Loading...
HomeMy WebLinkAboutSewer Installation (3) Citcy of Fontana LIFORNIA january i~, ~965 File: Tract 4181 Property Owners~ Subject: Petitions for the Installation of Sewer Mains and Laterals in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition, 60% of the property owners on both sides of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficient number of signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate of the cost per property owner would be as follows= If all the streets have successful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to only property within the corporate limits of the City of Fontana. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director Bob M. Porter Deputy Public Works Director RS:BMP:sm 8353SIERRA AVENUE(p.O. BOX518),FONTANA,CALIFORNIA92335' ~14}~Si~'=f'eee ~. ~:-. 350-7610 City of Fontana CALIFORNIA January 17, 1985 File: Tract 4181 Property Owners: Subject: Petitions for the Installation of Sewer Mains and Laterals in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition, 60% of the property owners on both sides of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficient number of signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate of the cost per property owner would be as follows: If all the streets have successful petitions, $1,000 to $1,500 per It should be noted that all the above information is applicable to. only property within the corporate limits of the City of Fontana. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director Bob M. Porter Deputy Public Works Director RS:BMP:sm 8353 SIERRA AVENUE ( P.O. BOX 518) · FONTANA,CALIFORNIA 92335 · (7t4)~5"(~-7'6'00 350-7610 City of Fontana CALIFORNIA January 17, 1985 File= Tract 4181 Property Owners= Subject= Petitions for the Installation of Sewer Mains and Laterals in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition, 60% of the property owners on both si~s of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficient number of signatures, the constructiou costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate of the cost per property owner would be as follows= If all the streets have successful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to only property within the corporate limits of the City of Fontaria. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director Bob M. Porter Deputy Public Works Director RS=BMP:sm 835381ERRA AVENUE(P.O, BOX518),FONTANA,CAL~FORNIA92335'(714)~SG'~ff~ 350-76Z0 City of Fontana CALIFORNIA ~_:,u,~ ,'~- 2; ~ 2985 File: Tract 4181 Property Owners: Subject: Petitions for the Installation of Sewer Mains and Laterals in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition~ 604 of the property owners on both sides of the street in which the sewer is to be installed mast sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how lonE the petitions are out being circulated. If it takes a long time to get a sufficient number of signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate of the cost per property owner would be asfollows: If all the streets have successful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to. only property within the corporate limits of the City of Fontana. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director By~ Bob M. Porter Deputy Public Works Director RS:BMP:sm 8353SIERRA AVENUE(p.O. BOX518)*FONTANA,CALIFORNIA92335'(714)~-~9'-'Tege ,,' 350-7610 City of Fontana CALIFORNIA January 17, 1985 File: Tract 4181 Property Owners: Subject: Petitions for the Installation of Sewer Mains and Laterals in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition, 60% of the property owners on both sides of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner~s costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficient number of Signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate of the cost per property owner would be as follows; If all the streets have successful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to only property within the corporate limits of the City of Fontaria. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director By, Bob M. Porter Deputy Public Works Director RS:BHP:sm 8353SIERRA AVENUE(p.O. BOX518) eFONTANA,CALIFORNIAO2335'(714)35~'T6130' ,,, 350-7610 Ci of Fontana LIFORNIA File: Tract 4181 Property Owners: Subject: Petitions for the Installation of Sewer Mains and Laterals in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition~ 60% of the property owners on both sides of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are liEured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficieat number of signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate of the cost per property owner wonld be as follows: If all the streets have snccessful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to. only property within the corporate limits of the City of Fontana. If there are any questions~ please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:sm 8353SIERRA AVENUE(p.O. BOX SIB)-FONTANA,CALIFORNIA92~S'(714)350-7600 / , City of Fontana CALIFOItNIA File: Tract 4181 Property Owners: Subject: Petitions for the Installation of Sewer Mains and Laterals in MontEomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition, 60% of the property owners on both sides of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficient number of signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind~ a rough estimate of the cost per property owner would be as follows: If all the streets have successful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to only property within the corporate limits of the City of Fontana. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director Bob M. Porter Deputy Public Works Director RS:BMP:sm 8353 SIERRA AVENUE ( P.O. BOX 518) · FONTANA,CALIFORN|A 92335 · (714) 350-7600 City' of Fontana CALIFORNIA January 17, 1985 File: Tract 4181 Property Owners: Subject: Petitions for the Installation of Sewer Mains and LateraIs in Montgomery Avenue within Tract 4181. Sanitary sewer facilities can be constructed under the provisions of Chapter 27 of the Streets and Highway Code in front of the property described above. In order to have a successful petition, 60% of the property owners on both sides of the street in which the sewer is to be installed must sign the petition. Under the provisions of a Chapter 27 improvement project, the property owners pay for their improvements'according to their street frontage. For corner lots the costs are figured using the shortest frontage with the exception of a corner lot that fronts an existing sewer main and is not connected. In this situation the property owner's costs are figured according to which frontage the sewer is installed. Regarding costs, at this time it is very difficult to estimate a cost to each property owner. There are a number of unknowns. The main unknown is how long the petitions are out being circulated. If it takes a long time to get a sufficient number of signatures, the construction costs could be much higher. Another variable in this situation is that there are a number of streets that could have successful petitions which would affect the quantity of work to be done. A larger quantity of work means a better price per foot. With the above information in mind, a rough estimate Of the cost per property owner would be as follows: If all the streets have successful petitions, $1,000 to $1,500 per lot. It should be noted that all the above information is applicable to only property within the corporate limits of the City of Fontana. If there are any questions, please feel free to contact our office. Robert Schoenborn, P.E. Public Works Director Bob M. Porter Deputy Public Works Director RS:BMP:sm 8353 SIERRA AVENUE ( P.O. BOX 518) ° FONTANA,CALIFORNIA 92335 · (714) 350-7600 NAME LIST FOR THE INSTALLATION OF SEWER MAINS AND LATERALS IN MONTGOMERY AVENUE FROM OLEANDER AVENUE TO 660 FEET WEST, WITHIN TRACT 41gl Petition No. 1 Assessor's ~. Owner & Mailin~ Address 241-151-01 Leora Croghan (16208 Montgomery Avenue) P.O. Box 565, Mt.Baldy, Ca. 91759 241-151-02 Duane G. & Debra M. Owens 16218 Montgomery Avenue, Fontana 241-151-03 Donald P. & Evenly E. Arivett 16226 Montgomery Avenue, Fontana 241-151-04 Leo B. & Norma M. Buffum 16236 Montgomery Avenue, Fontana 241-151-05 Allen D. & Rebecca S. French (16246 Montgomery Avenue 4800 Coolidge Ave. Culver City, CA. 90230 241-151-06 Donald G. Etal (16256 Montgomery Avenue) Raymond L. Cochrane, c/o R.L.Cochrane 8318 Maple, Fontana 241-151-07 Guadalupe A. & Trinidad M. Savala 16266 Montgomery Avenue, Fontana 241-151-08 Robefro B. & Margaret Baca 16276 Montgomery Avenue, Fontana 241-151-20 Buddy A. & Joyce A. Grimes 7412 Oleander Avenue, Fontana UNDER TEE PROVISIONS OF CHAPTER 27 OF TEE STREETS AND HIGHWAYS CODE To the City of Fontana, California: We, the undersiEned owners of property frontinE on the North side of MontEomery Avenue from Oleander Avenue to 660 feet West, hereby request the construction of sanitary sewer drainaEe facilities includinE lateral connection from main to property line in accordance with the provisions of Chapter 27 of the Streets and HiEhway Code of the State of California. The estimated cost of sewer main per property owner is shown on the attached letter. OWNER ADDRESS 1. 2. 3. 4. 5. 6. 7. 9. Petition No. 1 NAME LIST FOR THE INSTALLATION OF SEWER MAINS AND LATERALS IN MONTGOMERY AVENFUE FROM OLEANDER AVENUE TO 660 FEET Petition No. 2 Assessor's No. Owner & Mailing Address 241~152-10 Federal National Mortgage Assn.(16207 Montgomery Ave.) P.O. Box 11886, Santa Ana, CA, 92711 241-152-09 Donna L. Sirback 16217 Montgomery Avenue, Fontana 241-152-08 Felipe R. & Rosa De La Cruz 16225 Montgomery Avenue, Fontana 241-152-07 Michael C. Bates 16235 Montgomery Avenue, Fontana 241-152-06 Edward W. & Mary Ann Dailey 16247 Montgomery Avenue, Fontaria 241-152-05 Joseph S. & Marie Zboray (16257 Montgomery Ave.) 918 Genter Street, La Jolla, CA 92037 241-152-04 John V & Mary L. Martinez 16267 Montgomery Avenue, Fontana 241-152-03 Pablo & Maria M. Casterena 16277 Montgomery Avenue, Fontana 241-152-02 R.J. & Minnie Faye Keen 7436 Oleander Street, Fontana PETITION REQUESTING IMPROVEMENTS UNDER THE PROVISIONS OF CHAPTER 27 OF THE STREETS AND HIGHWAYS CODE 'To the City of Fontana, California: We, the undersigned owners of property fronting on the South side of Montgomery Avenue from Oleander Avenue to 660 feet West, hereby request the construction of sanitary sewer drainage facilities including lateral connection from main to property line in accordance with the provisions of Chapter 27 of the Streets and Highway Code of the State of California. The estimated cost of sewer main per property owner is shown on the attached letter. OWNER ADDRESS 1. 2. 3. 5. 7. Petition No. 2 Par. Semi-Tropic Land 8 Wafer Co. Sud. S.B.L,M.B. II/12 Fontaria city PETITION REQUESTING IMPROVEMENTS UNDER THE PROVISIONS OF CHAPTER 27 OF THE STREETS AND HIGHWAYS CODE To the City of Fontana, California: We, the undersigned owners of property fromring on the South side of Montgomery Avenue from Oleander Avenue to 660 feet West, hereby request the construction of sanitary sewer drainage facilities includins lateral co~nection from main to property line in accordance with the provisions of Ohapter 27 of the Streets and Highway Code of the State of California. The estimated cost of sewer main per property owner is shown on the attached letter. OWNER ADDRESS 't- - Petition No. 2 PETITION REQUESTING IMPROVEMENTS UNDER THE PROVISIONS OF CFH~PTER 27 OF TEE STREETS AND HIGHWAYS CODE To the City of Fontana, California, We~ the undersigned owners of property fronting on the North side of Montgomery Avenue from Oleander Avenue to 660 feet West~ hereby request the construction of sanitary sewer drainage facilities including lateral connection from main to property line in accordance with the provisions of Chapter 27 of the Streets and Highway Code of the State of California. The estimated cost of sewer main per property owner is shown on the attached letter. Petition No. 1 Por. Semi-Tropic Lond 8~ Woter Co. Sud. S,B,L;M.B. Ilil2 Fontono City 24t-15 TOx Rote Areo / ' 10005, 10034 PETITION REQUESTING IMPROVEMENTS UNDER THE PROVISIONS OF CHAPTER 27 OF THE STREETS AND HIGHWAYS CODE To the City of Fontana, California: We, the undersigned owners of property ironring on the North side of Montgomery Avenue from Oleander Avenue to 660 feet Wests hereby request the construction of sanitary sewer drainage facilities including lateral connection from main to property line in accordance with the provisions of Chapter 27 of the Streets and Highway Code of the State of California. The estimated cost of sewer main per property owner is shown on the attached letter. Petition No, 1 PETITION REQUESTING IMPROVEMENTS UNDER THE PROVISIONS OF CHAPTER 27 OF THE STREETS AND HIGHWAYS CODE TO the City of Fontanas California: Wes the undersigned owners of property fronting on the South side of Montgomery Avenue from Oleander Avenue to 660 feet Wests hereby request the construction of sanitary sewer drainage facilities including lateral connection from main to property line in accordance with the provisions of Chapter 27 of the Streets and Highway Code of the State of California. The estimated cost of sewer main per property owner is shown on the attached letter. OWNER ADDRESS 1. Petition No. 2 NAME LIST FOR THE INSTALLATION OF SEWER MAINS AND LATERALS IN MONTGOMERY AVENFUE FROM OLEANDER AVENUE TO 660 FEET WEST, WITHIN TRACT 4181 Petition No. 2 Assessor's No. Owner & Mailing Address 241-152-10 Federal National Mortgage Assn.