HomeMy WebLinkAbout3665-8v.o
Al 4►.
to
.t E S
e_
APFcw
1�
An AlK15 fjgffjlple;
FO OR 9,C
` AA19011,
..
r.
16
111mill RAN wl 11
I__.wmmffz=
IN
ilii"o. � a
'YA
0®�iY6._'W,j(lrfll Mw
mZ1
- Mx I
J
IN
MP
1
..
c, oa
..,..A.
j
W
4S—BUILT O REV. REVISION DESCRIFFION DAL ENGR. CITY DATE ,SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT ESS Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA
1 AS—BUILT 17 09 Alk 31i(o( 9 /p
COMMENCE' WITHIN TWO YEARS OF THE DATE OF APPROVAL �o 1 E8 kl SIERRA AVE AND BASELINE AVE IMPRO
2 RELOCATE EXISTING CATCH BASIN 24 15 C— �•(� •� �<v`�y
SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, No. 37 DRAwNI M: STORM DRAIN IMPROVEMENT PLAN
DIAL TWO WORKING THE CITY ENGINEER MAY O�EQr!.I/RE REVISIONS. TO THE PLANS TO , 6130/OB 2001 East First Street DESIGNED BY: SIERRA AVENUE
BEFORE DAYS BEFOREa CA 9 705 R DETAILS
YOU DIG YOU DIG Santa Ana, 2 B.A.S
RRIAIr. THFM IAITO P'0AIFr)RMAAII.F WIT14 MM)ITIONR LIN!) TEL: (714)568-7300 FAX: (714)836-5906 1 rurrurn c)VA APPRCIvFn R
910