HomeMy WebLinkAbout4923-20o Ln
N
O N
O
N
\ O
r�
o �
O
0)
3:: 0)
-D 3
o
o
't Lu
ao d-
00
v �
U o
/ U
00
°0
N nJ
I I
E
v v
a� a�
Lj
I I
ww
v aD
v, 0-
>1 >
> a
v
E a
(n ul
o v
J —1
N
C
0
Q
0
I
� DEMOLITION
ELECTRICAL SITE PLAN
•
GENERAL NOTES
1. THE CONTRACTOR SHALL FIELD VERIFY THE EXACT ROUTING OF THE
EXISTING UNDERGROUND CONDUIT SYSTEM AND INDICATE THE EXACT
ROUTING ON THE AS-BUILT/RECORD DRAWINGS.
SHEET NOTES
THE CONTRACTOR SHALL COMPLETELY DISCONNECT AND REMOVED
THE EXISTING POLE MOUNTED LIGHT FIXTURES, POLES, CONDUIT
SYSTEM AND CONDUCTORS.
THE CONTRACTOR SHALL COMPLETELY DISCONNECT AND REMOVED
THE EXISTING ELECTRICAL EQUIPMENT, CONDUIT SYSTEM AND
CONDUCTORS. HE SHALL CUT AND CAP THE EXISTING
UNDERGROUND CONDUIT SYSTEM AT THE LOCATION INDICATED.
DRAWN BY:
OMB
DESIGNED BY:
MWK
NORTHTH CHECKED BY: ` /u B
nq I a
L A N D S C A P E
ARCHITECTURE
310 N. JOY STREET
CORONA, CA 92879
T: 951.737.1 124
F: 951.737.6551
\.A Sq�F
2
SIGNATURE rn
9/30/13
EXP. DATE
ur
�9TF 0f CAV
CONSULTANT STAMP:
%OF E SS/pN�`
W
°C 0. 1 f
{
X30: .
sTq ECTR�GP� �P
TF
FC
PROJECT:
MARTIN TUDOR
AQUATIC CENTER
RENOVATION PROJECT
PREPARED FOR:
C I T Y O F
CITY OF FONTANA
16489 ORANGE WAY
FONTANA, CA. 92335
CONTACT: DAN WEST
PHONE: 909-350-6530
PROJECT TRACKING DATE
1. PROGRESS SET 8-1-11
2. DAB SET 8-18-11
3• FIRST PLAN CHECK 10-3-11
4. 4th PLAN CHECK 01-12-12
5.
6.
7.
8.
DELTA REVISIONS DATE
1.
2.
3.
4.
5.
6.
7.
8.
DATE PREPARED: 8-16-11
DRAWING SCALE: AS NOTED
DRAWN BY: OMB
DESIGNED BY: MWK
CHECKED BY: VHB
BMLA PROJECT NO: 1001 1210
Q �
: o
NUWwrlv� , , M !�
DIAL T 10WORKIt G
BEFORE DAYS BEFORE
YOU DIG YOU DIG
TOLL FREE 3 811
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
v"A
0' 20' 40' 60'
OMB ELECTRICAL ENGINEERS, INC. SHEET DESCRIPTION:
8825 Research Drive PARTIAL DEMO.
Irvine, CA 92618
(949) 753-1553 Fax (949) 753-1992 ELECTRICAL
E—Mail: mail®ombengrs.com
OMB PM: VB
JOB NO: 11184 SITE PLAN
CITY OF FONTANA
PROJECT NAME
MARTIN TUDOR WATER PARK DATE: .
8/18/2011
PPROE K:7
DWG NO. 20
4923 37
• Sheet 5 of 9