(16207 MontEemery Ave.) P.O. BOX 11886, Santa Aria, CA. 92711 241-152-09 Donna L. Sirback 16217 Montgomery Avenue, Fontana 6/7I 241-152-08 Felipe R. & Rosa De La Cruz 16225 Montgomery Avenue, Fontana 241-152-07 Michael C. Bates ~ 16235 Montgomery Avenue, Fontana '~~'~41-152-06 Edward W. & Mary Ann Dailey ~q / 16247 Montgomery Avenue, Fontaria 241-152'-05 Joseph S. & Marie Zboray (16257 Montgomery Ave.) 918 Genter Street, La Jolla, CA 92037 241-152-04 John V & Mary L. Martinez 16267 Montgomery Avenue, Fontana ~ 16277 Montgomery Avenue, Pontaria 241-152-02 R.J. & Minnie Faye Keen 4 / 7436 Oleander Street, Fontana ; 3 NAME LEST FOR THE INSTALLATION OF SEWER MAINS AND LATERALS IN MONTGOMERY AVENUE FROM OLEANDER AVENUE TO 660 FEET WEST, WITHIN TRACT 4181 Petition No. 1 Assessor's No_._i. Owner & Mailin~ Address 241-151-01 ,,sore croghan C16208 Montgomery Avenue> ~/~/~a / P.O. Box 565, Mt.Baldy, Ca. 91759 241-151-02 Duane C. & Debra M. Owens 16218 Montgomery Avenue, Fontana 241-151-03 Donald P. & Evenly E. Arivett ~S/ 16226 Montgomery Avenue, Fontana 241-151-04 Leo B. & Norma M. Buffum 16236 MontEomery Avenue, Fontana 241-151-05 Allen D. & Rebecca S. French (16246 MontEomery Avenue) 4800 Coolidge Ave. Culver City, CA. 90230 ~1-151-06 Donald . Etal (~ MontSomer7 Avenue) ? Raymond L. Cochrane, C/O R.L.eochrane ~ 8318 Maple, Fontana 16266 MontEomery Avenue, Fontana 16276 Hontgomery Avenue, Fontaria 241-151-20 Buddy A. & Joyce A. Grimes /~l 7412 Oleander Avenue, Fontana E PUBLIC WGFt~S CITY OF'FONTANA ,.. ~ ~Z_',' ..._,..,S--'.2 '~"-..'~'- ..... --' · : .....:":"' L "- .....~ ~ PLEASE PAY QABHIER · ..'~ ~,:~ F~' ~ ....... N lET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction z0~- lin.eal feet of Portland cement concrete curb and gutter, T0,- square feet of Portland cement concrete sidewalk, -0 square feet of asphalt concrete paving, and 65 linear feet of sewer facilities and appurtenances in from of your property located at l~?~ l~n~tgnme~-y Avenue (Assesso~'s No. 241-151-04) Fontana, CaSifornia. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard _ Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. iLg. 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date v~b, 8, 198.5 Superintendent of Streets City of Fontana, California If further information is needed, please phone N ICT NS RUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 65 linear feet of sewer facilities and appurf~nances in front of your property located at 16226 Montgomery Avenue (AsSessor's No. 241-151-03) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8. 1985 Superintendent of Streets City of Fontana, California if further information is needed, please phone City Hall, public Works Department (714) 823-3411 Ch. 27 #220 Arivett N ICET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -o~- lineal feet of Portland cement concrete curb and gutter, ,-0~- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 65 linear leer of sewer facilities and appur~nances jR front of your property located at 16218 Montgomery ~venue (Assessor us No, 241,151~02) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on ~'eS. 19. 1985 at 7;30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch. 27 # 220 Owens N lET NSTRU T Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction .-0~- lineal feet of Portland cement concrete curb and gutter, ~ square feet of Portland cement concrete sidewalk, -0.- square feet of asphalt concrete paving, and (;4.60 linear feet of sewer facilities ~nd appur'~'en~ces in front-of your property located at 16208 Montgomery Avenue (AssessorTs No, 241-151-01) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb, 19. 1985 at 7:30 in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 N lET NSTRU T Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction ,.o- lineal feet of Portland cement concrete curb and gutter, ;-0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 65 linear feec of sewer facilities and appurtenances in front of your property located at 16246 Montgomery A'venue (Assessor "s No, 241~151-05) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard _. Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on w~. 19., 1985 at 7:30 in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date V~T,~y 8, lqS=~ Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823~3411 Ch. 27 #220 French N ICET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portl.and cement concrete sidewalk, .0- square feet of asphalt concrete paving, and 65 linear feet of sewer facilities and appurtenances in front of your property located at 16258 Montgomery Avenue (AssesSor's No. 241-151-06) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtai ned from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on F~hL 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch. 27 #220 Parsons N lET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 65 linear feet of sewer facilities and appui~eenances in front of your property located at 16766 Montgomery Avenue ~Assesso~"s No. 241-I51-07) Fontana, Cafifornia. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtai ned from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch,. 