Loading...
HomeMy WebLinkAbout4938-4NOTE CONTRACTOR TO UTILITY CROSSING NOTIFY ENGINEER GRADE TO JOIN EXISTING SWALE PROPOSED 104000 BOTTOM SD=1 TOP WATE11 11,000 12+00 13.00 14#00 10.00 11+00 11.00 SAN BERNARDINO ASSOCIATION OF GOVERNMENTS R/W NOTE CONTRACTOR TO VERIFY ALL DEPTHS OF EXISTING UTILITY CROSSINGS PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER. AAAAAAAA DIG. WAYA L � TOLL FREE —800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT LINE " C" REVISION DESCRIPTION IMMMM SHOULD CONSTRUCTION OF REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT SEE SHEET 3 EXISTI GROU LINE v ZQ SEE PROFILE pAD=1294.1 ABOVE RIGHT — 5.96' — N 2CT28V MASTER STORM DRAIN IMPROVEMENTS PER DWG. NO. 4944 STREET' IMPROVEMENTS PER DWG. NO. 4943 wEsr SULTANA AVENUE EXISTING PROPOSED EAST R/W 25' EP C/L BASIS OF BEARINGS: CURVE AND UNE TABLE 0 RADIUS DELTA LENGTH TANGENT BEARING E — 5.96' — N 2CT28V F 22.50' 20'33'35" 8.07' 4.08' G — — 113.59' — N W04'43N H — — 160.67' — ' J 22.50' T 90'00'00" 35.34' 22.50' — K — — 36.44' — S 89"55'1 7N W wEsr SULTANA AVENUE EXISTING PROPOSED EAST R/W 25' EP C/L BASIS OF BEARINGS: BASIS OF BEARINGS: TAKEN FROM THE CENTERLINE OF LIME AVENUE AS SHOWN ON TRACT NO. 16271-1, M.B. 297/15-18. BEING N 00'01'12" W ORIGINAL BENCHMARK (SINCE DESTROYED) PREPARED FOR: CITY OF FONTANA BENCHMARK NO. 361 RAILROAD SPIKE IN NORTH FACE OF POWER POLE PJRJ LIME INVESTMENTS, LLC NO. 1536697E AT THE S.W. CORNER OF SULTANA AVENUE AND BASELINE AVENUE. ELEVATION: 1365.01 10370 TRADEMARK STREET RANCHO CUCAMONGA, SITE BENCHMARK CALIFORNIA 91730 SAN BERNARDINO COUNTY BENCHMARK NO. 7-15 (909) 291-7600 "1970" BRASS CAP IN CONCRETE ABUTMENT, LOCATEED FAX (909) 291-7630 34' NORTH OF CENTERLINE OF FOOTHILL BLVD. AND 131' WEST OF CENTERLINE OF LIME AVENUE. ADJUSTED HEVAT101t H TYPIG4L SCCiION 4 ROADSIDE SWALE NOT TO scv.e lAn rVice TAI/' D /W V b rI rI V v 4 10#00 GRAPHIC SCALE EXISTING WATER j UNE v I ......�- - -..ww ..�.,, z �— EXISTING DRIVEWAY —� PIPE I I I z I _: & 1400 1 Aloffffl 4 . B _41 :. Prepared By: ALLARD ENGINEERING ........... : .................................. ::::: .... ... Civil Engineering -Land Surveying -Land Planning B253 Sierra Avenue Fontana, California 92335 (909) 356-1 5 Fax (909) 434-1820 pew.j �f - 'V17. I � RayrMnd J. Allard, R.C.E. 36052 Date (expires 6/30/2012) (ENCASED THROUGH DRIVEWAY) (IN FEET) 1 M= 40 FT. 18' PVC SLURRY ENCASEMENT NOT To scue CONSTRUCTION NOTES 13 CONSTRUCT MANHOLE PER CITY STD. 3012 7 CONSTRUCT HEADWALL PER CITY STD. 3020 8 CONSTRUCT TRASH RACK (CASE A) PER CITY STD. 3021 9 INSTALL 18" PVC PIPE/ SDR 35 10 INSTALL RIP—RAP PER CALLOUT SHOWN ON PLAN 15 CONSTRUCT SLURRY ENCASEMENT PER DETAIL HEREON 24 8" ASPHALT CONCRETE DIKE PER CITY STD. 1007 L QROFESS/p� CITY OF FONTANA CALIFORNIA q(� STORM DRAIN IMPROVEMENT PLAN DRAWN BY: �q� NO 18676 & 1867fr1 SCALE: No. ssos2RRA� DESIGNED BY: LINE A�� AD' AND AES DAA: AS NOTED Exp. 6/30/12 RRA STA 1"0'00 tb13+6943 MAY, 2012 cjVj\' �P CHECKED BY:7 • DRAWING NO.: AP F OF- CA-�F� / r2 4 RJA CITY ENGINEER DR.C.E. �51152 4938 15 FILENAME: 1-\15947 Youna Homes Lime I and 1ALime 11 Tr.18676\ DWG's\ FINAL DESIGN\ Storm Drain\ Ultimate Intract18676—SD4/dwa