HomeMy WebLinkAbout4766-1E
E
E_
E
600 1 NL' E'T
(241f) ............ TYP E 2
Al,
r7,
ex,l,
%
XIA'
'pt",
`2
011
>
P-1 i. ow, W.
"g,
VA, 7K
SECTION 7
'2
'2, W1 1V',1"-'1
K", x, A'
7
"x
X",
T
N<
INLET TYPE 2
U
7
og
"'J
!,7 ",7",77
77' ili-, 2
'744
A
m
w
;,Oy R�/w ut*_� !4�0,tA 1 1,1 t- UL, V A
'Iel% '166 4s,
b
t i
EiAc (31F INA, I"', K _6
�7L 7K,,'��, f W, U,, 07- i IF N'C', 7' P� E (b
q
2,50 m
4�7
71
BAR
IL T
16 mm M-1 ,v
k
'Ir ,
I "") I-, R "0 f14 A fl I
. .... 3 rl
V N
77
t�Z,
�;,l< 3,
4
X, "N': yr,
OF- VJ E P 511"'," A C TI "'1117
IL
;w' 7�
J, 'J pi", I"
"'i U 'y
JUL
V)
m ro, WTI J A 25 rr' net 11'�_"Al�
)4� A., A E� EE� 5 1 ni
> 1 KA 7
> X
I E.
3L /a*`
"00 MAY B E u it"115, A S P0 oi,,lik", J`, 1, 11 61 ri,
DETAIL OF ANCHOR
k)
"I () 11 `1111�' A
la MM
CURB FACE CURB FACE �6 N,`7 MAL B FAQ, Al V0114 !J[ 'A N 1 11",>�, rA_Vol, 1, '1
ANCHOR
FL FL
7,
75 3 J& L I ANliC"C,,)' Z' A
&
7? A R 11i,11
\—POtNT M POINT N POINT P P01INT Q_/
11 1 � �11111[ — — & ,, I
I I � 7
POINT M r-1 U 1 N 1 N PROFILE
SIDEWALK
GALVANUED STEEL FINISH
ANGLE
Hi
J
89,06A17
v5l�s: ;W�
BARS ME #IQM (a,
Ml
10 SECTI�ON A -A
I All work shall be in accordance with these plans, the City of Fontana Standard Plans,
the contract provisions and the Standard Specifications for Public Works Construction ("Green
Book" ) . All reference specifications and standards shall be the latest edition unless
otherwise noted.
2 When a technical conflict is found to exist in the contract documents that can not be
resolved by reference to precedence provisions in the "Green Book", the contractor shall
immediately report said conflict to the City Engineer for resolution.
3 All materials and methods are subject to the approval of the City Engineer.
4 Construction permits shall be obtained from the City of Fontana Community Development
Department, Engineering Division prior to the start of any work. Inspection coordination
shall be requested at least two working days prior to the start of any work in public
right-of-way within the city limits. call (909) 350-7610.
5 The contractor shall conform to all traffic control policies, methods and procedures
described in the State of California Manual of Traffic Controls, latest non -metric edition
unless otherwise directed by the City Traffic Engineer.
6 It shall be the responsibility of the contractor to maintain barricades, delineators or other
traffic control devices at all times.
7 The contractor shall obtain a permit to perform excavation or trench work for trenches 5
feet or greater in depth from the California State Division of Industrial Safety.
8 The walls and faces of all excavations greater than five (5) feet in depth shall be
guarded by shoring, sloping of the ground or other approved means pursuant to the
requirements of the Division of Industrial Safety of the State of California. Trenches less
than five (5) feet shall also be guarded when the potential exists for ground movement.
9 No material or equipment shall be stored in the public right-of-way without obtaining a
separate permit for that purpose.
10 The locations of utilities shown have been determined from available information, however, it
shall be the responsibility of the contractor to determine in the field, the true location and
elevation of any existing utilities, and to exercise proper precaution to avoid damage
thereto . The contractor shall contact Underground Service Alert at 1-800-227-2600
two working days before excavation.
I I The contractor shall coordinate construction with all utility companies including, but not limited
to, gas, telephone, electric, cable television, landscaping, landscape irrigation, domestic
water, reclaimed water, sewer, storm drain, flood control and Caltrans. All utility
companies shall be given two working days notice prior to work around their facilities.
1 2 The contractor shall not operate any fire hydrant or wafer main valves without appropriate
agency authorization . Contractor shall coordinate with the appropriate water company for
valve operation and water requirements.
13 Curve data refers f o the face of curb .
14 Stationing refers to the centerline of streets except where otherwise noted
15 Adequate constructions control stakes shall be set by the Engineer to enable the contractor
to construct the work to the plan grades. The contractor shall be responsible for the
preservation of benchmarks and construction control staking during construction .
