HomeMy WebLinkAbout5109 Retaining Wall 2171 F'- (;"
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 549 1 624
Cherry Avenue
Overhead Dz1
02/01/12
10+00 11+00 1 2+00 13+00 14+00 15+00 16+00 17+00
DEVELOPED ELEVATION (MIRRORED) Chain Link Rai I ing B11-52
1 30'-0" Type 7 (Mod2)
B3-1 LOL
NOTES 3�� Concrete Barrier B1 1-54
Type 26A (Mod) ��j
1. For "INDEX TO RETAINING WALL PLANS', "STANDARD PLANS'' I ist, "RW21 11and "QUANTITIES", see "INDEX TO PLANS" sheet. Top of Curb and gutter
Wall LOL see "ROAD PLANS'?
20 For "GENERAL NOTES (MSE WALLS)", see 'MECHANICALLY STABILIZED �i
EMBANKMENT DETAIL NO. 2" sheet.
Z
Begin Wall
Sta 10+00.00
Sta 21+37.46
75000 Lt
NO0009'1 1 "W
10+00
BC Sta 21+87059
C Line
N00009'11"W
"RW21 " LOL
C Line
11+00
CURVE DATA
No.
R
O
T
L
10
2929.00
03032'55"
90073
181041
O2
8073000
000 16'38
19.53
39006
O3
8077000
00°05'47"
6079
13058
®
3004000
03032'55"
93006
186005
O5
7998000
04°08'51"
289061
578096
Type 1 to MSE transition
Sta 11+56.46 "RW21 " LOL
Sta 22+96.64 C Line
75000 Lt
BC Sta 10+50.13 "RW21 " LOL=
Sta 21+87.59 C Line
75°00 Lt
22+00
M
23+00
BY
DESIGN Tim Fuller
DESIGN OVERSIGHT DETAILS BY
Yihong Wan
QUANTITIES BY
SIGN OFF DATE Tim Fuller
DESIGN GENERAL PLAN SHEET (ENGLISH) (REV.7/16/10)
12+00
''RW21 " LOL
13+00
EC Sta 12+31.55 "RW21 " LOL=
Sta 23+73064 C Line
75000 Lt
24+00
EC Sta 23+73064
Ine
25+00
PLAN
1 11 =30/-011
CHECKED
Pete Smith
CHECKED BY
Pete Smith LAYOUT Y i hong Wan(
CHEED BY
Carol i na Lopez -Toro SPECIFICATIONS Jim Rucker
Fractured
Rib Texture
cn =
C c
.L �
'U)
> a) Q0
FG
Weep hole andg0-3
pervious
backf i I I 3-1
Retaining Wall
Type 1
(B3-1
TYPICAL SECTION (TYPE 1
NO30 4206"W
End Wa I 1
EC Sta 17+16.46 "RW21 " LOL
Sta 28+57.38 (�_ "C' Line
79000 Lt
Angle break
BC Sta 17+02.89 "RW21 " LOL=
Sta 28+43093 C "C" Line
79000 Lt
Angle break
EC Sta 16+45.32 "RW21 " LOL=
Sta 27+87.34 C "C" Line
75000 Lt
15+00
14+00
BC Sta 16+06.26 "RW21 " LOL=
Sta 27+48.36 C Line
75000 Lt
N030 42'0611W
26+00
CHECKED
Tim Fuller
PLANS AND SPECS
COMPARED Jeremy LaHaye
ORIGINAL SCALE IN INCHES
FOR REDUCED PLANS
C "C" Line
27+00
Sta 2(+
C" Line
16+00
—�
U c
a) 0)
.L —
0 0
> o
N07° 12' 19"\N -
1 7+00 - ------
3
Cherry Avenue Overhead
Structure Approach
PREPARED FOR THE
STATE OF CALIFORNIA Brett Makley
PROJECT ENGINEER
DEPARTMENT OF TRANSPORTATION
BB Sta 28+62.26±
Elev 1057004±
/ 2g+00
5 Y
PCC Sta 33+27.32
"C" Line
UNIT: 2232
0 1 z 3 PROJECT NUMBER & PHASE: 08000007441
FILE _> REQUEST
BRIDGE NO.
54EO103
POST MILES
13.2
CONTRACT NO.: 08-468004
FZpFESSIO
RE ISRED CIVIL ENGINEER DATE �o Q N4<'
Brett Makley Z
03/29/11
M
PLANS APPROVAL DATE
No. C66397
The State of California or its officers or agents Exp.
CIVIL
shall not be responsible for the accuracy or q 1
completeness of electronic copies of this plan sheet. ST TF OF CALZFO�� P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
"RW21 " LOL
Top of l
Wa 1
Chain Link Rai I ing B11-52
Type 7 ( Mod 1 )
-Concrete Barrier
Type 26 (Mod1) 61 1-54
Curb and gutter
� see ''ROAD PLANS'?
MSE Wall --- ------------
Panel Barrier slab
Fractured_
Rib Texture
C
0
0
', F G
----�Soil Re i of , Typ
----------
Vari
Base wetl+h
Leveling Pad
TYPICAL SECTION (MSE)
1/411=1 /-Oil
0
W
0
J
w
w
RETAINING WALL 21 V'
GENERAL PLAN
W
Q
DISREGARD PRINTS BEARING
REVISION DATES SHEET OF z
o'
LLJ
EARLIER REVISION DATES � 10/ 10 01/ /11 02/01/12 07/ /10 1 18 cn
Base width
MSE wal
TYPE 1 waI
LIMITS OF PAYMENT FOR EARTHWORK
Design H
"D"
1500'-1705'
1'-0''
2000'-3205'
STANDARD PLANS
3500'-4205'
INDEX TO
104
CY
(DATED
MAY 2006)_
RETAINING WALL PLANS
SF
79377
LB
229961
SF
207
LF
487
Al OA
ACRONYMS AND ABBREVIATIONS (SHEET 1 OF 2)
SHEET
NO. TITLE
LF
225961
Al OB
ACRONYMS AND ABBREVIATIONS (SHEET 2 OF 2)
Al OC
SYMBOLS (SHEET 1 OF 2)
1.
GENERAL PLAN
Al OD
SYMBOLS (SHEET 2 OF 2)
20
INDEX TO PLANS
A62B
LIMITS OF PAYMENT FOR EXCAVATION AND
3e
RETAINING WALL PLAN NOo
1
BACKFILL BRIDGE SURCHARGE AND WALL
4.
RETAINING WALL PLAN NO.
2
5.
RETAINING WALL PLAN NO.
3
NSP A85A
CHAIN LINK FENCE DETAILS
6.
RETAINING WALL PLAN NO.
4
BO -3
BRIDGE DETAILS
7.
RETAINING WALL PLAN NO.
5
B3-1
RETAINING WALL TYPE 1
8.
BARRIER DETAILS
H=4' THROUGH 30'
9.
MISCELLANEOUS DETAILS
10.
PANEL DETAILS
B3-8
RETAINING WALL DETAILS NO. 1
1 1 o
MECHANICALLY STABILIZED
EMBANKMENT
DETAIL NOo 1
B1 1 -52
CHAIN LINK RAILING TYPE 7
12.
MECHANICALLY STABILIZED
EMBANKMENT
DETAIL NO. 2
B1 1 -54
CONCRETE BARRIER TYPE 26
13.
MECHANICALLY STABILIZED
EMBANKMENT
DETAIL NO. 3
RSP P1
JOINTED PLAIN CONCRETE PAVEMENT
14.
MECHANICALLY STABILIZED
EMBANKMENT
DETAIL NO. 6
15.
LOG OF TEST BORINGS NO.
1 OF 4
PLAN
SYMBOLS
16.
LOG OF TEST BORINGS NO.
2 OF 4
17.
LOG OF TEST BORINGS NO.
3 OF 4
1 8 o
LOG OF TEST BORINGS NO.
4 OF 4
? — Section Ident i f !cation
Base width
MSE wal
TYPE 1 waI
LIMITS OF PAYMENT FOR EARTHWORK
Design H
"D"
1500'-1705'
1'-0''
2000'-3205'
3'-0''
3500'-4205'
5'-0"
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
NTS
STANDARD PLAN SHEET N0.
DETAIL N0.
LEGEND
- Structural excavation (Retaining wa I 1 )
i - Structural backf i 1 1 (Retaining wa 1 1)
2/_01 - I
Typ
Note: Earthwork limits in addition to
and "MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO. 611 sheet
DESIGN
DETAILS
QUANTITIES
(A62B
��j
BY Tim Fuller CHECKED Pete Smith PREPARED FOR THE
BY Yihong Wang CHECKED Pete Smith STATE OF CALIFORNIA
BY CHECKED DEPARTMENT OF TRANSPORTATION
Tim Fuller Carol i na Lopez -Toro
ORIGINAL SCALE IN INCHES
FOR REDUCED PLANS 0 1 2 3
Brett Mak I ey
PROJECT ENGINEER
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 550 624
D l ' 02/01/12
ES S10
RE(GIST)ERED CIVIL ENGINEER DATE Q Nq
03/29/11
Brett Makley Z
PLANS APPROVAL DATE
� No. C66397 M
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or 4 CIVIL 1
completeness of electronic copies of this plan sheet, ST TF of CALIFO P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
QUANTITIES
STRUCTURE EXCAVATION (RETAINING WALL)
STRUCTURE BACKFILL (RETAINING WALL)
PERVIOUS BACKFILL MATERIAL (RETAINING WALL)
EARTH RETAINING STRUCTURE, LOCATION A
STRUCTURAL CONCRETE, RETAINING WALL
STRUCTURAL CONCRETE, BARRIER SLAB
FRACTURED RIB TEXTURE
BAR REINFORCING STEEL (RETAINING WALL)
PREPARE AND STAIN CONCRETE
CHAIN LINK RAILING (TYPE 7 MOD1 )
CHAIN LINK RAILING (TYPE 7 MOD2)
CONCRETE BARRIER (TYPE 26 MOD1 )
CONCRETE BARRIER (TYPE 26A MOD)
ANTI -GRAFFITI COATING
UNIT: 2232
PROJECT NUMBER & PHASE: 08000007441
FILE => $REQUEST
181
CY
233
CY
20
CY
17,422
SF
104
CY
289
CY
564
SF
79377
LB
229961
SF
207
LF
487
LF
536
LF
157
LF
225961
LF
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 INDEX TO PLANS
DISREGARD PRINTS BEARING REVISION DATES
CONTRACT NO.: 08-468004 EARLIER REVISION DATES 10,/0 10 01//11 02/01/12 1 0
SHEET I OF
0 2 1 18
n,
w
V)
I I
W
Q
I I ,, . I 1 . —. — a/ — 11
r VV I I I IIJ b l C�J DJ -0
3-1
NOTES: DEVELOPED ELEVATION (MIRRORED)
1 o For Fractured R i b Texture deta i Is,
see ''MISCELLANEOUS DETAILS 11 sheet.
