Loading...
HomeMy WebLinkAbout4923-21N O � N � O N N `— � O N O O 0 o 0 00't �00 i� U 0 00 00 N N E E F_ ww � a > o U a U) U) o v J J N as cu ccu W Q 0 ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ 13 a v\ _oo \ •a — X X < \ Q) o (E) SERVICE ENTRPNCE\ EQUIPMENT "SEE" ANEL "SP" A. I I I I I I \\ \ \ � r \ \ \ 1 I ► I I I I 1 \ \ \ \ I I I I I I I I I \ \ \ PARTIAL ELECTRICAL SITE PLAN SCALE: 1 "=20'-0" GENERAL NOTES 1. PROVIDE POTHOLING AS NECESSARY TO EXPOSE EXISTING UTILITIES FOR COORDINATING INSTALLATION OF NEW UNDERGROUND INFRASTRUCTURE. 2. REFER TO FEEDER SCHEDULE ON SHEET E0.02 FOR CONDUIT AND CONDUCTOR SIZES. SHEET NOTES �j PROVIDE 2' X 3' X DEPTH AS REQURIED PRECAST CONCRETE HANDHOLE WITH BOLT—DOWN TYPE TRAFFIC—RATED GALVANIZED STEEL COVER STAMPED/LABELED "ELECTRIC", JENSEN TYPE 82436 OR EQUAL. mia L A N D S C A P E ARCH ITECTU RE 310 N. JOY STREET CORONA, CA 92879 T: 951.737.1124 F: 951.737.6551 E. k1j W ��P 3� y SIGNATURE rn n 9/30/13 EXP. DATE CA CONSULTANT STAMP: ®p�QFESS���q dr PROJECT: MARTIN TUDOR AQUATIC CENTER RENOVATION PROJECT I. PREPARED FOR: C I T Y O F CITY OF FONTANA 16489 ORANGE WAY FONTANA, CA. 92335 CONTACT: DAN WEST PHONE: 909-350-6530 PROJECT TRACKING DATE 1. PROGRESS SET 8-1-11 2. DAB SET 8-18-11 3, FIRST PLAN CHECK 10-3-11 4. 4th PLAN CHECK 01-12-12 5. 6. 7. 8. DELTA REVISIONS DATE 1. 2. 3. 4. 5. 6. 7. 8. DATE PREPARED: 8-16-11 DRAWING SCALE: AS NOTED DRAWN BY: OMB DESIGNED BY: MWK CHECKED BY: VHB BMLA PROJECT NO: 10011210 Q D >v" DIAL TWO WORKN'- BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 811 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 0' 20' 40' 60' OMB ELECTRICAL BnNEEM, INC. SHEET DESCRIPTION, 8825 Research Drive PARTIAL NEW Irvine, CA 92618 (949) 753-1553 Fax (949) 753-1992 ELECTRICAL E—Mail: mail®ombengrs.com OMB PM: VB JOB NO: 11184 SITE PLAN CITY OF FONTANA DRAWN BY: PROJECT NAME OMB DESIGNED BY: MARTIN TUDOR WATER PARK DATE MWK 8/18/2011 CHECKED BY: APPRO, D: DWG NO. 21 NORTH VHB 51152 R.C. 4923 37 • Sheet 6 Of 9