"C, MT w (CONDUCTORS BY SCE) SCE HAND HOLE H983E SEE SHEET E-11 FOR- S SERVICE DETAILS 11 3"C, MT ( CONDUCTORS —\ z BY SCE) w z o SEE SHEET E-3 FOR SERVICE can DETAILS o 8 Q l � U W � ----------------- o — — — — om m +— ~ N — Q� o — — — — � — Jz Q w O U CDR— u� w w Q w = W �o w z_ _ x O = W - — — U u� L. I— Q .y w � Q 1 00W Q= ES -9E O U Det P � Q u z 0 8 o V) Q 1 00W ES -9E Det P z O C2 Mme i w - Q c~r> V BORDER LAST REVISED 7/2/2010 Dist COUNTY ROUTE POST MILES SHEET TOTAL PROJECT NOTES (THIS SHEET ONLY) TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 457 624 1 2"C, 4#4(LTG), 2#4(SIGN ILLUMINATION), 2#10(TEST SWITCH), 1#4(G) ET E-16 09/08/11 oFEssl TA 690+50 SEE SHE � 2"C 4#4 LTG 2#4 SIGN ILLUMINATION 2#1 WEST SWITCH 1 #4 G REGISTERED CIVIL EN INEER DATE a eR 10 4/, < MATCHLINE S 12 2 9 4#4(LTG) 9 ( ) 9 ( ) 9 () RICHARD I I E. IVY 2"C 2#4 (SIGN ILLUMINATION) 2#1O(TEST SWITCH) 1#4(G) 09/08/11 w No. 21570 m 9 9 9 PLANS APPROVAL DATE - .6, Exp. v4- 7 p_ I I Q 2" C 4# 4 (LTG) 1#4(G) THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL Z NOT 5E RESPONSIa� E FOR s�q C I v I L P A B I I I Q 4 9 , THE ACCURACY OR COMPLETENESS OF SCANNED OF CAL 1Fc COPIES OF THIS RL AN SHEET - 0 R/WIol IOIo Z ��� 5 2"C, 2#8(LTG), 2#8 (SIGN ILLUMINATION) 2#10(TEST SWITCH), 1#8(G) PARSONS SANBAG (T) W 1 2 3200 EAST GUASTI ROAD 1 1 70 W 3RD STREET RC IJ I CD SUITE 200 ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 7G 4- 6 2 C, 2#10(LTG)91#8(G) j+I ISI No CD 7 P00 7 2'C, 2#10(LTG), 2#10(SIGN ILLUMINATION), 2#10(TEST SWITCH),1#8(G) IR ISI 7 w I RC (T)AB I I I I ` g 1 "C, 2#1 0(LTG),1#8(G) - CITY 1 � RS r I I I Ag 2"C, 4#4 (LTG), 2#4 (SIGN ILLUMINATION), 2#8 (LTG), 2#8 (SIGN ILLUMINATION), � j �AB 4#10(TEST SWITCH), 1#4(G), 1#8(G) W I 2 iic, 2#6 (ICC), 1#8(G) 11 2 C, 2#6 (ICC), 1#8(G) - CITY 12 2 C, 2#4 (LTG), 1#4(G) �' 1 2 v W I I `;, I I (T) ICC SEE I � � 693+71 IRRIGATION PLANS 6 8 I I 131+97 8 (T) R/W 8 SCE HAND HOLE H142B RC I 9A 10 8 1 /2"C, MT (CONDUCTORS BY SCE) -- RS38+54 � 10 1 1 41 +39 AB — y- � J RS ----- t — > Ln ��+ U— — — — — — — — — — — — — — — — RC6 - - — — — — — — — — — c\, t' - c~n ~ 6, y — — _ — — 6 w LLJ — 8 �.T 40 1 - z = � 1 = — — ASPH J-1 I- - - 6 - C -HE YY-Ay-ENUE ------ Z ----- ----------- a - - I �RC �I I I C-115 L- 33+79 - I Q 69 +00 10 CD � � I 39+93 1 8 h W SEE SHEET I 6, rn I I W v O (T) E-10 FOR 1 1 1 /2"C, MT 7 z o f SERVICE 1 �/2 C9 MT CONDUCTORS Q Q 703+38 (T) DETAILS I I � 4 - BY SCE) TORS BY SCE) r ►— SEE SHEET E-5 d0 II AB 0 Z FOR SERVICE 6 I I I I DI ar- W DETAILS ICC (CITY), SEE IRRIGATION PLANS RC I I c�09 O i'-� SCE HAND HOLE H142A J 4 2 ON 8 (T) RS D 1 RC I 698+00 5 II 3 �AB �I I _ (T) N 2 b� (T) PROJECT NOTES THIS SHEET ONLY o I I I (T) 2 ( ) Q I ( ) 709+84 ti 1❑ LIGHTING (CITY STREET); ELECTROLIERS AND CONDUCTORS TO BE R /W Cr � I I � 2 09 Q INSTALLED BY SCE. CONDUIT AND PULL BOXES TO BE INSTALLED w i i� (T) BY CONTRACTOR o I Ji T (T) iE am I I D 5 N 0- w I I gA o o T � N N I O I G7 QII IES -15A/ 5 n ES 15D (T z , I 2 -ISL SC1 Ce, R/W Ld f o 6 F- 9A0 0 Alm ti T � ILI-0NI INING _ o� MATCHLINE STA 699+50 SEE SHEET E-18 9 5 -Cffig" z o 7(9 s SCALE: 1 "=50' w o USERNAME=>p0099563 DGN FILE => 846800ua015odgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE - IS IN INCHES UNIT 2232 PROJECT NUMBER & PHASE o -15 N - 0 x x x 91 z w U) z O O > C:) Cr a U W � I � m � W m Q LL] D Jz w �CD �z U - U Ju� w Q lw = U 0 U O LL] un = --1 Q Q w z = O_ U � Q U z z O LL O V) z Q cn z O v z 0 Q O r Z Q Li O Z W Q F -- r) w 0 0 f r; i PROJECT NOTES (THIS SHEET ONLY)c. 1 2'1C, 2#4(LTG), 1#4(G) 2 2"C, 2#10 (LTG), 2#10 (SIGN ILLUMINATION), 2#10 (TEST SWITCH), 1#8(G) 3 2"C, 2#10(SIGN ILLUMINATION), 2#10(TEST SWITCH),1#8(G) Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 458 624 09/08/11 QROFESSI0" REGISTERED CIVIL EN INEER DATE 4, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RESPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD E. IVY z w No. 21570 m Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 * INSTALL CONDUIT IN BARRIER BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua016odgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES MODIFY LIGHTIPd{"a AND SiGt ILLUMINATION SCALE: 1 II=50' UNIT 2232 1 PROJECT NUMBER & PHASE E-16 x x x 0 a w I i cn I z w z O cn O C:) Or Q � U w f r; i w — Q c~r> V BORDER LAST REVISED 7/2/2010 PROJECT NOTES (THIS SHEET ON 1 2''C9 2#4 (LTG), 1#4(G) * INSTALL CONDUIT IN BARRIER USERNAME=>p0099563 DGN FILE => 846800ua017.dgn 670 WB Rte 10_ 0 675 EB Rte 10_ R/W THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES 3 Q0 i w Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 4 59 624 09/08/11 ROFEssIo REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY 09/08/11z PLANS APPROVAL DATE c� No, 21570 � � THE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp. OR AGENTS SHAL L NOT BE RFSPONSIBL E FOR S CIVIL P 7Hf ACCURACY OR COMPLETENESS OF SCANNED ATE of CAL 1F0 COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 MODIFY LIGHTING ANU SIGN ILLUMINATION SCALE: 1 ''=50' UNIT 2232 PROJECT NUMBER & PHASE E -1 7 N � O O � o0 00 O n � 0 I Lv W ~ � I Q 0 a- J Lv W F- 0 O li O O w O O J O 0 LL] m I (-/') x om w m QLL] o Jz w O U U J u� W Q W = U 0 U x -fr; i w — Q c~r> V 1 � hQ) X � PP 4823084E R /W 009+89 - 15 6 7 8 9 0 1- 2 3 4 WA�HINnION DR i ------------- 9A > w 9A % (T) 1 q 7, (T) � 1 � 1 � 1 Ln W (T) (T) 71 1+30 ----------------- ( T RC L 9A RC — X05— — — — 6 — — — — 7-- RS — — — — — — —9 — — AB RS — 710— — — 1— AB RS AB AB i / d Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 460 624 09/08/11 ROFEssIo REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY 09/08/11z PLANS APPROVAL DATE cr No, 21570 THE STA TF OF C% L IFOPNIA OR ITS OFFICERS Exp. OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR s CIVIL P THE ACCURACY OR COMPLETENESS OF SCANNED ATE of CAL 1F0 COPIES OF THIS RL AN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 */1 */ i \-\ 713+11 rim , ------------------- --------- -----------------Lu - W W O Ln r I— PROJECT NOTES (THIS SHEET ONLY)° 1 2"C9 2#8 (LTG), 2#8 (SIGN ILLUMINATION), 2#10 (TEST SWITCH), 1#8(G) 2 2"C9 2#10 (LTG),1#8(G) F3]CITY LOCATION° ELECTROLIERS, CONDUCTORS, AND PULL BOXES TO BE INSTALLED BY SCE. CONDUIT TO BE INSTALLED BY CONTRACTOR° * INSTALL CONDUIT IN BARRIER THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. MODIFY LIGHTING AND SIGN ILLUMINATION SCALE: 1 I'=50' BORDER LAST REVISED 7/2/2010 USERNAME => p0099563 RELATIVE BORDER SCALE - UNIT 2232 PROJECT NUMBER & PHASE DGN FILE => 846800ua018odgn IS IN INCHES E-18 x a w I i V) I z w z O O > C:) rr Q D U w 0 PROJECT NOTES (THIS SHEET ONLY). 1 2'1C9 2#10 (LTG), 1#8(G) 2 2"C9 2#8 (LTG), 2#8 (SIGN ILLUMINATION), 2#10 (TEST SWITCH), 1#8(G) 3 2"C9 2#8 (SIGN ILLUMINATION), 2#10 (TEST SWITCH), 1#8(G) 1-1— * INSTALL CONDUIT IN BARRIER 0 w Q c~r> V BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua019.dgn F-- LiJ W V) I -- — — — — _ WB Rte 10 715 EB Rte 1-0 R /W \714+35 THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 461 624 09/08/11 ROFEssIo REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY z 09/08/11 PLANS APPROVAL DATE c� No, 21570 � � THE STA TF OF C% L IFORNIA OR ITS OFFICERS Exp. OR AGENTS SHAL L NOT BF RFSPOVSIBL E FOR s C I V I L P 7 -Hf ACCURACY OR COMPLETENESS OF SCANNED ATE of CAL 1F0 COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 MODIFY SIUF4m- LIGH T ING AND LLumlN AT IOFa SCALE: 1 "=50' PROJECT NUMBER & PHASE E-19 x x x 0 a w m I V) z 0 Q O r Z Q Li O Z W R- Q F -- r) W 0 0 f r; i PROJECT NOTES THIS SHEET ONLY) F-11 LIGHTING (CITY STREET); ELECTROLIERS AND CONDUCTORS TO BE INSTALLED BY SCE. CONDUIT AND PULL BOXES TO BE INSTALLED BY CONTRACTOR. 1 �/2'1C, MT ( CONDUCTORS BY SCE) BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua020adgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 1 10 12.3/14.1 462 624 09/08/11 RoFESS10 REGISTERED CIVIL EN INEER DATE e 10,' REGISTERED 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RESPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 w (RICHARD E. IVY No_21570DD xp. S� CIVIL ATF OF CAL SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 N � O � N � o0 � o II II � p i MODIFY LI I N ANEW oma'! SIGN ILS m I I ww'' a o � i z O li SCALE: 1 ''=50' I I i O w O ® QO J O PROJECT NUMBER & PHASE x R- x 91 a w I I V) I z 0 Q O r Z Q Li O Z W R- Q F -- r) W 0 0 f■1; CTID: 08540100013o168M SEE SHEET E-10 Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 463 624 09/08/11 ROFEssIo REGISTERED CIVIL EN63INEER DATE sae Nq RICHARD E. IVY — z No. 21570 m DD Exp. s CIVIL P OF CAL 1F0 BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua021odgn CTID: 085401 0001 3.1 69M SEE SHEET E-11 THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 3RD STREET �NARDINO, CA 92410 SECONDARY �r�Q T ION t W IMINU UlAU "[AM ) PROJECT NUMBER & PHASE NO SCALE X X X 91 a w V) I O aid pe Old 11 w '011;1 GENERAL NOTES (THIS SHEET ONLY ) 1 o FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE° 20 SEE SHEET E-13 FOR RAMP METERING SYSTEM COMMUNICATION DETAILS° 3. CCTV AND FIBER OPTIC COMMUNICATIONS SHALL REMAIN OPERATIONAL DURING CONSTRUCTION° TEMPORARY CCTV AND FIBER OPTIC CONDUIT MOUNTING