Begin Wall
Sta 1 0+00 0 00 RW21 LOL
10
/8
II=1 /_011
"RW21 " LOL --"\
RW footing, Typ
+00 ill +00
",> r / 1010
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
DESIGN
DETAILS
QUANTITIES
Concrete barrier Type 26A (Mod)
sidewalk slab
/ 11
2
M
0
O
0
Ln
a�
c
U
4-
U
I0
0
10
Ln
,+
,o
c
J
I-
U
I
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 551 624
D l ' 02/01/12
�pFESSIO
RE ISRED CIVIL ENGINEER DATE �o Q N41
Brett Makley Z
03/29/11
PLANS APPROVAL DATE
W No. C66397 M
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or q CIVIL
V I L
S 1
completeness of electronic copies of this plan sheet. T TF of CALIF00P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
V` V 1 1 V 1 19 I% I%
Y^11=1 /_011
B11-54
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 RETAINING WALL PLAN NO.
REVISION DATES SHEET
DISREGARD PRINTS BEARING
CONTRACT NO.: 08-468004 EARLIER REVISION DATES so 10� 10 01/ /11 02/01/12 07/ /10 3
i�
w
V)
7D
I I
1 w
Q
OFLi
z
18
�014�
i
PLAN
/8 1 /— 011
BY Tim Fuller
CHECKED Pete Smith
PREPARED FOR THE
CHECKED
Brett
STATE OF CALIFORNIA
Mak I ey
BY
Y i hong Wang
Pete Smith
CHECKED
Carolina Lopez -Toro
PROJECT
DEPARTMENT OF TRANSPORTATION
ENGINEER
BY
T i m Fuller
ORIGINAL SCALE IN INCHES
I I 1 1 1 1 1 UNIT:
2232
FOR REDUCED PLANS
0 1 2 3 PROJECT
NUMBER & PHASE: 08000007441
FILE
=> $REQUEST
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 551 624
D l ' 02/01/12
�pFESSIO
RE ISRED CIVIL ENGINEER DATE �o Q N41
Brett Makley Z
03/29/11
PLANS APPROVAL DATE
W No. C66397 M
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or q CIVIL
V I L
S 1
completeness of electronic copies of this plan sheet. T TF of CALIF00P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
V` V 1 1 V 1 19 I% I%
Y^11=1 /_011
B11-54
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 RETAINING WALL PLAN NO.
REVISION DATES SHEET
DISREGARD PRINTS BEARING
CONTRACT NO.: 08-468004 EARLIER REVISION DATES so 10� 10 01/ /11 02/01/12 07/ /10 3
i�
w
V)
7D
I I
1 w
Q
OFLi
z
18
TYPE 1 MSE
Limits of Limits of
Concrete Barrier Concrete Barrier
Type 26A (Mod) Type 26 (Mod1 )
Fm
W
W
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
I L I L I V V I V V V ° I V
Datum E I ev 1000.00
12+00
13+00
DEVELOPED ELEVATION (MIRRORED)
/8
il=1 /_OII
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 552 624
D l ' 02/01/12
FZpFESSIO
REIST RED CIVIL ENGINEER DATE
Brett Makley Z
03/29/11
PLANS APPROVAL DATE
W No. C66397 M
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or q CIVIL 1
completeness of electronic copies of this plan sheet. ST
TF of CAL F0
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
Indicates interval i n years
from time of construction
to time of removal of
inspection wire, see
''MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO. 3"
sheet
! I I I �,u I cs pane I type
designation° For details
see 'PANEL DETAILS''
and ''MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO° 1 "
sheets
PANEL LEGEND
NO SCALE
o
II II I o
RW21 LOL ,o
LEGEND
I RW footing, Typ ,+�
o I 13+00 ��
C I Indicates I i m its of
° II �' I ,' J , � welded wire mat
o / \ \ / I�-
+ �I `�_12+00 I I -C TLP - Top of leveling pad
�a BW - Base width
---l—
►----- --- -1014
----
�- ---
" Barrier Slab __--------
I _ NOTE
For MSE wa I I and TYPE 1 wa I I joint deta i I , see
''MECHANICALLY STABILIZED EMBANKMENT DETAIL NO. 3" sheet
LANsiConcrete Barrier Type 26A (Mod) PLAN—
sidewalk
dewaIk slab I/8"=1 '-0"
DESIGN
DETAILS
QUANTITIES
BY Tim Fuller
CHECKED Pete Smith
PREPARED FOR THE
CHECKED
STATE OF CALIFORNIA
Brett
Mak I ey
BY
Y i hong Wang
Pete Smith
CHECKED
Carol i na Lopez -Toro
DEPARTMENT OF TRANSPORTATION
PROJECT
ENGINEER
BY
Tim Fuller
ORIGINAL SCALE IN INCHES
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
FILE
=> $REQUEST
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13°2 RETAINING WALL PLAN NO.
DISREGARD PRINTS BEARING REVISION DATES I SHEET
CONTRACT NO.: 08-468004 EARLIER REVISION DATES 1 10,/0 10 I 01/ /11 02/01/12 1 0,7,/DTA 10 4
w
0
W
0
J
w
n,
w
V)
kR
I I
2W
Q
Li
of z
lc/�
18
6
25'
1 8'
# of Panels
Design H =
BW =
---,7777-T-----r-----r- �-7777-- --D =�-
-----,-----T--- r I n
HppI uA uu — r u u I ul Iy
11RW21 " LOL
77771------- r-- 1,-
I L I L I %_ V I \./ I I o L l/
TLP EIev 1008070
Datum EIev 1000.00
I
LEGEND
_j
TLP TLP
BW
- Indicates limits of
welded wire mat
- Top of leveling pad
- Base width
F �
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
14+00
DEVELOPED ELEVATION (MIRRORED)
/811-1 ,_011
IIRW21'I LOL
nir\Trc^e
��----
A
A I o
0
A
A a)
C
J
A
' U
U
75
1. For Fractured Rib Texture detai Is, I
see MISCELLANEOUS DETAILS sheet.
2. Use MSE Panel Type A for Test Panel 11 I
14+00//
� ► � 101 q �' ► `� / /
Barrier Slab
1 020
Indicates interval i n years
from time of construction
to t i me of remova I of
inspection wire, see
"MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO. 3"
sheet
11 lu 1 %11U 1 Cs pane I type
designation. For details
see PANEL DETAILS"
and "MECHANICALLY
STABILIZED EMBANKMENT
DETAIL NO. 111 sheets
PANEL LEGEND
NO SCALE
DIST
COUNTY
ROUTE
POST MILES
SHEET
TOTAL
TOTAL PROJECT
No
SHEETS
08
SBd
10
12.3/14.1
553
624
D '
l 02/01/12
�OFESSIO
RE ISRED CIVIL ENGINEER DATE �o Q Nq�
Brett
Makley
DETAILS
Brett Makley
Z
03/29/11
No. C66397
PLANS APPROVAL DATE
M
The State of California or its officers or agents Exp.
CIVIL
ENGINEER
P
ST TF
shall not be responsible for the accuracy or q 1
completeness of electronic copies of this plan sheet. OF CALIF
SANBAG
1170 W 3RD STREET
2232
SAN BERNARDINO, CA 92410
FOR REDUCED PLANS
T.Y. LIN INTERNATIONAL
PROJECT
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
Top r,, -P IN i
Fractured
Rib Texture
L I m i is of paymen� r��
Prepare and Stain Co
and Anti -Graffiti C
I0
0
0
- o
C
J
-C
\ I
U
/ I4-
_5
I
I
PLAN-
LAN
I/811=1 /-o11
1/8
DESIGN
BY Tim Fuller
CHECKED Pete Smith
PREPARED FOR THE
CHECKED
STATE OF C
Brett
Makley
DETAILS
BY
Y i hong Wang
Pete Smith
CHCaro I i na Lopez -Toro
DEPARTMENT OF TRANSPORTATION
ENGINEER
QUANTITIES
BY Tim Fuller
ORIGINAL SCALE IN INCHES
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
FILE
=> $REQUEST
F(
CA T,4w,-
SAMPLE MSE WALL ELEVATION
WITH FRACTURED RIB TEXTURE
No Scale
SECTION A -A
I/2II=1 /_011
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 RETAINING WALL PLAN NO.
DISREGARD PRINTS BEARING REVISION DATES I SHEET
CONTRACT NO.: 08-468004 EARLIER REVISION DATES 1 10,/0 10 I 01/ /11 02/01/12 1 0,7,/DTA 10 5
w
I I
0
w
O
J
w
w
w
V)
I I
3w
Q
OF z
18
Limits of Chain Link
Railing Type 7 (Mod2)
# of Panels
Design H =
BW =
DESIGN OVERSIGHT
16
35'
25 /
Limits of Chain Link
Railing Type 7 ( Mod 1 )
9
3705'
26'
12
40'
28 /
Concrete Barrier (B*1 1-54
Type 26 (Mod1 )
10
4205'
p�
30"
C�\ ° �O
�x �\ °
\ O
o 'N\
�X J
�\o
Top of Wa
Datum E I ev 1000.00
15+00
DEVELOPED ELEVATION (MIRRORED)
I/8=1 ,_0..
16+00
''RW21 " LOL
► ` 16+00 I o
/ I `
15+00 I / / +
O / ► Qa
O
C
+ 1020I J
max' Barrier Slab �' I
N I <\\ \\ \\
4-
---------- -
-
I / I
/ Z /
� I ' I
I' --- ' ___--------- I
1030
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
DESIGN
DETAILS
QUANTITIES
PLAN-
LAN
I/8=1 ,_0..
