HomeMy WebLinkAbout4923-21N
O �
N �
O N
N `—
� O
N
O
O
0
o
0
00't
�00
i�
U 0
00 00
N N
E E
F_
ww
� a
> o
U a
U) U)
o v
J J
N
as
cu
ccu
W
Q
0
♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦
13
a v\
_oo \
•a
— X
X < \
Q)
o (E) SERVICE ENTRPNCE\
EQUIPMENT "SEE"
ANEL "SP"
A. I I I I I I \\ \
\
� r \ \ \ 1 I ► I I I I 1 \
\ \ \ I I I I I I I I I \ \ \
PARTIAL ELECTRICAL SITE PLAN
SCALE: 1 "=20'-0"
GENERAL NOTES
1. PROVIDE POTHOLING AS NECESSARY TO EXPOSE EXISTING UTILITIES
FOR COORDINATING INSTALLATION OF NEW UNDERGROUND
INFRASTRUCTURE.
2. REFER TO FEEDER SCHEDULE ON SHEET E0.02 FOR CONDUIT AND
CONDUCTOR SIZES.
SHEET NOTES
�j PROVIDE 2' X 3' X DEPTH AS REQURIED PRECAST CONCRETE
HANDHOLE WITH BOLT—DOWN TYPE TRAFFIC—RATED GALVANIZED
STEEL COVER STAMPED/LABELED "ELECTRIC", JENSEN TYPE 82436
OR EQUAL.
mia
L A N D S C A P E
ARCH ITECTU RE
310 N. JOY STREET
CORONA, CA 92879
T: 951.737.1124
F: 951.737.6551
E. k1j
W ��P 3� y
SIGNATURE rn
n
9/30/13
EXP. DATE
CA
CONSULTANT STAMP:
®p�QFESS���q
dr
PROJECT:
MARTIN TUDOR
AQUATIC CENTER
RENOVATION PROJECT
I.
PREPARED FOR:
C I T Y O F
CITY OF FONTANA
16489 ORANGE WAY
FONTANA, CA. 92335
CONTACT: DAN WEST
PHONE: 909-350-6530
PROJECT TRACKING DATE
1. PROGRESS SET 8-1-11
2. DAB SET 8-18-11
3, FIRST PLAN CHECK 10-3-11
4. 4th PLAN CHECK 01-12-12
5.
6.
7.
8.
DELTA REVISIONS DATE
1.
2.
3.
4.
5.
6.
7.
8.
DATE PREPARED: 8-16-11
DRAWING SCALE: AS NOTED
DRAWN BY: OMB
DESIGNED BY: MWK
CHECKED BY: VHB
BMLA PROJECT NO: 10011210
Q D
>v"
DIAL TWO WORKN'-
BEFORE DAYS BEFORE
YOU DIG YOU DIG
TOLL FREE 811
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
0' 20' 40' 60'
OMB ELECTRICAL BnNEEM, INC. SHEET DESCRIPTION,
8825 Research Drive PARTIAL NEW
Irvine, CA 92618
(949) 753-1553 Fax (949) 753-1992 ELECTRICAL
E—Mail: mail®ombengrs.com
OMB PM: VB
JOB NO: 11184 SITE PLAN
CITY OF FONTANA
DRAWN BY: PROJECT NAME
OMB
DESIGNED BY: MARTIN TUDOR WATER PARK DATE
MWK 8/18/2011
CHECKED BY: APPRO, D: DWG NO. 21
NORTH VHB 51152 R.C. 4923 37
• Sheet 6 Of 9