Loading...
HomeMy WebLinkAbout3614-9t MAIN LINE RCP OR REINFORCED MONOLITHIC ARCH. SEE NOTE 2 -' J SEE NOTE 10 H ' H D I _ 80 mm (31 MIN. o I �-l� I W' V) ROUND rn ~ (EDGE UJTo ti Z + 13) R mm- -- o - -- UJE �- Z T Z CONNECTOR PI us w0 450 mm (18') STA. POINT 525 mm (211 C: W = w O U cn a w o Z 975 mm (391 W w M 0 275 mm (110) Q: a 275 mm (II'l U 600 mm (241 (Li OR I cq B \_ Z LATERAL/ CONNECTOR PIPE G BARS 15M 0 150 mm �I O (#4 0 6-) OC l IOM 0 450 mm 03 OR -4 p 18') OC TIE BARS G E AND F BARS 15M 0 75 mm (m503')OC. SEE NOTE 8 E o -- STA. POINT T D CONNECTOR PI I�80 mm SEE MOTE 3 (3') MIN. 450 mm (18') STA. POINT 525 mm (211 LATERAL 600 mm (241 SEE NOTE 3 PLAN SPUR IOM 0 450 mm (•3 OR -4 0 18") OC TIE BAR REINFORCING STEEL I G BARS 15M 0 150 mm (•4 0 6') OC t- 80 mm (31 MIN. SPRING L INCE / ( E N- I 130 mm (5') tri IROUND t7 - I ( EDGES ELEV. R 4 E BARS 15M ('511 C \ ELEV. S / p 80 mm (3') • F BARS 15M (95) 0 75 mm (31 OC UNDISTURBED CONCRETE CRADLE. EARTH H ' H 265-C-14 (450-C-2000). SEE NOTE 9 SECTION Z -Z TABLE OF VALUES FOR T B T 300 mm (121 130 mm (5') 375 mm (151 130 mrn (5') 450 mm (18') 130 mm (51 525 mm (211 130 mm (5') 600 mm (241 140 mm (5 1/2•) 675 mm (271 140 mm (5 1/2') 750 mm (301 150 mm (61 825 mm (33') 170 mm (6 I/2•) 900 mm 1361 170 mm (6 1/2'3 975 mm (391 180 mm (7•) EN o - TIE BARS / \ 6 BARS T ( B 1 T \ 11 F - SECTION M -M AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE - JUNCTION STRUCTURE PIPE TO PIPE INLET STANDARD PLAN PUBLIC WORKS STANDARDS INC., CATCH BASIN FLOOR A6 . METRIC GREENBOOKCOMMITTEE 9 I D > 600 m m i9A ) OR OD > 1/2 MAIN LINE ID 331 - 2 1984 AND BAR SIZES r REV. 1996 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CONNECTOR PIPE ANO IOM0450 mm (+3 OR •40180) OC 8/ ROUND EDGES TO RADIUS G OF APPROXIMATE ID OF LATERAL. MAXIMUM 5 900 mm (360) Q` 150 m A 81 B BARS-�, ,c•� -L MAIN LINE -� N 0 P SEE NOTE 8 STATION STATION PT. ti TABLE TRANSITION STRUCTURE PIPE TO PIPE STANDARD PLAN METRIC 340-1 19 ,992 CATCH BASIN FLOOR A6 . FOR DIMENSIONS REV. 1998 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION BEDDING OF AND BAR SIZES r INLET PIPE 10i 1111111t111 -• D2 223 mm (9') --.-•S�-1�1♦�t�LIN T. - Ann I'-�V�Lt>Im F N - : .. 250 mm (10') 1500 mm (60' • 275 mm (110) a a 275 mm (II'l OR 600 mm (241 300 mm (12') OR m m a U CD w � B T O 0 a a o (mm) (INCHES) (mm) (INCHES) 300 12 110 4 o in c cc.p a " E 0 - ^ 375 13 110 4 1/4 450 18 120 4 1/2 525 21 130 5 ,� -- E n p 600 24 140 5 1/4 675 27 140 5 1/2 750 30 160 6 825 33 160 6 1/4 900 36 170 6 1/2 975 39 180 7 1050 42 190 71/2 U O coo .: E V 0 c"p E E N N E E ,n N 1125 45 200 7 3/4 1200 48 210 8 1275 51 220 8 I/2 1350 54 230 9 1425 57 240 9 1/4 1500 60 250 9 1/2 1575 63 260 10 1650 66 260 10 1/4 G 2 N 1725 69 280 10 3/4 1800 72 280 11 1950 78 300 II 3/4 2100 84 320 12 1/2 2250 90 340 13 1/4 0 _ ►n 0 .. 