HomeMy WebLinkAbout4923-25A% 0
9��
cil
541_411
101_011 131_Q11 2'-�" J i01_411 111_1011
51_111 �'-il" 4'--i" �, 2'-1111 �1'-0" ��_��� 11_ 11 8,-0„ �11 ��� ,_2;, 2..1,1 ��1_111 (�1��111 41_1►
J v d a v
I I I I
I I I I
I
I I I I
i t I I I I
� 1
6 ,
lo
GY
\ c J -
S� I CJ I 5 13.03 - - �- -
\ TOVDLEi;� BAY
10
s
la
/ e
�� O TE 5 Y I \S) -
CJ' % ,EJ
I �� I /
/ 16 I _t
i
00
13.03 \\ < + (�
t
- - 00
STAR'�
TCS I �'
10 13.03\ \ -
\ - _
L CJ 1` cu cJ -
�., CJ
SIAI
1
OGY�
EJ
o
1 NOTE REFER TO GRAD ING PLAN FOR
A L ELEVATIONE-0. WET PLAY
GJ FI 15H SHALL BE MEDIUM _t
5� 15 OOM FIN15H CONCRETE WITHMID
A PLIED COLOR HARDENER.
%l!/
STAR
TG I
15 13.03' STAR _
\01 D'\
\ I t
_.._._... _ - 12-
\� 11
SPIN SPLSH
- I FAMILY BAY '
\ I CJ I
I \I
11 /'
1 \ I I �
ilk J*
I I I
I 1 I
4'-1" 5'-3" 3'-10" 3'-11" 4'-11" 14"I 3'_11" 4'-1" 3-511 9'-0" I 5'-211
41_1
11 22._011 14.01011 201_011 (01_111
541.411
WET PLAY LAYOUT PLAN ',,"-,'-m"
. . . . . . . . . . . . . . . . . .
. T PLAY DATA
SURFACE A1RE�.EA = or 5Q. FT.
VOLUME = 4,000 GAL,
30 MIN. TURNOVER = 133 GPM
VVE7 PLL_/,,A--Y Bi,.3ALANCE 7ANK DAA
a005TE1� PUMP 1RATE
CIRCULATION -71.,!MF FRATE
TOTAL WATEf'' PLOW
502 GPM x 3
8,_O'1 x 10'-0'' 5URGEF C>P'N' I5ER
• 4,000 GAL. > 1500 GAL. O
LEGEND
= 3513 GPM
143 GFM
- 502 GPM
- 11500 GAL.
d non rtAI
-
-EJ - - _ EXPANSION JOINT r(oC
U1P-5
CJ - CONTROL JOINT r(oS
WP -5
5L = SLOPE DIRECTION
TG _ ?OP OF GRATE
WET PLAY REQUIREMENTS
li" v®UuT LEG'SND
A PLAN REVIEWAND APPROVAL 15 REQUIRED BY THE
PRODUCT
CODE
OTY
TOTAL FLOUR
FOR CLEANING AND INSPECTION. RESERVOIR SHALL HAVE AT
O
MIX'N MATCH 5
1
20 GPM
2
uD� 3
O
SPRAY LOOP TUNNEL
1
22 GPM
UJP 3
O
GROUND SPRAY
GU5HER
1
10 GPM
UJP 3
o
WATER FROM THE FEATURES FLOWS BACK TO THE RESERVOIR,
1.2-1.(o MUST BE MAINTAINED AT ALL TIMES THE FOUNTAIN 15 IN
AREAS ADJACENT TO THE SPLASH ZONE MUST BE SLOPED
O
GROUND SPRAY 5fi
DECK : R,A- Y 5'
1
24 GPM
OTHER SAFETY HAZARDS WITHIN THE IMMEDIATE AREA OF THE
SHALL BE PROVIDED FOR CONTINUOUSLY MONITORING AND
DIAL TWO WORKING
BEFORE DAYS BEFORE
5PLA5H ZONE ARE PROHIBITED.
ADJUSTING THE DISINFECTANT AND pH.
