NOTICE of starn
E a set pedA,
It is the developers responsibility to maintain
until final landscape inspection.
signed plans at the job site
A
%,,uy Requirect Not%ws
Ins Dections:
1.1t is the Landscape Contractor's responsibility to contact the
Engineering Division's Landscape Inspector
48 hours prior to desired inspection of an its at (909) 350-6632
2.Prior to the release of utilities or maintenance period commencement,
the following inspections are required:
Pre -construction meeting
Inspection of irrigation system in open trench condition (prior to backfill).
Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting.
Plant materials prior to planting.
Planting, including street trees. Contact the Parks Planning and Landscape
Development section Engineering Division, for species and final locations.
Compliance with approved plans.
Final Inspection.
3.The Owner's representative and Landscape Contractor shall be present at each inspection.
The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall
become a part of this document.
Maintenance uuidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recorm-nended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering Division Landscape Inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
eN J 'k
ZSUILS' REP"e"'RT N%()%TE:_
After grading of site is complete, soils report will be prepared and provided by owner to
contractor for his information prior to construction. Upon completion of project, owner will
provide report to city inspector for record purposes.
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES,CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.