HomeMy WebLinkAbout4181-19ghtEm, bw=,
1. ALL WORK SHALL B I
AL E IN ACCORDANCE WITH THESE PLANS THE CITY OF FONTANA STANDARD PLANS THE CONTRACT PROVISIONS AND
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK-). ALL REFERENCE SPECIFICATIONS AND STANDARDS
SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENIGNEER
FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION
PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE
START OF ANY WORK IN PUBLIC DIGHT -OF -WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF
CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT
ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCALATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH
FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE MALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE 5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF
THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE
OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT-OF-WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT
PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFOR=MATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY
OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE
PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT
1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE,
ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD
CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR
FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK
TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION
CONTROL STAKING DURING CONSTRUCTION.
1. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION
TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS,
SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A
RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO
CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEH=ICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL
TIMES.
0. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE
PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
2. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
2. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF
THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-E'RODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL
CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
6. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWERLATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
2. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS
DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED
BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR
UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL
DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE
SATISFACTION OF THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS
TO THE CITY ENGINEER.
= r_
k
k ?
4'
k«
PI
R
d
1101welmlillia
a
0
GRIND 0.10 FT MIN. EXISTING 5' MIN. LIMIT OF AC PAVEMENT PER PLAN OWNER/DEVELOPER:
PAVEMENT AND BLEND
OVERLAY/AC PAVEMENT NEW PAVEMENT
(REMOVE ALL EXISTING
PAVEMENT)
CIVIL ENGINEER:
EXISTING PAVEMENT --2I
SAWCUT AND PAVEM-ENT JOIN DETAIL
d
ELECTRIC
VII ■ II
1. !
141.1]IaIII1�/[64[#N
FONIM WATER COMPANY
8440 AVENU
FONTANA, CA 92335
SOUTHERN1 ' ® EDISON
7951 REDWOOD AVENUE
FONTANA, 1 92335
e e
ILL
e i #
909.820.5598 ' ' !
909.875.5100 TRANSMISSION
213.637.1233 PIPELINES
909.357.6233 DISTRIBUTION
RICKEY .
EYES
gyp , � Cpl
*! i • _ Ia11
d � i d � �i
M
•
ado *1 l • �
CONSTRUCTION NOTES
1
CONSTRUCT 6 PCC CURB AND GUTTER PER CITY STD 10,03
CONSTRUCT 4" MIN. AC PAVEMENT OVER 12" MIN. 95 COMPACTED NATIVE MATERIAL PER SOILS REPORT (SEE GENERAL NOTE 31
AND 32)
CI
CONSTRUCT PER TY STD. 1006
PCC CURB RETURN ACCESS RAMP
CONSTRUCT PCC CROSS GUTTER PER CITY STD. 104 -8')
CONSTRUCT LOCAL DEPRESSION PER SPPWC STD 313-2 CASE A (SEE DETAIL ON SHEET 4)
6
INP PWC STD 300-2 SEE DETAIL ON SHEET 4
CONSTRUCT CATCH BAS PER SP { )
7
CONSTRUCT DRIVEWAY APPROACHR CITY STD 1005 WIDTH PER
PER PLAN)
CONSTRUCT 4" THICK PCC SIDEWALK PER CITY STD 1015 (WIDTH PER PLAN)
REMOVE AND DISPOSE OF EXISTING CURB AND GUTTER
10 SAWCUT AND REMOVE EXISTING AC PAVEMENT
11
RT S GENERAL NOTE
N 95 COMPACTED NATIVE MATERIAL PER SOILS REPO EE
CONSTRUCT 4,5 MIN. AC PAVEMENT OVER 12 MI �, �
31 AID 3)
1 CONSTRUCT 8" PCC CURB AND GUTTER PER CITY STD 1003
1 INSTALL STREET NAME SIGN PER CITY STD 139
1 INSTALL "R 1 " STOP SIGN W/ LIMIT LINE AND STOP LEGEND
15
INSTALL 9500 LUMEN HPSV STREET LIGHTT PER CITY STD 1016 (SCE #10)
1 J6 INSTALL 5800 LUMEN HPSV STREET LIGHT PER CITY STD 1016 (SCE 7)
1075 LF
21684 SF
3 EA
925 SF
3 EA
3 EA
3456 SF
1772 SF
436 LF
1447 SF
4015 SF
300 LF
3 EA
2 EA
1 EA
4 EA
LEGEND
(PAD=)
INDICATES EXISTING POACH GRADE PAD ELEVATION
G.F.
GARAGE FLOOR ELEVATION @ DRIVEWAY
FL.
FLOW LINE
F.F.
FINISH FLOOR
F.G.
FINISH GLADE
FL HP
FLOW LIE HIGH POINT
F.S.
FINISH SURFACE
G.B.
GRADE BREAK
INV.
INVERT
T.C.
TCP OF CURB
TRW
TOP OF RETAINING FALL
TF
TOP OF FOOTING
PCC
PORTLAND CEMENT CONCRETE
`� 1249 ''- EXISTING CONTOUR
97.61
INDICATES PROPOSED ELEVATION
(97.61)
INDICATES EXISTING ELEVATION
SLOPE
0.
INDICATES EXTRA DEPTH FOOTING
RETAINING WALL
GARDEN WALL
J:\103 -II 8\Streets\st0l.dw , 11/3/2006 10:14:46 , 1:1,