O
5PRAY TUNNEL
1
48 GPM
6(0�
l�P 3
®
Douc_rl !N.ul"
1
45 G101M
�-
lUP 3
O
GE's 5}=R
2
12 GPM
8
U1P-3
®
MONSTER a
3
130 GPM
9
U1P-3
O
STARLET SPRAY
4
20 GPM
1
l0
SPLIT SPURT
S
18 GPM
2
U1P-�•
11
CANON 5PLA5H BLASTER
STRAIGHT LOOP
3
18 GPM
3
U1P-4
ULTRAVIOLET LIGH D15INFECTION 5Y5TEM 5PECIFIED IN
BEFORE IT ENTERS THE RESERVOIR TO PREVENT LARGER
ONE-HALF INCH. SPRAY DEVICE5 THAT EXTEND ABOVE THE
THIS SECTION. ALL WATER THAT 15 PROVIDED TO THE
ENGINEER. RESERVOIR FLOORS SHALL BE SMOOTH TO
12
SPIN 5PLA5HER UD/
WHEEL HANDLE
1
10 GPM
4
WP -4
8.
ALL FOGGER5 AND JET NOZZLE SPRAYS THAT PRODUCE
ULTRAVIOLET LIGHT UNIT VALIDATED DOSAGE SHALL
SIGNS STATING:
FINELY ATOMIZED M15T5 MUST BE CONNECTED TO A SEPARATE
13
ACTIVATOR POWER
P05T 2.0
2("_(O�
END OF LAMP LIFE.
WP -4
THE RECIRCULATION PUMP MUST BE IN OPERATION AT ALL
5. ALL ULTRAVIOLET LIGHT UNITS MUST BE VALIDATED.
TIMES THAT THE SPRAY GROUND 15 OPEN FOR USE AND A
THE VALIDATION PROCESS MUST DETERMINE THE
14
HO -LEE POST
1
5 GPM
5
WP -4
15
MAINTENANCE MINIMIZER
WATER ODYSSEY "M000
4
315 GPM
3
WP -5
ARTIFICIAL LIGHTING SHALL BE PROVIDED 50 THAT ALL
OR GREATER THAN THE DESIGN FLOW RATE AT THE SET
FROM ANY PART OF THE 5PRAY GROUND.
PORTIONS OF THE SPRAY GROUND AND DECK MAY BE EASILY
POINT INTENSITY. VALIDATION TESTING MUST BE
TOTAL=
300 GPM
1.
A PLAN REVIEWAND APPROVAL 15 REQUIRED BY THE
18. THE RESERVOIR MUST BE DESIGNED TO HAVE EASY ACCE55
A O
ENFORCING AGENCY PRIOR TO CONSTRUCTION
FOR CLEANING AND INSPECTION. RESERVOIR SHALL HAVE AT
2.
ALL PARTS OF THE SPRAY GROUNDS MUST BE DESIGNED,
LEAST ONE LADDER ACCE55. PROVIDE ONE THREE FOOT BY
CONSTRUCTED, MAINTAINED AND OPERATED 50 THERE ARE NO
THREE FOOT (3'x3') ACCE55 OPENING FOR EVERY 51X C(o) FT. OF
SLIP, TRIP, OR FALL HAZARDS OR OTHER CONDITIONS THAT
RESERVOIR LENGTH. LIDS SHALL BE LOCKED OR REQUIRE A
MAY POSE A SAFETY HAZARD.
TOOL TO OPEN.
3.
THE SPLASH ZONE MUST BE PROPERLY SLOPED 50 THAT ONLY
A FREE CHLORINE RESIDUAL OF AT LEAST 3.0 PPM AND pH OF
o
WATER FROM THE FEATURES FLOWS BACK TO THE RESERVOIR,
1.2-1.(o MUST BE MAINTAINED AT ALL TIMES THE FOUNTAIN 15 IN
AREAS ADJACENT TO THE SPLASH ZONE MUST BE SLOPED
OPERATION. TH18 LEVEL MUST BE PRESENT AS MEASURED AT
AWAY FROM THE COLLECTION DRAINS. PLANTS, VEGETATION OR
THE SPRAY GROUND FEATURES. AN AUTOMATIC CONTROLLER
AUTOMATIC SHUTDOWN FEATURE TO INACTIVATE THE
DATER FEATURE PUMP IF THE UV DOSAGE RATE DROPS
OTHER SAFETY HAZARDS WITHIN THE IMMEDIATE AREA OF THE
SHALL BE PROVIDED FOR CONTINUOUSLY MONITORING AND
DIAL TWO WORKING
BEFORE DAYS BEFORE
5PLA5H ZONE ARE PROHIBITED.
