Loading...
HomeMy WebLinkAbout2678-1GENERAL NOTES: 1 THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO THE REQUIREMENTS OF THE CITY STANDARD SPECIFICATIONS, PUBLIC WORKS DEPARTMENT, CITY OF FONTANA AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK), LATEST EDITION. 2 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK WITHIN THE CITY LIMITS. ALL INSPECTION REQUESTS SHALL BE MADE THROUGH THE CITY OF FONTANA ENGINEERING DIVISION AT LEAST 24 HOURS PRIOR TO THE START OF ANY WORK AT (909) 350-6632. 3 STATIONING REFERS TO THE CENTERLINES OF STORM DRAINS AND REFERENCE MADE TO CENTER LINE OF STREET STATIONING EXCEPT WHERE OTHERWISE NOTED 4 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL ADJACENT SURFACES. 5. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAS BEEN PLACED, INSPECTED AND APPROVED. 6. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF STREETS. 7. LOCATION OF UNDERGROUND UTILITIES ARE SHOWN ON THE PLAN PER AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELD. THE CONTRACTOR SHALL CALL U.S.A. AT LEAST TWO WORKING DAYS PRIOR TO EXCAVATING. 8. THE WALLS AND FACES OF EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND OR OTHER APPROVED METHODS. TRENCHES LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION INDICATES GROUND MOVEMENT MAY BE EXPECTED. 9. THE CONTRACTOR(S) SHALL ALSO OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED IN NOTE 8 ABOVE FROM CAL/OSHA. 10. ALL MANHOLES SHALL BE CONSTRUCTED 6" BELOW PAVEMENT GRADE AND BROUGHT TO FINISHED GRADE BY THE PAVING CONTRACTOR AFTER PAVEMENT IS CONSTRUCTED. IN AREAS WHERE THERE WILL BE NO ASPHALT PAVING MANHOLES SHALL BE CONSTRUCTED 6" ABOVE FINAL GRADES. 11. IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER, THE CONTRACTOR SHALL DILIGENTLY PURSUE THAT PORTION OF THE WORK TO COMPLETION. 12. ALL STORM DRAIN INSTALLATIONS AND CONNECTIONS SHALL BE MADE PER MANUFAC- TURER'S SUGGESTED METHOD UNLESS OTHERWISE SPECIFIED ON THE PLANS. 13. IF DURING CONSTRUCTION, GROUND WATER IS ENCOUNTERED, A SYSTEM SPECIFIED BY THE SOILS ENGINEER AND APPROVED BY THE CITY ENGINEER SHALL BE INSTALLED TO DEWATER SAID AREA. 14. NO BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 15. ALL METAL SURFACES SHALL BE GALVANIZED IN ACCORDANCE WITH THE CITY STANDARD SPECIFICATONS UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. 16. DRAWINGS OF RECORD SHALL BE PROVIDED TO THE ENGINEER BY THE CONTRACTOR. (SEE NOTE 1B HEREON.) 17. THE CONTRACTOR SHALL NOT DISTURB OR DESTROY ANY EXISTING SURVEY MONUMENTS OR BENCH MARKS SHOWN OR NOT SHOWN ON PLANS, OR ANY FOUND DURING CONSTRUCTION WITHOUT PRIOR NOTIFICATION OF THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT BY A REGESTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. REMOVAL AND REPLACEMENT OF SUCH SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LAND SURVEYOR. PRIOR TO REMOVAL OF ANY MONUMENTS A CALIFORNIA REGISTERED LICENSED CIVIL ENGINEER AND LAND SURVEYOR SHALL FILE CORNER RECORDS WITH THE COUNTY SURVEYOR'S OFFICE. THE DISTURBED OR REMOVED/DESTROYED SURVEY MONUMENT SHALL BE REPLACED AT THE END OF CONSTRUCTION ACTIVITY BY A REGISTERED CIVIL ENGINEER OR LAND SURVEYOR, LICENSED BY THE STATE OF CALIFORNIA. 