HomeMy WebLinkAbout4951-3DI
Planting Legend
SYMBOL QTY. SIZE
11 24" Box
14 24" Box
18 5 Gal.
97 5 Gal.
104 5 Gal.
16 5 Gal.
53 1 Gal.
25 1 Gal
Planting Notes
BOTANI
Magnol
Gei jera I
Cotonea
Nandina
Callistei
Rosmar
Lantana
Partheni
Cobblestone Paving
In addition to specified backfill mix, plants shall also re
3 tablets per 1 gallon, 8 tablets per 5 gallon, 15 tablets
A 3" deep layer of shredded bark mulch shall be placed
Plant counts are for bidding purposes only. Contractor
All above ground utilities and Irrigation equipment shall
DIAL TOLL FREE
—800--227-2600
AT LEAST TWO DAYS
BEFORE YOU DIG
UNDERGROUND SERVICE ALERT OF SOUTIERN CALIFORNIA
CERES AVENUE
All Work to Meet or Exceed State & Local Codes and Industry Standards.
Written Dimensions to Precede Scaled Dimensions.
UNDERGROUND UTILITIES:
The Contractor shall be responsible for locating or verifying locations of all existing utilities, and for protection of
same. Damages resulting from Contractor's work or that of Contractor's sub -contractors shall be restored to original
condition at their own expense. City shall have the final say if repairs are to be made by Contractor or others.
Sheet number Q
Detail/ section number
�1'4�9fthh._
Planting Plan
Scale: 1"=20' North
R I C H A R D
P(DPf
Landscape Architecture
1585 S. 'D' Street, Suite 103
San Bernardino, CA 92408
phone: (909) 888-5568
fax: (909) 384-9854
e-mail: rpa.la@verizon.net
www.richardpopeandassociates.com
Richard Pope, Landscape Architect CA# 2664
SC,4 P
)OPE L /C �
�
Z
OF CPALx
Owner/Applicant:
S&S Homes
1231 Cactus Avenue #D
Rialto, CA 92376
(909) 887-2777
Attn: Saber Awad
Sheet De5crlption:
Planting Plan
Date: November 15, 2011
RPDA Job No.: 11-20
Drawn by: LKD GP
KeV151on5:
Sheet:
L-3
Of: 7
v
a�
u.
CID:y
.a'
y
O
0
W.
V
CID
06
O
y
'O
CO)
CL
�-
C*;
a
CIO
v
v
co
Re
•-
C
d"
„
C3
U
'~
•iy
c
E
v
O
r
O
J
=
IL
H
00
IL
C12
mi
Sheet De5crlption:
Planting Plan
Date: November 15, 2011
RPDA Job No.: 11-20
Drawn by: LKD GP
KeV151on5:
Sheet:
L-3
Of: 7