2400 96 360 14 2550 102 400 15 1/2 E 0 a o N �. m E a 2700 108 410 16 E n N 2850 114 420 16 1/2 3000 120 440 17 3150 126 440 17 3300 132 450 IT I/2 3450 138 450 17 1/2 3600 144 460 18 P SEE NOTE 8 STATION STATION PT. ti I) I (' ELEV. ELEV. I I I STA. STA. I II I I 15MO450 mm (•40181 OC, BOTH WAYS, TO BE USED WHEN D2 IS 1500 mm (60') OR MORE LONGITUDINAL SECTION D BARS w A BARS F BARS ----:;;n ' I 10MO450 mm I ` m (+3 OR 04 B BARS 0 18") Oc I ELEV. R ELEV. S > T�- 15M*450 mm (@4018') OC, BOTH WAYS. TO BE USED WHEN B IS 1500 mm (600) OR MORE C MAIN LINE SECTION N' -N°-N" PROJECTED ON M -M -Nu IOM (+3 OR +4) AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED STANDARDS PUBLIC WORKS STANDARDS INC., GREENBO COMMITTEE TRANSITION STRUCTURE PIPE TO PIPE STANDARD PLAN METRIC 340-1 19 ,992 CATCH BASIN FLOOR A6 . i ��Iei. • Ti"glibm74 REV. 1998 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION BEDDING OF RCP OR CSP r INLET PIPE 10i 1111111t111 -• BACKFILL WITH 223 mm (9') --.-•S�-1�1♦�t�LIN T. - Ann I'-�V�Lt>Im SEE NOTE 6 265 K -C-14 Mpa (450--2000) - : .. 250 mm (10') 1500 mm (60' • 275 mm (110) 1650 mm (66' 525 mm (219 275 mm (II'l 1800 mm (72') 600 mm (241 300 mm (12') • I) I (' ELEV. ELEV. I I I STA. STA. I II I I 15MO450 mm (•40181 OC, BOTH WAYS, TO BE USED WHEN D2 IS 1500 mm (60') OR MORE LONGITUDINAL SECTION D BARS w A BARS F BARS ----:;;n ' I 10MO450 mm I ` m (+3 OR 04 B BARS 0 18") Oc I ELEV. R ELEV. S > T�- 15M*450 mm (@4018') OC, BOTH WAYS. TO BE USED WHEN B IS 1500 mm (600) OR MORE C MAIN LINE SECTION N' -N°-N" PROJECTED ON M -M -Nu IOM (+3 OR +4) AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED STANDARDS PUBLIC WORKS STANDARDS INC., GREENBO COMMITTEE TRANSITION STRUCTURE PIPE TO PIPE STANDARD PLAN METRIC 340-1 19 ,992 CATCH BASIN FLOOR A6 . SEE NOTE 40� REV. 1998 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION U 0: IS 0 N o Ld 1= -0 A#VVVVv%kAAAA&AA&AA#*vW DIAL TWO WORKING BEFORE .� DAYS BEFORE YOU DIG YOU DIG TOLL FREE 1-800-227-2600 o A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT a NOTES I. THIS JUNCTION STRUCTURE SHALL BE USED WHEN THE OUTSIDE DIAMETER OF THE LATERAL IS GREATER THAN 1/2 THE INSIDE DIAMETER D OF THE MAIN LINE; OR WHEN THE INSIDE DIAMETER B OF THE LATERAL IS GREATER THAN 600 mm {24'). B SHALL NOT EXCEED .75 D OR 975 mm (39'). 2. IF THE MAIN LINE IS A REINFORCED MONOLITHIC ARCH STORM DRAIN, D SHALL REFER TO THE CLEAR SPAN OF THE ARCH. REINFORCING STEEL SHALL BE CUT AND BENT INTO THE JUNCTION STRUCTURE IN THE SAME MANNER AS FOR A PIPE. A CONCRETE CRADLE IS NOT REQUIRED ,FOR A REINFORCED MONOLITHIC ARCM. 3. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR LATERALS APPLY AT THE INTERSECTION OF CENTER LINES OF MAIN LINE AND LATERAL. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR CATCH BASIN CONNECTOR PIPES APPLY AT THE INTERSECTION OF THE INSIDE WALL OF THE MAIN LINE WITH THE CONNECTOR PIPE CENTER LINE. 4. VALUES FOR A. B. C AND D SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN ONLY WHEN REOUIRED PER NOTE 5. 5. a_ ELEVATIONS R AND 5 NEED NOT BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET PIPE IS TO ENTER THE MAIN LINE RADIALLY. b. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY IF A STUB IS TO BE PROVIDED IN THE MAIN LINE FOR FUTURE CONNECTION OF AN INLET PIPE. c. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF AN INLET PIPE IS TO ENTER THE MAIN LINE OTHER THAN RADIALLY. INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM! ELEVATION S TO THE CATCH BASIN OR GRADE BREAK IN LINE. 6. THE INLET PIPE SHALL ENTER THE MAIN LINE RADIALLY UNLESS OTHERWISE INDICATED. THE INLET PIPE MAY ENTER THE MAIN LINE OTHER THAN RADIALLY IF ANGLE A IS GREATER THAN 450. B IS LESS THAN OR EQUAL TO 600 mm (24") AND THE OUTSIDE DIAMETER OF THE INLET PIPE IS LESS THAN .5 D: OTHERWISE, STANDARD PLAN 340 SHALL BE USED. 7. NO MORE THAN ONE OPENING SHALL BE MADE IN ANY ONE SECTION OF PIPE. 8. THE OPENING FOR THE BREAKOUT SHALL BE RECTANGULAR AND CUT NORMAL - TO THE PIPE SURFACE WITHOUT DAMAGING THE REINFORCING STEEL. THE TRANSVERSE REINFORCEMENT OF THE MAIN LINE SHALL BE CUT AT THE CENTER OF THE OPENING AND BENT INTO THE TOP AND BOTTOM SLABS OF THE SPUR. 9. THE MAIN LINE SHALL BE REINFORCED WITH A CONCRETE CRADLE AND ENCASEMENT (AS APPLICABLE). A CONCRETE ENCASEMENT IS REQUIRED IF A JOINT IN THE MAIN LINE FALLS WITHIN THE LIMITS OF THE CRADLE. THE CONCRETE ENCASEMENT SHALL EXTEND 300 mm (12') ABOVE THE TOP OF THE MAIN LINE AND TO THE LIMITS OF THE CRADLE. IF CONNECTING TO AN EXISTING STORM DRAIN, PORTION OF CRADLE OPPOSITE INLET MAY BE OMITTED. 10. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M, GRADE 300, (ASTM A 615. GRADE 40), AND BE PLACED 40 mm (1 1/2') CLEAR FROM CONCRETE SURFACES, UNLESS OTHERWISE SHOWN F BARS SHALL BE CARRIED TO A POINT NOT LESS THAN J DISTANCE FROM CENTER LINE WITH J= 7D/12 + 150 mm (6"). II_ FLOOR OF THE SPUR SHALL BE STEEL -TROWELED TO THE SPRING LINE OF THE SPUR. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC 331 - 2 JUNCTION STRUCTURE PIPE TO PIPE INLET ID > 600 mm 24" OR O D> 1 /2 MAIN LINE ID ( ) SHEET 2 OF 2 NOTES I. THE HORIZONTAL ANGLE OF CONVERGENCE OR DIVERGENCE, 6, SHALL NOT EXCEED 5045'. 