27 #220 Savala N ICET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0-- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 65 11near feet of sewer facilities and appurtenances in front of your property located at 16276 Montgomery Avenue (AsSessor's No. 241-151-08) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtai ned from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch. 27 #220 Baca N ICET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewa!k, -n- square feet of asphalt concrete paving, and 150 linear feet of sewer facilities and appurtenances in front-of your property located at 7412 Oleander Avenue (Assessor's No. 241-151-20) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontand, California, the City Council will hear and pass Upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, PubtiC Works Department (714) 823-3411 Ch. 27 #220 Grimes NTIC NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construct. ion -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -n- square feet of asphalt concrete paving, and 66.80 linear feet of sewer facilities and appurte~{ances in front of your property located at 16207 Mont~omer~7 Avenue (Assessor's No. 241~152-10) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on FeB. 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Pubtic Works De artment (714) 823-3411 Ch, 27 ~ d National 20 Fe , N ICT NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 67 linear feet Of sewer facilities and appurtenances in front of your property located at 16217 Montgomery Avenue (Assessor's No. 241-152-09) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb, 19, 1985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, public Works Department (714) 823-3411 Ch. 27 #220 Sirback N ICET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -n- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portl. and cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 67 linear feet of sewer facilities and aDDurt~nances in front of your property located at 16225 Montgomery Avenue (Assessor's No. 241-152-08) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. Z,9,::.I985 at 7:30 in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date February 8, 1985 Superintendent of Streets City of Fontana, California if further information is needed, please phone City HALL, PubLic Works Department (714) 823-3411 Ch. 27 #220 De ~ Cruz N IC NSTRU T Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -n- square feet of asphalt concrete paving, and 67 l:I. nea~r feet of sewer fac-llities and al~l~ur~nances in front-of your property located at 16235 Montgomery Avenue (Assessorts No. 241-152-07) Fontana, California. - All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7:30 p,m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date ~e~- 9-1995 Superintendent of Streets City of Fontana, California If further information is n~eded, please phone City Hall, Public Works Department (714) 823-3411 Ch~ 27 #220 Bates · -N lET NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction ~0- lineal feet of Portland cement concrete curb and gutter, -o- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 67 linear feet of sewer facilities and appurtenances in front' of your property located at 16247 Montgomery Avenue (Assessorts No. 241-152-06) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtai ned from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7:30 in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Pubtic Works Department (714) 823-3411 Ch. 27 #220 Sundquist N I NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction ~0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 67 linear feet of sewer facilities and appurtenances in front-of your property located at 16257 Montgomery Avenue (Assessor's No. 241-152-05) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies Of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtained from the Public ~Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1986 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 1985 Superintendent of Streets City of Fontaria, California If further information is needed. please phone City Hail Public Works Department (714)"693"~4~-1 Ch~ 27 I1220 Zboray N I NSTRU Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and 67 linear feet; of sewer facilities and a~urte~ances infront-of your property located at 16267 Mont~omer7 Avenue (AssessorTs No. 241-152-04) Fontana, California. All work shall be done in accordance with the City of Fontaria Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it will be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on ~eb. 19, ]_985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- ment which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch,/27 ~'~220 Hartinez N I NSTRUCT Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0r square feet of Portland cement concrete sidewalk, -o- square feet of asphalt concrete paving, and 67 linear feet of sewer facilities and appurtenances in front-of your property located at 16277 Montgomery (Assessor's No. 241~152~03) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontana. Before starting work it wi II be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on Feb. 19, 1985 at 7;30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California~ the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- merit which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 198 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch~ 27 #220 Casterena N ICET NSTRU T Pursuant to the provisions of Chapter 27 of the "Improvement Act of '19'1 '1" of the State of California: NOTICE IS HEREBY GIVEN to construction -0- lineal feet of Portland cement concrete curb and gutter, -0- square feet of Portland cement concrete sidewalk, -0- square feet of asphalt concrete paving, and, 134 linear :Eeet of sewer facilities and urt ~' in front-of your property located at aDD chances 7436 Oleander Avenue (AssessoruS No. 241~152-02) Fontana, California. All work shall be done in accordance with the City of Fontana Standard Specifications, Standard Drawings and Plans, copies of which are on file in the Public Works Department of the City of Fontaria. Before starting work it wi II be necessary for a construction permit to be obtained from the Public Works Department. If the construction of said work or improvement is not commenced within 60 days after notice is given and diligently and without interruption prosecuted to completion, the Superintendent of Streets shall cause the construction to be done and the cost of the same shall be a lien on the property. NOTICE IS FURTHER GIVEN THAT on feb. 19, t985 at 7:30 p.m. in the Council Chambers in the City Hall in the City of Fontana, California, the City Council will hear and pass upon written or oral objections or protests, if any, to the proposed work or improve- merit which may be raised by any