Loading...
HomeMy WebLinkAbout4923-22�r- o Lr) 0 N `-N O N � O CNo roo 0 -o �w Bo 00 v � v � 00 00 N N I I E E D 0 I I Ld w -5;�' a) v � v, a -° > -+ v 0 � a Cf) co v v J J N C c u.i Q Q ♦ / / / / ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ � ENLARGED ELE CTRICAL SITE PLAN A GENERAL NOTES 1. PROVIDE POTHOLING AS NECESSARY TO EXPOSE EXISTING UTILITIES FOR COORDINATING INSTALLATION OF NEW UNDERGROUND INFRASTRUCTURE. 2. REFER TO FEEDER SCHEDULE ON SHEET E0.02 FOR CONDUIT AND CONDUCTOR SIZES. SHEET NOTES PROVIDE 10" X 17" X DEPTH AS REQURIED PRECAST CONCRETE HANDHOLE WITH BOLT—DOWN TYPE TRAFFIC—RATED GALVANIZED STEEL COVER STAMPED/LABELED "ELECTRIC", JENSEN TYPE 81017 OR EQUAL. POLE MOUNTED LIGHT FIXTURES "ON—OFF" PUSH BUTTON MOUNTED IN LOCKABLE ENCLOSURE ON BUILDING WALL AT +48" A.F.F. TO TOP OF BOX, VERIFY EXACT LOCATION IN THE FIELD. REFER TO DETAIL 2 ON SHEET E0.03 FOR ADDITIONAL REQUIREMENTS. LIGHT FIXTURE SHALL BE MOUNTED ON UNDERSIDE OF SHELTER PURLINS. CONDUITS SHALL BE ROUTED EXPOSED ON THE UNDERSIDE OF SHELTER PURLINS AND TRUSS. PROVIDE AND INSTALL A 8" SQUARE CONCRETE BOLLARD WITH RECEPTACLE AS MANUFACTURED BY LITELINES, INC. #TCB800—SQ—CPT-24—AB—*—*—* (* = COLORS AND FINISHES AS SELECTED BY THE LANDSCAPE ARCHITECT) OR APPROVED EQUAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF AN 18"X18"X18" DEEP CONCRETE FOOTING WITH THE TOP OF THE FOOTING SET 3" BELOW THE FINISH GRADE. BUILDING LIGHTING PLAN 1 0 OMB ELECTRICAL ENGINEERS, INCSHEET DESCRIPTION.. 8825 Research Drive ENLARGED Irvine, CA 92618 (949) 753-1553 Fax (949) 753-1992 ELECTRICAL E—Mail: mail®ombengrs.com OMB PM: VB JOB NO: 11184 SITE PLAN CITY OF FONTANA L BY: PROJECT NAME oMg MARTIN TUDOR WATER PARK DED BY: ATE El i 1 MWK 8/18/2011 ' CHECKED BY: `,u A PROV DWG NO. I ON22 NORTH V HB / R 511 R.C.E 4923 37 • Sheet 7. of 9 L A N D S C A P E ARCH ITECTU RE 310 N. JOY STREET CORONA, CA 92879 T: 951.737.1 124 F: 951.737.6551 1ANDSq�F #E 2M,< -yam ck� SIGNATURE rn 9/30/13 EXP. DATEJr Q �-9TF OFCA L \���� CONSULTANT STAMP: PROJECT: MARTIN TUDOR AQUATIC CENTER RENOVATION PROJECT PREPARED FOR: C I T Y O F CITY OF FONTANA 16489 ORANGE WAY FONTANA, CA. 92335 CONTACT: DAN WEST PHONE: 909-350-6530 PROJECT TRACKING DATE 1. PROGRESS SET 8-1-11 2. DAB SET 8-18-11 3. FIRST PIAN CHECK 10-3-11 4. 4th PLAN CHECK 01-12-12 5. 6. 7. 8. DELTA REVISIONS DATE 1. 2. 3. 4. 5. 6. 7. 