2. VALUES FOR A, B, C. DI AND D2 ARE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S ARE SHOWN WHEN REQUIRED BY NOTE 10. 3. FLOOR OF STRUCTURE SHALL BE STEEL TROWELED TO SPRING LINE. 4. REINFORCEMENT STEEL SHALL CONFORM TO ASTM A 615 M (A 615). GRADE 300(40). AND SHALL TERMINATE 40 mm (1 1/2') CLEAR OF CONCRETE SURFACES UNLESS OTHERWISE SHOWN. LONGITUDINAL BARS SHALL BE IOM * 450 mm (03 OR •4 0 18') OC OR LESS. 5. ELEVATION S APPLIES AT INSIDE WALL OF STRUCTURE. 6. TRANSITION STRUCTURE SHALL BE POURED IN ONE CONTINUOUS OPERATION, EXCEPT THAT THE CONTRACTOR SHALL HAVE THE OPTION OF PLACING AT THE SPRING LINE A CONSTRUCTION JOINT LONGITUDINAL KEYWAY. 7. THE LENGTH OF THE STRUCTURE MAY BE INCREASED AT THE OPTION OF THE CONTRACTOR TO MEET RCP ENDS, USING D BARS, LONGITUDINAL AND BOTTOM REINFORCEMENT IN EXTENDED PORTION OF SAME DIAMETER AND SPACING AS SPECIFIED IN THE TABLE, BUT ANY CHANGE IN THE LOCATION OF SPUR MUST BE APPROVED BY THE ENGINEER. 8. EMBEDMENT P SHALL BE AS SPECIFIED IN THE TABLE. UNLESS OTHERWISE SHOWN ON THE PROJECT DRAWINGS. 9. WHEN THERE IS NO SPUR REQUIRED, A a B BARS SHALL BE OMITTED. 10. WHEN ELEVATION R AND ELEVATION S ARE NOT SHOWN ON PROJECT DRAWINGS, INLET PIPE SHALL ENTER MAIN LINE RADIALLY. WHEN INLET PIPE ENTERS MAIN LINE OTHER THAN RADIALLY. ELEVATION S SHALL BE SHOWN ON PROJECT DRAWINGS, AND INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO CATCH BASIN OR GRADE BREAK IN INLET LINE. ELEVATION R SHALL BE SHOWN ON PROJECT DRAWINGS ONLY WHEN STUB IS TO BE PROVIDED IN MAIN LINE FOR FUTURE CONSTRUCTION OF INLET PIPE. II. THE MAXIMUM COVER ABOVE THIS STRUCTURE SHALL BE 7.5 m (25'). IF THE COVER EXCEEDS 7.5 m (25') A SPECIAL STRUCTURE SHALL BE DESIGNED FOR THE COVER AND DETAILED ON THE PROJECT DRAWINGS. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES EXCEPT REINFORCING BAR SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF REQUIRED V-tpoot> 'Ove A IA 2 3 ab 3*13-ov IMPROVEMENTS NOT COMMENCE WTTHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DIUCENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT PREPARED FOR: MY OF FONTANA 8353 SIERRA AVENUE FONTANA, CA 92335 (909) 350-7644 V, R LATERAL/'CONNECTOR PIPE FF4__F_lL MAIN, I INF RrP I I CLASS C MORTAR I STA. P -T. I tB I J 6AJ 45' Q �. 100 mm d' 0 0 CASE I PLAN 265 Kgg-C-14 Mpa (450-C-2000) CONC. ENCASEMENT, SEE NOTE 5 -� SEE NOTE -CONC. PIPE. RCP OR CSP IL MAIN LINE RCP -1 too mm I O CONCRETE OR a ., COMPACT SOIL TO RELATIVE DENSITY _ REOUIRED BY SPECIFICATIONS UNDISTURBED EARTH BEDDING, PER SPECIFICATIONS CASE SECTION B -B FOR OUTLET SEE STD. 115 mm (1/21 MIN CATCH BASIN PLANS i T ..AA CATCH BASIN FLOOR A6 . SEE NOTE 40� � 125 mm (51 � 1 