property owner or other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Feb. 8, 1985 Superintendent of Streets City of Fontana, California If further information is needed, please phone City Hall, Public Works Department (714) 823-3411 Ch. 27 #220 Keen C of Fontana LIFORNIA F~bruary 8, 1985 File: Chapter 27 #220 Chapter 27 of the Streets and Highways Code, one of the many State laws,. authorizes a City to order the construction of a variety of street improve- ments within a block when that psrticular type of improvement already exists in front of not less than half of the frontage of the block, or when a peti- tlon requesting improvements and signed by at least 60% of the property owners in the block is filed with the City, or when the City Council ordered the improvements to be constructed. A block is defined as one side of a street between any two intersecting streets, This refers to your property in the area ,of Montgomery Avenue between Citrus and Oleander. We are posting your property with a Notice to Construct. A copy of the Notice is also enclosed. The Notice sets the time and place for a public hearing. If you wish to attend you may, but your attendance is not required. The item shown on the Notice is what will be included in the assessment project. If the City Council orders the improvements installed, the property owner has to have the required improvements installed by a licensed contractor within the 60 day period after the Notice to Construct is received. The only practical course for sewer construction would be to take no action and allow the City to have the work done by contract and assess the cost to the bene- fitting property, If you have any questions, please get in touch with us before the hearing. Robert Schoenborn, P.E~ Public Works Director By: Bob M, Porter Director Deputy Public Works Enclosure 8358 S~ERRA AVENUE ( P.O. BOX 518) · FONTANA,GAL~FORN~A 350-7610 tcOp CitcYA of Fontana LIFOBNIA February 22, 1985 File: Chapter 27 #220 Sewer Installation in Montgomery Avenue In connection with sewer installation for your property on Montgomery Avenue, on February 8, 1985, you were sent a "Notice to Construct" with a Ietter informing you that a Public Hearing would he held on February 19, 1985, regarding the matter. Un- fortunately, the item was missed on the City Council Agenda of February 19; and it will, therefore, be necessary to reschedule the Public Hearing for March 5, 1985. A "Notice to Construct" is again being posted on your property with March 5, 1985, shown as the date for the Public Hearing. If you should have any questions, please contact this office before the Public 1{eating, Robert Schoenhorn, Public Works Director By: Bob M. ~orter Deputy Public Works Director RS:BMP:wp 8353 SIERRA AVENUE ( P.O. BOX 518) · FONTANA,CALIFORNIA 92335 · (714) 350-7600 Motion by Councilman Koehler, seconded by Councilman Day to receive PETITION SE~EI~S petition from owners of property on Montgcmery Avenue from Oleander MONmlG(Iv~RY Avenue to 660 ft. west, which requests the installation of sanitary 'CH.' '27 #220 sewers. Motion carried by"the following vote: MO 85-71 AYES: Mayor Simon, Councilmen Day, Kragness, Koehler, Boyles NOES: None ABSENT: None Motion made by Councilman Day, seconded by Mayor Simon to instruct Public Works Director to order the installation of sanitary sewers in Montgomery Avenue from Oleander Avenue to 660 ft. west, within Tract 4181, under provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code, CH. 27 #220, and carried by the following vote: AYES: Mayor Simon, CounciLmen Day, Kragness, Koehler, Boyles NOES: None ABSENT: None February 5, 1985 Mayor Simon opened the public hearing regarding Notice to Construct PUBLIC HEAR/NG Sanitary Sewer Facilities in Montgomery Avenue 660 ft. west of SEWERS Oleander Avenue under provisions of Chapter 27 o][ the 1911 Act eRY AVE. Of the Streets and Highways Code. No written ccmmunication was CH 27-220 received, nor did anyone speak in favor or opposition. MO 85-100 ~/ Motion made by Councilman Koehler, seconded by Councilman Kragness to overrule all protests and ratify and confirm all acts and determinations of all officers of the City of Fontana in relation to the Ordering of the construction of sanitary sewer facilities in Montgomery Avenue 660 feet West Of Oleander Avenue, within Tract #4181, Ch. 27 #220, and carried by the following vote: AYES: Mayor Simon, Councilmen Day, FDehler, Kragness NOES: None ABSENT: Councilman Boyles March 5, 1985 CITY OF FO.%'TANA REOUEST FOR ACCOU:;T ADD I T I0;~ OR CORRECT 10~,' Date: 5-21-85 Fund: Sewer (70) Request is hereby made for an additional account to be added or changed: ADDITION: Account # 70~ 7~/ Account Name Montgomery Ave. Sewers CHANGE: .Account # Account Name ~ iit Jus]~ificat~n: Approved by City Council at Feb, 5~ i985 meeting; Sewers in Montgomery Ave. ~ Oleander Ave. to 660 feet west, within T~act 4181. I Requested by: Department Head ~0proved by Director of Finance: Director of Finance CITY OF FONTANA REQUEST FOR BUDGET ADJUSTMENT Date: 5-23-85 Fund: 70~ewer Request is hereby made for a transfer: From: Account #70~0000 Account Name GeneralsSewer $ 37,520 To: Account # 70~722i,ll Account Name Montgomery Sewer~ 2,100 7077221,19 1,300 70~7221.22 120 70~7221,33 34,000 Justification: Transfer funds to cover const. payroll and advertising costs. Project approved by City Council on 2-5~85 Requested by: Department Head Approved by Director of Finance: Approved by City Manager: Director of Finance City Manager J. Approve] plans and specifications for the construction Of sewer APPR. PLANS & facility improvements on Montgomery Avenue 660' west of Oleander SPECS. & ADV. Avenue with Tract #4181 and authorize the Public Works Depart- BIDS TR. 4181 ment to advertise for bids (proposed bid c~Denir~ date 6/24/85) MOM1F_4iMEI~ A~E. CH 27 #220, Project .