Loading...
HomeMy WebLinkAbout4923-7"T a o dI- Qa a.a Q IIIIIIIIIIIII "3- -III=III- =1 11=1 11=1 11=1 I -III -I 4-,, I I I-- 10 5 LEGEND: 1. CONCRETE PAVING. THICKNESS VARIES REFER TO PLAN 2. 1/2" BULLNOSE EDGE. EXTENDED COLLAR AT PERIMETER 3. #4 REBAR @ 18" O.C. (MIN. 2" COVER) 4. #4 REBAR, OPPOSITE DIRECTION @ 18" O.C. 5. 90% COMPACTED SUBGRADE * REFER TO HARDSCAPE LEGEND SHEET L-2 AND L-3 10 CONCRETE EDGE DETAIL SCALE: 2" = 1'-0" EXISTING CONCRETE PROPOSED CONCRETE a a ca ° a a a < EQ. a 12" G 12"'� ° a EQ. a� a -III-III-III-IIIIIIIIIIIIIIIIII-III-I I- =1 LEGEND 1. CORE AND EPDXY IN PLACE IN EXISTING CONCRETE 2. 90% COMPACTED SUBGRADE 3. #4 REBAR @ 24" O.C. 4. WRAP IN PARAFFIN PAPER BEFORE POURING NEW CONCRETE 5. 1/2" RADIUS NOTES 1. SURFACES TO MEET FLUSH 5� COLD JOINT TO EXISTING CONCRET 8'0.C. Nom. 19%" 289/6" 1 Varies with Height 8' SCALE: 2" = 1'-0" E DETAIL 13/4" FORERUNNER" Rail (See Cross- Section Below) Post size varies with Height (See AEGIS IIT" Post -Sizing chart)(D 1" Ja" x 14ga. Picket Bracket Options 2" Nom. 334" TYP• 36" Min. `.) I:.a. Footing depth NOTES: I 1.) Post size depends on fence height and wind loads. See AEGIS II T" post sizing chart. 2.) Additional heights available on request 3.) Third rail optional. PANEL BRACKET 4.) Panels also available for 6' on center Specially designed two post spacing. -point connection ensures fixity of rail ends for 13/„ increased strength. 4 1-11-12 FORERUNNER""' RAIL 134" Uniform Zinc Coating (Hot Dip Galvanized) Base Material - Uniform Zinc Coating (Hot Dip Galvanized) Zinc Phosphate & - Conversion Coating Epoxy base coat - "No -Mar" Polyester - Powder finish coat o N ti 4� i� Q INTERNAL RETAINING ROD Variable pitch connection system for ease of installation, high angle bias ability and elimination of unsightly external fasteners. FORERUNNER ""'RAIL Double -walled "U" -Channel Specially formed high strength architectural shape. HIGH 'INVINCIBLE' TUBE STEEL FENCE 1 LEGEND 1. PVC WATERSTOP 2. #4 REBAR @ 18" O.C., CORE AND EPDXY IN PLACE, WRAP EXPOSED END IN PARAFFIN PAPER 3. ELASTOMERIC CAULKING, COLOR GREY 4. 90% COMPACTED SUBGRADE 5. SPLASH PAD CONCRETE AND REINFORCEMENT BY OTHERS 6. 1/2" RADIUS NOTES 1. SURFACES TO MEET FLUSH LEGEND 1. TOOLED ELASTOMERIC CAULKING, COLOR GREY 2. 1/2" BACKER ROD 3. 1/2" X 3" IMPREGNATED POLY FELT EXPANSION JOINT (TYP.) 4. 1/2" RADIUS NOTES 1. FELT JOINT TO BE USED AS SHOWN ON PLAN 2. ALL SURFACES TO MEET FLUSH SPLASH PAD CONCRETE EDGE DETAIL SCALE,/z°=11-o° �3 EXPAN COLD JOINT - - �z SIGN JOINT DETAIL �• a : �� � • � a � - - � � LEGEND d a ° a . a a SAWCUT JOINT 1. TOOLED ELASTOMERIC CAULKING, COLOR GREY 2. 1/2" BACKER ROD TOOLED JOINT 3. 1/2" X 3" IMPREGNATED POLY CONTROL JOINT 1 FELT EXPANSION JOINT 3ff"'DEEP v 1/2" DEEP ° d . LEGEND 2. #4 REBAR @ 18" O.C. (MIN 2" COVER) 3. WRAP ONE END WITH PARAFFIN PAPER CONCRETE PAVING, 3250 SSI @ 28 DAYS P.C.0 0 STANDARD CONCRETE JOINTS ickets welded to RERUNNERT" Rail prior to coating 2" (Hir 19%, 28%6" Varies with Height 8' 36" Min. Footing depth (TYP.) 4. 1/2" RADIUS 5. ADJACENT BUILDING WALL NOTES 1. FELT JOINT TO BE USED AS SHOWN ON PLAN 2. ALL SURFACES TO MEET FLUSH SHRUBS TURF LEGEND 1. CONCRETE MOW STRIP 3250 PSI 28 DAYS 2. RADIUS EDGES 1/2" BULLNOSE 3. 90% COMPACTED SUBGRADE 4. #4 REBAR, CONTINUOUS -OVERLAP 6" AND TIE SPLICES 5. IMPREGNATED POLYFELT EXPANSION JOINT (TYP.) NOTE: 1. PROVIDE EXPANSION JOINTS @ 20'-0" O.C. SCORE JOINTS AT 5'0.C. 2. ALL MOW CURBS SHALL BE FORMED AND HAND POURED NOT TO SCALE I � MOW CURB DETAIL LEGEND 1. 1/2" RADIUS 2. FENCE POST FOOTING 3. SQUARE FOOTING CAP LEGEND 1. ALL SURFACES TO MEET FLUSH 6" NOT TO SCALE SCALE: z"=V-o" �7 EXPANSION JOINT BUILDING DETAIL MOW CUR NOTES: 1.) Post size depends on fence height, weight and wind loads. See AEGIS IF post sizing chart. 2.) See Ameristar gate table for standard out to outs. Custom gate openings available for special out to out/leaf widths. 3.) Additional styles of gate hardware are available on request This could change the Latch & Hinge Clearance. 4.) Third rail optional. 5.) Lockable Cane bolt per manufacturer. 10 8' HIGH 'INVINCIBLE' TUBE STEEL GATE ance) 1%" FORERUNNER"' Rail (See Cross- Section on Panel Drawing) Post size varies with Height (See AEGIS IIT"' Post -Sizing chart)O Gate Upright 1%"x 14 ga. Z x 14ga. Picket /eld on Box Hinge MOST DEPENDABLE FOUNTAINS, INC. MOST DEPENDABLE FOUNTAINS INC. 5705 COMMANDER DR. P.O. BOX 587 ARLINGTON, TN 38002-0587 TOLL FREE: 1-800-552-6331 PHONE: (901) 867-0039 FAX: (901) 867-0159 www.mostdependable.com T (4) SHOWER HEADS AT 900 W/ 8" STEEL PIPE, (1) FOOT WASHER STAINLESS STEEL PIPE in 1=4"xZ" MUSHROOM STYLE PUSHCo BUTTON CONTROL WITH 20 SECOND I METERED VALVE (TYPICAL) 3/8" NYLON REINFORCED NYLONBRAID TUBING W/ 112" MIP (WATER SUPPLY) I ED 8C~� CCESS DOOR 8" STAINLESS STEEL CARRIER dA c 1/2" X 12" ZINC PLATED ROD NOTES: 1. DO NOT SCALE DRAWINGS. 2. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 3. OPTIONAL STAINLESS STEEL SURFACE CARRIER RECOMMENDED ON SURFACE MOUNT INSTALLATIONS MODEL 590 SM SHOWN W/ 8" SS SURFACE CARRIER 3354-10.10 PROTECTED BY COPYRIGHT - 01102/06 J 11 STAINLESS STEEL SHOWER www.CADdetails.com u EXPANSION JOINT SCALE: 2" = 1'-0" 1 4 3" a •. d a ° a d ° ° -'1 a B/FENCE POST DETAIL LEGEND: 1. ADJACENT CONCRETE PAVING / BANDING 2. CONCRETE PAVERS - REFER TO FINISH SCHEDULE 3. CLEAN SAND LAYING COURSE 4. GEOTEXTILE FABRIC - REFER TO SPECIFICATIONS 5. 90% COMPACTED SUBGRADE 6. 1/2" RA D I U S 7. CLASS II ROAD BASE, 95% COMPACTION m1a L A N D S C A P E ARCH ITECTU RE 310 N. JOY STREET CORONA, CA 92879 T: 951.73 7.1 124 F: 951.737.6551 ��Q `ANDS�pF 210, �y SI URE rn n 9/30/13 J, EXP. DATE ,qTF OF � �FO��\ CA CONSULTANT STAMP: PROJECT: MARTIN TUDOR AQUATIC CENTER RENOVATION PROJECT PREPARED FOR: . � a�,i. CITY OF FONTANA hi:''!�y ::iii. :f i.•. J 16489 ORANGE WAY FONTANA, CA. 92335 K. CONTACT: DAN WEST PHONE: 909-350-6530 PROJECT TRACKING DATE 1. PROGRESS SET 8-1-11 2. DAB SET 8-18-11 3. FIRST PLAN CHECK 10-3-11 4. SECOND PLAN CHECK 1 1-9-1 1 5. THIRD PLAN CHECK 12-5-11 6. FOURTH PLAN CHECK 1-12-12 7. 8. DELTA REVISIONS DATE 1. 2. 3 3. 4. 5. 6" 6. 7. 8. 12 PERMEABLE PAVERS DATE PREPARED: 1-11-12 DRAWING SCALE: NTS DRAWN BY: SK, SF DESIGNED BY: JH CHECKED BY: BAXTER BMLA PROJECT NO: 1001 1210 0 MVA 'A DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 811 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT • � I LEGEND Q DEWITT WEED BARRIER CLOTH SHEET DESCRIPTION: 122 NATIVE SOIL -COMPACTION AT 90% Q FINISH GRADE ® REFER TO HARDSCAPE PLAN SHEET L-2 FOR SIZE AND TYPE OF ROCK MULCH HARDSCAPE DETAILS 13 CRUSHED ROCK CITY OF FONTANA DRAWN BY: JH, SK, AN PROJECT NAME DESIGNED BY: MARTIN TUDOR WATER PARK DATE: _ JH 8/18/2011 CHECKED BY: ED: DWG NO. BAX EN EE 51152 R. • Z 4923 37 • Sheet 7 of 11