BEDDING OF RCP OR CSP r INLET PIPE 175 mm (70) 900 mm (36') BACKFILL WITH 223 mm (9') SEE NOTE 6 265 K -C-14 Mpa (450--2000) - : 1425 mm (57') 450 mm (180) 250 mm (10') CONCRETE OR a ., COMPACT SOIL TO RELATIVE DENSITY _ REOUIRED BY SPECIFICATIONS UNDISTURBED EARTH BEDDING, PER SPECIFICATIONS CASE SECTION B -B 5 mm U/2')'MIN�� SEE NOT 4 -- - �r L113y4$o CASE 2 (SEE NOTES 9 8 10) uao�re TO SUIT DNS PLAN Eo x Q - gocj T CASE 3 SADDLE -CONNECTION 1/2 OD MIN. :'�'Q•' '' BACKFILL ,, BEDDING OD CASE I SECTIO! C -C n rr•r� nw� CLASS C MORTAR AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE JUNCTION STRUCTURE PIPE TO PIPE STANDARD PLAN PUBLIC WORKS STANDARDS INC., METRIC GREENBOOKCOMMITTE!E VD < 800 mm (24")] 332-1 1984 REV. 1996 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 2 GENERAL NOTE I. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS, NOTES CASE I AND CASE 2 I. IF ANGLE A IS LESS THAN 450 OR IF D IS LARGER THAN 600 mm (24'), THEN ANOTHER STANDARD STRUCTURE SHALL BE SPECIFIED. 2- THE OUTSIDE DIAMETER OF THE INLET PIPE SHALL NOT EXCEED ONE-HALF THE INSIDE DIAMETER OF THE MAIN LINE. 3. THE INLET PIPE SHALL ENTER THE MAIN LINE RADIALLY. IF THE INLET PIPE CANNOT ENTER RADIALLY. THEN ANOTHER STANDARD STRUCTURE SHALL BE SPECIFIED. 4. THE SIZE OF THE OPENING INTO THE MAIN LINE SHALL BE THE OUTSIDE DIAMETER OF THE INLET PIPE PLUS 30 mm (I') MINIMUM TO 75 mm W) MAXIMUM. 5. ALL CONNECTOR PIPES FOR CASE 2 SHALL BE ENCASED IN CONCRETE IF LAID WITHIN THE MAIN LINE EXCAVATED TRENCH OR IF LAID ON FILL WHICH HAS NOT BEEN DENSIFIED. 6. BURN OR CHIP END OF CONNECTOR PIPE FLUSH WITH INNER SURFACE OF MAIN LINE. ROUND EDGE OF CONCRETE PIPE OR RCP. 7. ALL CSP AND FITTINGS SHALL BE GALVANIZED, S. STATION SPECIFIED ON THE PROJECT DRAWINGS APPLIES AT THE INTERSECTION OF THE INSIDE WALL OF MAIN LINE AND THE CENTER LINE OF INLET PIPE. 9. CASE 2 SHALL NOT BE USED TO CONNECT TO THE FLOOR OF A GRATING CATCH BASIN WHERE THE GRATE WILL BE SUBJECT TO VEHICLE TRAFFIC. 10. FOR CASE 2, NOT MORE THAN 3.5 m (12') OF INLET PIPE SHALL BE LOCATED WITHIN THE MAIN LINE EXCAVATED TRENCH. CASE 3 11. CONNECTIONS TO PIPES 525 mm (21') OR LESS IN DIAMETER WITHOUT JUNCTION STRUCTURES OR PRECAST Y BRANCHES SHALL BE MADE WITH SADDLES. 12. THE OUTSIDE DIAMETER OF THE INLET PIPE SHALL. NOT EXCEED ONE-HALF THE INSIDE DIAMETER OF THE MAIN LINE. 13. TRIM OR CUT SADDLE TO FIT SNUGLY OVER THE OUTSIDE OF THE MAIN LINE SO ITS AXIS WILL BE ON THE LINE AND GRADE OF THE CONNECTOR PIPE. 14. THE OPENING INTO THE PIPE SHALL 8E CUT AND TRIMMED T4 FIT THE SADDLE SO THAT NO PART WILL PROJECT WITHIN THE BORE OF THE SADDLE PIPE. 15. THE CONNECTOR PIPE SHALL BE SUPPORTED AS SHOWN IN CASES I AND 2. NOTES ISAA ta< 300 mm (04 12° - 330-C-23 (560-C-3250) CONCRETE ZS mm (I') (TVP.) I. A CONCRETE COLLAR IS REQUIRED WHERE THE CHANGE IN GRADE L/2 (TYP.