1/8
BY Tim Fuller
CHECKED Pete Smith
PREPARED FOR THE
CHECKED
STATE OF CALIFORNIA
Brett
Mak I ey
BY
Y i hong Wang
Pete Smith
CHECKED
Carolina Lopez -Toro
DEPARTMENT OF TRANSPORTATION
I
PROJECT
ENGINEER
BY
Tim Fuller
ORIGINAL SCALE IN INCHES
I 1 1 1 1 1
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
FILE
=> $REQUEST
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 554 624
D l ' 02/01/12
RE �pFESSIO
ST
IRED CIVIL ENGINEER DATE �o Q Nq�
Brett Makley Z
03/29/11
W No. C66397 M
PLANS APPROVAL DATE
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or q CIVIL 1
completeness of electronic copies of this plan sheet. ST TF of CALjFa P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
Indicates interval i n years
from time of construction
to time of removal of
inspection wire, see
"MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO. 3"
sheet
! I I I �,u I cs pane I type
designation. For details
see 'PANEL DETAILS"
and ''MECHANICALLY STABILIZED
EMBANKMENT DETAIL NOo 1
sheets
PANEL LEGEND
NO SCALE
LEGEND
�- - Indicates limits of
L- — — welded wire mat
TLP - Top of leveling pad
BW - Base width
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 RETAINING WALL PLAN NO.
REVISION DATES SHEET
DISREGARD PRINTS BEARING
CONTRACT NO.: 08-468004 EARLIER REVISION DATES so 10� 10 01/ /11 02/01/12 07/ /10 6
W
I I
0
w
0
J
!Z
w
Limits of Concrete Barrier Type 26 (Mod1) Structure Approcchl Cherry Avenue Overhead
and Barrier Slab Bridge No. 54C0065
# of Panels 10 3 12
Design H = 4205' 40' 4205'
BW = 30' 28' eco 30'
0 EndV
Concrete _ ��oN� ohsTop of Wa I IBarrier B11 54 0xC>Type 26 ��o CD ���(Mod1)--------------------------------
-----------------------------------------------_-------------
--- -- --------Y,
-------------- -- tE
------------- ----- ----- II
------ ----- - D D p D D E D E :L;
D D D
D
E E E E A A A A A
' 40 50 20 O
A A A A A A A A
A A— See Note 1
A A A A A A A A A
I I
A A A A A A A A A
o A A A A A A A A A
0
M A A A A A A A A A
+
�A— AA A A A A A A
A A 1 o A
A � A A 40 A A 30 A
o
I I
c A A A A A A A A A
J A A A A A A A A A
A A A A A A A A A
o A A A A A A A A A A I I
LA A A A A A '
I
C B B B B B B B
L =B
Approx OG = FG along
11RW21 " LOL
TLP EIev 1011020 TLP Elev 1013070
NOTES:
PREPARED FOR THE
ROUTE
POST MILES
1 o For MSE
wall and abutment stubwa I I
joint detail, see
"MECHANICALLY STABILIZED
EMBANKMENT
DETAIL NO. 3" sheet
2. Provide
I/2'open joint in
concrete
barrier at location
of contact joint between
approach
slab and barrier slab.
Provide
Water Stop from
Standard
P I ansat I ow
side of
Roadway
UNIT:
('BO -3
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
"RW21 " LOL
17+00
DEVELOPED ELEVATION (MIRRORED)
I/8..=1 /_0..
Indicates interval i n years
from time of construction
To time of removal of
inspection wire, see
"MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO. 3"
sheet
11 IV I Vu I �S pane I type
designation. For details
see PANEL DETAILS''
and ''MECHANICALLY STABILIZED
EMBANKMENT DETAIL NOo 1"
sheets
PANEL LEGEND
LEGEND
\ i - Indicates limits of
welded wire mat
TLP - Top of I eve I i ng pad RW LOL—,,,,
BW - Base width
End Wa
See "DETAIL A" Sta 17+16046 ''RW21" LOL
A Cherry Avenue Overhead Abutment Stubwall,
Sta 16+92.35 "RW21 " LOL see Note 1
- --- ----------i -----
--
__ - - - - --------i-----
I ------ - I
--- L 17+00
I
I
/\ ---------------i----- --------------
--
0! � I � / I �� � II I
Cherry Avenue Overhead Footing,
II 020 A I see "BRIDGE PLANS"
1020
I '
BB
JI II Barrier S I ab ;► Cherry Avenue Overhead Abutment 1 ,
see BRIDGE PLANS
U I I / \\' II �/102\ II I
I 5
0
\\ IV_ —_______ ��' ___ 030
r------ PLAN
MSE face panel
/811=1 /_OII
BY
DESIGN Tim Ful ler
BY
DETAILS Y i hong Wan
QUANTITIES BY
Tim Fuller
Cherry Avenue Overhead
Structure Approach Slab,
see "BRIDGE PLANS"
CHECKED Pete Smith
PREPARED FOR THE
ROUTE
POST MILES
SHEET
STATE OF CALIFORNIA
Brett
Mak I ey
CHECKED
TOTAL PROJECT
Pete Smith
I
PROJECT
ENGINEER
CHECKED
Carolina Lopez -Toro
DEPARTMENT OF TRANSPORTATION
555
624
ORIGINAL SCALE IN INCHES
l .: 02/01/12
�OFESSIO
RE ISRED CIVIL ENGINEER DATE �o Q Nq�
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
No. C66397
PLANS APPROVAL DATE
M
The State of California or its officers or agents Exp.CIVIL
FILE
=> $REQUEST
See Note
Barrier Slab
DIST
COUNTY
ROUTE
POST MILES
SHEET
TOTAL
TOTAL PROJECT
No
SHEETS
08
SBd
10
12.3/14.1
555
624
T<,4D � 4z
l .: 02/01/12
�OFESSIO
RE ISRED CIVIL ENGINEER DATE �o Q Nq�
Brett Makley
Z
03/29/11
No. C66397
PLANS APPROVAL DATE
M
The State of California or its officers or agents Exp.CIVIL
shall not be responsible for the accuracy or T q P
TF
completeness of electronic copies of this plan sheet. OF CALZFO��
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
Concrete Barrier,
see "BRIDGE PLANS"
Cherry Avenue Overhead
Structure Approach Slab,
see "BRIDGE PLANS"
SECTION A -A
NTS
DETAIL A
BRIDGE NO.
54EO1 03
POST MILES
13.2 RETA
CONTRACT NO.: 08-468004
NTS
Face of MSE Panels
-�h Slab
dowe I s
on V-0" centers
W
n
0
w
0
J
w
w
Q
0
i
0
w
H-
0
J
W
Q
0
n,
LJ
RETAINING WALL 21 V'
INING WALL PLAN NO. 5
Q
REVISION DATES SHEET OF
z
DISREGARD PRINTS BEARING �
EARLIER REVISION DATES � 17/1
0 01/ /11 02/01/12 07/ /10 7 18 cn
Concr
Type
see N
0
Concrete Barrier
Type 26A (Mod),
see Note 1
Retaining Wall
Type 1
B3-1
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
vvi •v1 %L_ I L_ v"i %I %a.`I % i I 1 11— `v \I.Ivv I /
ON MSE WALL BARRIER SLAB DETAILS
1 "=1 /-nil
CONCRETE BARRIER TYPE 26A (MOD)
ON TYPE 1 WALL DETAILS
'-0"
DESIGN
DETAILS
QUANTITIES
Curb and gutter
see "ROAD PLANS'?
Curb and gutter
see "ROAD PLANS'
LEGEND
10
1'' Expanded polystyrene.
02 2" Expanded polystyrene. Recess expanded
polystyrene 2" Into barrier slab.
03 Contact joint
04 Welded Wire Mat So i I reinforcement
O#5 -,7 @1 1 /-oil
(0 3/_411
06 #5 4/-711 @1 1 /-0" bundled with 0 bars
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 556 624
D l ' 02/01/12
RE �pFESSIO
ST
IRED CIVIL ENGINEER DATE �o Q Nq�
Brett Makley Z
03/29/11
PLANS APPROVAL DATE
No. C66397 M
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or S4T, q CIVIL 1
completeness of electronic copies of this plan sheet. OF CALIFO��P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
70
#5
ca, 1 /-oil
80
"a" bar = #6 continuous.
CHECKED
STATE OF CALIFORNIA
"b" bar = #6 X 59/-0"
NOTES:
BY
"c" bar = #6 X 49/-2''
Pete Smith
CHECKED
Caro I i na Lopez -Toro
DEPARTMENT OF TRANSPORTATION
Place "b" and "c" bars at beginning
1 o Reinforcement shown is
BY
Tim Fuller
and ending ends of barrier slab.
i n addition to standard
UNIT:
2232
re i nforcement i n s i dewa I ko
OSign
post and anchor. For locations
g1 1-54
For details not shown see
and details, see SIGN PLANS o
FILE
20 Install standard CIDH
foundation before Concrete
Barrier Type 26A (Mod) is
constructed.
3. Install standard pole after
Concrete Barrier Type 26A
( Mod) is constructed.
4. Place post anchor prior
to placement of barrier
slab concrete.
Type 15 standard, see
ES -6A
(L'Pole, Note 3
"ELECTRICAL PLANS" and RSP
(BO-1 3 I/2
Concrete Barrier
po I yestyrene
� 1 3-2 all around
Type 26A
Slope to
match
Curb and gutter,
s i dewa I k
_
_ see "ROAD PLANS'
a�
U
Q L N
C O+
O`-
.-C-0
C
+ -
O (D 0 L C
-000
Q D U
TYPE 15 STANDARD THRU
TYPE 26A (MOD1 ) BARRIER
BY Tim Fuller
CHECKED Pete Smith
PREPARED FOR THE
CHECKED
STATE OF CALIFORNIA
Brett
Mak I ey
BY
Y i hong Wang
Pete Smith
CHECKED
Caro I i na Lopez -Toro
DEPARTMENT OF TRANSPORTATION
PROJECT
ENGINEER
BY
Tim Fuller
ORIGINAL SCALE IN INCHES
1 1 1 1 1 1 1
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
FILE
=> $REQUEST
I/2=1 /_0..
CIDH Foundation,
see Note 2
eES-11 and ES - 7N
Except as noted
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 BARRIER DETAILS
DISREGARD PRINTS BEARING REVISION DATES SHEET OF
CONTRACT NO.: 08-468004 EARLIER REVISION DATES 10/ 10 01/ /11 02/01/12 07/ /10 8 18
w
V)
I I
W
Q
See
Note 1
See
Note 2
Finished
arade
Backface of
Retaining Wa
Deta i I "A"
Geocompos i to
Drain
Deta i I "B"
WALL SECTION
Filter Fabris
wrap around
DETAIL "A"
DESIGN OVERSIGHT
4" 0 drain
3" Uns I otted
Plastic Pipe
3"
mind
SECTION A -A
10 mil Polyethylene
sheet
Bond 6" to wa I I e 1
Cut hole for 3" pipe
Cap-typ
See Note 2
3" Slotted
Plastic Pipe.