16 The contractor shall not disturb existing survey monuments, monument ties or bench marks
without prior notification to the City Engineer.
1 7 Qemoval and replacement of existing survey control , including survey monuments, monument
ties and bench marks, shall be done by a registered civil engineer of licensed land
surveyor . Survey monuments that will be destroyed as result of this construction shall be
replaced. The contractor shall notify the engineer one week prior to construction so that
ties to monuments can be established for later replacement of the monument.
18 The contractor shall maintain access for local residents and businesses at all times. A
minimum 1 2 foot lane shall be maintained at all times in the construction area for residents
and emergency vehicles.
19 The contractor shall provide and maintain an effective means of dust control , including
adequate watering, at all times.
20 All grading operations shall be discontinued when sustained wind velocities exceed 2 5 miles
per hour .
2 1 The contractor shall not cause any excavated material mud, silt or debris to be
deposited onto public or private property adjacent to the right -of -way during construction
without prior written approval .
22 No trench back fill shall take place without prior approval of the City Inspector .
2 3 A Geotechnical Engineer shall certify all back fill compaction. Failure to obtain the
required density shall require re -working of that portion of the work until the specified
density is obtained.
24 Care should be taken to prevent grades, ditches, and swales from undermining street
improvements. Upon inspection of the site, the City Engineer may require temporary
non-erodeable swales entering or leaving improvements.
2 5 The final location and width of driveway approach aprons shall be approved at the time of
construction and shall conform to the City of Fontana Standard Details.
26 All exposed concrete surfaces shall conform in grade, color and finish to match existing
concrete .
27 The sewer contractor shall stamp and "S" in the face of the curb at the location of the
sewer lateral .
2 8 No concrete shall be placed until the forms and reinforcing steel have been placed,
inspected and approved.
29 All underground utilities shall be installed, tested and approved prior to paving of streets.
30 Approved soil sterilant is required under all new asphalt pavement prior to placement.
3 1 Pavement structural sections shown are minimum and subject to revision and approval of the
City Engineer as determined by soils tests taken after completion of rough grading.
3 2 Actual thickness of A. C. pavement and/or base course material for structural street
sections shall be recommended by a Geotechnical Qeport and submitted the the City of
Fonfcna for approval upon completion of rough grading.
3 3 All manholes, cleanout frames, covers and valve boxes shall be raised to finished grade
by the paving contractor upon completion of paving.
34 Upon completion of construction, contractor shall restore all signing, striping, barricades,
and other traffic control devices to the satisfaction of the City Traffic Engineer.
35 Contractor shall relocate and/or replace landscaping, sprinklers and sidewalks affected by the
construction to the satisfaction of the City Engineer.
3 6 As -built drawings shall be provided by the contractor to the Engineer of Qecord, who shall
provide record drawings to the City Engineer.
W
��OFESS/
PA 64
V� 6/09
V
If[CWT Y MAP
APN 236 — 111111 — 34
10788 CHERRY AVE
APPLICANT:
OWNIER*
BIQEMCO CONSTRUCTION CO.
ESTES EXPRESS LINE
3470 EAST SPRING STREET
3901 WEST BROAD ST12EET
LONG BEACH, CA
RICHMOND, VA 23230
562-595-4687
PLAN PREPARER
HOWARD PARSELL COMPANY
4854 MAIN STREET
YORBA, LINDA, CA 92886
(714) 777-3765
ELECTRICITY PURVEYOR
GAS PURVEYOR
SOUTHERN CALIFOR14A, EDISON
SOUTHERN CALIFORNIA GAS
P. 0. BOX 600
9781 SIEWA, AVE
ROSEMEAD. CA
FONTANA. CA
800-65,5-45,55
800-427-2000
WATER PURVEYOR s
TELEPHONE PURVEYOR:
FONTANA WATE112 CO.
PAC BELL
8440 NUEVO AVE
1010 WILS141RE BLVD
FONTANA, CA
ROOM 420
951-822-2201
LOS ANGELES, CA
213-975-3455
a
CITY OF FONTANA STREET NPROVEMENTS"
CHERRY AVENUE — JURUPA AVE. TO SLOVER AVE.
DRAWING NO* 3154
PERMITTED GRADING PLANO
G. 1. TRUCKING
SWEETS G I TWRU G3
Prepared by: C i
HOWARD PARSELL COMPMY
A division of Howard Parsell, Structural Engineer, Inc. DRAWN BY:
architecture — structural engineering — H. P. C.
civil engineering
4854 MAIN STREET DESIGNED BY:
YORBA LINDA, CALIFORNIA 92886
714-777-3765 FAX: 714-777-9083 CHECKED BY:
Project No. 4853 9ZA_
q I
lam