} EXCEEDS 10 PERCENT. - - - 2. FOR CURVE JOINTS (SEE DETAIL B. SHEET 1) IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE •'' =j = :!"'="' THAT IS GREATER THAN 25 mm (10), BUT IS LESS THAN 75 mm((3') A CONCRETE COVER IS REQUIRED IN ACCORDANCE WITH SUBSECTION . 306-1.2.4 OF THE SSPWC. i I I r� N 1 NEW OR _�_ 1 g6 EXIST. -PIPE I J FLOW j o J' FW / FL W P� 15M 0 300 mm (*4 0 12') D FOR OUTLET SEE STD. 0j�� CATCH BASIN PLANS i T ..AA CATCH BASIN FLOOR A6 . r 300 mm (120) 125 mm (51 CONC. PIPE, - RCP OR CSP r 450 mm (I81) 5 mm U/2')'MIN�� SEE NOT 4 -- - �r L113y4$o CASE 2 (SEE NOTES 9 8 10) uao�re TO SUIT DNS PLAN Eo x Q - gocj T CASE 3 SADDLE -CONNECTION 1/2 OD MIN. :'�'Q•' '' BACKFILL ,, BEDDING OD CASE I SECTIO! C -C n rr•r� nw� CLASS C MORTAR AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE JUNCTION STRUCTURE PIPE TO PIPE STANDARD PLAN PUBLIC WORKS STANDARDS INC., METRIC GREENBOOKCOMMITTE!E VD < 800 mm (24")] 332-1 1984 REV. 1996 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 2 GENERAL NOTE I. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS, NOTES CASE I AND CASE 2 I. IF ANGLE A IS LESS THAN 450 OR IF D IS LARGER THAN 600 mm (24'), THEN ANOTHER STANDARD STRUCTURE SHALL BE SPECIFIED. 2- THE OUTSIDE DIAMETER OF THE INLET PIPE SHALL NOT EXCEED ONE-HALF THE INSIDE DIAMETER OF THE MAIN LINE. 3. THE INLET PIPE SHALL ENTER THE MAIN LINE RADIALLY. IF THE INLET PIPE CANNOT ENTER RADIALLY. THEN ANOTHER STANDARD STRUCTURE SHALL BE SPECIFIED. 4. THE SIZE OF THE OPENING INTO THE MAIN LINE SHALL BE THE OUTSIDE DIAMETER OF THE INLET PIPE PLUS 30 mm (I') MINIMUM TO 75 mm W) MAXIMUM. 5. ALL CONNECTOR PIPES FOR CASE 2 SHALL BE ENCASED IN CONCRETE IF LAID WITHIN THE MAIN LINE EXCAVATED TRENCH OR IF LAID ON FILL WHICH HAS NOT BEEN DENSIFIED. 6. BURN OR CHIP END OF CONNECTOR PIPE FLUSH WITH INNER SURFACE OF MAIN LINE. ROUND EDGE OF CONCRETE PIPE OR RCP. 7. ALL CSP AND FITTINGS SHALL BE GALVANIZED, S. STATION SPECIFIED ON THE PROJECT DRAWINGS APPLIES AT THE INTERSECTION OF THE INSIDE WALL OF MAIN LINE AND THE CENTER LINE OF INLET PIPE. 9. CASE 2 SHALL NOT BE USED TO CONNECT TO THE FLOOR OF A GRATING CATCH BASIN WHERE THE GRATE WILL BE SUBJECT TO VEHICLE TRAFFIC. 10. FOR CASE 2, NOT MORE THAN 3.5 m (12') OF INLET PIPE SHALL BE LOCATED WITHIN THE MAIN LINE EXCAVATED TRENCH. CASE 3 11. CONNECTIONS TO PIPES 525 mm (21') OR LESS IN DIAMETER WITHOUT JUNCTION STRUCTURES OR PRECAST Y BRANCHES SHALL BE MADE WITH SADDLES. 