See Note 2
Tee
Connection
Bond to
Geocompos i to
A Drain
E
M
� o
Level or sloped
toward wa
Cement Treated
Permeable Base
DETAIL "B"
WEEP HOLE AND GEOCOMPOS I TE DRAIN
No Scale
Alternative to bridge detail (BO -3
3 -
NOTES:
1. 4" 0 drains at intermediate sag points and at 25' max
center to center (9' c -c for Type 3 and 9'-3" c -c for
Type 4 retaining walls)°
For wa I I s adjacent to s i dewa I ks or curbs, prov i de
4" plastic pipe under the sidewalk
to discharge through curb face
Exposed wa I I drains shall be located 3"± above finished grade
2. Geocompos i to drain, cement treated permeable base, and
3" 0 s I otted plastic pipe continuous behind reta i n i nq wa I l o
Cap ends of pipe. ProvIde "Tee" connection at each 4' 0 drain.
3. Connect the low end of plastic pipe to the main outlet
pipe as applicable.
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
DESIGN
DETAILS
QUANTITIES
C Fractured R i b
valley, Note 5
2
Face of pane
or wa I
V V U I I 11Cll I I
FRACTURED RIB TEXTURE DETAIL
Face (
MSE pan(
Note
No Scale
FRACTURED RIB TEXTURE
TERMINATION DETAIL (MSE)
No Scale
Kin TrC, o
4. For vertical joint deta i I , see "MECHANICALLY STABILIZED
EMBANKMENT DETAIL NO. 1" sheets
5. Permissible location of weakened plane and expansion
joints
BY Tim Fuller
CHECKED Pete Smith
PREPARED FOR THE
POST MILES
SHEET
TOTAL
CHECKED
STATE OF CALIFORNIA
Brett
Mak I ey
BY
Y i hong Wang
Pete Smith
CHECKED
Carol i na Lopez -Toro
DEPARTMENT OF TRANSPORTATION
PROJECT
ENGINEER
BY
Tim Fuller
ORIGINAL SCALE IN INCHES
D '
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
Brett Makley
Z
03/29/11
FILE
=> $REQUEST
DIST
COUNTY
ROUTE
POST MILES
SHEET
TOTAL
TOTAL PROJECT
No
SHEETS
08
SBd
10
12.3/14.1
557
624
D '
l 02/01/12
�pFESSIO
RE IRED CIVIL ENGINEER DATE �o Q Al
ST
Brett Makley
Z
03/29/11
PLANS APPROVAL DATE W No. C66397
M
The State of California or its officers or agents Exp.
CIVIL
ST TF
shall not be responsible for the accuracy orq 1
completeness of electronic copies of this plan sheet, OF CALIFp��P
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
top
.5A
CV
CHAIN LINK RAILING
TYPE 7 (MOD2) DETAIL
No Scale
Note: For details not shown, see rB1 -52
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 MISCELLANEOUS DETAILS
OF
DISREGARD PRINTS BEARING REVISION DATES SHEET
CONTRACT NO.: 08-468004 EARLIER REVISION DATES 10/ 10 01/ /11 02/01/12 07/ /10 9 1 $
w
Q
0
I I
0
w
0
o -
W
Q
0
n,
w
V)
I I
W
Q
#4 @, 6" Max
stagger on
each side of
#4 vertical k
NIOTF c
6"
Li' Top soi
re i of • mesh
N
�L Bottom so
0 re i of • mesh,
> see Note 1
x
U) C�
aD
�L r�
o i
TYPE "D"
TOP PANEL
1 11=1 /_Oil
1 o Omit bottom soil reinforcement mat when spacing
between top and bottom mats is less than 9"
2. Omit intermediate soiI reinforcement mesh when spacing
between top and intermediate mats is less than 6"
3e See "MECHANICALLY STABILIZED EMBANKMENT DETAIL NOe1"
sheet for panel TYPE "A", "B" AND "C"
4 • Architectural Treatment not shown •
D
N
I
L(7
O
I
FEE
L
U
N
.L
#4 `I 1. r------
0
N
#4 @, 6" Max
stagger on
each side of
#4 vertical bars--�----
• U
`I
TYPE "E"
TOP PANEL
Top so i
reinfo mesh
Intermediate
soil reinfo mesh,
see Note 2
Bottom so
reinfo mesh
x
0
Q0
4-
c
N
TABLE 1: WELDED WIRE MAT SOIL REINFORCEMENT LAYOUT
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 558 624
D l ' 02/01/12
ES S10
RE(GIST)ERED CIVIL ENGINEER DATE Q Nq
03/29/11
Brett Makley -
z
PLANS APPROVAL DATE
� No. C66397 M
The State of California or its officers or agents Exp.
shall not be responsible for the accuracy or 4 CIVIL %V-
completeness
P
completeness of electronic copies of this plan sheet, ST TF of CALIFO
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
Design H
15
17.5
20
22.5
25
2705
30
3205
35
3705
40
42.5
Base Width
11
12
14
16
18
19
21
23
25
26
28
30
ORIGINAL SCALE IN INCHES
2@W1 1 xW1 1 +6"x9"
29W1 1 xW1 1 +6"x9"
2@W1 1 xW1 1 +6"x9"
5@,W1 1 xW1 1 +6"x1 8"
5@,W1 1 xW1 1 +6"x1 8"
5@,W1 1 xW1 1 +6"x1 8"
1 O@,W1 1 xW1 1 +6"x24"
1 O@,W1 1 xW1 1 +6"x24"
1 O@,W1 1 xW1 1 +6"x24"
1 O@,W1 1 xW1 1 +6"x24"
1 O@,W1 1 xW1 1 +6"x24"
1 O@,W1 1 xW1 1 +6"x24"
Reinforcing Mesh
29W1 1 xW1 1 +6"x1 2"
2@W1 1 xW1 1 +6"x1 2"
39W1 1 xW1 1 +6"x1 8"
49W1 1 xW1 1 +6"x24"
59W1 1 xW1 1 +6"x24"
59W1 1 xW1 1 +6"x24"
2@,W1 5xW1 1 +6"x30"
3@W1 5xW1 1 +6"x30"
4@,W1 5xW1 1 +6"x30"
5@,W1 5xW1 1 +6"x30"
5@,W1 5xW1 1 +6"x30"
5aW1 5xW1 1 +6"x30"
configuration,��
Top Down
11
1 @,W1 1 xW1 1 +6 x1 8
�� 11
1 @,W1 1 xW1 1 +6 x1 8
�� 11
3@,W1 1 xW1 1 +6''x24
�� 11
1 @,W1 1 xW1 1 +6 x30
�� 11
1 9W20xW1 1 +6 x30
�� 11
29W20xW1 1 +6 x30
1 9W1 1 xW1 1 +6"x24"
2@,W1 1 xW1 1 +6"x24"
* Mesh configuration = # of mats 9 longitudinal wire size x transverse wire size + longitudinal wire spacing x transverse wire spacing
DESIGN OVERSIGHT
SIGN OFF DATE
DESIGN DETAIL SHEET (ENGLISH) (REV.7/16/10)
DESIGN
BY Tim Fuller
RETAINING
CHECKED Pete Smith
PREPARED FOR THE
WALL 21
54EO103
POST MILES
PANEL
CHECKED
STATE OF C
Brett
Makley
DETAILS
BY
DISREGARD PRINTS
EARLIER REVISION
Y i hong Wang
Pete Smith
CHCaro I i na Lopez -Toro
DEPARTMENT OF TRANSPORTATION
PROJECT
ENGINEER
QUANTITIES
BY Tim Fuller
07/ /10
ORIGINAL SCALE IN INCHES
18
UNIT:
2232
FOR REDUCED PLANS
0 1 2 3
PROJECT
NUMBER & PHASE: 08000007441
FILE
=> $REQUEST
BRIDGE NO.
RETAINING
WALL 21
54EO103
POST MILES
PANEL
DETAILS
13.2
CONTRACT NO.: 08-468004
DISREGARD PRINTS
EARLIER REVISION
BEARING
DATES
REVISION DATES
SHEET
OF
10/ 10
01/ /11
02/01/12
07/ /10
10
18
n,
w
V)
I I
w
Q
n
M
%11 chamfer
when no
raised reli
HORIZONTAL JOINT DETAIL
No Scale
Dr of face panel
O
See "HORIZONTAL JOINT DETAIL"
i
#4 Tot 11
C\1 equally spaced
#4
--- -------------
#4 8" Max
a�
_ = O
• CO .0 We I ded
E wire mats
N O
z
O
Ln
#4, Tot 11 =
•
�� 3
TYPE A�� 1
INTERMEDIATE PANEL
No Scale
STANDARD DRAWING
APPROVED BY
K. GR/SWERELEASED BY LL F?OBERTO LACALLE
i
FILE x s 1 3 OZ O� I� RESPONSIBLE TECHNICAL SPECIALIST RESPONSIBLE OFFICE CHIEF
NO.APPROVAL DATE 5-6-08 RELEASE DATE REVISED
DS OSD 2147A (ENGLISH STANDARD DRAWING "XS" BORDER REV. 01/11/08)
5'-0" nominal length
PLAN - FACE PANEL
No Scale
NOTES:
1. Architectural treatment not shown.
2. Place reinforced elastomeric bearing pads in all of the
panel joints between the panels. Place one in each vertical
joint where the horizontal joint intersects it. Place two
per panel in each horizontal joint.
Y4" x 2%'' x 6" for vertical joints
%4" x 4" x 6" for horizontal joints.
3. Bond a strip of filter fabric, 1' - 0" wide, over the full
length of all panel joints.
N
N
TYPE "C" 1 3
BOTTOM PANEL
No Scale
- Welded
wire mats
See "VERTICAL JOINT DETAIL"
%11 chamfer when
no ra I SE
Rea r of f ace par I. ,
DIST. COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT NO. SHEETS
08 SBd 10 12.3/14.1 559 624
E S S ION
q�
R IS ERED ENGINEER — CIVIL
Brett Makley
z
03/29/11 U No. C66397 m
CC
PLANS APPROVAL DATE Exp.
The State of California or its officers or agents s, C I V I L P
shall not be responsible for the accuracy or qTF OF CALlFa
completeness of electronic copies of this plan sheet.