METHODS AND LOCATIONS TO ARE TO BE APPROVED BY THE ENGINEER IN THE FIELD. TRENCH IN ASPHALT (SHEETS E-22 AND E-23 ONLY): /'11 \AT AI TI AI I A PROJECT NOTES (THIS SHEET ONLY) �1 AB EXISTING FIBER OPTIC CONDUIT. F2] 4'' CONDUIT WITH 4 1'' INNERDUCTS AND 1 EACH TYPE ''A ''B AND "C" FIBER OPTIC CABLES. F3] RS EXISTING WIRELESS VEHICLE DETECTION SYSTEM STANDARD AND EQUIPMENT. LEGEND (SHEETS E-22 AND E-23 ONLY): ® NEW SPLICE VAULT 17--A 1\ ./I FXTCTTNI(: CPI T( -F \/AI II T Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 464 624 09/08/11 REGISTERED CIVIL EN INEER DATE eROFEssIoNq 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS PLAN SHEET PARSONS RICHARD E. IVY w No. 21570 m DD Exp. sT CIVIL ATF �F CAL 1F0 3200 EAST GUASTI ROAD SANBAG SUITE 200 1170 W 3RD STREET ONTARIO, CALIFORNIA 91761 SAN BERNARDINO, CA 92410 BORDER LAST REVISED 7/2/2010 L/\1 J 1 1114 V I 1LJLI \ VI I I \i \1t --%LJ LLJ AND CONDUITS TO REMAIN° USERNAME=>p0099563 DGN FILE => 846800ua022odgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE rI IS IN INCHES rEM MODIFY COMMUNICATION SY STEM SCALE: 1 "=50' UNIT 2232 PROJECT NUMBER & PHASE E-22 N � O O N N � n I � 0 I w W ~ � I F- 00 a- J w LLj F- 0 O li O w Oi O O J O rN x CD z Lu I-- 0 O cn O C) > Cr Q Y D U w o X I om w QLL] Jz O U — J u/ Q w U D m o w U w = U � O 1" INNERDUCTS AND 1 EACH TYPE "A119'B"9 AND "C" FIBER OPTIC CABLES. �3 I EXISTING CCTV CAMERA AND POLE. T E L E sv'w I S 10 w SYSTEM M a_ IFY COM M u _ ICA TIdN Q w Q z = E�'! O_ U � Q z z -D O O V) z Q z O CAT 5E CAT 5E 2"C9 1 TYPE "D" (ICC) ICC9 SEE IRRIGATION PLANS i CAT 5E I I SEE SHEET E-10 � FOR DETAILS y RMS#1 3 z 0 x Q (D N E02 n Lu z w 1 ❑5 3 o � - w - z w - w � '— O + w N o rn �o Q SEE SHEET-' ~ E-11 FOR Q u� SERVICE z DETAILS C:) J X _T_Q U U F— Q w � 0 w a c~r> V BORDER LAST REVISED 7/2/2010 0 AMU �I N I Q iY cr W r/f/---SEE 2"C91 TYPE "D" (ICC) CAT 5E SHEET E-5 FOR DETAILS (T) O lN0 Q° (T) I CAT 5E I , I II i 2 "C9 1 TYPE "D" ICC (T) SIC TYPE ''D11 CABLE I I I I I AND CAT 5E I I I I I (T) M I I I SEE SHEET E-10 RMS#2 I I FOR DETAILS I I r► I I cr ! �I TYPE "D" CABLE - RAM 6 A y y 665 I e WB LOOP HERR`( Av ll� RC s 'I 69 O SIC USERNAME=>p0099563 DGN FILE => 846800ua023odgn RMS#3 PROJECT NOTES (THIS SHEET ONLY): FilAB EXISTING FIBER OPTIC CONDUIT, [2]4" CLO CONDUIT WITH 4 1" INNERDUCTS AND 1 EACH TYPE "A119'B"9 AND "C" FIBER OPTIC CABLES. �3 RS EXISTING CCTV CAMERA AND POLE. 4 INSTALL SPLICE CLOSURES AND SPLICE TRAY, SEE SHEETS E-25 AND E-27 FOR SPLICE VAULT DETAILS, 5 INSTALL NEW CCTV SYSTEM, SEE SHEET E-24 FOR DETAILS. �6 RS EXISTING WIRELESS VEHICLE DETECTION SYSTEM STANDARD AND EQUIPMENT. Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 465 624 09/08/11 10 REGISTERED CIVIL EN INEER DATE sae Nq RICHARD E. IVY 09/08/11z PLANS APPROVAL DATE No. 21570 � Exp. � THE STA TF OF C% L IFORNIA OR I TS OFFICERS OR AGENTS SHAL L NOT BF RESROVSIHL F F01,? s CIVIL P THE ACCURACY OR COMPLETENESS OF SCANNED ATE of CAL 1F0 COPIES OF THIS PLAN SHEET PARSONS SANBAG 3200 EAST GUASTI ROAD 1170 W 3RD STREET SUITE 200 SAN BERNARDINO, CA 92410 ONTARIO, CALIFORNIA 91761 GENERAL NOTES (THIS SHEET ONLY ) 1 o FOR ACCURATE RIGHT OF WAY DATA9 CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE° 20 SEE SHEET E-13 FOR RAMP METERING SYSTEM FIBER OPTIC COMMUNICATION DETAILS. 3. CCTV AND FIBER OPTIC COMMUNICATIONS SHALL REMAIN OPERATIONAL DURING CONSTRUCTION° TEMPORARY CCTV AND FIBER OPTIC CONDUIT MOUNTING METHODS \ AND LOCATIONS TO ARE TO BE APPROVED BY THE ENGINEER IN THE FIELD. \ R /W -_- A SPH --- ---------- \ -------------------------- -t05— 6 L- - ------------------------------------".----------------- - _ =----- ---- -- 0 — — —� — - — — — —— — — - ---------------- - -------------- --- ---- —----------- 7— — — — — — - -7oo-— — - - ---------------- ---------------------------- -EB Rte- - - ---- -------- 4 — — 70-5 — _ — 7:� 2 Ell 1 fo — -- �— 7 �- --f O---- —� f 0- f° 1 2 3 --------- - 2"C 9 1 TYPE "D" CABLE SEE SHEET E-11 FOR DETAILS 2"C 9 1 TYPE "D" CABLE SEE SHEET E-3 FOR DETAILS 2'C9 2#8 (CCTV) 9 1 #8(G) THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES 3 R/W 705 7 CHERRY Ave EB ENTRANCE RAMP fo _ f CONNECT TO SPLICE VAULT 2 1 STA. 707+10 SEE DETAIL SHEETS E-25 AND E-28 EXISTING FIBER OPTIC CABLES AND CONDUITS TO REMAIN MODIFff Y CLO SE D I R'c U_ I T T E L E sv'w I S 10 N SYSTEM M OD IFY COM M UN ICA TIdN �Y ST E�'! SCALE: 1 II=50' UNIT 2232 � PROJECT NUMBER &PHASE E-23 x x 0 w om � w m QLL-] o Jz w O U — U L-1 Q Lw = U D U cr O LL] un = --1 a Q w z = O U � Q U z z 0 LL 0 V) z Q z O Or �1 EW CCTV ASSEMBLY CONTINOUS REINFORCED