ADJUSTING THE DISINFECTANT AND pH.
4.
A CONTINUOU5 CLEAR DECK SHALL SURROUND THE ENTIRE
20. THE SPRAY GROUND FEATURE PUMP MUST BE PROVIDED WITH
.u.O
YOU DIYOU DIG
SPRAY PAD PERIMETER. IT SHALL BE NOT LE55 THAN FOUR
AN AUTOMATIC 5HUT-OFF THAT SHUTE DOWN THE FEATURE PUMP
.
FEET WIDE. THE DECK SHALL BE OF A UNIFORM, EA51LY
IF THE CHEMICAL CONTROLLER REGISTERS A READING BELOW
CLEANED, IMPERVIOUS MATERIAL.
050mv,
5.
H05E 8155 SHALL BE PROVIDED TO FACILITATE FLUSHING OF
21. U.V. LIGHT DISINFECTION UNITS:
l0. THE SPRAY PAD RESERVOIR SHALL BE CONSTRUCTED OF
THE SPRAY PAD AND DECK AREA.
A. TREATMENT SYSTEMS SHALL INCLUDE AN ULTRAVIOLET
0,
THERE SHALL BE NO PONDING OF WATER WITHIN THE 5PLA5H
DISINFECTION SYSTEM UNLE55 ANOTHER TREATMENT
ZONE,
PROCESS 16 PROVIDED THAT HAS BEEN DETERMINED
1.
THE SPRAY DEVICES MUST BE DESIGNED, CONSTRUCTED AND
BY THE STATE DEPARTMENT OF PUBLIC HEALTH TO BE
STEEL, WHICH CAN WITHSTAND ALL ANTICIPATED LOADS UNDER
INSTALLED 50 THAT THEY DO NOT CREATE A SAFETY HAZARD.
CAPABLE OF PROVIDING THE EQUIVALENT LEVEL OF
NOZZLES THAT SPRAY FROM THE GROUND LEVEL MUST BE
REDUCTION OF CRYPTOSPORIDIUM AS THE
FLUSH WITH THE GROUND, WITH OPENINGS NO GREATER THAN
ULTRAVIOLET LIGH D15INFECTION 5Y5TEM 5PECIFIED IN
BEFORE IT ENTERS THE RESERVOIR TO PREVENT LARGER
ONE-HALF INCH. SPRAY DEVICE5 THAT EXTEND ABOVE THE
THIS SECTION. ALL WATER THAT 15 PROVIDED TO THE
ENGINEER. RESERVOIR FLOORS SHALL BE SMOOTH TO
GROUND MUST BE HIGH ENOUGH 50 THEY CAN BE CLEARLY
SPRAY PAD SHALL BE TREATED WITH ULTRAVIOLET
DESIGN GROUP
SEEN AND ARE NOT A TRIP HAZARD.
LIGHT DURING SPRAY PAD OPERATION. THE
8.
ALL FOGGER5 AND JET NOZZLE SPRAYS THAT PRODUCE
ULTRAVIOLET LIGHT UNIT VALIDATED DOSAGE SHALL
SIGNS STATING:
FINELY ATOMIZED M15T5 MUST BE CONNECTED TO A SEPARATE
BE EQUIVALENT TO 40mJ/cm2 OR GREATER AT THE
AUTOMATIC WATER LEVEL CONTROLLER FOR THE SPRAY PAD
POTABLE WATER SOURCE.
END OF LAMP LIFE.
9,
THE RECIRCULATION PUMP MUST BE IN OPERATION AT ALL
5. ALL ULTRAVIOLET LIGHT UNITS MUST BE VALIDATED.
TIMES THAT THE SPRAY GROUND 15 OPEN FOR USE AND A
THE VALIDATION PROCESS MUST DETERMINE THE
DO NOT DRINK
MINIMUM FOUR (4) TURNOVERS PRIOR TO OPENING FOR PROPER
ULTRAVIOLET LIGHT UNIT'5 D15INFECTION PERFORMANCE
ANOTHER METHOD WHICH WILL PREVENT BACK FLOW AND
D151NFECTION AND FILTRATION.
BY INDICATING T14AT A D05E OF 40mJ/cm CAT END OF
5ACK-51PHONAGE.