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
L
U
= a
T
F-
. N
#4 G, 8 " Max
Ln
----------------
#4
------------ —#4 Tot 6 =
equally spaced
= n
T
Minor Concrete_---_/"*
1,-0"
Leveling pad Typ
TYPE "B'' <14
BOTTOM HALF PANEL
No Scale
N
D
O Welded
z wire mat
N
1 Revised detail STATE OF
DIVISION OF
2 Removed detail
CALIFORNIA
3 Removed scale DEPARTMENT OF TRANSPORTATION ENGINEERING SERVICES
ORIGINAL SCALE IN INCHES I I I I I I I ICU 08224
FOR REDUCED PLANS 0 1 2 3 E A 4 6 8 0 0 1
VERTICAL JOINT DETAIL 0
No Scale
O
SPECIAL DETAILS
RETAINING WALL 21
BRIDGE NO.
54E0103 MECHANICALLY STABILIZED EMBANKMENT
POST MILE
13.2
DISREGARD PRINTS BEARING
EARLIER REVISION DATES 173
USERNAME => $USER
DETAIL NO. 1
REVISION DATES (PRELIMINARY STAGE ONLY)
i) > i i> > 0210111
SHEET1 OF
11 18
$REQUEST
i
w
COUF
Transverse wires W11
I_ 5 spaces @ 6"
Longitudina
w i res 5�
Note D
n
PLAN OF PANEL WITH WELDED WIRE MAT
No scale
Notes:
1) Distance as required to permit coupler to be swaged.
02 Place #4 bar, 3' - 2" long, centered on connector
mat, but not welded to it.
03 Length equals "Base width" of wall, except it
shall not be less than 16' for the top 2 levels
of mats at the top of the wa I I
® All Transverse Wires size W11 at various spacings
as shown elsewhere in plans.
05 All Longitudinal Wires at 6'' spacing, of various
sizes, as shown elsewhere in plans.
GENERAL NOTES (MSE WALLS)
Live loading: Surcharge = 240 Ib/ft2
Soil parameters:
Internal design 3409 Y = 120 I b/ft3
External design (b (Backf i I I ) = 3409 y = 120 I b/ft3
(p(Foundation) = 300
Precast concrete panels:
f'c = 49000 psi (Concrete compressive strength at 28 days)
fy = 609000 psi (Yield strength of reinforcement)
Soil reinforcement:
Welded wire mats: fy = 659000 psi (Yield strength)
Coupler: fy = 36,000 psi (Yield strength)
Corrosion rate = 1.1 mils/year
Reinforced concrete:
f'c = 39600 psi, except as noted
(Concrete compressive strength at 28 days)
fy = 609000 psi (Yield strength of reinforcement)
MSE = Mechanically stabilized embankment
SECTION B -B
No scale
�It
ckness = 1/41'
t i re mat
)wn
DIST. COUNTY ROUTE POST MILES
TOTAL PROJECT
08 SBd 10 12.3/14.1
�91 Z�
— 7�--,4D R IS ERED ENGINEER — CIVIL
03/29/11
SHEET
TOTAL
NO.
SHEETS
560
624
O Q�OFESS jON
4
Brett Makley
z
W No. C66397 M
cr_PLANS APPROVAL DATE Exp. Q,
The State of California or its officers or agents C I V I L P
shall not be responsible for the accuracy or qTF OF CALIFO���
completeness of electronic copies of this plan sheet.
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
RETAINING WALL 21
STANDARD DRAWING STATE OF
BRIDGE NO.
APPROVED BY K. GR/SWELL RELEASED BY F?OBERTO LACALLE DIVISION OF 54E0103 MECHANICALLY STABILIZED EMBANKMENT
FILE x s 1 3- OZ O- Z e RESPONSIBLE TECHNICAL SPECIALIST RESPONSIBLE OFFICE CHIEF CALIFORNIA POST MILE
APPROVAL DATE 5-6-08 RELEASE DATE 5-6-08 DEPARTMENT OF TRANSPORTATION ENGINEERING SERVICES 13.2 DETAIL NO . 2
DS OSD 2147A (ENGLISH STANDARD DRAWING "XS" BORDER REV. 01/11/08) ORIGINAL SCALE IN INCHES CU 08224 DISREGARD PRINTS BEARING REVISION DATES (PRELIMINARY STAGE ONLY) SHEET of
FOR REDUCED PLANS 0 1 2 3 EA 468001 EARLIER REVISION DATES so 3/ /1 7/ /1 10/ /1 01 / /11 2/01/1 12 18
USERNAME => $USER $REQUEST
MSE Face i
Place vertical bearing pads where horizontal
panel joint intersects vertical panel joint.
Welded wire mats
LevE
3/,11
l..\JI Ik. I C 1 C VVa
(wingwall$ return wa
or retaining wall)
MSE FACE PANEL -TO -CONCRETE WALL JOINT DETAIL
LEGEND:
O Bond a strip of filter fabric, 1'-6" wide, to back of
MSE panels and the adjacent concrete wall for
entire length of vertical joint.
O2 Bond expansion joint material to the concrete wall.
O3 Offset between face of MSE face panel and face
of the concrete wall as dictated by location of
layout lines shown elsewhere in Project Plans.
O
611 TYPE-
REAR ELEVATION
1'-0" wide strip of filter fabric bonded
to adjacent panels fu I I length of both
vertical and horizontal panel joints.
Neoprene plug (may
radially at one loc
W 1 1 x 10'-0''
see Note 2
Fill void
see Note
Encapsulate -
see Note 4
NOTES:
DIST. COUNTY ROUTE POST MILES
TOTAL PROJECT
08 SBd 10 12.3/14.1
-k4D�Z:�
R IS ERED ENGINEER - CIVIL
03/29/11
SHEET
TOTAL
NO.
SHEETS
OF
NO.
54E0103
561
624
O Q�OFESS jON
q�
0 Brett Makley
z
LU No. C66397 M
PLANS APPROVAL DATE Exp.
The State of California or its officers or agents s, C I V I L P
shall not be responsible for the accuracy or qTF OF CALIFO���
completeness of electronic copies of this plan sheet.
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
Front of
face pane
� Inspection wire
see Note 1
ied or cored hole
SECTION THRU INSPECTION WIRE
1. Center inspection wire in face panel.
2. Fabricate inspection wires f rom W11 wire representative
of the welded wire mats, with %11 d i a - 16 UNC threads for
at I east 11/2'' of one end
3. Place inspection wire horizontal and perpendicular to the wall
panel prior to backfilling. After backfill placement to a level
at least 2'-0'' above the Inspection wire, dry pack opening
with 1000 to 1500 psi mortar. Trowel mortar smooth and flush
with face of panel.
4. Encapsulate threaded end with corrosion inhibiting mastic,
and secure round vinyl cover with nylon tie.
UNC = Unified coarse threads
SPECIAL DETAILS
RETAINING WALL 21
STANDARD DRAWINGBRIDGE
1O Revised detail
STATE OF
DIVISION
OF
NO.
54E0103
MECHANICALLY STABILIZED EMBANKMENT
K. GRSE
APPROVED BY /WLL
OBO LACALL
RELEASED BY RERTE
CALIFORNIA
Q
FILE xs13 OZO�V
NO.RESPONSIBLE
RESPONSIBLE TECHNICAL SPECIALIST
OFFICE CHIEF
ENGINEERING
S E R V I C E S
POST MILE
APPROVAL DATE 5-6-08
RELEASE DATE REVISED
DEPARTMENT OF TRANSPORTATION
13.2
DETAIL NO. 3
DS OSD 2147A (ENGLISH STANDARD DRAWING "XS" BORDER REV. 01/11/08)
ORIGINAL SCALE IN INCHES
CU 08224
DISREGARD PRINTS BEARING
REVISION DATES (PRELIMINARY STAGE ONLY)
SHEET
OF
FOR REDUCED PLANS 0 1 2 3
E A 4 6 8 0 01
EARLIER REVISION DATES
3/ /1 7/ 1/110/
1/1O1
/ /1 l
2/01 /1
13
18
USERNAME => $USER
$REQUEST
LJ
0
W
0
J
IL
LJ
w
Note 1
II D II+1 /
Note 5
Layout
CY
N
C
on
Leveling
IID11+1 /
Note 5
I i no=
� 8" Underdrain 0.
Existing
ground line
11D11+1 / _011
9
Note 5
LIMITS OF EXCAVATION
No Scale
C 8'I Underdrain -
SLOPING FINISHED SURFACE
3 /_0
FS or excavation limits
EXCAVATION
1 Q0
3/ -0'�
OUTLET
PIPE
3/
CLEANOUT
PIPE
BACKFILL
OUTLET OR CLEANOUT PIPE FOR UNDERDRAIN
1O ABBREVIATIONS
OG Original ground
FS Planned finished surface
GP Planned grading plane
above Elev. top
ded wire mats
W
-oil
9
Note 1
11D11+1 / _011
9
Note 5
No Scale
cL 8" Underdrain
ROADWAY SECTION WITH
BASE WIDTH 16' OR GREATER
LIMITS OF BACKFILL
No Scale
wo
_oil
9
LEGEND
Limits of structure excavation
Limits of structure backfill
Limits of permeable material
Note 1
11D11+1 / _011
9
Note 5
DIST. COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT NO. SHEETS
SBd 10 12.3/14.1 562 624
E S S ION
q�
R IS ERED ENGINEER - CIVIL
Brett Makley
z
03/29/11 U No. C66397 m
CC
PLANS APPROVAL DATE ,, Exp.
The State of California or its officers or agents s� C I V I L P
shall not be responsible for the accuracy or qTF of CALIF��`�1
completeness of electronic copies of this plan sheet.
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
T.Y. LIN INTERNATIONAL
3550 VINE STREET, SUITE 120
RIVERSIDE, CA 92507
+1 / _Oil
9
e 5
to 2
16 / -0" 1� QL 8" Underdrain
1 ROADWAY SECTION WITH 1
00
BASE WIDTH LESS THAN 16/
SPECIAL DETAILS
NOTES:
10
Limits
to FS except to GP when
in roadway section.
2.
Locate
8" perforated underdrain
below bottom level
OF
SERVICES
of welded
wire mats.
MECHANICALLY STABILIZED EMBANKMENT
3.
Maximum
spacing of outlet pipes
is 200 ft.
4.
At sa s
in profile of underdrain, install outlet
pipe or
each direction of flow.
REVISION DATES (PRELIMINARY STAGE ONLY)
<9> 5.
For "D"
dimension, see table on
"INDEX TO PLANS" sheet.
+1 / _Oil
9
e 5
to 2
16 / -0" 1� QL 8" Underdrain
1 ROADWAY SECTION WITH 1
00
BASE WIDTH LESS THAN 16/
SPECIAL DETAILS
i
w
RETAINING WALL
21
STANDARD DRAWING
1 Revised detail
2 Added note
STATE OF
C A L I F O R N I A
DEPARTMENT OF TRANSPORTATION
DIVISION
OF
SERVICES
BRIDGE NO.