~-43r~'~24. MO 85-284 Motion carried by the following vote: ,~ AYES: Mayor Simon, Councilmen Boyles, Day, Koehler, Kragness ~'~' NOES: None ABSENT: None City of Fontana CALIFORNIA June 12, 1985 To: Molders of Plans and Specifications From= Public Works Department Subject= Addendum ~1 to Specifications (Bid date June 24, 1985) Project: The construction of sewer facility improvements and A.C. overlay of Montgomery Avenue 660' west of Oleander Avenue. File: Chapter 27 ~220, 70-7221 Please make the following change in specifications, Section 11, Page 8: Substitute word: The word "contacting" has been substituted for the word "contracting." This change has been made on the enclosed page 8, which we would appreciate your substituting for page 8 in your specifications. Robert Schoenborn, P.E. Public Works Director Carlos Navarro Civil Engineering Assistant III RS:CN:sm Enclosure / :~353 SIERRA AVI~NUE ( P.O. Brj)< ~18)" FONTANA,L;AL iFORNtA 92335 ' (714) 350-7600 / CITY OF FONTANA STATE OF CALIFORNIA CONTRACT DOCUMENTS AND SPECIAL PROVISIONS FOR CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS OF MONTGOMERY AVENUE 660' WEST OF OLEANDER AVENUE 70-7221 Ch. 27 ~220 CITY COUNCIL Nathan A. Simon, Rayor Don Day Robert Schoenborn Gary E. Boylos Public Works Director Charles A, Koehler R.C.E. 18932 William Kragness CITY OF FONTANA STATE OF CALIFORNIA NOTICE TO CONTRACTORS 1. SEALED PROPOSALS will be received at the office of the City Clerk, City Hall, 8353 Sierra Avenue, Fontana, California, until 3=00 o'clock p.m. on June 24, 1985 at which time they will be publicly opened and read, for performing work as follows= THE CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A.C. OVERLAY OF MONTGOMERY AVENUE 660' WEST OF OLEANDER AVENUE. 2. BIDDING BOND= No bid will be considered unless it is made on a proposal form furnished by the City Engineer. Each bid must be accompanied by cash, certified or cashjerks check, or bidder's bond made payable to the City of Fontana for an amount equal to at least ten (10) percent of the amount bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. Any bid received after the hour stated above for any reason whatsoever, will not be considered for any purpose, but will be returned, unopened, to the bidder. If an award is made to a contractor in accordance with the terms of his bid, the contractor shall promptly secure workmens~ compensation insurance and liability insurance, a City Business license, execute the contract in the required form. Contractor shall furnish satisfactory bonds for the faithful performance of the contract and for payment of claims of material suppliers and laborers thereunder. Said bonds shall each be in an amount not less than fifty percent (50%) of the total of the contract amount. The City of Fontand reserves the right to reject any bond, if in the opinion of the City Engineer, the Sureryes acknowledgment is not in the form included in the contract documents or in another form substantially as prescribed by law. The contractor shall submit all of the above in required form at a pre-construction meeting as agreed upon by the Contractor/City. The Contractor may, at Contractor~s sole cost and expense, substitute securities equivalent to any monies withheld by the City to insure performance under the contract. Such security shall be deposited with the City, or a state or federally chartered bank as escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the contract. The contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any accrued interest thereon. Securities eligible for investment shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. All bids are to be compared on the basis of the City Engineer~s Estimate of the quantities Of work to be done. No bid will be accepted from a contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division 3 of the Business and Professions Code. 1 Plans and forms of proposal, bonds, contract, and special provisions may be obtained at the office of the City Engineer, 8353 Sierra Avenue, Fontand, California. The charge for plans and specifications is $ 6.50 if picked up directly~ or $ 8.00 if mailed to purchaser; and the charge is nonrefundable . The City of Fontand reserves the right to reject any or all bids and to waive any irregularity or informality in any bid to the extent permitted by law. 3. GENERAL PREVAILING WAGE RATE: In accordance with the provisions of Sections 1770 to 1780 of the Labor Code Of the State of California, the City Council has ascertained that the general prevailing rate of wages and employer payments for health and welfare, vacation, pensions and similar purposes applicable to the locality in which the work is to be done is in accordance with the "General Prevailing Wage Rates" current at time of bidding as published by the State of California Business and Transportation Agency, Department, of Public Works, Division of Highways, on file in the office of the City Clerk. Attention is directed to the provisions in Sections 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by the contractor or any subcontractor under him. Section 1777.5, as amended, requires the contractor or subcontractor employing tradesmen in any apprenticeable occupation to apply to the Joint Apprenticeship Committee nearest the site of the public works project and which administers the apprenticeship program in that trade, for a Certificate of Approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in cuch cases shall not be less than one to five except: A. When unemployment in the area of coverage by the Joint Apprenticeship Committee has exceeded an average of 15 percent in the 90 days prior to the request for certificate, or B. When the number of apprentices in training in the area exceeds a ratio of one to five, or C. When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis statewide or locally, or D. When the contractor provides evidence that he employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. The contractor is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions- The contractor and any subcontractor under him shall comply with the requirements of Sections 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, exofficio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. AFFIRMATIVE ACTION - The City of Fontand hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for the award. ADDRESS AND MARKING OF PROPOSAL - The envelope enclosing the proposal shall be sealed and addressed to the City Clerk and delivered or mailed to the City of Fontand, P.O. Box 518, Fontand, CA 92335. The envelope shall be plainly marked in the upper left hand corner with the name and address of the bidder and shall bear the words, "BID PROPOSAL FOL.." followed by the title of the specifications for the work and the date and hour of opening of bids. The certified or cashier's check, money order, or bidder's bond shall be enclosed in the same envelope with the proposal. 