LAMP LIFE) 15 ACHIEVED AT A FLOW RATE EQUAL TO
10.
ARTIFICIAL LIGHTING SHALL BE PROVIDED 50 THAT ALL
OR GREATER THAN THE DESIGN FLOW RATE AT THE SET
FROM ANY PART OF THE 5PRAY GROUND.
PORTIONS OF THE SPRAY GROUND AND DECK MAY BE EASILY
POINT INTENSITY. VALIDATION TESTING MUST BE
SEEN. A MINIMUM 3 FOOT-CANDLES (f.c.) OF ARTIFICIAL LIGHT
PERFORMED BY AN INDEPENDENT AGENCY.
SHALL BE PROVIDED, MEASURED 30'' FROM THE DECK, AT ALL
SPRAY PAD5 WHICH ARE USED AT NIGHT OR WHICH DO NOT
C. AN ACCURATELY CALIBRATED ULTRAVIOLET LIGHT
HAVE ADEQUATE NATURAL LIGHTING.
INTENSITY METER, PROPERLY FILTERED TO RESTRICT
11.
THE TOTAL VOLUME IN THE RESERVOIR, INCLUDING ALL PIPING,
ITS SENSITIVITY TO THE D151NFECTION SPECTRUM SHALL
MUST BE AT LEAST 4,000 GALLONS. THE VOLUME IN THE
BE INSTALLED IN THE WALL OF THE D 15INFECTION
RESERVOIR, INCLUDING ALL PIPING, MUST BE A MINIMUM OF 3
CHAMBER AT THE POINT OF GREATEST WATER DEPTH
FROM THE TUBE OR TUBES.
TIMES THE FLOW RATE OF ALL ATTRACTION PUMPS AND THE
RECIRCULATION PUMP COMBINED (e.g. IF THE FLOW RATE OF
D. THE UNIT SHALL BE DESIGNED TO PROTECT THE
ALL PUMPS 15 2,000 GPM, A VOLUME OF AT LEAST 01000
OPERATOR AGAINST ELECTRIC SHOCK OR EXCE551VE
GALLONS WOULD BE NEEDED).
RADIATION.
12.
THE TURNOVER RATE SHALL NOT EXCEED 30 MINUTES.
E. UV 5Y5TEM MUST HAVE AN AUTOMATIC WIPER.
13.
AN ADEQUATE NUMBER OF SANITARY FACILITIES SHALL BE
F. UV SYSTEMS MUST BE CERTIFIED TO NSF 5TANDARDS
PROVIDED FOR ALL SPRAY GROUNDS. THESE FACILITIE5 SHALL
50.
INCLUDE RESTROOMS, SHOWERS AND DRINKING FOUNTAINS.
ADDITIONALLY DIAPER CHANGING FACILITIES MUST BE
G. A SPARE ULTRAVIOLET LAMP AND OTHER NECE55ARY
PROVIDED AT THE RE5TROOM5.
EQUIPMENT TO AFFECT PROMPT REPAIR BY QUALIFIED
14,
THE SUCTION PIPING INTAKE OF THE WATER FEATURES' PUMP IN
PERSONNEL PROPERLY INSTRUCTED IN THE OPERATION
AND MAINTENANCE OF THE EQUIPMENT SHALL BE
THE RESERVOIR MUST NOT BE LOCATED IN THE IMMEDIATE
PROVIDED ON-SITE
L A N D S C A P E
ARCHITECTURE
310 NI. JOY STREET
CORONA, CA 92879
T: 951.73 7.1 124
F: 951.737.6551
E. 4flz
.d
t,+ 2 13
ri
SIGNATURE C7
..y
9/30/13
S EXP. DATE \�
CA
CONSULTANT STAMP:
�S�,° ARC/
N.
N C- 22
REN 1 31/13
T� OF CALF'_O�
PROJECT:
MARTIN TUDOR
AQUATIC CENTER
PREPARED FOR:
C I T Y O F
,1 CITY OF FONTANA
16489 ORANGE WAY
FONTANA CA. 92335
CONTACT: DAN WEST
PHONE: 909-350-6530
PROJECT TRACKING DATE
1. PROGRESS SET 8-1-11
2. FIRST PLAN CHECK SUBMITTAL 10-3-11
3. SECOND PLAN CHECK SUBMITTAL 11-09-11
4. FOURTH PLAN CHECK SUBMITTAL 01-10-12
5.
