Loading...
HomeMy WebLinkAbout3391-5mm IDS 0 46) 0C a 1.5 m ONC c FROM, _,�M ,, PIAPATEPY THE pusm"'WIR"m , D, 44,04 Afte'e'INC.. GRUEN00%,�#*110E 2 REV, IN$ PROMULGATED BY THF_ PURIC VVDRXS STANDARDS INC_ JUNCTION STRUCTUM TO RCB ST LAW GnSSNWOK COMMITTEE UPIPE 333-1 IN4 :IST. PIPE REV Im SHEET 1 OF 2 CONC. PIPE OR RCP- 2.65 Kg -C-14 MPe .(460- CHEWED ft ATS/MJG C-2000) CONCRETE EN- Abl WHEN MOOE III DRWNG NO.: 3391 HAI 1 0 T N ONE SWTIION Of Plot T D <A Rc Box .0 BARS., NOTE: pp 8 BARS ON TOP OF BOX. THE SEE NOTE 9 OPKINMAY BE FORM90 THUGPLOON OF CA e 'TCH R H 3 EASE BASIN MD TOP SLAS."OF 8" m gl.N T R A�NgE B BARS FROM, _,�M ,, PIAPATEPY THE pusm"'WIR"m , D, 44,04 Afte'e'INC.. GRUEN00%,�#*110E 2 REV, IN$ mm . .... ....... .. = It, 11 DO "ll T PROMULGATED BY THF_ PURIC VVDRXS STANDARDS INC_ JUNCTION STRUCTUM TO RCB ST LAW GnSSNWOK COMMITTEE UPIPE 333-1 IN4 :IST. PIPE REV Im SHEET 1 OF 2 CONC. PIPE OR RCP- 2.65 Kg -C-14 MPe .(460- CHEWED ft ATS/MJG C-2000) CONCRETE EN- Abl WHEN MOOE III DRWNG NO.: 3391 HAI 1 0 T N ONE SWTIION Of Plot T D <A Rc Box .0 BARS., NOTE: VIIHEN CATCH BASIN FALLS 8 BARS ON TOP OF BOX. THE SEE NOTE 9 OPKINMAY BE FORM90 THUGPLOON OF CA e 'TCH R H 3 EASE BASIN MD TOP SLAS."OF 8" m gl.N T R A�NgE B BARS mm . .... ....... .. = It, 11 DO "ll T PROMULGATED BY THF_ PURIC VVDRXS STANDARDS INC_ JUNCTION STRUCTUM TO RCB ST LAW GnSSNWOK COMMITTEE UPIPE 333-1 IN4 :IST. PIPE REV Im SHEET 1 OF 2 CONC. PIPE OR RCP- N TE DETAI L DRAW[NGS NOT TO SCALE x in I MIA, m MTAWLAN WT_ all i F * lti !'rulMMU, 91 44"u411114-1311 S7 JUNCTION STRUCTURE PIPE TO RCB 333-1 SHEET 2 OF 2 a- BARS -',- STANOM PLAN METRIC 341-1 SHEET 2 2 OFX 12 1 MW FOR U AT ET3 7r, R CATCH BASIN FLOOR :IST. PIPE PLOW CONC. PIPE OR RCP- 2.65 Kg -C-14 MPe .(460- CHEWED ft ATS/MJG C-2000) CONCRETE EN- Abl WHEN MOOE III DRWNG NO.: 3391 HAI 1 0 T N ONE SWTIION Of Plot T D <A Rc Box .0 BARS., NOTE: VIIHEN CATCH BASIN FALLS 8 BARS ON TOP OF BOX. THE SEE NOTE 9 OPKINMAY BE FORM90 THUGPLOON OF CA e 'TCH R H 3 EASE BASIN MD TOP SLAS."OF 8" TOP S L gl.N T R A�NgE B BARS _`-8 BARS yr CUT BARS 50 mm (2') CLEAR OF OPENING 15M 0 300 mm (04 0 L/2 (TYP.)� 330-C-23 (560-C-3250) CONCRETE ,25 nwn (11 (TYPA STANOM PLAN METRIC 341-1 SHEET 2 2 OFX 12 1 MW 15M 0 300 mm (04 0 L/2 (TYP.)� 330-C-23 (560-C-3250) CONCRETE ,25 nwn (11 (TYPA iA q II LAN PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE380-2 im ET3 15M 0 300 mm (04 0 L/2 (TYP.)� 330-C-23 (560-C-3250) CONCRETE ,25 nwn (11 (TYPA 10 mm CUT N i 6 1 MIN D AIL MAO (Sm N2TE to) $ONO -TUU. 00 EQUAL. IVAtjqg_EM CUT NO. 1; SAW THE TUBE AT AN ANGLE OF A/2 WITH THE TRANS- VERSE PLANE. REVERSE ONE SECTION AND TAPE ROTH SECTIONS TOGETHER FORMING THE DEFLECTION ANGLE A, CUT NO. 2. SAW THE TUBE LONGITUDINALLY REMOVING A STRIP 5A4 (DO -D ) WIDE ON THE SIDE OPPOSITE THE OPEN JOINT. SEND THE ENDS OF THE CUT TOGETHER AND INSERT THE TUBE IN THE PIPE. Mf, P711 �m �",0) 111 [174 PROMULGATED BY THE taw II LAN PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE380-2 im REV. 1998 jmlm "Awai va'! ALL R —J. :IST. PIPE PLOW DES100 8M LP/ATS/MJG CHEWED ft ATS/MJG - ----- III DRWNG NO.: 3391 0 <A 15M 0 500 tititl (04 0 12®) 3-15M (*4) CIRCULAR TIES. SEE NOTE 9 10 mm CUT N i 6 1 MIN D AIL MAO (Sm N2TE to) $ONO -TUU. 00 EQUAL. IVAtjqg_EM CUT NO. 1; SAW THE TUBE AT AN ANGLE OF A/2 WITH THE TRANS- VERSE PLANE. REVERSE ONE SECTION AND TAPE ROTH SECTIONS TOGETHER FORMING THE DEFLECTION ANGLE A, CUT NO. 2. SAW THE TUBE LONGITUDINALLY REMOVING A STRIP 5A4 (DO -D ) WIDE ON THE SIDE OPPOSITE THE OPEN JOINT. SEND THE ENDS OF THE CUT TOGETHER AND INSERT THE TUBE IN THE PIPE. Mf, P711 �m �",0) 111 [174 PROMULGATED BY THE taw II LAN PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE380-2 im REV. 1998 jmlm "Awai va'! ALL SHEET I OF 2 i pN m I RN -T PLANS STORM D I W�PROVEMEN J:\652-14521storm\sd-ph2a-05.d,wg, 11/10/2003 09:03:29 AM, MC pN m I RN -T PLANS STORM D I W�PROVEMEN ,vk �e No. 62183 Expl 9-30-0 T I DES100 8M LP/ATS/MJG CHEWED ft ATS/MJG - ----- III DRWNG NO.: 3391 0 J:\652-14521storm\sd-ph2a-05.d,wg, 11/10/2003 09:03:29 AM, MC