SLOTTED HOLE CCTV COMPOSITE CABLE "J" HOOK FOR CABLE SUPPORT GRIP STRAIN RELIEF CABLE GRIP CCTV COMPOSITE CABLE TYPE 35 CCTV CAMERA POLE PER ES -16A BORDER LAST REVISED 7/2/2010 "'IRONMENTAL ENCLOSURE WITH CCTV CAMERA PAN AND TILT DRIVE UNIT CCTV COMPOSITE CABLE FROM PAN AND TILT DRIVE UNIT ONTINOUS REINFORCED LOTTED HOLE CCTV ASSEMBLY FRONT (INTERIOR) USERNAME=>p0099563 DGN FILE => 846800ua024odgn CCTV ENCLOSURE INSTALL CONNECTORS AS REQUIRED AC PLU CCTV CONTROL CABLE CV 21/4'� T 1 3/6�� V DIAMETER ROUND BAR "J" HOOK r -i inr"iv 1-9 25" 0-1 FRONT PLUG SHRINK TUBING CCTV COMPOSITE CABLE 1' 151/2�� SIDE CCTV ENCLOSURE DETAILS 0.1793 3" SLOTTED HOLE Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 466 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 GENERAL NOTES (THIS SHEET ONLY ) 1 o PLACE ALL COUPLINGS ON THE SAME SIDE OF POLE. RICHARD E. IVY z L13 No. 21570 m Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 20 CHASE NIPPLES AND SLOTTED HOLE TO HAVE A RAIN TIGHT PLUG. PLUG SHALL ONLY BE REMOVED IF CHASE NIPPLE OR SLOTTED HOLE MAIN CONNECTOR IS USED (TO CCTV ASSEMBLY) TV COMPOSITE CABLE U -BOLT TYPE "D" CABLE FROM SPLICE VAULT DIRECTION OF TRAVEL CTV POLE U -BOLT ABINET POWER ROM SERVICE THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE — 3 IS IN INCHES I I I U ETW UNIT 2232 3. ALL ATTACHMENTS9 UNLESS OTHERWISE NOTED9 SHALL BE MOUNTED TO THE POLE WITH STAINLESS STEEL STRAPS OR OTHER METHOD WITHOUT DRILLING HOLES IN THE POLE. ENCLOSURE MAY REQUIRE DRILLING THROUGH THE POLE FOR MOUNTING° METHOD OF MOUNTING ENCLOSURE TO BE APPROVED BY THE ENGINEER. FOC JUN nlr-TAI nn T\r- r-kIMI \/ CCTV ASSEMBLY WIRING DIAGRAM N NN o0 uj 0 D o0 II II I F Y L 0 S� I R Ce SIT T ISI Y�T ww (CCTV DETAILS) z 0 0 0 NO SCALE wo E-24 �o <0 J 0 PROJECT NUMBER & PHASE FILTERED VENTILATION LOUVERS O I I I I I i I I I I i I I I i I I I i I I I I I I I I I I I I I FRONT PLUG SHRINK TUBING CCTV COMPOSITE CABLE 1' 151/2�� SIDE CCTV ENCLOSURE DETAILS 0.1793 3" SLOTTED HOLE Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 466 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 GENERAL NOTES (THIS SHEET ONLY ) 1 o PLACE ALL COUPLINGS ON THE SAME SIDE OF POLE. RICHARD E. IVY z L13 No. 21570 m Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 20 CHASE NIPPLES AND SLOTTED HOLE TO HAVE A RAIN TIGHT PLUG. PLUG SHALL ONLY BE REMOVED IF CHASE NIPPLE OR SLOTTED HOLE MAIN CONNECTOR IS USED (TO CCTV ASSEMBLY) TV COMPOSITE CABLE U -BOLT TYPE "D" CABLE FROM SPLICE VAULT DIRECTION OF TRAVEL CTV POLE U -BOLT ABINET POWER ROM SERVICE THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE — 3 IS IN INCHES I I I U ETW UNIT 2232 3. ALL ATTACHMENTS9 UNLESS OTHERWISE NOTED9 SHALL BE MOUNTED TO THE POLE WITH STAINLESS STEEL STRAPS OR OTHER METHOD WITHOUT DRILLING HOLES IN THE POLE. ENCLOSURE MAY REQUIRE DRILLING THROUGH THE POLE FOR MOUNTING° METHOD OF MOUNTING ENCLOSURE TO BE APPROVED BY THE ENGINEER. FOC JUN nlr-TAI nn T\r- r-kIMI \/ CCTV ASSEMBLY WIRING DIAGRAM N NN o0 uj 0 D o0 II II I F Y L 0 S� I R Ce SIT T ISI Y�T ww (CCTV DETAILS) z 0 0 0 NO SCALE wo E-24 �o <0 J 0 PROJECT NUMBER & PHASE X X X 91 0 w m i u� om w m QLL] o Jz w OCD U — U w Qw = U 0 U O LL] _ u _ Q Q w z = O_ U � Q u z z O LL O V) z Q _ z O z O R— Q z Q w O z w Q F -- r) w 0 04 f■1; M w 0 C� a 0 m O r_ _ i T k i r = I I r I I A r i r RAMP METER ( LOCATION 2 ) Tnr)T/� A TT/\KI t�/IAITn/\I I r -M / Tt- nN ( WFF?RY A\/F7 LEGEND (THIS SHEET ONLY): • SPLICE OF TWO FIBERS >— CUT AND CAP END OF FIBER, NOT Sl ---------- EXISTING FIBER NEW FIBER COLOR CODES FOR BUFFER TUBES A 1. BLUE (BL) 20 ORANGE (OR) 3. GREEN (GR) 4. BROWN (BR) 5. SLATE (SL) 6. WHITE (WT) BORDER LAST REVISED 7/2/2010 7. RED (RD) 8. BLACK (BK) 9. YELLOW (YL) 10. VIOLET (VL) 1 1 o ROSE (RS) 1 2 o AQUA (AQ) USERNAME=>p0099563 DGN FILE => 846800ua025odgn CCTV TRAFFIC SIGNAL RAMP METER (LOCATION 3) CHERRY Ave CHERRY Ave CHERRY AVE 10 EB EB ENTRANCE RAMP EB ENTRANCE RAMP THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES T Exist TYPE I'BI' Ci^ �' ------- BL -- OR -=-G R -- BR__. G --- -----S L--- WT -- T __ RD-- B----- Y L--- V_L_---- A Q ---R R-- S S - Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 467 624 09/08/11 QROFEssIoN REGISTERED CIVIL EN INEER DATE q, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RESPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 Exist TYPE 'ICII CABLE (THIS SHEET ONLY) �SULATION COLOR. MODIFY UNIT 2232 w z m U V) O O COMMUNICATION RICHARD E. IVY z w No. 21570 m DD Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 SYSTEM (FIBER BREAKOUT DIAGRAM FOR TYPE C AND D