6.
7.
8.
DELTA REVISIONS DATE
1.
2.
3.
4.
5.
6.
7.
8.
DATE PREPARED: 01-10-12
DRAWING SCALE:
DRAWN BY- GSF
DESIGNED BY- GSF
CHECKED BY: SJF
BMLA PROJECT NO: 10011210
VICINITY OF THE SUCTION INTAKE OF THE RECIRCULATION PUMP.
IT MUST BE LOCATED A5 CL05E AS P05615LE TO THE
H. THE ULTRAVIOLET LIGHT UNIT SHALL BE LOCATED
A O
RECIRCULATION RETURN LINE. THE LOCATION OF INLETS SHALL
BETWEEN THE SPRAY PAD WATER FEATURE PUMP
DISCHARGE AND THE SPRAY FEATURES.
FACILITATE GOOD CIRCULATION OF WATER TO ALL AREAS OF
o
THE RESERVOIR.
I. THE UV 5Y5TEM5 MUST BE EQUIPPED WITH AN
db
15. THE SUCTION INTAKE FROM THE RECIRCULATION PUMP MUST BE
AUTOMATIC SHUTDOWN FEATURE TO INACTIVATE THE
DATER FEATURE PUMP IF THE UV DOSAGE RATE DROPS
DIAL TWO WORKING
BEFORE DAYS BEFORE
LOCATED IN THE LOUDEST PORTION OF THE RESERVOIR. AN
BELOW 40 mJ/cm 2
.u.O
YOU DIYOU DIG
OVERFLOW PIPE TO CONVEY EXCESS WATER TO WASTEG
.
THROUGH A SUITABLE AIR GAP MUST BE PROVIDED.
22. A DIVERTER VALVE SHALL BE INSTALLED ON THE SPRAY
TOLL FREE 811
A PUBLIC SERVICE BY
l0. THE SPRAY PAD RESERVOIR SHALL BE CONSTRUCTED OF
GROUND DRAINAGE PIPING BEFORE THE RESERVOIR TO
UNDERGROUND SERVICE ALERT
MATERIALS WHICH ARE CORROSION RESISTANT, NONTOXIC, AND
DIVERT RAIN WATER TO THE STORM DRAINAGE 5Y5TEM WHEN
WATERTIGHT SUCH A5 CONCRETE, FIBERGLASS, OR 5TAINLE55
THE SPLASH GROUND 15 CLOSED FOR THE SEASON.
STEEL, WHICH CAN WITHSTAND ALL ANTICIPATED LOADS UNDER
23. A REMOVABLE AND CLEANABLE CATCH SCREEN OR 5A6KET
FULL AND EMPTY CONDITIONS. THE RESERVOIR DE51GN SHALL
SHALL BE INSTALLED ON THE SPRAY GROUND DRAINAGE PIPE
BE WET STAMPED BY A CALIFORNIA REGISTERED STRUCTURAL
BEFORE IT ENTERS THE RESERVOIR TO PREVENT LARGER
ENGINEER. RESERVOIR FLOORS SHALL BE SMOOTH TO
DEBR15 FROM COLLECTING IN THE RESERVOIR.
DESIGN GROUP
FACILITATE VACUUMING OF SILT AND DE5R15.
X24• EACH SPRAY GROUND MUST BE PROVIDED WITH ONE OR MORE
FARADAY AVE., CAR92008
11. A POTABLE WATER 5OURCE SHALL BE PROVIDED WITH AN
SIGNS STATING:
Tel
Tel 760.438.8400 Fax x 76 760.4343 8.5251
AUTOMATIC WATER LEVEL CONTROLLER FOR THE SPRAY PAD
CAUTION:
RE5ERVOIR. THE MAKEUP WATER SHALL BE INTRODUCED INTO
WATER 15 RECIRCULATED
SHEET DESCRIPTION:
THE SPRAY PAD RESERVOIR THROUGH AN AIR GAP OR BY
DO NOT DRINK
ANOTHER METHOD WHICH WILL PREVENT BACK FLOW AND
5ACK-51PHONAGE.
4" LETTERING MUST BE PROVIDED. SIGNS MUST BE V1615LE
INET PL
PLAY LAYOUT PLAN
FROM ANY PART OF THE 5PRAY GROUND.