4. WORKING DAYS= The designated number of working days for this contract is twenty (20) working days from date of said approval of this contract as outlined in Section 8 (c) of the City Standard Specifications. 5. PARTIAL PAYMENTs The contractor shall, once in each month, cause an estimate in writing to be made of the total amount of the work done to the time of such estimate. The City shall retain ten percent (10%) of such estimated value of the work done, as aforesaid, as partial security for the fulfillment of this contract by the contractor, and shall monthly pay to the contractor, while carrying on the work, the balance not retained as aforesaid, after deducting therefrom all previous payments and all sums to be kept or retained~ under the provisions of this contract. No such estimate or payment will be required to be made when, in the judgment of the Engineer, the work is not proceeding in accordance with the provisions of this contract, or when in his judgment the total value of the work done since the last estimate amounts to less than Five Hundred Dollars ($500.00). The contractor's billing shall show any previous payments made, and shall show the ten percent (10%) withholding. The retained percentage as specified above will be held by the City and will be due and payable to the contractor thirty-five (35} days after filing of the Notice of Completion. 6. FINAL ESTIMATE, PAYMENT AND ACCEPTANCE OF WORK= Whenever in the opinion of the Engineer, the contractor shall have completely performed the contract on his part, the contractor shall submit to the Engineer a written statement of the final quantities of contract items for inclusion in the final estimate. Upon receipt from the contractor of written statement of the final quantities~ the Engineer will make~ in writing, an estimate in which he will state, from actual measurements, the whole amount of work done by the contractor and the value of such work under and according to the terms of the contract. If~ in its discretion, the said City finds that the work has been completed according to the contract, it will thereupon, by Minute Order of the City Council, so find and declare the work to be accepted. 3 Within ten (10) days after the date of acceptance of the work, the Engineer will cause to be filed on behalf of the City~ in the office of the County Recorder, a Notice Of Completion of the work herein agreed to be done by the contractor. Upon expiration of thirty-five (35) days after the filing of such Notice of Completion of the work~ the City will pay to the contractor the amount remaining after deducting from the amount or value stated in the above-mentioned estimate all prior payments to the contractor and all amounts to be kept and retained under the provisions of the contract. If the contractor disagrees with the Engineer~s final estimate and within said period of thirty five (35) days files a written statement of his claims~ the Engineer will issue as a semi-final estimate the proposed estimate submitted to the contractor and the City will~ within thirty (30) days~ pay the sum found due thereon after deducting from the amount or value stated in the first-mentioned estimate of all prior payments to the contractor and all amounts to be kept and retained under the provisions of the contract. The Engineer will then consider and investigate the contractor~s claim and will make such revision in the said estimate as he may find to be due and will then certify in writing to the City Clerk the whole amount and value of the work done by the contractor under and according to the terms of the contract. The City will pay the amount so found due~ after deducting all previous payments, amounts to be retained under the contract, and amounts which may be retained in accordance with the applicable specifications. All prior estimates upon which partial payments have been made shall be subject to correction in the final estimate. The final estimate and payments made thereunder shall be final and conclusive upon the contractor. 7. FINAL PAYMENT TO TERMINATE LIABILITY OF THE CITY= The acceptance by the contractor of the final payment made according to the terms of this contract shall operate as and be a release to the City from all claims and liabilities to the contractor for anything done or furnished for or relating to the work. SECTION 1 -CITY ENGINEER~S ESTIMATE OF QUANTITIES 1. Construct Pre-cast Standard Manholes = 2 each 2. lnstall 4" V.C.P. = 480 L.F. 3. Install 8" V.C.P. = 568 L.F. Modify existing Manhole = 1 each 5. A.C. Paving = 175 Tons SECTION 2 - SCOPE OF WORK The contractor shall furnish and construct~ in accordance with the specifications and drawingss all labors equipment and materials required for construction of improvements in Montgomery Avenue in the City of Fontana as follows: Sewer MAin Lines, Laterals~ Manholes~ A.C. Overlay and Miscellaneous and Appurtenant Work Unless otherw{se shown in the~e Special Provisions~ the scope of all work shall conform to the City Standard Specifications- The City reserves the right to make alterations, deviations, additions to or omission from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work or to omit any ite~r portion of the work, as may be deemed by the Engineer to be necessary or advisable~ and to require such extra work as may be determined by the Engineer to be required for the proper completion or construction of the whole work contemplated. When the contractor feels compensation for an item of work should be subject to adjustment, the contractor shall furnish the City with adequate detailed cost data for such items of work, such data to be submitted with his request. The work covered by these specifications include all labor, materials, equipment, excavation, backfill and all incidental work and services required in connection with the construction of sanitary sewers and appurtenances complete, in accordance with the specifications and applicable drawings. Pipe: Unless otherwise specified, all sanitary sewers shall be constructed of bell and spigot type vitrified clay pipe. All vitrifted clay pipe shall conform to the applicable provisions of the American Society for Testing Materials Designation 278, currently in use and to the specifications entitled "Vitrified Clay Pipe,. Materials Sections published by the Clay Pipe Institute. Where provisions of these specifications are in conflict, the more restrictive provision shall apply. All vitrified clay shall be extra strength class as designated