CABLES) NO SCALE PROJECT NUMBER & PHASE B L---- ----------- ---0 R ---------- ----'G R --- --- B R---------- ---- - S L---- ---WT__.R - - ---- R D --- B K Y L ---- - -- ---V L ---------- R S--- - --- q Q ---------- Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 467 624 09/08/11 QROFEssIoN REGISTERED CIVIL EN INEER DATE q, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RESPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 Exist TYPE 'ICII CABLE (THIS SHEET ONLY) �SULATION COLOR. MODIFY UNIT 2232 w z m U V) O O COMMUNICATION RICHARD E. IVY z w No. 21570 m DD Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 SYSTEM (FIBER BREAKOUT DIAGRAM FOR TYPE C AND D CABLES) NO SCALE PROJECT NUMBER & PHASE B L- --- --- - --- G ---BR__. ---- -S L---- ---WT__.R - - ---- R D--- - -- ---YL--- V R S --- AQ---------- Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 467 624 09/08/11 QROFEssIoN REGISTERED CIVIL EN INEER DATE q, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RESPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 Exist TYPE 'ICII CABLE (THIS SHEET ONLY) �SULATION COLOR. MODIFY UNIT 2232 w z m U V) O O COMMUNICATION RICHARD E. IVY z w No. 21570 m DD Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 SYSTEM (FIBER BREAKOUT DIAGRAM FOR TYPE C AND D CABLES) NO SCALE PROJECT NUMBER & PHASE x x x 0 0 w m I u� I � m � W m Q LL] D J z w CD U — U J u/ w Q w = U 0 U 2 BUF O LL] un = --1Q Q w z = O U � Q u z z O LL O V) z Q z 0 I r rrr- U �-HOLL FROM SPLICE VAULT MODEL 2070 CONTROLLER INTERFACE (TRAFFIC SIGNAL) C 041 ANEL �—T AND 1 TRAFFIC CABINET 2 BUF 1 1 r— r— U I.HDLC FROM SPLICE VAULT ECTORS C CONNECTORS IBER DISTRIBUTION PANEL INSTALL FIBER OPTIC RACK MOUNTABLE INTERCONNECT AND TERMINATION UNIT IN IRRIGATION CONTROLLER CABINET IRRIGATION CONTROLLER INTERFACE Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 468 624 09/08/11 QR0FESSI0" REGISTERED CIVIL EN INEER DATE 4, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD ��� Eo IVY z w No_ 21570 m Exp. s� CIVIL F OF CAL JFA�' SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 MODIFY COMMUNICATION SYSTEM (TRAFFIC SIGNAL AND IRRIGATION CONTROLLER INTERFACE DETAILS) w THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. NO SCALE E-26 BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800uc026odgn RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 1 PROJECT NUMBER & PHASE NOTES (THIS SHEET ONLY) 10 A SPLICE CLOSURE AND SPLICE TRAY SHALL BE x INSTALLED IN THE SPLICE VAULT. 20 SEE FIGURES 19 2 AND 3 FOR DETAILS ON SPLICING° x x x x z w U) z O V) 0 > C) Q D U W 0 om w m QLL] o Jz w �C U � U J U/ W Q W = U 0 U O U U _ Q Q w z = O_ U � Q U z z 0 LL 0 V) z Q z O z O Q O w z Q w O z w Q r w 0 0 fr ;i Aft w■ ■w� Ina M ■■■ � .JUIVII \liLlV I LI\LLj 30' SLACK INCOMING F OPTIC COf BORDER LAST REVISED 7/2/2010 UU JLHI.f\ TORSION ASSISTED 2 PIECE COVER NDUIT '\OUT (TYP) UTGOING FIBER OPTIC CONDUIT TYPE D CABLE — CCTV TYPE D CABLE — SIG TYPE D CABLE — RMS#3 TYPE D CABLE — RMS#2 TYPE D CABLE — Irr ' SLACK FIGURE 1 -SPLICE VAULT DETAIL USERNAME=>p0099563 DGN FILE => 846800ua027odgn TYPE D CABLE — CCT TYPE D CABLE — SI1 TYPE D CABLE — RMS# TYPE D CABLE — RMS# TYPE D CABLE — Ir INCOMING TYPE C CABL INCOMING TYPE C CAE ONE BUFFER TL 12 FIBERS Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 469 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET JTGOING TYPE C CABLE FIGURE 2 -SPLICE CLOSURE DETAIL PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 ISI IrrER TUBES THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES DE D CABLE -YPE C CABLE R TUBE �PE D IIDARKII > IN TRAY RICHARD Eo IVY w No. 21570 m DD Exp. sT CIVIL F of CAL IF°�� SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 FIGURE 3 -SPLICE TRAY DETAIL o0 00 ww F- 00 J J a- a- 3 fv- 10-.— D li F Y COMMUNICATION SYSTEM L<j Lu o�_ _ UNIT 2232 (SPLICE VAULT DETAILS) =0 o O NO SCALE �I O -27 ��' QO J O PROJECT NUMBER & PHASE NOTES (THIS SHEET ONLY) 10 A SPLICE CLOSURE AND SPLICE TRAY SHALL BE X INSTALLED IN THE SPLICE VAULT. 