Loading...
HomeMy WebLinkAbout4923-19N d- . t� O u7 0 N C) N O O O O \ 0 0) O d - O O w O d- w 00 d- 00 r� t� o� U 0 00 00 r � N N I I E E o 0 0 N Li 4- o � a, a 0 0 � a 0 0 o N 05 T_ L N C CII 6i Q I� CERTIFICATE OF COMPLIANCE Part 1 of 4 0LTG-1 C Project Name Date Martin Tuder Aquatic Center Renovation Project 11/9/2011 Project Address Total Illuminated Area 11660 Sierra Avenue Fontana, CA 92336 1,115 GENERAL INFORMATION Phase of Construction: 0 New Construction ❑ Addition ❑ Alteration Documentation Author's Declaration Statement 873 certify that this Certificate of Compliance documentation is accurate and complete. S atu i n re 9 "_ /.001, /7(10e NameRoYLopez Lo Company OF Date OMB Electrical Engineers, Inc. IV 111 / 0 �4 Address CEA # 8825 Research Drive CEPE # City/State/Zip Phone Irvine, CA 92618 949-753-1553 Principal Lighting Designer's Declaration Statement • 1 am eligible under Division 3 ofthe California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building plication. !�! Name Signature Roy Lopez Ener Pro 5.1 by Ener Soft User Number: 6861 RunCode: 2011-11-09T10:30:42 ID: Company Phone OMB Electrical Engineers, Inc. 9494541553 Address 8825 Research Dr. License # E13442 City/State2ip Irvine, CA 92618 Date 11/09/11 Principal Lighting Designer's Declaration © I certify that this Certificate of Compliance documentation is accurate and complete, and accounts for all outdoor lighting power, including building mounted, pole mounted, as well as all other lighting designed for the site, and that Additional Lighting Power Allowances for Specific Applications or Additional Lighting Power Allowances for Ordinance Requirements have not been counted more than one time for the same area, in accordance with Section 147 of the Standards. Outdoor Lighting Mandatory Measures Indicate location on building plans of Mandatory Measures Note Block: LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheets is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published by the California Energy Commission. Q OLTG-1 C Certificate of Compliance. All 4 pages required on plans for all submittals. OLTG-2C (Pages 1 of 3) Lighting Wattage Allowances for General Hardscape, Sales Frontage, or Ornamental Lighting. Optional on tans. ❑ . OLTG-2C (Pages 2 of 3) Lighting Wattage Allowance for Per Application or Per Area. Optional on plans. ❑ OLTG-2C (Pages 3 of 3) Additional Lighting Power Allowance for Ordinance Requirements. Optional on plans. A B EnergyPro 5.1 by Ener Soft User Number: 6861 RunCode: 2011-11-09T10:30:42 ID: Pae 1 of 5 CERTIFICATE OF COMPLIANCE Part 4 of 4 0LTG-1 C Project Name Martin Tuder Aquatic Center Renovation Project Date 11/9/2011 ALLOWED AND INSTALLED OUTDOOR LIGHTING POWER Luminaire Schedule Installed Watts Lighting Wattage Power Allowance A Lighting power allowance for general hardscape (from OLTG-2C Page 1 of 3) 873 B Specific application lighting wattage allowance per unit length (from OLTG-2C Page 1 of 3) 0 C Specific application lighting wattage allowance for ornamental lighting (from OLTG-2C Page 1 of 3) 0 D Specific application lighting wattage allowance per application (from OLTG-2C Page 2 of 3) 0 E Specific application lighting wattage allowance per area (from OLTG-2C Page 2 of 3) 0 F Specific application lighting wattage allowance for ordinance requirements (from OLTG-2C Page 3 of 3) 0 G Total Allowed Wattage = Sum of rows A through F: 873 H Total installed watts (from Compliance Fixture Schedule, (from OLTG-2C Page 1 of 3) 488 Complies if wattage in row H is less than or equal to the wattages in row G 0 Yes ❑ No certifies plans, specifications, installation certificates, and operating anmaintenanceinformation meet the requirements of 4 Ener Pro 5.1 by Ener Soft User Number: 6861 RunCode: 2011-11-09T10:30:42 ID: Page 4 of 5 CERTIFICATE OF COMPLIANCE Part 2 of 4 OLTG-1 C Project Name Martin Tuder Aquatic Center Renovation Project Date 11/9/2011 COMPLIANCE FIXTURE / LIGHTING CONTROL SCHEDULE and FIELD INSPECTION CHECKLIST INSTALLATION CERTIFICATE, OLTG-1 INST (Retain a copy and verify form is completed and signed.) Flt+ ld sped On CI CERTIFICATE OF ACCEPTANCE OLT -2A in n verify r i m G (Retain a co a d ve f form s completed and signed.) Luminaire Schedule Installed Watts A B C D E F G H I N ame or Item Ta i Lum Haire Description' p See footnote below i.e.: 1 lam ole -to shoe -box 400 watt metal halide)U C o — c P a> L m - ca c — > —' N ca m — cu a How wattage was determined �� o m L ._ a� �n c z cv a� — Field:;:::;>< .:....:.:::... I is recto»< 0 L — co a� ¢ z o .. rn c — "0 W �. W L v p ¢ �m� a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference .................; D 100w Metal Halide M I Ma H b Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting 1 22 .0 The OLTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating anmaintenanceinformation meet the requirements of 4 488 ' `''', ><�" > Luminaires Controlled OLTG-2A' El ❑ ❑ Like Outdoor Lighting Equipment Re uirin Testing ......''' - Acceptance Tests Enter total into OLTG-1 C• Page 4 of 4• Row A• Lighting Power Allowance for General Hardscape ❑ ❑ ❑ DETERMINE WATTAGE ALLOWANCE ❑''❑ A B C D E ❑ ❑ ❑ J Linear Specific Lighting Foot of Application Fronto a `Q>' Astronomical Time Switch; and, STS for Standard non -astronomical Time Switch acceptance. Ener Pro 5.1 by Ener Soft User Number: 6861 RunCode: 2011-11-09T10:30:42 ID: Page 3 of 5 Lumin Luminaire Type QTY Watts Per Luminaire Design Watts G X H ❑ ❑ ❑ i'' ....._........ ❑ ❑ ❑ 0 . ................._._ '> > ❑ ❑ ❑ ❑ ❑ ❑ LIGHTING DETERMINE WATTAGE ALLOWANCE i DESIGN WATTS A B C D E F G H I ...... ............. ....... Enter total into OLTG-1 C; Page 4 of 4: Row H; Total Installed Watts: 48s 1. Type of luminaire (i.e.: post top, wall pack, surface, shoe box); for non -incandescent luminaires, indicate nominal lamp wattage and lamp type ( i.e.: fluorescent, incandescent, HID); ballast type (i.e.: electronic or magnetic); number of lamps and number of ballasts per luminaire. For incandescent luminaires, the luminaire wattage listed in column D shall be the maximum relamping rated wattage on a permanent factory -installed label on the luminaire, NOT the wattage of the lamp (bulb) used, in accordance with Section 130(d or e). 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EXEMPT LUMINAIRES F ft>= I <;;::<.:;:w f :."M Ce w... .::. Name'or Symbol Description of exempt luminaires in accordance with §147 Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I MANDATORY CONTROLS f{ :<x<=v„„,<<<,v;; # Description Location # Description Location SPECIAL FEATURES INSPECTION CHECKLIST (See Page 2 of 4 of OLTG-1 C) The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Filed Inspector Notes or Discrepancies: Ener Pro 5.1 by Ener Soft User Number. 6861 RunCode: 2011-11-09T70:30:42 /D: Page 2 of 5 CERTIFICATE OF COMPLIANCE Part 3 of 4 OLTG-1 C Project Name Date Martin Tuder Aquatic Center Renovation Project 11/9/2011 A. OUTDOOR LIGHTING ZONE OUTDOOR LIGHTING ZONE: ❑ OLZ 1 ❑ OLZ 2 63 OLZ 3 ❑ OLZ 4 Is the Outdoor Lighting Zone: 0 Default in accordance with §10-114, or ❑ Amended by JHA Complete the information below if the default Outdoor Lighting Zone has been amended by the local jurisdiction having authority (JHA): ❑ The government Th it i a vernm nt desi Hated ark recreational area wildlife reserve or onion thereof, and has been designated as 9 9 p P p 9 LZ2 or L 3 in accordance with Table 10-1 14- A, because the site is contained within such azone13 The local jurisdiction having authority has officially adopted a change to the State Default Lighting Zone and has notified the Energy Commission by providing the materials required in §10-114(d) to the Executive Director. ❑ The adopted change is posted on the Energy Commission website. B. ADDITIONAL LIGHTING POWER ALLOWANCE FOR ORDINANCE REQUIREMENTS Are additional lighting ower allowances for ordinance in Table 147-C used? ❑ Yes 0 No Complete the information below if additional lighting power allowances for ordinance requirements are used: ❑ The local jurisdiction having authority