54E0103
POST MILE
13.2
MECHANICALLY STABILIZED EMBANKMENT
FILE
NO. W3 -020-6e
APPROVED BY K. GR/SWELL
RESPONSIBLE TECHNICAL SPECIALIST
APPROVAL
APPROVAL DATE 5-6-08
RELEASED BY F?OBERTO LACALLE
RESPONSIBLE OFFICE CHIEF
RELEASE DATE REVISED
DETAIL NO. 6
DS OSD 2147A (ENGLISH STANDARD DRAWING "XS" BORDER REV. 01/11/08)
ORIGINAL SCALE IN INCHES 1 1 1 1 1 1 1
FOR REDUCED PLANS 0 1 2 3
CU 08224
E A 4 6 8 0 01
DISREGARD PRINTS BEARING
EARLIER REVISION DATES
REVISION DATES (PRELIMINARY STAGE ONLY)
SHEET
OF
3/ /1 7/ /1
10/ /1
01 / /11
210111
14
18
USERNAME => $USER
$REQUEST
i
w
BENCHMARKS
POST MILES SHEET No TOTAL
DIST COUNTY ROUTE TOTAL PROJECT SH
08 SBd 10 12.3/14.1 563 624
Horizontal coordinates
are CCS NAD -83 (NSRS2007)
Vertical control
based on NAVD- 88 ( NGS NAVD88)
4002101112
Pt 1010
Z
Q9,OFESSIO�
REGISTERED CIVIL ENGINEER DATE 1:) q�
N: 1846472.883
E: 671 651 0.983 Elevation: 1 054.523
SET MAG NL & FLASH
FOR AT RW 21
S.PIRATHIVIRAJ z
03/29/11 NO. C71662 M
ANS
Pt. 5001
PLcr
APPROVAL DATE
N: 1846561 .879 E: 671 6362.1 30 E I evat I on: 1025.534
Exp. 12/31/13
The State of California or its officers or agents
SETREBAR �W/'AECP
LS 4430'' PLUG 30' +/- SLY OF RAILS9
sT CIVIL P
shall not be responsible for the accuracy or q �.
TF
100' + /- W L Y OF
CHERRY
A-09-112
" C " Line
completeness of scanned copies of this plan sheet. OF CALIF"
Pt. 5002
� Cherry Ave
EJ30
N: 1846574.454
E: 671 6783.325 Elevation: 1 027.1 34
7
6
SET REBAR W/'AECP
LS 4430'' PLUG 30' +/- S'LY OF RAILS,
4 25
1 1 70 W 3RD STREET
300' +/- E'LY OF
CHERRY 1 2
3
SAN BERNARDINO, CA 92410
8
EARTH MECHANICS, INC.
A-09-113
17660 NEWHOPE STREET, SUITE E
NOTES: FOUNTAIN VALLEY CA 92708
(1) This LOTB sheet was prepared in accordance with the Caltrans Soil
PLAN
and Rock Logging, Classification and Presentation Manual (June 2007) .
II
(2) 2.4 samples were taken using a California Modified Sampler.
1" - 60'
(3) An automatic trip hammer system consisting of a hammer weight of
140 lbs fal I ing a distance of 30'' was used to advance the drive sampler.
(4) Conversion factor from 2.4" Modified California Ring Sampler b I owcounts
to Standard Penetration Test ( SPT) b I owcounts is 0.5.
+1050
J
+1050
CD+
CD
0
+1040
O
M
�C N
+1040
J
_ Q
"Cn A-09-112
+
+1030
CCV
'–
J Q
El. +1030.0 ft
®
4 Asphalt Concrete 6 Base +1030
U V' A-09-113
SILTY SAND (SM): dense, o I I ve-brown, moist, few fine GRAVEL, mostly
coarse to fine SAND, little fines, nonplastic, weak cementation
EI. +1022.0 ft
EE
2611.41=T
. O
+1020
7 Aspha It concrete, 5 base
Bulk 1
SILTY SAND (SM): very dense, olive, moist, few fine GRAVEL, mostly
F50/672.41 2
`OM UW
becomes very dense +1020
coarse to fine SAND, IittIe fines, nonplastic, weak cementation non
5711.41 2 °OM
m
m
72 1.4 3
OM
<
+1010—
35 2.4 3 ;; OM UW Poorly graded SAND with SILT and GRAVEL (SP -SM): medium dense olive -
ray,
ray, dry, I i tt I e coarse to fine GRAVEL, most I y coarse to fine 9SAND,
11 2.4 4
., OM UW PA DS
becomes I loose, o I i ve-gray, moist, 6% fine GRAVEL, 69% coarse to fine +1010
0
fines, non I ast i c weak cementation
SAND, 25% fines, nonp 1 ast i c, weak cementation z
Q
10 1 .4 4 OM SILTY SAND SM : medium um dense, olive -brown, mo I st few fine ne GRAVEL, ,
mostly coarse to fine SAND, little fines, nonp 1 ash i c, weak cementation
29 1 .4 5
OM
Poor I ygraded SAND w I th SILT and GRAVEL SP -SM : dense, o I i ve-gray,
w
J
14212.41 5 :: OM UW Poorly graded SAND with GRAVEL (SP): medium dense, olive -gray, dry,
dry, little coarse to fine GRAVEL, mostly coarse to fine SAND, few
f i nes, nonplastic, 1 ast i c, weak cementation
LU + 1 000
little coarse to fine GRAVEL, mostly coarse to fine SAND, trace
50/5 2–.-4-T-6
+1000
becomes very dense, no recovery
fines, nonpIastic, weak cementation, with SANDY SILT layer
16311.41 6 becomes very dense, no SANDY SILT layer
16011.41=
: OM
becomes moist
+990
''1
50/62.4 7 ' ° OM UW Poorly graded SAND with SILT and GRAVEL(SP-SM):very dense, olive -
+990
ray, dry, little coarse to fine GRAVEL, mostly coarse to fine SAND,
?ew
717-1,41 8
OM
SILTY SAND (SM): very dense, olive -gray, moist, few fine GRAVEL,
f i nes, nonplastic, weak cementation
Terminated at E 1. 990.5 ft
mostly coarse to fine SAND, I i tt I e f Ines, nonplastic, weak cementation
Drilled on 10/22/2009 0
Hammer Energy Ratio (ERi=75/)
85 1.4 9
;`°OM
Poorly graded SAND with GRAVEL (SP): very dense, olive -gray, dry,
+980--
Groundwater not Encountered During Drilling
little coarse to fine GRAVEL, mostly coarse to fine SAND, trace
f i nes, nonplastic, 1 ast i c, weak cementation
REF /3"l 2.4110
+980
REF/6 1.4 11
Ki)
+97028
17, 4 12
: `OM
CLAYEY SAND with GRAVEL SC :dense, Olive, moist, l ittle fine GRAVEL, +970
mostly coarse to fine SAND, little fines, low plasticity, weak
cementation
Terminated
at El. 968.5 ft
Drilled on 10/21/2009
+960
Hammer Energy Ratio (ERi=75%) +960
PROFILE
Groundwater not Encountered During
Drilling
VERTICAL 1 " = 10'
HORIZONTAL 1 " = 20'
+950
+950
Stationing along "C" Line
21+00 22+00
23+00
24+00
25+00
R. Zezoff
DRAWN BY
J. Fang
R. Jie
PREPARED
STATE OF
FOR THE S. Pirathiviraj
CALIFORNIA
BRIDGE NO.
54EO103
R E T A I N I N G W A L L 21
DESIGN OVERSIGHT
FIELD INVESTIGATION BY:
PROJECT ENGINEER
POST MILES
CHECKED BY
L. Cheung
DATE: 10/21 /09 and 10/22/09
DEPARTMENT OF
TRANSPORTATION
13.2
L 0 G OF T E S T B 0 R I N G S 1 OF 4
SIGN OFF DATE
OGS CIVIL LOG OF TEST BORINGS
SHEET (ENGLISH) (REV. 06-01-09)
ORIGINAL SCALE IN INCHES j I I I
FOR REDUCED PLANS 0 1
I I I UNIT: 2232 DISREGARD PRINTS BEARING
2 3 PROJECT NUMBER & PHASE: 08000007441 EARLIER REVISION DATES
REVISION DATES
SHEET
OF
03/ 10
07/ 10
10/ /10
01 /11
71
02/01/12
1
1
1
1
1
1 15
18
FILE => $REQUEST CONTRACT NO.: 08-468004 PROJECT ID: 0800000744
LU
Q
EO
0
LU
0
0 -
LU
a
0
CL
w
V)
W
r
BENCHMARKS:
Horizontal coordinates are CCS NAD -83 (NSRS2007)
Vertical control based on NAVD- 88 ( NGS NAVD88 )
Pt. 1010
N: 1846472.883 E: 671 651 0.983 Elevation: 1 054.523
SET MAG NL & FLASH FOR AT
Pt. 5001
N: 1846561 .879 E: 671 6362.1 30 Elevation: 1 025.534
SETREBAR W/"AECP LS 4430" PLUG 30' +/- SLY OF RAILS,
100' +/- W LY OF CHERRY
Pt. 5002
N: 1846574.454 E: 671 6783.325 Elevation: 1 027.1 34
SET REBAR W/"AECP LS 4430" PLUG 30' +/- SLY OF RAILS,
300' +/- E'LY OF CHERRY
NOTES: 1
(1) This LOTB sheet was prepared in accordance with the Ca I trans So i I
and Rock Logging, Classification and Presentation Manual ( June 2007) .
(2) 2.4" sump I es were taken us i ng a Ca I i forn I a Mod i f I ed Samp I er.
(3) An automatic trip hammer system consisting of a hammer weight of
140 lbs falling a distance of 30" was used to advance the drive sampler.