20 SEE FIGURES 19 2 AND 3 FOR DETAILS ON SPLICING. X X X X z w U) z 0 V) 0 > C) a Y D U W D om w m Jz W U U J u/ W Q W = U 0 U O LL] m u� _ Q Q w z = O_ U � Q U z z m 0 LL 0 V) z Q z O z 0 Q O r Z Q Li O Z W R— Q F -- r) w 0 0 fr ;1 Exist CABLES I BORDER LAST REVISED 7/2/2010 SPLICE VAULT .JUIVII \ I-L—IV I LI\LU / 7n/ C -'I A (- I r\ EW CABLES OUT TORSION ASSISTED 2 PIECE COVER NDUIT '\OUT (TYP) Exist BUFFER TL IN FROM BACKBON NOT ALL FIBERS SHOWN Exist CABLES I ni ir-rrn -ri inr c, f -\i iT r- . Rum NEW OT ALL EW CABLES OUT UUI I LI\ I UULJ 11\4I I\UIVI LA I St BACKBONE CABLES (NOT ALL BUFFER TUBES SHOWN) FIGURE 2—SPLICE CLOSURE DETAIL NOT ALL FIBERS SHOWN =ER TUBES v BACKBONE Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 470 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSRONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD Eo IVY w No. 21570 m DD Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 T E M rin 0� D I F Y UUW-41'4"Mam M U—Nam I (-o;'A T 10 Nm SR Y iap FIGURE 1—SPLICE VAULT DETAIL FIGURE 3—SPLICE TRAY DETAIL (SPLICE VAULT DETAILS) NO SCALE THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. � AC� USERNAME=>p0099563 DGN FILE => 846800ua028odgn RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 PROJECT NUMBER & PHASE N � O N O � o0 �Ln o0 o wLLji 00 J OJ a- a W w o � z 0 0 j w 0 01 0 J 0 1 x x x x FRON DOOR z Lu V) z 0 V) 0 > o Q U C) W O I LL] _ u Q Q w z = O_ U � Q U z z 0 0 V) z Q z O C2 z O R— Q O r z Q w 0 z w Q w 0 0 AdnMr-1 7-22 OR 334 CABINET 26" SIDE VIEW POLICE PANEL 'C NIPPLE SEE NOTE 1 FR DO ;EAR )OOR BOLT MOUNTING LOCATION (4 Typ) ""^'fir' -7-7' r_� 334 CABINET 26" _ �E Min TOP VIEW EXTERNAL BBS CABINET MOUNTED TO THE MODEL 332 OR 334 CABINET MODEL 332 OR 334 CABINET FRONT DOOR EXTERNAL BBS CABINET r' 26 " Min BASE PLAN FOR BBS MOUNTED TO THE NOTES° (THIS SHEET ONLY) Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 471 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD E. IVY z L13 No. 21570 m c Exp. sT CIVIL ATF OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 REAR 10 THE EXTERNAL BBS CABINET SHALL BE MOUNTED TO THE MODEL 332 OR "-16 334 CABINET WITH FOUR 18-8 " STAINLESS STEEL DOOR HEX HEAD, FULLY -THREADED, 3/8 " X 1" BOLTS; TWO WASHERS PER ow z� BOLTS AND ARE 18-8 STAINLESS STEEL, 1 OUTSIDE DIAMETER, ROUND, AND FLAT; AND ONE K -LOCK NUT PER BOLT THAT IS 18-8 STAINLESS 0Q POLICE PANEL THE ENGINEER TO APPROVE THE BOLT MOUNTING LOCATION PRIOR TO INSTALLATION° U 20 THE ANCHOR BOLTS SHALL BE 3/4 ''Dia X 15" WITH A 2"-90° BEND. THE CABINET MANUFACTURER'S EXTERNAL BBS CABINET r' 26 " Min BASE PLAN FOR BBS MOUNTED TO THE NOTES° (THIS SHEET ONLY) Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 471 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN� 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHAL L NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD E. IVY z L13 No. 21570 m c Exp. sT CIVIL ATF OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 REAR 10 THE EXTERNAL BBS CABINET SHALL BE MOUNTED TO THE MODEL 332 OR "-16 334 CABINET WITH FOUR 18-8 " STAINLESS STEEL DOOR HEX HEAD, FULLY -THREADED, 3/8 " X 1" BOLTS; TWO WASHERS PER BOLT, DESIGNED FOR 3/8 BOLTS AND ARE 18-8 STAINLESS STEEL, 1 OUTSIDE DIAMETER, ROUND, AND FLAT; AND ONE K -LOCK NUT PER BOLT THAT IS 18-8 STAINLESS STEEL AND A HEX -NUT. POLICE PANEL THE ENGINEER TO APPROVE THE BOLT MOUNTING LOCATION PRIOR TO INSTALLATION° NIPPLE 20 THE ANCHOR BOLTS SHALL BE 3/4 ''Dia X 15" WITH A 2"-90° BEND. THE CABINET MANUFACTURER'S SPECIFICATION SHALL DETERMINE THE LOCATION OF THE ANCHOR BOLTS IN THE FOUNDATION° THE ENGINEER TO APPROVE THE ANCHOR BOLTS AND THEIR LOCATION IN THE FOUNDATION PRIOR TO CONSTRUCTION° MODEL 332 OR 334 CABINET ANCHOR BOLTS, 4 Min (SEE NOTE 2) SEE NOTE 1 MODEL 332 OR 334 CABINET (FOR DIMENSIONS AND DETAILS NOT SHOWN, SEE SHEET A6-1 TO A6-4, CABINET HOUSING DETAILS OF THE TRANSPORTATION ELECTRICAL EQUIPMENT SPECIFICATION (TEES)) BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua029odgn 3. THE CONTRACTOR SHALL VERIFY THE DIMENSIONS OF THE BBS CABINET PRIOR TO CONSTRUCTING THE FOUNDATION OF THE MODIFIED PORTION OF THE Std MODEL 332 AND 334 CABINET FOUNDATION. THE ENGINEER TO APPROVE ANY NECESSARY DEVIATIONS PRIOR TO CONSTRUCTION 4. ALL DIMENSIONS ARE NOMINAL. CONDUIT AREA (9" x 1 5" ) RAISED PCC PAD IN UNPAVED AREAS OR MATCH EXISTING GRADE EXTERNAL BBS CABINET ANCHOR BOLTS, 2 Min (SEE NOTE 2) EXTERNAL BBS CABINET DOOR MODIFIED MODEL 332 AND 334 CABINET FOUNDATION DETAIL FOR BATTERY BACKUP SYSTEM (FOR DIMENSIONS AND DETAILS NOT SHOWN AND ADDITIONAL NOTES, SEE SHEET ES -3C OF THE STANDARD PLANS FOR MODEL 332 AND 334 CABINETS) THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 (BBS) N NN o0 �Ln o� wui E L Eul�` T R I A L T E M -S' ww a :2(BBS FOUNDATION DETAILS) z 01 0 NO SCALE moo', E-29 0 Jol PROJECT NUMBER & PHASE x x x x LEGEND o ( THIS SHEET ONLY) PTS = POWER TRANSFER SWITCH UPS = UNINTERRUPTIBLE POWER SUPPLY UPSC = UNINTERRUPTIBLE POWER SUPPLY CONTROLLER UPSM = UPS MODE BP = BYPASS MBPS = MANUAL BYPASS SWITCH AC+ = UNGROUNDED CONDUCTOR AC- = GROUNDED CONDUCTOR C = COMMON Grn = GREEN B I k = BLACK Wht = WHITE SF = STATE -FURNISHED TB = TERMINAL BOARD Cntl = CONTROL Gnd = GROUND Temp = TEMPERATURE Batt = BATTERY NOTES OO ( TH I 1, TYPE A REF 2. CASE -1 REF Z INSTALLED III 3. THE LOCATI z � 4. THE CONTRA U) CIRCUIT BRE O o > ? 