Loading...
HomeMy WebLinkAbout4181-2*CONTRACTOR TO VERIFY LOCATION AND ELEVATION PRIOR TO START OF CONSTRUCTION, EX. MEDIAN CURB E. CURB & GUTTER E. STORM DRAIN— EX. WATER — E. SEWER — EX. SlDEWALK— 11+00 12+00 111 1 IDI ANI 1"— An' 1 10+00 11+00 12+00 1 6+UU 1 4+UU �/ A Y f -TRACT BOUNDARY 2 0-1- (b4.061 -L) WESTERLY LIMIT SIDEWALK REMOVAL EX. PIP REF R/W LAN I 77 --T LEN./DIST. TANGENT C. ) Lo fit 25' 8 35.00' PROP. R/W 116 4 C2 /V 201 41 42 19.55' of -mooll L m 13y 13 ftft it, CD TO BE UNDERGROUNDED 111.42' < C) 90*03'14" 25.00' o 25,02' gni1)'i 89*56'46" 35.00' F - co 11+00 12+00 111 1 IDI ANI 1"— An' 1 10+00 11+00 12+00 1 6+UU 1 4+UU �/ A Y f -TRACT BOUNDARY 2 0-1- (b4.061 -L) WESTERLY LIMIT SIDEWALK REMOVAL EX. PIP REF BEARING/DELTA ti LEN./DIST. TANGENT C. ) Lo fit 25' 8 35.00' PROP. R/W 116 4 C2 /V 201 41 42 19.55' of -mooll L m 13y 13 ftft it, 00 ROP. I m 4-) TO BE UNDERGROUNDED 111.42' BY OTHERS C4 90*03'14" 25.00' 39.29' 25,02' C5 89*56'46" 35.00' 54.94' 34.97'_ LOCAL DEPRESSION DETAIL 31.79' PA C7 212*31'17" 10+00 CRABTREE A AY 130.28' Ll NO* 16'25"W -- 21.33' -- L2 N 10* 1625 "W yo 42.71' CB#2 L3 N80`13'11 "W 0 42.71' =75+52.55 WALNUT AV r,'. 50.00 L5 N73`57'32 "W 50.00' = 1 "20' 3'.��. 14' 6 5' EASTERLY LIMIT t"'oe 5 A SIDEWALK REMOVAL 811CF Ln L EC -58.40 TC 49, — -------- 74+99.61 WALNUT AVE.' oi -I -0, 18 BCR: (55.15TC) +Ln rY + -1-4- 57.90FL 00 PROP. R (54.48FL) 1 O'� + n 06 Lo C:) Ln 0 co J M Ln n Lo Ln in m ILQ 0 o6 5 18 17 16 EX. CURB & GUTTER— 6 LOCAL DEPRESSION DETAIL CB#1 LA 1 =20' 'c CONSTRUCTION NOTES SM LAM Ul CONSTRUCT 6 rut, CURB AND GUTTER PER CITY T --) I D 1403 No. 62183 i"' � (D CONSTRUCT 4" Mllk AC PAVEMENT OVER 12" MIN. 95% COM'PACTED NATIVE MATERIAL PER SOILS REPORT (SEE GENERAL NOTE 31 AND 32) Exp. �P-f 3 L,t E WAY CONSTRUCT PCC CURB RETURN ACCESS RAMP PER CITY STD. 1006 z S PELANE CONSTRUCT PCC CROSS GUTTER PER CITY STD, 104 W=8BRRY ' it CONSTRUCT LOCAL DEPRESSION PER SSPWC STD 313-2 CASE A (SEE DETAIL ON SHEET 4) MODIFIED PER DETAILS HEREON (a) CONSTRUCT CATCH BASIN PER SSPWC STD 300-2 (SEE DETAIL ON SHEET 4) j CONSTRUCT DRIVEWAY APPROACH PER CITY STD 1005 (WIDTH PER PLAN) CONSTRUCT 4" THICK PCC SIDEWALK PER CITY STD 1015 (WIDTH PER PLAN) CH MARK: BEN BASIS OF BEARINGS: REMOVE AND DISPOSE OF EXISTING CURB AND GUTTER #7-15 (PSN 00510) H SAWCUT AND REMOVE EXISTING AC PAVEMENT BRASS DISK IN NORTHEAST CORNER (TOP) OF BEARINGS ARE BASED ON THE CENTERLINE OF CONCRETE RAILROAD BRIDGE ABUTMENT STAMPED WALNUT STREET HAVING A BEARING OF NORTH INSTALL STREET NAME SIGN PER CITY STD 139 "7-15 1970", 34 FEET NORTH OF CL FOOTHILL B9°46'4'"EAST, PER TRACT NO, 16363, I.B. n4 INSTALL "Rl" STOP SIGN W/ LIMIT LINE AND STOP LFGFNr) IN MOC:61.35TC 60.85FL 16' Dwx, CURVE/LINE DATA TABLE REF BEARING/DELTA RADIUS LEN./DIST. TANGENT Cl 90°03' 14' 35.00' 55.01' 35.03' C2 10*00,00" 112.00' 19.55' 9.80 C3 114°04' 12" 58.00' 111.42' 82.94 C4 90*03'14" 25.00' 39.29' 25,02' C5 89*56'46" 35.00' 54.94' 34.97'_ C6 16* 15'39" 112.00' 31.79' 16.00' C7 212*31'17" 38.00' 140.95' 130.28' Ll NO* 16'25"W -- 21.33' -- L2 N 10* 1625 "W 42.71' L3 N80`13'11 "W 42.71' L4 N73°31'10"E 50.00 L5 N73`57'32 "W 50.00' liq III I Du r r_r_ 1 r-I)l Ur LIME MVE- 0 ELEVATION' REVOW MOR"M CITY OF FONTANA, CALIFORNI1, ani IMA _7 S"IFIREET IMPROVEMENT PLANS DRAWN BY: SCALE: 9 o. 62183 7ats-'ll■ r TRAUT 17388 DIAL--I-I-. Exp: 9-30-07 CRABTREE WAY FROM WALNUT AVE. TO SOAPBERRY LANE DATE: 0 WORKING JUNE 2006 BEFORE DAYS BEFOREI SOAPBE LANE f90�7CIRABTREEOVA" 359' E/O CRABTREE WAY YOU DIG YOU DIG civ i CH CKED BY. DRAWING NO.' ww IN! � ats 41 I TVY R.cl. 51152 9:\103-118\Sfreefs\sf02.dwg, 11/3/2,0,06 10:14:29 AM, 1:1,afs