12. THE OUTSIDE DIAMETER OF THE INLET PIPE SHALL. NOT EXCEED ONE-HALF THE INSIDE DIAMETER OF THE MAIN LINE. 13. TRIM OR CUT SADDLE TO FIT SNUGLY OVER THE OUTSIDE OF THE MAIN LINE SO ITS AXIS WILL BE ON THE LINE AND GRADE OF THE CONNECTOR PIPE. 14. THE OPENING INTO THE PIPE SHALL 8E CUT AND TRIMMED T4 FIT THE SADDLE SO THAT NO PART WILL PROJECT WITHIN THE BORE OF THE SADDLE PIPE. 15. THE CONNECTOR PIPE SHALL BE SUPPORTED AS SHOWN IN CASES I AND 2. NOTES ISAA ta< 300 mm (04 12° - 330-C-23 (560-C-3250) CONCRETE ZS mm (I') (TVP.) I. A CONCRETE COLLAR IS REQUIRED WHERE THE CHANGE IN GRADE L/2 (TYP.} EXCEEDS 10 PERCENT. - - - 2. FOR CURVE JOINTS (SEE DETAIL B. SHEET 1) IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE •'' =j = :!"'="' THAT IS GREATER THAN 25 mm (10), BUT IS LESS THAN 75 mm((3') A CONCRETE COVER IS REQUIRED IN ACCORDANCE WITH SUBSECTION . 306-1.2.4 OF THE SSPWC. i I I r� N 1 NEW OR _�_ 1 g6 EXIST. -PIPE I J FLOW j o J' FW / FL W P� 15M 0 300 mm (*4 0 12') D L T 300 mm (121 300 mm 021 100 mm (40) 450 mm (18') • 300 mm (120) 125 mm (51 600 mm (24') 300 mm (121 150 mm (60) 7SO mm (306) 450 mm (I81) 175 mm (70) 900 mm (36') 450 mm (101 223 mm (9') 1050 mm (4P') 450 mm 118') 223 mm f91) 1200 mm (48') 450 MM (180) 250 mm (101 1425 mm (57') 450 mm (180) 250 mm (10') 1500 mm (60' 525 mm (21-) 275 mm (110) 1650 mm (66' 525 mm (219 275 mm (II'l 1800 mm (72') 600 mm (241 300 mm (12') IF THE EXTREME ENDS OF THE PIPE LEAVE A CLEAR SPACE THAT IS EQUAL TO OR GREATER THAN 75 mm (3'), BUT LESS THAN 150 mm (6'), A CONCRETE COLLAR IS REQUIRED_ IF THE CLEAR SPACE IS 150 mm (61 OR GREATER. A TRANSITION STRUCTURE IS REQUIRED. 3, CONCRETE COLLAR SHALL NOT BE USED FOR A SIZE CHANGE ON THE MAIN LINE. 4. CONNECTOR PIPES A. WHERE PIPES OF DIFFERENT DIAMETERS ARE JOINED WITH A CONCRETE COLLAR, L AND T SHALL BE THOSE OF THE LARGER PIPE. D=D1 OR D2, WHICHEVER IS GREATER. 8. WHEN D( IS EQUAL TO OR LESS THAN [�, JOIN INVERTS AND WHEN D1 IS GREATER THAN D2, JOIN SOFFITS. 5. FOR PIPE LARGER THAN 1800 mm (72') SPECIAL COLLAR DETAILS ARE REQUIRED. 3-15M (+4) CIRCULAR TIES, 6. FOR PIPE SIZE NOT LISTED USE NEXT SIZE LARGER. SEE NATE 9 NNW7. REINFORCEMENT SHALL CONFORM TO ASTM A 615 M (A 615) GRADE 300(40). 150 mm 8. WHERE REINFORCING IS REQUIRED THE DIAMETER OF THE CIRCULAR 6) MIN FOG�rF 'a y TIES SHALL BE D+(2X WALL THICKNESS) + T. ��s'Q t� H.e ,o REINFORCING SHALL BE USED WHERE THE PIPE DIAMETER IS GREATER THAN 525 mm (21") AND ON ALL PIPES WHERE THE SPACES fA CUT >~ 3 .� BETWEEN THE EXTREME OUTER ENDS IS 75 mm (3) OR LARGER. NO. 2 CUT NO. I 43 9 0 LINEN [� 0 ,_ 00 N CIRCULAR TIES: -- - - - - -- a - ° CUT I,. a .