5. A TEMPERAT cl�a Y TERMINAL OF 0" o 6o THE ELECTR ``I THE TB IN - 7. THE CONTRA III m m #18 AWG WIF ~THE Q� o CONDUC Jz �C w U— —J u/ __1 W Q W U 0 = U z O Q O r Z Q Li O Z w Q r w 0 0 fR; SEE NOTE 4 SINGL� f__ I,/ 2 -WIRE CIRCUIT FROM SERVICE EQUIPMENT AC POWER TO BBS CABINET /cr-rr nin--r -\ Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 112.3/14.1 472 624 09/08/11 QROFEssIoN REGISTERED CIVIL EN INEER DATE q, 09/08/11 PLANS APPROVAL DATE BORDER LAST REVISED 7/2/2010 332 CONTROLLER CABINET USERNAME=>p0099563 DGN FILE => 846800ua030odgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE IS IN INCHES 3 ---—- - —---— - UNIT 2232 FICERs E FOR SCANNED RICHARD ��� Eo IVY z w No. 21570 m Exp. 4. sT CIVIL F OF CAL IFAS' SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 E LECTRICAL SYSTEMS (BBS POWER CONNECTION DIAGRAM, TYPE A, CASE -1) PROJECT NUMBER & PHASE E- 3 0 x x x 91 04 'Mr;i SEE NOTE 4 I . - I L� + N -BUS G -BUS AC- I I I r -------I r -------I I I I I I I I ' I I I Gnd I I I I I I I I I I I I I I I I I I I m `--+--� AC+ LINE FROM SF PTS 75 TO 80 AMPERE -HOURS •-- L-----------1--� AT m 1 20 HOUR RATE Q -------- I I I 1 U I r-;--� I I T--.• PER BATTERY O r-----+--♦ I I � I I I I � I I � I 1 � i i i i i I I I L I I I ; I i I I I I I I c a BATTERY SET I ----I � I I s---; --4---; ---4 -- (4 TO 8 BATTERIES) I I I AI� + TB U C U m Q i Q U I I I I I � SEE ' lII`jNOTE 6 I ' J Blk SINGLE-PHASE, 120 V 2 -WIRE CIRCUIT FROM SERVICE EQUIPMENT BORDER LAST REVISED 7/2/2010 AC+ LINE FROM SF PTS 332 CONTROLLER CABINET USERNAME=>p0099563 DGN FILE => 846800ua031odgn o THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE - 3 IS IN INCHES BBS CABINET UNIT 2232 ELECTRI`- ��T E M Z'S' (BBS POWER CONNECTION DIAGRAM, TYPE B, CASE -1) NO SCALE E - 'g jr_-_ PROJECT NUMBER & PHASE Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS LEGEND O (THIS SHEET ONLY) 08 SBd 10 12.3/14.1 473 624 PTS = POWER TRANSFER SWITCH 09/08/11 UPS = UNINTERRUPTIBLE POWER SUPPLY REGISTERED CIVIL EN INEER Es eR°FsIoN4 DATE UPSC = UNINTERRUPTIBLE POWER SUPPLY CONTROLLER �a RICHARD UPSM = UPS MODE E. IVY BP = BYPASS AC POWER TO 09/08/11 z 21570 BBS CABINET MBPS = MANUAL BYPASS SWITCH (SEE NOTE 3) PLANS APPROVAL DATE c No. Exp. AC+ = UNGROUNDED CONDUCTOR AC+ LINE TtiE STATE of CALIFOPNIA OR ITS OFF117' CIVIL AC- = GROUNDED CONDUCTOR T O S F PTS OR AGENTS SHALL NOT BE RESPONSIBLE FOR T s� �P TRE ACCURACY OR COMPLETENESS of SCANNED F C = COMMON COPIES OF THIS RL AN SHEET of CAL 1F0 Grn = GREEN B I k = BLACK PARSONS 3200 EAST GUASTI ROAD SANBAG OBERNARDINOW 3RD ET o Wht = WHITE SUITE 200 ONTARIO, CALIFORNIA 91761 SAN ECA 92410 Lv w O SF = STATE -FURNISHED > Batt = BATTERY LLI � Temp = TEMPERATURE w TB = TERMINAL BOARD Cntl = CONTROL Gnd = GROUND SF PTS INVERTER/CHARGER UNIT NOTES (THIS SHEET ONLY) UPS OUT N 0 Ac+ AC OUTPUT NO ON Batt O + 1 o TYPE B REFERS TO THE BBS EQUIPMENT FROM MANUFACTURER Bo � BP Cntl C O RELAY A Qz 0- 2o CASE -1 REFERS TO THE SITUATION WHEN THE ENTIRE BBS EQUIPMENT INCLUDING THE BATTERIES ARE UPS IN G N NC 0 0� z INSTALLED IN THE BBS CABINET. + 1 -0 + AC+ AC INPUT U) 3. THE LOCATION OF THE 2''C NIPPLE WILL BE DETERMINED BY THE ENGINEER IN THE FIELD. Q Q CD QNO O LOW Batt +w 0 4. THE CONTRACTOR SHALL FURNISH AND INSTALL A NEMA -1 ENCLOSURE WITH 30 A9 1 P9 120/240 VOLTS RATED 41 41 41 40 C O RELAY B '--' CIRCUIT BREAKER MANUFACTURED PER UL STANDARD 489. AC+ IN AC+ OUT NC 0 05. A TEMPERATURE PROBE SHALL BE ATTACHED TO THE BATTERY BY TAPE OR ATTACHED TO THE NEGATIVE - TERMINAL OF THE BATTERY. NO O TIMER 4� a D Y 6o THE ELECTRICAL POWER FOR THE COOLING FAN FOR THE BBS CABINET SHALL BE TAPPED FROM THE BOTTOM UPSC Temp SENSE C O RELAY C m z w OF THE TB IN THE 332 CABINET° RELAY CONTROL NCO I� 7. THE CONTRACTOR SHALL PROVIDE A 9 -WIRE WIRING HARNESS OR BUNDLED 9 MULTICOLOR CONDUCTORS, NC NO NO NC m #18 AWG WIRES FROM THE RELAY ON THE INVERTER/CHARGER UNIT TO THE CONTROLLER. THE ENDS OF Temp PROBE � m THE CONDUCTORS SHALL BE INSULATED WITH TAPE AND A SIX-FOOT COIL ON EACH END. Q � o UPSM O BP UPS Jz �C U- w MBPS Ju� Qw w TO 332 CABINET �o u CIRCUITRY 04 'Mr;i SEE NOTE 4 I . - I L� + N -BUS G -BUS AC- I I I r -------I r -------I I I I I I I I ' I I I Gnd I I I I I I I I I I I I I I I I I I I m `--+--� AC+ LINE FROM SF PTS 75 TO 80 AMPERE -HOURS •-- L-----------1--� AT m 1 20 HOUR RATE Q -------- I I I 1 U I r-;--� I I T--.