Loading...
HomeMy WebLinkAbout5073-11 -.RRA V.S A IIT ��i � ��; J V 'Awi //X11►1i 1I1�i �� ��� La fir_ ICS I� !� Il�lll �.�, , �, II��!I �� � ���i �'C� \� SII �, �1J a 1A , II �lll 10 111 1 I!�lll mill LCD SIERRA CRES E= I 1156 Mountain Ave. GENERAL NOTES. 110111 I _�86 E�� Upla ,ndCA 91/ APPROVED TRACT k 1t DR NO. ASP. NO. OTHER LS DATE: REVIEWED BY: APPROVED BY: PARKS AND LAN SC PE DEVELOPMENT NQTICE: It is the developers responsibility to maintain a set of stamped & wet signed plans at the job site until final landscape inspection. q City Required Notes', Tn3e{%tinS 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an its at (909) 350-6632 2. Prior to the release of utilities or maintenance period commencement, the following inspections are required: Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final.. Inspection. 3.The Owner's representative, City's representative and Landscape Contractor all be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall become a part of this document. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10, The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SOILS REPORT NOTEL After grading of site is complete, soils report will be prepared and provided by owner to contractor for his information prior t* construction. Upon completion of project, owner will provide report to city inspector for record purposes. Upon the completion of the rough grading, the landscape contractor shall submit a soils sample to a certified Laboratory to perform soils tests for agricultural suitability. All results shall be submitted to the Owner and Landscape Architect. Soil amendment specifications shall be modified to comply with recommendation set forth in the soils report. The soil management report shall be submitted to the City as part of the Certificate of Completion prior to the Certificate of occupancy. The soil management report shall be made available to the City landscape inspector or inspector designated by the City 121-911111=1 - C. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SITESCAPES, IN SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS A -NY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. SHEET KEY See Sheets L4, L9, L13 & L416 See Sheets L3, L8, L 12 fL L 15 See Sheets L2, L11 &L14 A See Sheets L4. L95 L13 & L16 f ,� �I�I �I�= � �� Irl I���� C� I i`��a T- 1 TITLE SHEET L- 1 CONSTRUCTION DETAILS, NOTES & LEGEND L- 2 CONSTRUCTION PLAN (20 SCALE) L- 3 CONSTRUCTION PLAN (20 SCALE) L- 4 CONSTRUCTION PLAN (20 SCALE) L® 5 IRRIGATION DETAILS, NOTES & LEGEND L® 6 IRRIGATION DETAILS, CALCULATIONS & SCHEDULE L® 7 IRRIGATION PLAN (20 SCALE) L® 8 IRRIGATION PLAN (20 SCALE) L- 9 IRRIGATION PLAN (20 SCALE) L- 10 PLANTING DETAILS, NOTES & LEGEND L® 11 PLANTING PLAN (20 SCALE) TREES L® 12 PLANTING PLAN (20 SCALE) TREES L- 13 PLANTING PLAN (20 SCALE) TREES L- 14 PLANTING PLAN (20 SCALE) SHRUBS L- 15 PLANTING PLAN (20 SCALE) SHRUBS L® 16 PLANTING PLAN (20 SCALE) SHRUBS L- 17 SPECIFICATIONS �NOS CAp X, P OL,6r 2782 J> 4� IGNA7 Al DAT9 N tiOn Da to C D1 LSCP 13-000020