•a 'a :'�'' W •� 904 NO. 2 ---- - LINE e _ ;� ' L . ® w tlr PIPE DIAMETER NO. OF CIRCULAR TIES 525 mm (21') OR LESS 3 600 mm (24') TO 750 mm (300) 3 825 mm (33') TO 1425 mm (57') 4 1500 mm (60') TO 1800 mm (72') 5 150 mm CUT NO. 2 A a� a WHERE THE SPACE BETWEEN PIPE ENDS EXCEEDS 75 mm (3'). THE 6'J MIN ? •p = O NUMBER OF CIRCULAR TIES SHALL BE INCREASED TO MAINTAIN AN 3.14 ((30-D) C y APPROXIMATE SPACING OF 150 mm (6) O.C. INTERIOR SURFACE ® • Ca ,° 10. WHERE THE PIPE 1S 525 mm (210) OR LESS IN DIAMETER AN INTERIOR DETAIL Aa (SEE NOTE 10) OF PIPE .� �o 7 .0 • FORM OF UNSEALED SONO-TUSE OR EQUAL SHALL BE USED TO SONO -TUBE. OR EQUAL, INTERIOR FORM o c -w PROVIDE A SMOOTH INTERIOR JOINT. THE PAPER FORM MAY BE �y S h �, LEFT IN PLACE (SEE DETAIL A). WHEN THE PIPE IS 600 mm (240) CUT NO. I: SAW THE TUBE AT AN ANGLE OF A/2 WITH THE TRANS- W 0 � v '� OR LARGER A REMOVABLE INTERIOR FORM SHALL BE USED OR THE DETAIL "B" VERSE PLANE. REVERSE ONE SECTION AND TAPE BOTH SECTIONS C �,, INTERIOR JOINT I NT SHALL BE COMPLETELY FILLED WITH MORTAR AND TOGETHER FORMING THE DEFLECTION ANGLE A. TYPICAL JOINT FOR 'v dD NEATLY POINTED_ CUT NO. 2; SAW THE TUBE LONGITUDINALLY REMOVING A STRIP 'n y ..► ,H 41,3.14 (DO -D ) WIDE ON THE SIDE OPPOSITE THE OPEN JOINT. REINFORCED CONCRETE PIPE A e 11 DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS SEND THE ENDS OF THE CUT TOGETHER AND INSERT THE ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED, ALL TUBE IN THE PIPE. 41NVALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BAR SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. C6 AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER a z a s - STANDARD PLAN �p L v ERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN PROMULGATED BY DS CONCRETE CELLAR FOR RCP METRIC � ,� CONCRETE COLLAR FOR RCP Mm'c PUBLIC WORKS STANDARDS INC.. Q GREENBOOK COMMITTEE 11 77 3 V - im 300 mm �t 2 THROUGH 1800 mm 72 380-2 5�" 300 mm 12" THROUGH 1800 mm 72" REV. 1998 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 2 SHEET 2 OF 2 BENCHMARK CITY OF FONTANA BENCHMARK NO. 615 SPIKE IN POWER POLE AT THE CORNER OF CITRUS AVENUE AND LOS CEDROS AVENUE ELEVATION: 1467.59 Prepared By: ALLARD ENGINEERING Civil Engineering - Land Surveying - Land Planning 8253 Sierra Avenue Fontana, California 92335 (909) 356-1815 Fax (909) 356-1795 David S. Hammer, A.C.E. 43976 Date (expires 6/30/2005) Q�pF ESS lON S H'j �� F DRAWN BY: w No. 43976m AE Exp. 6/30/05 DESIGNED BY: AE �9T C r V 1 �- ��\P CHECKED Bim. SOF CAL\ FO ml CITY OF FONTANA, CALIFORNIA STORM DRAIN IMPROVEMENT PLAN SCALE: JUNIPER AVENUE FROM AS NOTED BASELINE AVENUE TO DATE: SOUTH WHLAND AVENUE DECEMBER, 2004 APP VED B . DRAWING NO.: 9 DTE: L/,Z CIN ENGINEER R.C.E. 51152 3614 11 Filename: M:�dwg�14907�final design�sd�JUNIPER SD 09.dwg