(4) Conversion factor from 2.4" Modified Cal ifornia Ring Sampler bIowcounts
to Standard Penetration Test ( SPT) b I owcounts is 0.5.
z
0
a
LU
LU
+1050
+1040
+1030
+1020
+1010
+1000
+990
+970
+950
25+00
R. Zezof f
DESIGN OVERSIGHT
SIGN OFF DATE
OGS CIVIL LOG OF TEST BORINGS SHEET (ENGLISH) (REV. 06-01-09)
DRAWN BY I J. Fang
CHECKED BY I L. Cheung
26+00
g
RW 21
Cherry Ave
3
27+00
R. J ie
FIELD INVESTIGATION BY:
DATE: 10 /21 /09 nn(i 10 /22 /O9
' 6
4 25 A-09-111
11fl-1
ORIGINAL SCALE IN INCHES
FOR REDUCED PLANS 0
C "C" Line
7
PLAN
1 " = 60'
PREPARED FOR THE
STATE OF CALIFORNIA I
s. PirathIviraj
PROJECT ENGINEER
DEPARTMENT OF TRANSPORTATION
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 564 624
4 0-0-1* 02101112 9,oFESS10
REGISTERED CIVIL ENGINEER DATE �o e IV4
�4/ F`�c
S.PIRATHIVIRAJ
03/29/11No. C71662 M
PLANS APPROVAL DATE
. �
The State of California or its officers or agents � Exp12/31 /13
shall not be responsible for the accuracy or STa CIVIL �P
completeness of scanned copies of this plan sheet. TF OF CALIFO��
T— u g 30
8 A-09-001 SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
EARTH MECHANICS, INC.
17660 NEWHOPE STREET, SUITE E
FOUNTAIN VALLEY. CA 92708
UNIT: 2232
1 2 3 PROJECT NUMBER & PHASE: 08000007441
FILE => $REQUEST
-001
6 Asphalt Concrete
SILTY SAND (SM): very gense, Q I i ve, moist, few fine GRAVEL, most I y
nnnrco +n -Finn C A KIn I i ++ I n f i nnc nnnn I nc+ 1t- uinnl< r-omnn+n+ i nn
+1050
+1040
+1030
+1020
+1000 -
+990
off -ogre
+970
+960
+950
29+00 30+00
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 LOG OF TEST BORINGS 2 OF
REVISION DATES SHEET
DISREGARD PRINTS BEARING
EARLIER REVISION DATES 03/ 10 07/ 10 10/ /10 01 /11 02101112 16
CONTRACT NO.: 08-468004 PROJECT ID: 0800000744
a
w
Q
0
EO
0
LU
0
n
w
a
0
CL
w
V)
4 W
Q
OF z
18 w
REFERENCE: CALTRANS SOIL & ROCK LOGGING, CLASSIFICATION, AND PRESENTATION MANUAL (JUNE 2007)
CEMENTATION
Description
Criteria
Weak
Crumb I es or breaks w i th hand I i ng or
A
i tt I e f i nger pressure.
Moderate
Crumbles or breaks with considerable
Rotary drilled boring
finger pressure.
Strong
Will not crumble or break with finger
"
pressure.
BOREHOLE IDENTIFICATION
Symbol
Hole
Type
Description
s�Ze
A
Auger Boring
s�Ze
R
Rotary drilled boring
Strength (tsf)
P
Rotary percussion boring (air)
"
R
Rotary drilled diamond core
N
HD
Hand driven (1 -inch soil tube)
HA
Hand Auger
®
D
Dynamic Cone Penetration Boring
®
CPT
Cone Penetration Test (ASTM D 5778-95)
r ,
0
Other
L_J
0.25 to 0.50 Penetrated severa I inches by
and kneading to reach the plastic I i m i t. The
Note: Size in inches.
Top Hole E I .
Casing driven —
Size of Sampler
(inches)
SPT N -Value
(per ASTM 1586-99),
P = push sample,
or as noted
R. Zezof f
DESIGN OVERSIGHT
SIGN OFF DATE
Hole I.D.
o
000<
16 11.4 /.
3 'I
Description of materia
Muw uu --Field & Lab Tests
GWS Elev.
Date measured
Material change
Estimated material change
Soil/Rock boundary
Boring Date
Terminated at E I ev
Hammer Energy Ratio (ERi) _
ROTARY BORING
OGS CIVIL LOG OF TEST BORINGS SHEET (ENGLISH) (REV. 06-01-09)
DRAWN BY I J. Fang
CHECKED BY I L. Cheang
CONSISTENCY OF COHESIVE SOILS
PLASTICITY OF
Unconfined
Pocket
Description
Description
Compress i ve
Penetrometer
Torvane Field Approximation
Measurement (tsf )
A 1/8 -inch thread cannot be rolled
Strength (tsf)
Measurement (tsf)
Very Soft
< 0.25
< 0.25
< 0.12 Easily penetrated several inches
plastic limit.
by fist
Soft
0.25 to 0.50
0.25 to 0.50
0.12 to 0.25 Easily penetrated several inches
The thread cannot be rero I I ed after reaching the plastic limit. The lump crumbles
by thumb
Medium Stiff
0.50 to 1.0
0.50 to 1.0
0.25 to 0.50 Penetrated severa I inches by
and kneading to reach the plastic I i m i t. The
thread
High
thumb with moderate effort
formed
without crumbling when drier than
Readily indented by thumb but
Stiff
1 to 2
1 to 2
0.50 to 1.0 penetrated only with great effort
Very Stiff
2 to 4
2 to 4
1.0 to 2.0 Readily indented by thumbnail
Indented by thumbnail with
Hard
> 4.0
> 4.0
> 2.0 difficulty
F_
0
0
U
O
Top Hole EI.
o0 0
0
Blows per 12'' 30
(Using 28 Ib hand
hammer with a 12''
Hole I.D.
Ground water
surface
GWS Elev.
drop or as noted) P Date ensured
° Description of
Pulled Pipe materials
: -
60
P (S) Sample
500 taken
Refusal (S)
Boring Date
Terminated at E I ev
HAND BORING
R. J ie
FIELD INVESTIGATION BY:
DATE: 10/21/0() nn(i 10/22/0()
ORIGINAL SCALE IN INCHES
FOR REDUCED PLANS 0
Top Hole EI.
No count recorded
Pushed
Driving rate in
seconds per 12''
(using a Stanley
MB 156 percussion
hammer and a 2.2"
cone, or as noted)
C:
0
4-
U
O
J Hole I.D.
NPC
2 EI
4
6
10
37
17
56
91
58
65
60
43
1137 180/09
15
Boring Date 100
DYNAMIC CONE PENETRATION BORING
PREPARED FOR THE
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
S. Pirathiviraj
PROJECT ENGINEER
UNIT: 2232
1 2 3 PROJECT NUMBER & PHASE: 08000007441
FILE => $REQUEST
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 565 624
LE02/01 /12 gOFFSSIO
REGISTERED CIVIL ENGINEER DATE �o e
S. PIRATHIVIRAJ
03/29/11u No. C71662 M
PLANS APPROVAL DATE
� . �
The State of California or its officers or agents Exp12/31 /13
shall not be responsible for the accuracy or ST4C I V I L �P
completeness of scanned copies of this plan sheet. TF of CALtFo��
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
EARTH MECHANICS, INC.
17660 NEWHOPE STREET, SUITE E
FOUNTAIN VALLEY. CA 92708
TOD Hole EI.
Pressure measured
along sleeve friction
element (34.88 i n t
area) divided by
pressure measured
on tip element.
C:
0
Hole I.D.
U
Pressure measured
on tip element
(2.33 int area)
6 4 2 0 10 20 30
20
2t0 Friction Ratio (%) Tip Bearing (MPa)
Boring Date
CONE PENETRATION TEST (CPT) SOUNDING
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 1 LOG OF TEST BORINGS 3 OF 4
DISREGARD PRINTS BEARING REVISION DATES SHEET OF
EARLIER REVISION DATES CM103/ 10 07/ 10 10/ /10 01 /11 02101112 1 1 1 1 1 17 18
CONTRACT NO.: 08-468004 PROJECT ID: 0800000744
w
0
LU
0
J
LU
LU
Q
0
EO
0
LU
I-
0
n
LU
a
0
fl'
r
z
PLASTICITY OF
FINE-GRAINED SOILS
Description
Cr i ter i a
Nonp I ast i c
A 1/8 -inch thread cannot be rolled
at any water content.
The thread can barely be rolled and
the lump cannot be formed when drier than
the
Low
plastic limit.
The thread is easy to roll and not
much time is required to reach the plastic
limit .
Medium
The thread cannot be rero I I ed after reaching the plastic limit. The lump crumbles
when drier than the plastic limit.
It takes considerable time rolling
and kneading to reach the plastic I i m i t. The
thread
High
can be rero I I ed several times after reaching the plastic limit. The lump can be
formed
without crumbling when drier than
the plastic limit .
F_
0
0
U
O
Top Hole EI.
o0 0
0
Blows per 12'' 30
(Using 28 Ib hand
hammer with a 12''
Hole I.D.
Ground water
surface
GWS Elev.
drop or as noted) P Date ensured
° Description of
Pulled Pipe materials
: -
60
P (S) Sample
500 taken
Refusal (S)
Boring Date
Terminated at E I ev
HAND BORING
R. J ie
FIELD INVESTIGATION BY:
DATE: 10/21/0() nn(i 10/22/0()
ORIGINAL SCALE IN INCHES
FOR REDUCED PLANS 0
Top Hole EI.
No count recorded
Pushed
Driving rate in
seconds per 12''
(using a Stanley
MB 156 percussion
hammer and a 2.2"
cone, or as noted)
C:
0
4-
U
O
J Hole I.D.
NPC
2 EI
4
6
10
37
17
56
91
58
65
60
43
1137 180/09
15
Boring Date 100
DYNAMIC CONE PENETRATION BORING
PREPARED FOR THE
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
S. Pirathiviraj
PROJECT ENGINEER
UNIT: 2232
1 2 3 PROJECT NUMBER & PHASE: 08000007441
FILE => $REQUEST
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 565 624
LE02/01 /12 gOFFSSIO
REGISTERED CIVIL ENGINEER DATE �o e
S. PIRATHIVIRAJ
03/29/11u No. C71662 M
PLANS APPROVAL DATE
� . �
The State of California or its officers or agents Exp12/31 /13
shall not be responsible for the accuracy or ST4C I V I L �P
completeness of scanned copies of this plan sheet. TF of CALtFo��
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
EARTH MECHANICS, INC.
17660 NEWHOPE STREET, SUITE E
FOUNTAIN VALLEY. CA 92708
TOD Hole EI.
Pressure measured
along sleeve friction
element (34.88 i n t
area) divided by
pressure measured
on tip element.
C:
0
Hole I.D.