8. DATE PREPARED: 8-16-11 DRAWING SCALE: AS NOTED DRAWN BY: OMB DESIGNED BY- MWK CHECKED BY: VHB BMLA PROJECT NO: 1001 1210 Q � C= DIAL TWC-) WC'RI<II\1Is BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 811 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 491 _m ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ � ENLARGED ELE CTRICAL SITE PLAN A GENERAL NOTES 1. PROVIDE POTHOLING AS NECESSARY TO EXPOSE EXISTING UTILITIES FOR COORDINATING INSTALLATION OF NEW UNDERGROUND INFRASTRUCTURE. 2. REFER TO FEEDER SCHEDULE ON SHEET E0.02 FOR CONDUIT AND CONDUCTOR SIZES. SHEET NOTES PROVIDE 10" X 17" X DEPTH AS REQURIED PRECAST CONCRETE HANDHOLE WITH BOLT—DOWN TYPE TRAFFIC—RATED GALVANIZED STEEL COVER STAMPED/LABELED "ELECTRIC", JENSEN TYPE 81017 OR EQUAL. POLE MOUNTED LIGHT FIXTURES "ON—OFF" PUSH BUTTON MOUNTED IN LOCKABLE ENCLOSURE ON BUILDING WALL AT +48" A.F.F. TO TOP OF BOX, VERIFY EXACT LOCATION IN THE FIELD. REFER TO DETAIL 2 ON SHEET E0.03 FOR ADDITIONAL REQUIREMENTS. LIGHT FIXTURE SHALL BE MOUNTED ON UNDERSIDE OF SHELTER PURLINS. CONDUITS SHALL BE ROUTED EXPOSED ON THE UNDERSIDE OF SHELTER PURLINS AND TRUSS. PROVIDE AND INSTALL A 8" SQUARE CONCRETE BOLLARD WITH RECEPTACLE AS MANUFACTURED BY LITELINES, INC. #TCB800—SQ—CPT-24—AB—*—*—* (* = COLORS AND FINISHES AS SELECTED BY THE LANDSCAPE ARCHITECT) OR APPROVED EQUAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF AN 18"X18"X18" DEEP CONCRETE FOOTING WITH THE TOP OF THE FOOTING SET 3" BELOW THE FINISH GRADE. BUILDING LIGHTING PLAN 1 0 OMB ELECTRICAL ENGINEERS, INCSHEET DESCRIPTION.. 8825 Research Drive ENLARGED Irvine, CA 92618 (949) 753-1553 Fax (949) 753-1992 ELECTRICAL E—Mail: mail®ombengrs.com OMB PM: VB JOB NO: 11184 SITE PLAN CITY OF FONTANA L BY: PROJECT NAME oMg MARTIN TUDOR WATER PARK DED BY: ATE El i 1 MWK 8/18/2011 ' CHECKED BY: `,u A PROV DWG NO. I ON22 NORTH V HB / R 511 R.C.E 4923 37 • Sheet 7. of 9 L A N D S C A P E ARCH ITECTU RE 310 N. JOY STREET CORONA, CA 92879 T: 951.737.1 124 F: 951.737.6551 1ANDSq�F #E 2M,< -yam ck� SIGNATURE rn 9/30/13 EXP. DATEJr Q �-9TF OFCA L \���� CONSULTANT STAMP: PROJECT: MARTIN TUDOR AQUATIC CENTER RENOVATION PROJECT PREPARED FOR: C I T Y O F CITY OF FONTANA 16489 ORANGE WAY FONTANA, CA. 92335 CONTACT: DAN WEST PHONE: 909-350-6530 PROJECT TRACKING DATE 1. PROGRESS SET 8-1-11 2. DAB SET 8-18-11 3. FIRST PIAN CHECK 10-3-11 4. 4th PLAN CHECK 01-12-12 5. 6. 7. 8. DELTA REVISIONS DATE 1. 2. 3. 4. 5. 6. 7. 8. DATE PREPARED: 8-16-11 DRAWING SCALE: AS NOTED DRAWN BY: OMB DESIGNED BY- MWK CHECKED BY: VHB BMLA PROJECT NO: 1001 1210 Q � C= DIAL TWC-) WC'RI<II\1Is BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 811 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT