Loading...
HomeMy WebLinkAbout2947-1X x UJ a 0 CITY O IF' FONTANA GENERAL NOTES 1. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO THE REQUIREMENTS OF THE CITY STANDARD SPECIFICATIONS, COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEP/jRTMENTS, CITY OF FONTANA. REFER TO DEFINITIONS AND TERMS IN CITY STANDARD SPECIFICATIONS, DATED 1975, AND ANY REVISION THEREAFTER. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENTS PRIOR TO START OF ANY WORK WITHIN THE CITY LIMITS. 3. STATIONING REFERS TO THE CENTERLINES OF STREET EXCEPT WHERE OTHERWISE NOTED. 4. CURB DATA REFERS TO THE FACE OF THE CURB. 5. ALL EXPOSED CONCRETE SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL ADJOINING CURBS AND SIDEWALKS. 6. ACTUAL THICKNESS OF A. C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTION SHALL BE RECOMMENDED BY A GEOTECHNICAL ENGINEERING REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION PROJECT PLANS FOR PHASE I CONSTRUCTION ON STATE HIGHWAY ROUTE 66 ( �OOTHI�� 3 VD 41 LANDSCAPING 0� SROM EAST AV \ U E CALTRANS GENERAL NOTES CITY 7. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT a) AN ENCROACHMENT PERMIT IS REQUIRED BEFORE ANY WORK MAY IRRIGATION PLAN TO REVISION AND APPROVAL OF THE CITY AS REQUIRED BY SOILS TEST LANDSCAPE BEGIN IN OR NEAR THE STATE RIGHT OF WAY. x TAKEN AFTER COMPLETION OF ROUGH GRADING. b) ALL WORK WITHIN THE STATE RIGHT OF WAY SHALL CONFORM TO CITY LC -3 Q THE LATEST STATE STANDARD PLANS & SPECIFICATIONS OR AS 8. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALES 15 OF DIRECTED BY THE STATE'S REPRESENTATIVE (STANDARDS OTHER & VINES) FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE w THAN STATE MUST BE PRE -APPROVED AND JUSTIFIED). FONTAN SITE, THE CITY ENGINEER MAY REQUIRED TEMPORARY GUNITE SWALES, w NO EQUIPMENT OR MATERIALS MAY BE STORED ON THE STATE RIGHT S. PACIFIC RAILROAD ENTERING OR LEAVING IMPROVEMENTS c) LP- w M LD -1 LANDSCAPE OF WAY. 9. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF d) ALL DISTURBED AREAS IN THE STATE RIGHT OF WAY MUST BE MI THE STREETS. TREATED FOR EROSION CONTROL (HYDROSEEDING OR EQUIVALENT, Q OR AS DIRECTED BY THE STATE'S REPRESENTATIVE). THE 10. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE } RESPONSIBILITY FOR MAINTAINING EROSION CONTROL WILL NOT BE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. OF RELEASED UNTIL THE SEEDING IS WELL ESTABLISHED. THE w REGIONAL CONTRACTOR WILL BE RESPONSIBLE FOR THE COST OF CALTRANS 11. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND ALL TELEPHONE PROJECT CLEANING ANY DRAINAGE STRUCTURE/CHANNELS WHICH HAVE PARK CU OR POWER POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION FOOTHILL BLVD. BECOME CLUTTERED WITH DEBRIS AND/OR SILT AS A RESULT OF, SITE STRUCTURES, ETC., SHOWN OR NOT SHOWN ON THIS PLAN AND LOCATED OR CAUSED BY, THE CONSTRUCTION PROJECT. WITHIN AREAS TO BE IMPROVED AND INTERFERING WITH CONSTRUCTION, COUNTY OF SAN BERNARDINO SHALL BE RELOCATED BY OTHERS. IT SHALL BE THE CONTRACTOR'S e ) THE STRUCTURAL SECTION SHOWN WITHIN THE STATE RIGHT OF WAY RESPONSIBILITY TO NOTIFY ALL OF THE AGENCIES CONCERNED BEFORE IS FOR ESTIMATING PURPOSES ONLY. THE ACTUAL SECTION WILL CONSTRUCTION BEGINS. BE DESIGNED BY A SOIL ENGINEER AFTER NATIVE SOIL TESTING HAS BEEN COMPLETED. A TRAFFIC INDEX (TI) OF 11 SHALL BE 12. ALL MANHOLE AND CLEANOUT FRAMES AND COVERS SHALL BE USED IN THE DESIGN OF THE TRAVELLED WAY, AND A TI OF 7 CONSTRUCTED 150mm BELOW FINISHED GRADE BY SEWER CONTRACTOR AND SHALL BE USED FOR THE SHOULDER DESIGN. THE LABORATORY SHALL BE RAISED TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION REPORTS AND THE DESIGN CALCULATIONS SHALL BE SUBMITTED TO OF PAVING. THE STATE'S REPRESENTATIVE FOR APPROVAL PRIOR TO CONSTRUCTION OF THE STRUCTURAL SECTION. 13. ALL VALVE FRAMES AND COVERS SHALL BE CONSTRUCTED 150mm BELOW f). ALL STATE DRAINAGE STRUCTURES MUST FIRST BE COMPLETELY FINISHED GRADE BY WATER CONTRACTOR AND SHALL BE RAISED TO GRADE CLEANED OF DEBRIS AND/OR SILT BY THE CONTRACTOR PRIOR TO BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING. MAKING THE CONNECTION. 14. REFER TO CITY -OF FONTANA, UNDERGROUND UTILITY LOCATION STANDARD 9) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ANY DETAIL 129. STATE DRAINAGE FACILITY WHICH IS CONNECTED TO OR DIRECTLY AFFECTED BY THE CONTRACTORS OPERATION SHALL BE CLEAN AND 15. THE CONTRACTOR(S) SHALL COORDINATE CONSTRUC110N WITH ALL OPERATIONAL PRIOR TO FINAL ACCEPTANCE OF THE PERMIT WORK UTILITIES AND OTHER IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO BY THE STATE. ADEQUATE CLEAN -OUTS AND ACCESS OPENINGS GAS, TELEPHONE, ELECTRICAL, LIGHTING, TELEVISION CABLE, SHALL BE PROVIDED IN ANY CONTRUCTION WITHIN THE STATE'S LANDSCAPING, LANDSCAPING IRRIGATION, DOMESTIC WATER, RECLAIMED RIGHT OF WAY FOR FUTURE MAINTENANCE AND REPAIR WORK AS WATER, SEWER, STORM DRAINAGE, FLOOD CONTROL SYSTEMS, ETC. NEEDED. THIS WORK SHALL BE FURNISHED AT NO COST TO THE STATE. 16. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE h) WHERE SURVEY MONUMENTS EXIST, SUCH MONUMENTS SHALL BE CITY OF FONTANA. PROTECTED OR SHALL BE REFERENCED AND RESET PURSUANT TO BUSINESS AND PROFESSIONS CODE. SECTIONS 8700 TO 8500 (LAND 17. TYPE, LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS WILL BE SURVEYOR'S ACT). DETERMINED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM WITH THE CITY OF FONTANA STANDARD DETAILS. i) THE PAVEMENT MUST BE SAW -CUT .6m MINIMUM FROM THE EDGE OF PAVEMENT. THE SAW -CUTS MUST BE PERPENDICULAR OR PARALLEL 18. CONTRACTOR IS INSTRUCTED TO REFER TO THESE PLANS AND THE TO THE STATE HIGHWAY CENTERLINE. SPECIFICATIONS, AND WHERE THERE IS OR MAY BE A CONFLICT SHALL j) ALL SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL BE IN IMMEDIATELY REPORT SAID CONFLICT OR POSSIBLE CONFLICT TO THE CONFORMANCE WITH THE CURRENT EDITION OF THE TRAFFIC OWNER'S REPRESENTATIVE. MANUAL, PUBLISHED BY THE STATE OF CALIFORNIA, DEPARTMENT 19. STERILANT REQUIRED UNDER ALL A.C. PAVEMENT. OF TRANSPORTATION, AND THE SPECIAL PROVISIONS. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC UNLESS OTHERWISE 20. NO CONCRETE SHALL BE PLACED UNTIL FORMS AND REINFORCING STEEL NOTED. HAVE BEEN PLACED, INSPECTED AND APPROVED. k) THE EXACT LOCATION OF ALL SIGNS SHALL BE DETERMINED IN THE FIELD BY THE STATE'S REPRESENTATIVE. 21. ALL UTILITY COMPANIES SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO WORKING AROUND THEIR FACILITIES. 1) ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS SHALL BE REMOVED FROM THE PAVEMENT BY 22. ALL BACKFJI--L COMPACTION TO BE CERTIFIED BY SOILS ENGINEER. SANDBLASTING BY THE CONTRACTOR. 23. ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF m) ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED OR RELOCATED THE CITY ENGINEER. BY THE CONTRACTOR. RELOCATABLE SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS DETERMINED IN THE FIELD BY 24. BACKFILL MATERIALS SHALL BE VERIFIED BY SOILS ENGINEER AND THE STATE'S REPRESENTATIVE. APPROVED BY PUBLIC WORKS INSPECTOR PRIOR TO THE PLACING n) ALL SIGNS, ROADSIDE MARKERS, ELECTROLIERS, ETC., SHALL BE OF ANY PERMANENT PAVEMENT. PROTECTED AND/OR REPLACED IN KIND ACCORDING TO THE CURRENT STATE STANDARD PLANS AND THE CURRENT TRAFFIC MANUAL, AT NO 25. CONTRACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED BY THE CITY ENGINEER. o) WORK SHALL NOT COMMENCE UNTIL THE STORM DRAIN, SEWER AND WATER PROJECTS HAVE BEEN COMPLETED. 26. CONTRACTOR SHALL NOT OPERATE ANY MAIN LINE WATER VALVE. COST TO THE STATE. LG -1 LG -2 LC -1 LC -2 LI -1 LI -2 LP -1 LP -2 EAST AVENUE LP -4 MULBERRY LP -5 BANANA AVENUE AVENUE w z 'L OOTH��L�`�R-66 --- - o� \IORTHER\I SIDE TO CHERRY AVENUE MONTANA PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY: THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE AGENCY AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILTY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE AGENCY OR THE ENGINEER. UNDERGROUND UTILITIES & STRUCTURES THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN IN THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND IS RESPONSIBLE FOR THE PROTECTION OF, AND ANY DAMAGE TO THESE LINES OR STRUCTURES. "CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS." �P �P > G�. GP5 0 M Q Pte. G ARROW HIGHWAY VICINITY MAP N. T. S. BENCH[ MARK: CHISELED 'Y' N.E_ CORNER OF ABUTMENT AT FOOTHILL BLVD. AND EAST AVE. #67-5 ELEV. 364.395m (1195.52ft) LG -3 LC -3 LI -3 LP -3 CHERRY LP -6 AVENUE INDEX 01F' SHEETS SHEET No. L-0 LG -1 IRRIGATION PLAN LG -2 LANDSCAPE LG -3 x w z > CITY LC -3 Q 0 � Q 15 OF LI -3 & VINES) LP -1 w Q FONTAN LP -3 w Q o S. PACIFIC RAILROAD w BUS SHELTER PLANS & ELEVATIONS LP- w M LD -1 LANDSCAPE BASE LINE AV LD -3 LANDSCAPE BASE LINE AVE. MI LER AVE. LD -6 Q I TY } FUTURE OF w REGIONAL ANCHO ROUTE 66 v PROJECT PARK CU AMON FOOTHILL BLVD. SITE COUNTY OF SAN BERNARDINO ARROW HIGHWAY VICINITY MAP N. T. S. BENCH[ MARK: CHISELED 'Y' N.E_ CORNER OF ABUTMENT AT FOOTHILL BLVD. AND EAST AVE. #67-5 ELEV. 364.395m (1195.52ft) LG -3 LC -3 LI -3 LP -3 CHERRY LP -6 AVENUE INDEX 01F' SHEETS SHEET No. L-0 LG -1 IRRIGATION PLAN LG -2 LANDSCAPE LG -3 x LC -1 PLANTING PLAN (TREES & LC -2 LANDSCAPE LC -3 GROUND COVERS) LI -1 PLANTING PLAN (TREES & LI -2 LANDSCAPE LI -3 & VINES) LP -1 PLANTING PLAN (SHRUBS LP -2 LANDSCAPE LP -3 & VINES) LP -4 CONSTRUCTION DETAILS LP -5 BUS SHELTER PLANS & ELEVATIONS LP- 6 LD -1 LANDSCAPE LD -2 LANDSCAPE LD -3 LANDSCAPE LD -4 LD -5 LD -6 DIST COUNTY ROUTE KILOMETER POST SHEET TOTAL TOTAL PROJECT No SHEETS 08 SBd 66 1'7.49/19.84 L-0 '22 1 DEL NORTE SISKIYOU I MODOC TRINITY SHASTA LASSEN HU BOLDT TEHAMA PLUMAS GLENN BUVE S ERRA ME DOCINO COLUSA LAKE NG LACER 'A EL DORADO YOLO S NO MA NAPLPI N LAN �JF� MA IN CO P TUOLUMNE MJ0NO COSTA PC�J SAN FRANCISCO A O CJS MARIPOS SAN MAT 0 SANTA P�\� CLARA MERCED SANTA RU S BENIT FRESNO TULARE MONTEREY KINGS SAN LUIS KERN OBISPO SANTA BARBARA LOS ANGELES VENTURA DESCRIPTION LOCATION M Fpm TITLE SHEET ' i� LANDSCAPE GRADING PLAN LANDSCAPE GRADING PLAN LANDSCAPE GRADING PLAN LANDSCAPE CONSTRUCTION PLAN Iwo I' GE PROJECT SITE SAN BERNARDINO RIVERSIDE SAN DIEGO IMPERIAL LANDSCAPE CONSTRUCTION PLAN The State of California or its officers or agents shall not be responsible for the accuracy LANDSCAPE CONSTRUCTION PLAN or completeness of electronic copies of this plan sheet. LANDSCAPE IRRIGATION PLAN LANDSCAPE IRRIGATION PLAN Q LANDSCAPE IRRIGATION PLAN x LANDSCAPE PLANTING PLAN (TREES & GROUND COVERS) LANDSCAPE PLANTING PLAN (TREES & GROUND COVERS) LANDSCAPE PLANTING PLAN (TREES & GROUND COVERS) LANDSCAPE PLANTING PLAN (SHRUBS & VINES) LANDSCAPE PLANTING PLAN (SHRUBS & VINES) LANDSCAPE PLANTING PLAN (SHRUBS & VINES) GRADING & CONSTRUCTION DETAILS BUS SHELTER PLANS & ELEVATIONS BUS SHELTER DETAILS LANDSCAPE IRRIGATION LEGEND & DETAILS LANDSCAPE PLANTING LEGEND & DETAILS LANDSCAPE DETAILS FOR MANHOLE ACCESS BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED ON FOOTHILL BOULEVARD (ROUTE 66) AS SHOWN N ON THE RECORD OF SURVEY BEING NORTH 89' 48' 09" WEST AND BEING THE SOUTH SIDE OF SECTION 2, TOWNSHIP 1 SOUTH, RANGE 6 WEST, IN THE COUNTY OF SAN BERNADINO, STATE OF CALIFORNIA. w ------------_- �- - --- - - - - -_= _- -- -r� -- I I I '- I I� ISI- —>- , ; �I i - 0p 1 I 1 I �r �I �I I I I I I I I I I X COTT N WOOD CAL/ BASH AL OND 1AV UE AVENUE AVENUE AVENUE I FC-)FNn z The Contractor shall possess the Class (or Classes) of license w w as specified in the "Notice to Contractors". 0 FORM DC -OE -93 -PF (REV. 3/88) INDEX MAP 1: 60m FOR REDUCED PLANS ORIGINAL g(`01 P' IC INI KAII I IAAP7P Pq SHEET NUMBERS 0 20 40 60 80 1 I I I I I I I 100% PLANS USERNAME => USER nrN FII F --> IRFC)IJFST 12EGORD DRAW_�r1C�5_ /JJtt� 4 3%3 etric �ANDSLd Cn Cgp y 0 o MICHAEL T. HARADA o m m Project Director Date No. 3848 -+ N 1-11 Registered Landscape Ar hitect Exp. 11-30-02 s 0100 Ld OF o4 P an Ap p ro a l Date.� 0o m �i W w 3i�a ya CD CD CDlipC xP• to Z C -9�� OQ►�`P o �jc Contract No. c C Cu EA 317901����'� w Q x af w w Z z The Contractor shall possess the Class (or Classes) of license w w as specified in the "Notice to Contractors". 0 FORM DC -OE -93 -PF (REV. 3/88) INDEX MAP 1: 60m FOR REDUCED PLANS ORIGINAL g(`01 P' IC INI KAII I IAAP7P Pq SHEET NUMBERS 0 20 40 60 80 1 I I I I I I I 100% PLANS USERNAME => USER nrN FII F --> IRFC)IJFST 12EGORD DRAW_�r1C�5_ /JJtt� 4 3%3 etric �ANDSLd Cn Cgp y 0 o MICHAEL T. HARADA o m m Project Director Date No. 3848 -+ N 1-11 Registered Landscape Ar hitect Exp. 11-30-02 s 0100 Ld OF o4 P an Ap p ro a l Date.� 0o m �i W w 3i�a ya CD CD CDlipC xP• to Z C -9�� OQ►�`P o �jc Contract No. c C Cu EA 317901����'