U
Pressure measured
on tip element
(2.33 int area)
6 4 2 0 10 20 30
20
2t0 Friction Ratio (%) Tip Bearing (MPa)
Boring Date
CONE PENETRATION TEST (CPT) SOUNDING
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 1 LOG OF TEST BORINGS 3 OF 4
DISREGARD PRINTS BEARING REVISION DATES SHEET OF
EARLIER REVISION DATES CM103/ 10 07/ 10 10/ /10 01 /11 02101112 1 1 1 1 1 17 18
CONTRACT NO.: 08-468004 PROJECT ID: 0800000744
w
0
LU
0
J
LU
LU
Q
0
EO
0
LU
I-
0
n
LU
a
0
fl'
r
z
REFERENCE: CALTRANS SOIL & ROCK LOGGING, CLASSIFICATION, AND PRESENTATION MANUAL (JUNE 2007)
GROUP SYMBOLS AND NAMES
Graphic/Symbol
Group Names
Graphic/Symbol
Group Names
® 0®
�
Very loose
Well -graded GRAVEL
0 -
4
Lean CLAY
5 to
GW
10
Medium Dense
15 to
Lean CLAY with SAND
®®0
Dense
Wel 1 -graded GRAVEL with SAND
31 -
50
Lean CLAY with GRAVEL
50 to
>
50
CL
SANDY lean CLAY
o
00 0 o
Poorly graded GRAVEL
SANDY lean CLAY with GRAVEL
0 00°
GP
GRAVELLY lean CLAY
0 ° O
Poorly graded GRAVEL with SAND
GRAVELLY lean CLAY with SAND
0 0
®
®
®
Well -graded GRAVEL with SILT
SILTY CLAY
GW -GM
SILTY CLAY with SAND
®
Wel 1 -graded GRAVEL with SILT and SAND
SILTY CLAY with GRAVEL
®
0
CL -ML
SANDY SILTY CLAY
®
®
We I I - raded GRAVEL with CLAY
(or SILTY CLAY)
SANDY SILTY CLAY with GRAVEL
®
GW -GC
Wel I - raded GRAVEL with CLAY and SAND
GRAVELLY SILTY CLAY
®
(or SILTY CLAY and SAND)
GRAVELLY SILTY CLAY with SAND
0
00
0 &
Poorly graded GRAVEL with SILT
SILT
o c
GP -GM
SILT with SAND
0 °
Poorly graded GRAVEL with SILT and SAND
SILT with GRAVEL
'9A
ML
SANDY SILT
a
00
o
Poorlyy ggraded GRAVEL with CLAY
(or 'SOYr CLAY)
SANDY SILT with GRAVEL
o
°
GP -GC
Poorly graded GRAVEL with CLAY and
GRAVELLY SILT
° °
0
°
SAND (or SILTY CLAY and SAND)
GRAVELLY SILT with SAND
°
SILTY GRAVEL
ORGANIC lean CLAY
GM
ORGANIC lean CLAY with SAND
o
°
°
°
SILTY GRAVEL with SAND
ORGANIC lean CLAY with GRAVEL
OL
SANDY ORGANIC lean CLAY
°
CLAYEY GRAVEL
SANDY ORGANIC lean CLAY with GRAVEL
GC
GRAVELLY ORGANIC lean CLAY
0
CLAYEY GRAVEL with SAND
GRAVELLY ORGANIC lean CLAY with SAND
o
°ORGANIC
�
SILTY, CLAYEY GRAVEL
SILT
GC -GM
ORGANIC SILT with SAND
O
SILTY, CLAYEY GRAVEL with SAND
ORGANIC SILT with GRAVEL
OL
SANDY ORGANIC SILT
°
Wel 1 -graded SAND
SANDY ORGANIC SILT with GRAVEL
o
SW
GRAVELLY ORGANIC SILT
Well -graded SAND with GRAVEL
GRAVELLY ORGANIC SILT with SAND
:.
Poorly graded SAND
Fat CLAY
SP
Fat CLAY with SAND
:. .:
Poorly graded SAND with GRAVEL
Fat CLAY with GRAVEL
CH
SANDY fat CLAY
°
We I I -graded SAND with SILT
SANDY fat CLAY with GRAVEL
o
SW -SM
GRAVELLY fat CLAY
Well -graded SAND with SILT and GRAVEL
GRAVELLY fat CLAY with SAND
Wel I - raded SA D with CLAY
Elastic SILT
o
_
SW SC
(or SILTY CLAY
Elastic SILT with SAND
°
Well - raded SAND with CLA and GRAVEL
(or SILTY CLAY and GRAVEL
Elastic SILT with GRAVEL
°.
MH
SANDY elastic SILT
Poorly graded SAND with SILT
SANDY elastic SILT with GRAVEL
SP -SM
GRAVELLY elastic SILT
Poorly graded SAND with SILT and GRAVEL
GRAVELLY elastic SILT with SAND
Poor I yy gqraded SAND with CLAY
ORGANIC fat CLAY
SP -SC
(or S Y' CLAY)
ORGANIC fat CLAY with SAND
Poor Iy raded SAND with CLAY and
GRAVEL �or SILTY CLAY and GRAVEL)
ORGANIC fat CLAY with GRAVEL
OH
SANDY ORGANIC fat CLAY
SILTY SAND
SANDY ORGANIC fat CLAY with GRAVEL
SM
GRAVELLY ORGANIC fat CLAY
SILTY SAND with GRAVEL
GRAVELLY ORGANIC fat CLAY with SAND
CLAYEY SAND
ORGANIC elastic SILT
SC
ORGANIC elastic SILT with SAND
CLAYEY SAND with GRAVEL
ORGANIC elastic SILT with GRAVEL
OH
SANDY ORGANIC elastic SILT
SILTY, CLAYEY SAND
SANDY ORGANIC elastic SILT with GRAVEL
SC -SM
GRAVELLY ORGANIC elastic SILT
SILTY, CLAYEY SAND with GRAVEL
GRAVELLY ORGANIC elastic SILT with SAND
ORGANIC SOIL
PT
PEAT
ORGANIC SOIL with SAND
ORGANIC SOIL with GRAVEL
'
OL /OH
SANDY ORGANIC SOIL
00C
COBBLES
SANDY ORGANIC SOIL with GRAVEL
COBBLES and BOULDERS
GRAVELLY ORGANIC SOIL
BOULDERS
GRAVELLY ORGANIC SOIL with SAND
R. Zezof f
DESIGN OVERSIGHT
SIGN OFF DATE
OGS CIVIL LOG OF TEST BORINGS SHEET (ENGLISH) (REV. 06-01-09)
DRAWN BY I J. Fang
CHECKED BY I L. Cheung
R. J ie
FIELD INVESTIGATION BY:
DATE: 10/21/0() nn(i 10/22/0()
ORIGINAL SCALE IN INCHES
FOR REDUCED PLANS 0
FIELD AND LABORATORY
TESTING
C Conso I i dat i on ( ASTM D 24 35 )
CL Col lapse Potential ( ASTM D 5333 )
CP Compaction Curve ( CTM 21 6 )
CR Corros i v i ty Testing
(CTM 643, CTM 422, CTM 417)
CU Conso I i dated Undra I ned
Triaxial (ASTM D 4767)
DS Direct Shear (ASTM D 3080)
EI Expansion Index (ASTM D 4829)
M Moisture Content ( ASTM D 221 6 )
OC Organic Content- % ( ASTM D 2974 )
P Permeability (CTM 220)
(PA) Particle Size Analysis (ASTM D 422)
PI Plasticity Index (AASHTO T 90)
Liquid Limit (AASHTO T 89)
PL Point Load Index (ASTM D 5731
PM Pressure Meter
PP Pocket Penetrometer
R R -Value ( CTM 301 )
SE Sand Equivalent ( CTM 21 7 )
(SG Specific Gravity (AASHTO T 1 00)
SL Shrinkage Limit (ASTM D 427)
SW Swell Potential (ASTM D 4546)
TV Pocket Torvane
Unconf I ned Compress i on -So i
UC (ASTM D 2166)
Unconfined Compress i on -Rock
(ASTM D 2938)
UU Unconso I I dated Undra i ned
Triaxial (ASTM D 2850)
UW Unit Weight (ASTM D 4767)
VS Vane Shear (AASHTO T 223)
PREPARED FOR THE
STATE OF CALIFORNIA I
s. PirathIvIraj
PROJECT ENGINEER
DEPARTMENT OF TRANSPORTATION
I I I I UNIT: 2232
1 2 3 PROJECT NUMBER & PHASE: 08000007441
FILE => $REQUEST
DIST COUNTY ROUTE POST MILES SHEET TOTAL
TOTAL PROJECT No SHEETS
08 SBd 10 12.3/14.1 566 624
02101112 �oVEssjo
REGISTERED CIVIL ENGINEER DATE �o e �ql
S. PIRATHIVIRAJ z
03/29/11 No. C71662rn
PLANS APPROVAL DATE
�
The State of California or its officers or agents -�t Exp. 12/31/13
shall not be responsible for the accuracy or STa CIVIL �P
completeness of scanned copies of this plan sheet. TF of CALIVo��
SANBAG
1170 W 3RD STREET
SAN BERNARDINO, CA 92410
EARTH MECHANICS, INC.
17660 NEWHOPE STREET, SUITE E
FOUNTAIN VALLEY. CA 92708
APPARENT DENSITY
OF COHESIONLESS SOILS
Description
Dry
SPT N 60 (B I ows
/ 12 1 nches )
Very loose
Moist
0 -
4
Loose
5 to
5 -
10
Medium Dense
15 to
11 -
30
Dense
30 to
31 -
50
Very Dense
50 to
>
50
MOISTURE
Description
Criteria
Dry
Absence of moisture, dusty, dry to the
Criteria
touch
Moist
Damp but no visible water
Wet
Visible free water, usually soil is
5 to
below water table
PERCENT
OR PROPORTION
OF SOILS
Description
> 1211
Criteria
Trace
Particles are present
be less than 5%
but estimated to
Few
Fine
5 to
10%
Little
No. 10 to No. 4
15 to
25%
Some
No. 200 to No. 40
30 to
45%
Mostly
50 to
100%
PARTICLE SIZE
Description
Size
Bou I der
> 1211
Cobble
31I to 12"
Grave I
Coarse
3/4" to 3"
Fine
No. 4 to 3/4''
Sand
Coarse
No. 10 to No. 4
Med i um
No. 40 to No. 10
Fine
No. 200 to No. 40
BRIDGE NO.
54EO103 RETAINING WALL 21
POST MILES
13.2 1 LOG OF TEST BORINGS 4 OF 4
DISREGARD PRINTS BEARING REVISION DATES SHEET OF
EARLIER REVISION DATES 03/ 10 07/ 10 10/ /10 01 /11 02101112 1 1 1 1 1 1 18 18
CONTRACT NO.: 08-468004 PROJECT ID: 0800000744
w
0
LU
0
J
LU
LU
Q
0
EO
0
LU
I-
0
0-
w
a
0
fl'
r
z
M