• PER BATTERY O r-----+--♦ I I � I I I I � I I � I 1 � i i i i i I I I L I I I ; I i I I I I I I c a BATTERY SET I ----I � I I s---; --4---; ---4 -- (4 TO 8 BATTERIES) I I I AI� + TB U C U m Q i Q U I I I I I � SEE ' lII`jNOTE 6 I ' J Blk SINGLE-PHASE, 120 V 2 -WIRE CIRCUIT FROM SERVICE EQUIPMENT BORDER LAST REVISED 7/2/2010 AC+ LINE FROM SF PTS 332 CONTROLLER CABINET USERNAME=>p0099563 DGN FILE => 846800ua031odgn o THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE - 3 IS IN INCHES BBS CABINET UNIT 2232 ELECTRI`- ��T E M Z'S' (BBS POWER CONNECTION DIAGRAM, TYPE B, CASE -1) NO SCALE E - 'g jr_-_ PROJECT NUMBER & PHASE X x X 0 z w U) z 0 0 > o > n, Q :D U 0 0 w om w m QLL] o Jz w �C U — U u, w Qw = U 0 U O LL] m m u _ Q Q w z = O_ U � Q u z z 0 LL 0 V) z Q z O z O Q O Z Q 0 z w Q w 0 0 z r CD U f■1;1 PROJECT NOTES (THIS SHEET ONLY): F-11 PREFORMED LOOP. CHAIN LINK RAILING TYPE 7 CONCRETE BARRIER TYPE 26 ( MOD) 3'' C (Sig) '3""'C (Sig) �)IIt� 1)x/_ /C- rn\ -1_"/-/t-1 1 "C, 2#1 EXPANDED VERTICALLY TO CLARIFY CONDUIT AND PULL BOX LOCATIONS° STRUCTURE APPF TYPE N(30D) (MC EXPANDED VERTICALLY TO CLARIF CONDUIT AND PULL BOX LOCATION GENERAL NOTES (THIS SHEET ONLY): L l., J ULI., I+i-O\V) BdPLA, SCALE: 1 II=20' CAL Sgo"" ECTI C) -N (W9S_ T ) NO SCALE SEE SHEETS E-3 AND E-4 FOR DETAILS° 2"C, 2#10 (LTG), 1#8 (G) 2'C, 2 DLC (RMS#3), 1#8 (G) 2"C, 2#6 (RMS#3) , 1 #6 (G) r No. 54CO065 J l f 1 100W ES -9E Det P "1 00W` ES -9E Det P PC/PS Conc I -GIRDERS, Typ Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 1203/1401 474 624 09/08/11 QROFEssIoN REGISTERED CIVIL EN63INEER DATE q, 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHALL NOT BF RESPOSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 RICHARD E. IVY w No. 21570 m Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 CHAIN LINK RAILING TYPE 7 CONCRETE BARRIER TYPE 736 (MOD) 2'' C (SIG) T- —-----------�;—:_�----- — — T—__�- — — — —j;—__�------------1-- — — Exist PC/PS Conc-7 I -GIRDERS, Typ T YRICAL E13 ECTION iE AST) NO SCALE —� -------------�--_ 1. INSTALL EXPANSION -DEFLECTION FITTINGS (DETAIL XY) AS PER ES -9B FOR ALL CONDUITS AT BRIDGE EXPANSION JOINT. � T� � � � � � � � � I� � � A ILQ 20 ALL CONDUITS IN BRIDGE MUST TERMINATE IN PULL BOXES OUTSIDE THE BRIDGE AS PER ES -9A. THE TERMINATING PB (CHERRY AVE OH) SHALL BE No. 5 IF IN SIDEWALK, OTHERWISE 5(T) AND THE LOCATION SHALL BE DETERMINED BY THE ENGINEER. BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua032odgn NO SCALE THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. E _ 3 � 77 RELATIVE BORDER SCALE IS IN INCHES UNIT 2232 PROJECT NUMBER & PHASE x X x T z 0 0 > a :D U W � I Q m >- W m Q LL-] D J z W CD �z u- U J u/ W Q W = U 0 U O LL] cup _ --1Q Q W z = O U � Q u z z 0 LL 0 V) z Q z O 04 PROJECT NOTES (THIS SHEET ONLY): F-11 PREFORMED LOOP. EXPANDED VERTICALLY TO CLARIFY CONDUIT, PULL BOX, AND ELECTROLIER FOUNDATION LOCATIONS° 2"C, 11 DLC, 1#8 (G) 3"C, 1 TYPE "D" (RMS#2)9 1#8 (G) 2''C 9 8 DLC 2"C, 6 DLC, \�211C9 1 TYPE "D" FO (ICC), 1#8 (G) z 0 J 0 0 GENERAL NOTES (THIS SHEET ONLY): 2"C, 4 DLC, 1#8 (G) 2"C, I rr 5"C, MT �2"C, 3 DLC, 1#8 (G) 1 "C, 2#8 (LTG), 1#10 (G) (CITY) Br No. 54-053 PLAN EXPANDED VERTICALLY TO CLARIFY CONDUIT, PULL BOX, SCALE 1 =20� AND ELECTROLIER FOUNDATION LOCATIONS° 3"C9 1 SIC, 1#8 (G) 2"C, 3 DLC, 1#8 (G) 1 o INSTALL EXPANSION -DEFLECTION FITTINGS (DETAIL XY) AS PER ES -9B FOR ALL CONDUITS AT BRIDGE EXPANSION JOINT. 20 ALL CONDUITS IN BRIDGE MUST TERMINATE IN PULL BOXES OUTSIDE THE BRIDGE AS PER ES -9A. THE TERMINATING PB SHALL BE No. 5 IF IN SIDEWALK, OTHERWISE 5(T) AND THE LOCATION SHALL BE DETERMINED BY THE ENGINEER° BORDER LAST REVISED 7/2/2010 USERNAME=>p0099563 DGN FILE => 846800ua033odgn THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. RELATIVE BORDER SCALE - IS IN INCHES I I I ES -6A V ES -6B Dist COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT No. SHEETS 08 SBd 10 12.3/14.1 475 624 09/08/11 REGISTERED CIVIL EN INEER DATE QR°FEssIoN</ 09/08/11 PLANS APPROVAL DATE THE STA TF OF C% L IFORNIA OR ITS OFFICERS OR AGENTS SHALL NOT BF RFSPONSIBL E FOR THE ACCURACY OR COMPLETENESS OF SCANNED COPIES OF THIS RL AN SHEET PARSONS 3200 EAST GUASTI ROAD SUITE 200 ONTARIO, CALIFORNIA 91761 CONCRETE BARRIER TYPE 26 (MOD) -2"C, Irr 2"C, LTG 2"C, SIG 5"C, MT TyPICAL SECTI(7N (WEST) NO SCALE TYPICAL SECTION (EAST) NO SCALE 'z' RICHARD E. IVY - L13 No. 21570 m Exp. sT CIVIL F OF CAL 1F0 SANBAG 1170 W 3RD STREET SAN BERNARDINO, CA 92410 CONCRETE BARRIER TYPE 736 (MOD) STRUCTURE ELECTRICAL DETAILS UNIT 2232 (CHERRY AVE OC) NO SCALE PROJECT NUMBER & PHASE E-33