18. ENGINEER OF RECORD SHALL BE RESPONSIBLE TO PROVIDE RECORD DRAWINGS TO THE CITY PRIOR TO ACCEPTANCE OF THE PROJECT. 19. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN TWO-WAY TRAFFIC AT ALL TIMES. ALL TRAFFIC CONTROL SIGNS AND DEVICES SHALL BE IN PLACE TO THE SATISFACTION OF THE CITY TRAFFIC ENGINNER PRIOR TO START OF ANY WORK IN THE PUBLIC RIGHT OF WAY. 20. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE WORK DAY. UNLESS SECURED BY K -RAILS OR TRENCHING PLATING TO THE SATISFACTION OF THE CITY ENGINEER AND TRAFFIC ENGINEER. 21. CONTRACTOR SHALL BE REQUIRED TO FULFILL ALL THE NPDES PERMIT REQUIREMENTS. 22. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY CITY PUBLIC WORKS INSPECTOR OF CITY ENGINEERS OFFICE AND ENGINEER OF RECORD IN CASE OF ANY DIS- CREPANCY FOUND IN THE CONTRACT PLANS AND SPECIFICTIIONS. ANY DESIGN CHANGES MUST BE APPROVED BY THE CITY ENGINEER'S OFFICE PRIOR TO ITS CONSTRUCTION IN THE FIELD. 23. THE CONTRACTORS MUST NOTIFY ALL UTILITY COMPANIES AND ANY AGENCIES PRIOR TO EXCAVATION IN AND AROUND THEIR FACILITIES AND WITHIN THIER RIGHT OF WAY. 24. THE CONTRACTOR SHALL PROVIDE ACCESS TO LOCAL RESIDENTS AND EMERGENCY SERVICE PERSONNEL AND VEHICLES AT ALL TIMES. 25. THE CONTRACTOR SHALL NOT BE ALLOWED TO STORE ANY MATERIAL/EQUIPMENT IN THE PUBLIC RIGHT -OF -WAY WITHOUT PRIOR APPROVAL OF THE CITY ENG- INEER/CITY TRAFFIC ENGINEER. 26. ADEQUATE SURVEY STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. 27. SOIL STERILENT IS REQUIRED UNDER ALL AC PAVEMENT. PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS; TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPON- SIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONS- IBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. CITY OF FONTANA UTILITY NOTIFICATION UST CITY OF FONTANA UTILITY NOTIFICATION LIST CITY OF FONTANA ATTN: CARLOS NAVARRO 8353 SIERRA AVENUE FONTANA, CA 92335 (909) 350-6632 SO. CALIFORNIA GAS COMPANY ATTN: ALAN KESELOFF 16231 VALLEY BLVD. FONTANA, CA 92335 (909) 335-7781 EMERGENCIES: (800) 427-2200 SO. CALIFORNIA EDISON COMPANY ATTN: JAIME AMESZCUA (909) 357-6581 7951 REDWOOD AVENUE FONTANA, CA 92335 (909) 820-5598 - UNDERGROUND (909) 820-5137 - TRANSMISSIONS (213) 637-1233 - PIPELINES (909) 357-6589 - DISTRIBUTION (800) 422-4133 CRAWFORD CANYON MUTUAL WATER CO. ATTN: BILL VANDRKIEFT, JR. (619) 868-6040 UNDERGROUND SERVICE ALERT (800) 226-2700 PACIFIC BELL CO., ATTN: VIRGINIA BECKER 3939 E. CORONADO STREET ANAHEIM, CA 92807 (714) 666-5467 COMCAST (CABLE TV) ATTN: JACK HAYES 1205 DUPONT AVENUE ONTARIO, CA 91761 (909) 390-4777 X 3055 GENERAL TELEPHONE COMPANY ATTN: STEVE HOCK 1400 E. PHILLIPS BLVD. ONTARIO, CA 91766 (800) 422-4133 FONTANA WATER COMPANY ATTN: AL KROHN 8440 NUEVO AVENUE FONTANA, CA 92335 (909) 822-2201 X 323 FAX: (909) 823-5046 0 ca U w w SUMMIT cn AVENUE w z La SEE HT. 4 lb SEE SHT.2 SE SHT. 6 P.A. 14A P.A. 14B w V) i FUTURE COMMERCIAL FUTURE COMMERCIAL FUTURE ROUTE 30 FREEWAY RE 1D THESE RECORD DRAWINGS HAVE. 7.