HomeMy WebLinkAbout2248-1BASELINE AVE. CLOSED
TO THRU TRAFFIC
CHERRY AVE. TO CITRUS AVE.
USE ALTERNATE ROUTE
(DATE) TO (DATE)
HIGHLAND AVENUE
------------
- - - - - -
BASELINE AVE. CLOSED
TO THRU TRAFFIC
I
BASELINE AVE. CLOSED
I TO THRU TRAFFIC
CHERRY AVE. TO CITRUS AVE.
I
USE ALTERNATE ROUTE
(DATE) TO (DATE)
I
I
DETOUR DETOUR
ROAD AHEAD
CONAHEADON Cl C5(RT)
C18
" ROA
ROAD CLOSED <AHEAD>
LOSE
END TO
THRU TRAFFIC C 1
DETOUR
C7 I DETOUR C5(RT) ROAD
CONSTRUCTION
I AHEAD
TYPE III BARICADE C18
W/TYPE "N" MARKERS
I
BASELINE AVE. CLOSED
TO THRU TRAFFIC r
CHERRY AVE. TO CITRUS AVE. 'I
USE ALTERNATE ROUTE
(DATE) TO (DATE)
550 550' 550' __1 I '-
D
CS(RT) R17 O
3 \ ^V
I
I
BASELINE AVE. CLOSED
TO THRU TRAFFIC
1. ALL SIGNS AND TRAFFIC CONTROL DEVICES SHALL CONFORM
CHERRY AVE. TO CITRUS AVE.
USE ALTERNATE ROUTE
(DATE) TO (DATE)
I
ROAD
DNSTRUCTION C3A ROADTCOLOSED
AHEAD
C 1 8 THRU TRAFFIC
DETOUR DETOUR
C5(LT) DETOUR I AHEAD
C5(LT) Cl
I
TYPE III BARICADE
W/TYPE " N" MARKERS
I
I
I
550' 550' I 550' 550' 550'
I
I
I
I
I
I
ROAD BASELINE AVE. CLOSED
CONSTRUCTION TO THRU TRAFFIC
AHEAD CITRUS AVE. TO CHERRY AVE.
C 1 8 USE ALTERNATE ROUTE
(DATE) TO (DATE)
MASK ADVANCE do MAST ARM MOUNTED
=DETOUR3 SIGNS RESTRICTING LEFT TURNS
ON TO CITRUS AVENUE FROM BASELINE
C5(RT) FOR DURATION OF DETOURlit N.T.S.
R17 I
GENERAL NO TES:
I
I
1. ALL SIGNS AND TRAFFIC CONTROL DEVICES SHALL CONFORM
I
TO THE MANUAL OF CONTROLS FOR CONSTRUCTION AND
MAINTENANCE WORK ZONES (LATEST EDITION) OF THE STATE
OF CALIFORNIA DEPARTMENT OF TRANSPORTATIONCAL TRANS )
it
BUSINESS, TRANSPORTATION AND HOUSING AGENCY
2. ALL WORK AREAS SHALL BE COMPLETELY CONED/OR
DELINEATED AND/OR BARRICADED.
r�,
I
3. ALL SIGNS SHALL BE REFLECTORIZED OR ILLUMINATED.
ALL ADVANCE WARNING SIGNS SHALL BE ILLUMINATED.
I
4. A MINIMUM 12' LANE SHALL BE MAINTAINED AT ALL TIMES
FOR RESIDENTS AND EMERGENCY VEHICLES IN THE CLOSURE AREA.
5. LOCATION OF ALL EQUIPMENT IS SUBJECT TO FINAL APPROVAL
,
AND MAY BE MODIFIED BY THE ENGINEER.
6. ADDITIONAL TRAFFIC SAFETY EQUIPMENT MAY BE REQUIRED
I
BY THE ENGINEER.
SIGN " B"
I
I t
SIGN " B" 7. QUALIFIED FLAGGERS SHALL BE USED WHERE CONSTRUCTION
-*- REDUCES THE ROAD WAY TO A SINGLE THROUGH LANE OR
I
WHERE THROUGH TRAFFIC MUST STOP FOR EQUIPMENT MOVEMENT.
-
- - - - - -
I
_ - -_
8. ACCESS FOR LOCAL RESIDENTS AND BUSINESSES WILL BE
III
SC3 t DETOUR
I
I
I
m
3
�
C5(RT)
I
I
SIGN B
I
DETOUR
'� DETOUR SC3
C5(LT)
I
MAINTAINED AT ALL TIMES. ONLY EXACT AREA OF WORK WILL
BE BLOCKED TO THROUGH TRAFFIC FROM ALL ACCESS WHILE
WORK IS UNDER ACTIVE CONSTRUCTION.
9. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM
TO THE LATEST CALTRANS SIGN SPECIFICATION SHEETS.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES.
11. MASK OR BAG ALL CONFLICTING SIGNS. ALL CONFLICTING STRIPPING
AND PAVEMENT MARKINGS ARE TO BE REMOVED FROM THE PAVEMENT
BY SAND BLASTING BY THE CONTRACTOR.
12. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
ALL SIGNING, STRIPPING BARRICADES AND OTHER TRAFFIC CONTROL
DEVICES TO THEIR ORIGINAL CONDITION.
13. EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE
DETERMINED BY THE ENGINEER. ADDITIONAL WARNING AND/OR
CONSTRUCTION SIGNS MAY BE REQUIRED BY THE ENGINEER.
LEGEND:
INDICATES DIRECTION OF TRAVEL
XI INDICATES BARICADE
INDICATES TRAFFIC CONTROL SIGN
INDICATES 4 -WAY FLASHING SIGNAL
BASELINE AVE. CLOSED
TO THRTRAFFIC
SIGN" A' CHERRY AVE. TO CITRUS AVE.
USE ALTERNATE ROUTE
(DATE) TO (DATE)
BASELINE AVE. CLOSED
THU TRAFFIC
S I GN P)B" CITRUSO AVER TO CHERRY AVE.
USE ALTERNATE ROUTE
(DATE) TO (DATE)
C:\CADFILES\93029\93029.DWG
DATE: 3-28-93