Loading...
HomeMy WebLinkAbout4951-1Fract Lots Facilities D LANDSCAPE CONSTRUCTION PLANS SW CORNER OF CERES AVE. AND CITRUS AVE. FONTANA, CA Landscape Square Footage: Ceres Avenue: 2,053 sq.ft. Citrus Avenue: 4,331 sq.ft. Total: 6,384 sq.ft. CERES AVENUE 0 0 Istnct FACE CMU WALL � (PROVIDE ANTI -GRAFFITI COATING) (lYP. PERIMETER WALL) Site Plan Scale: V=30' North 0 CITY OF FONTANA REQUIRED NOTES: INSPECTIONS: Areas 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6632. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE CONSTRUCTION MEETING INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST @ 150 P.S.I. FOR A THREE (3) HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. FINISH GRADE PRIOR TO PLANTING. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH APPROVED PLANS. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. Vicinity Map 77 not to scale North Sheet Index Title Sheet L-1 Irrigation Plan L-2 V Planting Plan L-3 Irrigation Details L-4 a' Planting Details L-5 Irrigation Specifications L-6 � Planting Specifications L-7 s+ R I C H A* :R' D P(DPf Landscape Architecture 1585 S. 'D' Street, Suite 103 San Bernardino, CA 92408 phone: (909) 888-5568 fax: (909) 384-9854 e-mail: rpa.la@verizon.net www.dchardpopeandassociates.com Richard Pope, Landscape Architect CA# 2664 .Nt SCA p1,,, V COD OF- CAOV'15�1 Owner/Applicant: S&S Homes 1231 Cactus Avenue #0 Rialto, CA 92376 (909) 887-2777 Attn: Saber Awad sheet Description: Title Sheet Date: November 15, 2011 RP*A Job No.: 11-20 Drawn by: LKD GP ReVl51on5: Sheet: L-1 Of: 7 ..N% U �y a' CA � v � i s+ 0. o C.3 p C.5 ca y co= W. 0; .— co � , Q = o CO CD cc r= Q Cj co ra=�Go V yr Mill"E C3 O i 0 0 = 00 LI. C'3 .1 sheet Description: Title Sheet Date: November 15, 2011 RP*A Job No.: 11-20 Drawn by: LKD GP ReVl51on5: Sheet: L-1 Of: 7