HomeMy WebLinkAbout4951-1Fract
Lots
Facilities D
LANDSCAPE CONSTRUCTION PLANS
SW CORNER OF CERES AVE. AND CITRUS AVE.
FONTANA, CA
Landscape Square Footage:
Ceres Avenue: 2,053 sq.ft.
Citrus Avenue: 4,331 sq.ft.
Total: 6,384 sq.ft.
CERES AVENUE
0
0
Istnct
FACE CMU WALL �
(PROVIDE ANTI -GRAFFITI
COATING)
(lYP. PERIMETER WALL)
Site Plan
Scale: V=30' North
0
CITY OF FONTANA REQUIRED NOTES:
INSPECTIONS:
Areas
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT
THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR
TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6632.
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT
THE FOLLOWING INSPECTIONS ARE REQUIRED:
PRE CONSTRUCTION MEETING
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION
(PRIOR TO BACKFILL). MAINLINE PRESSURE TEST @ 150 P.S.I. FOR A
THREE (3) HOUR CONTINUOUS PERIOD.
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
FINISH GRADE PRIOR TO PLANTING.
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION.
PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING
AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR
SPECIES AND FINAL LOCATIONS.
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION.
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE
PRESENT AT EACH INSPECTION.
Vicinity Map 77
not to scale North
Sheet Index
Title Sheet
L-1
Irrigation
Plan
L-2
V
Planting
Plan
L-3
Irrigation
Details
L-4
a'
Planting
Details
L-5
Irrigation
Specifications
L-6
�
Planting
Specifications
L-7
s+
R I C H A* :R' D
P(DPf
Landscape Architecture
1585 S. 'D' Street, Suite 103
San Bernardino, CA 92408
phone: (909) 888-5568
fax: (909) 384-9854
e-mail: rpa.la@verizon.net
www.dchardpopeandassociates.com
Richard Pope, Landscape Architect CA# 2664
.Nt SCA p1,,,
V
COD
OF- CAOV'15�1
Owner/Applicant:
S&S Homes
1231 Cactus Avenue #0
Rialto, CA 92376
(909) 887-2777
Attn: Saber Awad
sheet Description:
Title Sheet
Date: November 15, 2011
RP*A Job No.: 11-20
Drawn by: LKD GP
ReVl51on5:
Sheet:
L-1
Of: 7
..N%
U
�y
a'
CA
�
v
�
i
s+
0.
o
C.3
p
C.5
ca
y
co=
W.
0;
.—
co
� ,
Q
=
o
CO
CD
cc
r=
Q
Cj
co
ra=�Go
V yr
Mill"E
C3
O i
0
0
=
00
LI.
C'3
.1
sheet Description:
Title Sheet
Date: November 15, 2011
RP*A Job No.: 11-20
Drawn by: LKD GP
ReVl51on5:
Sheet:
L-1
Of: 7