has officially adopted specific outdoor light levels, which are expressed as average or minimum footcandle levels, by following a public process that allowed for formal public notification, review, and comment about the proposed change. ❑ The local jurisdiction having authority which adopted specific outdoor light levels and has notified the Commission by providing the following materials required §10-114(f) to the Executive Director. C. ACCEPTANCE FORMS Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, OLTG-2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The OLTG-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating anmaintenanceinformation meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the OLTG-2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Certificate of Acceptance Luminaires Controlled OLTG-2A' Qty. of Like Outdoor Lighting Equipment Re uirin Testing Description Controls Location Acceptance Tests Enter total into OLTG-1 C• Page 4 of 4• Row A• Lighting Power Allowance for General Hardscape 873 10 Yes AWA, LWA, and IWA from Table 147-A was used as appropriate for the Outdoor Lighting Zone B. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER UNIT LENGTH Available only for sales fronts e DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A B C D E F G H I J Linear Specific Lighting Foot of Application Fronto a 1. Insert: OMS for Outdoor Motion Sensor; OLSC for Outdoor Lighting Shutoff Controls; OP for Outdoor Photocontrol; ATS for Astronomical Time Switch; and, STS for Standard non -astronomical Time Switch acceptance. Ener Pro 5.1 by Ener Soft User Number: 6861 RunCode: 2011-11-09T10:30:42 ID: Page 3 of 5 OUTDOOR LIGHTING WORKSHEET Part 1 of 3 OLTG-2C Project Name Martin Tuder Aquatic Center Renovation Project Date 11/9/2011 A. LIGHTING POWER ALLOWANCE FOR GENERAL HARDSCAPE AREA WATTAGE ALLOWANCE AWA LINEAR WATTAGE ALLOWANCE LWA INITIAL WATTAGE ALLOWANCE TOTAL GENERAL HARDSCAPE LIGHTING ALLOWANCE A B C D E F G H Illuminated Hardscape Area AWA Per Square Foot AWA A X B Perimeter Length of General Hardscape LWA Per Linear Foot LWA D X E IWA Watts C+ F+ G 1,115 0.092 103 0 0.920 0 770 873 Enter total into OLTG-1 C• Page 4 of 4• Row A• Lighting Power Allowance for General Hardscape 873 10 Yes AWA, LWA, and IWA from Table 147-A was used as appropriate for the Outdoor Lighting Zone B. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER UNIT LENGTH Available only for sales fronts e DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A B C D E F G H I J Linear Specific Lighting Foot of Application Fronto a Sales Frontage Allowance for OLZ Watts per LF Wattage Allowance B X C Name or Symbol Lumin Luminaire Type QTY Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I Enter total into OLTG-1C• Page 4 of 4• Row B• Specific Application Lighting Wattage Allowance Per Unit Length 0 C. SPECIFIC APPLICATION WATTAGE ALLOWANCE FOR ORNAMENTAL LIGHTING DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A B C D E F G H I J Square Specific Lighting feet of Application Harsco a Ornamental Lighting Allowance for OLZ Matts per ft) Wattage Allowance B X C Name or Symbol Luminaire Type Lumin QTY Watts Per Luminaire Design Watts G X H Allowed Watts Minimum of D or I Enter total into OLTG-1 C; Page 4 of 4; Row C; Specific Application Wattage for Ornamental Lighting 0 Ener Pro 5.1 by Ener Soft User Number: 6861 RunCode: 2011-11-09T10:30:42 ID: Pa e 5 of 5 . . . . . . . . . . . . . . . m [a L A N D S C A P E ARCHITECTURE 310 N. JOY STREET CORONA, CA 92879 T: 951.737.1 124 F: 951.737.6551 MARTIN TUDOR AQUATIC CENTER ENOVATION PROJECT C I T Y O F CITY OF FONTANA 16489 ORANGE WAY FONTANA, CA. 92335 :ONTACT: DAN WEST ROJECT TRACKING DATE 1. PROGRESS SET 8-1-11 2. DAB SET 8-18-11 3. FIRST PLAN CHECK 10-3-11 4. 4th PLAN CHECK 01-12-12 )ELTA REVISIONS DATE 1. //� I L 1 I\LI /-%I\LV. )RAWING SCALE: AS NOTED )RAWN BY: OMB )ESIGNED BY: MWK __NECKED BY: VHB MLA PROJECT NO: 1001 1210 Ll_WIAL w��i aTWO WORKING 'EFORE DAYS BEFORE YOU DIG 7OU DIG TOLLFREE TITLE 24 Sheet 4 of 9