-,,F2N PREPA`ciD 'tN PART, ON THE BASIS OF tr=O; ;".�i'kT?-0N• GO:!+; :LEDAND FURNISHED BY OTHERS. THE ENGINEER WILL MOT BE RESPONSIBLE -FOR ANY.ERRORS OR OMISSIONS WHICH . HAVE BEEN INCORPORATED INTO THE DOCUMENTS AS A RESULT THEREOF. INDEX MAP E CONSTRUCTION NOTES: 10 11 12 13 INSTALL 18' R.G.P. D -LOAD PER PLAN. INSTALL 24' R.G.P. D -LOAD PER PLAN. INSTALL 27' R.G.P. D -LOAD PER PLAN. INSTALL 30' R.G.P. D -LOAD PER PLAN. INSTALL 3G' R.C.P. D -LOAD PER PLAN. INSTALL 42' R.G.P. D -LOAD PER PLAN. CONSTRUCT JUNCTION STRUCTURE PER A.P.W.A. STD. PLAN 331-1 DETAIL ON SHT. 9 CONSTRUCT MANHOLE PER A.P.W.A. STD. PLAN 320-0. DETAIL ON 511T. 8 CONSTRUCT MANHOLE PER A.P.W.A. STD. PLAN 320-0. CNO SHAFT) DETAIL ON SHT. 8 CONSTRUCT MANHOLE PER A.P.W.A. STD. PLAN 321-0. DETAIL ON SHT. 8 CONSTRUCT MANHOLE PER A.P.W.A. STD. PLAN 321-0. CNO SHAFT) DETAIL ON SHT. 8 CONSTRUCT MANHOLE PER A.P.W.A. STD. PLAN 322-0. DETAIL ON SHT. 7 CONSTRUCT CURB OPENING CATCH BASIN PER A.P.W.A. STD. PLAN 300-1. DETAIL ON SHT. 8 14 CONSTRUCT BRICK PLUG PER SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT STD. DWG. 5.F. 17GA. DETAIL ON SHT. 8 15 CONSTRUCT JUNCTION STRUCTURE PER A.P.W.A. STD. PLAN 332-0. DETAIL ON SHT. 9. CD/INSTALL 48' R.G.P. D -LOAD PER PLAN 17 CONSTRUCT CONCRETE COLLAR FOR R.G.P.. PER A.P.W.A. STD. PLAN 380-1. DIAMETER PER PLAN. DETAIL ON SHEET NO. 9. 18 CONSTRUCT TRANSITION STRUCTURE PER A.P.W.A STD. PLAN 340-0. DETAIL ON SHT. 3. }z INTERCHANGE LaJ cn. 0 z FUTURE HIGHLAND BASELINE 0 LYTLE CREEK SUMMIT AVENUE AVENUE co� DUNCAN CYN. RD. W z W N 1- AV NUE W z W z H N 0 0 VICINITY MAP NOT TO SCALE QUANTITIES; 405 L.F. 827 L.F. 171 L.F. 111G L.F. 450 L.F. 848 L.F. 4 EA. 3 EA. 1 EA. 4 EA. 3 EA. 1 EA. 28 EA. 4 EA. G EA. 89 L.F. 4 EA. 1 EA. 1 PLANS PREPARED FOR Lk KAUFMAN & BROAD ATTN: MR. MIKE PEARSON 801 CORPORATE CENTER DRIVE SUITE 201 POMONA, CA. 91768-2641 PHONE: (909) 802-1100 FAX: (909) 802-1111 RECUrn 5-v1-01 BENCH MARK: # 615 RAILROAD SPIKE AT INTERSECTION OF CITRUS AVE. AND LOS CEDROS AVE., IN POWER POLE NO. 9011E ON THE EAST SIDE OF CITRUS AVE. ELEVATION: 1467.59 BASIS OF BEARINGS: THE BEARING OF N89°30'06" ALONG THE NORTH LINE OF SECTION 30 TOWNSHIP 1 NORTH RANGE 5 WEST, UDAASTEFASISROFERINGSY WASSETHE BA FOR THIS MAP CITY OF FONTANA. CALIFORNIA REVISIONS ENGR'S APPROVAL DATE CITY APPROVAL DATE PREPARED IN THE OFFICE OF MADOLE AND ASSOCIATES, INC. OF THE INLAND EMPIRE 10601 CHURCH STREET STE. 107 RANCHO CUCAMONGA, CA 91730 PHONE (909) 948-1311 )1,1044L_ 4-1-99 .M. MADOLE R.C.E.14814 DATE DRAWN BY: DESIGNED: CHECKED: SIERRA LAKES PHASE 1 STORM GRAIN PLANS TITLE SHEET SCALE: AS SHOWN DATE: JOB NO. 826-1163 APPROVED T, DWG. NO. 97 2678 CITY ENGINEER R.C.E. 25126 N SHEET NO. 00 1 0F9 *P* STORM DRAIN TITLE SHT., TR. 15685 - 21 [0, 231] PF: 15685 856 18 -Mar -99 04: 16 PM / 826-1154-1 DWG . DATE: 2Q. WAtAl '99 z