in the aforementioned specfications and shall be first quality, durable, sound, wellburned throughout its entire thickness. SECTION 3- EXCAVATIONS Excavations shall include removal of all materials of whatever nature encountered. The excavation shall be true to line and grade, and shall be made a sufficient distance below the flow line to allow for the proper placement of bedding material. The length of an open trench, at the end of a day shall not exceed (50~) fifty feet in advance of the pipe laying, or left unfilled for more than (50') fifty feet behind the pipe that has been laid. All excavations shall be made, protected and supported as required for safety and in the manner set forth in the operation rules, orders and regulations prescribed by the California Division of Industrial Safety. Barriers shall be placed and maintained at each end as well as intervals along the excavation as required to warn pedestrian and vehicular traffic of open trench, obstructions, and hazards. The contractor will place warning lights and they shall be maintained along the excavation or at other obstructions or hazards from sunset to sunrise each night. During excavation and construction of the sewer, the contractor shall bear the responsibility for dust and sand control. Whenever the Gity Engineer determines that blowing sand or dust is a public nuisances the contractor shall apply water over the necessary area in sufficient amounts to alleviate this nuisance. Contractor~s attention is directed to "Under- ground Service Alert", 1-800-422-4133. Full compensation for shoring of excavation, protection and or support, warning barriers and lights, and dust control shall be considered as included in the prices paid for various contract items of this work and no separate payment will be made therefor% SECTION 4 - SANITARY SEWER AND MANHOLE CONSTRUCTION All sanitary sewer construction shall conform to the standard special provisions for sanitary sewer construction. All construction of sewer manholes shall conform to City Standard detail ~112. The contract unit price for this construction shall include all labor, pre-cast sections~ materials tools, equipment and incidentals involved in this work. SECTION 5 - 8" V.C.P. SEWER PIPE All 8"vitrified clay pipe shall conform to the standard special provisions for sanitary sewer construction. The contract unit price for 8"V.C.P. shall include compensation for all labor, materials, tools, equipment, and incidentals involved in the performance of this work. All pavement removal shall be included in the unit price paid for 8" V.C.P. SECTION 6 - 4" V.C.P. SEWER-SERVICE LATERAL All sewer service laterals shall be four inch (4") vitrified clay pipe (V.C.P.) installed to the property lines and plugged. The contract unit price paid per linear foot of four inch (4") V.C.P., shall enclude full compensation for furnishing and installing and all incidentals involved in this work. SECTION 7 - BACKFILLING All sewer pipes installed shall be backfilled with sand to one and one-half (1- 1/2D feet above the pipe. The backfill material placed in the area around and to within eighteen (18) inches above the pipe and from street subgrade to within the pipe and from street subgrade to within six (6) inches below street subgrade shall be termed "select backfill". Select backfill shall be free from broken pavement matter. Except where otherwise specified, bedding material shall be sand, gravel, crushed aggregate, or native free-draining granular material having a sand equivalent of not less than thirty (30), and shall have a percentage composition by weight which conforms to the following grading= Sieve Sizes Percentage Passing Sieves 2 - 1/2 ........................... 90 - 100 No. 4 ............................. 35 - 100 Backfill material which is not "select backfill" shall be termed "common backfill". Common backfill shall be free from broken pavement or concrete, stones or lumps exceeding six (6) inches in greatest dimension, vegetable matter, or other unsatisfactory material. The select backfill placed around and over the pipe shall be placed evenly on each side of the pipe for the full width of the trench in layers of about twelve (12) inches in depth. Each layer shall be throughly compacted to a relative density of ninety percent (90%) by the use of vibratory or other approved compaction equipment. In lieu of using native excavated material, the contractor has the option of importing slurry type pre-moistened sand as approved by the City Engineer, which would not require placement in twelve (12) inch layers. The compaction requirements for slurry sand backfilling will be the same as for native material. Particular attention is to be given the class bedding called for, and care shall be exercised in backfilling to avoid damage to the pipe. In all cases, after backfill is in place subgrade shall be mechanically compacted until the upper six (6) inches is throughly compacted to not less than ninety-five (95%) percent of standard density. All backfilling shall be considered as an incidental and is included in the unit price paid for V.C.P. Class bedding shall conform to plans and specifications as shown, and as prepared by the American concrete Pipe Association Design Manual. SECTION 8 - TEST FOR LEAKAGE When directed by the City Engineer, the sewer main shall be tested for exfiltration. Tests shall be made after placement of select backfill, but before pavement replacement. The method of testing shall be determined by the Engineer. The Contractor shall, at his own expense, furnish all water, materials and labor for making the test required. All tests shall be made under direction of the Engineer. Section 9 - ASPHALT CONCRETE PAVINGMATCH-IN All asphalt concrete paving shall conform to Section 19 and 39 of the City Stan- dard Specifications. The mineral aggregate for asphalt concrete match-in pavement and final overlay shall conform to the grading specified for three-eights inch (3/8") maximum size, fine gradation. Match-In Paving The match-in paving shall consist of asphalt concrete not less than two (2) inches in thickness. The match-in paving shall be placed immediately after the completion of the backfill and shall be maintained so as to provide a smooth- riding surface until the final paving has been placed, but not before tests for leakage. Final Overlay The final overlay paving shall consist of 1" inch and shall extend to the limits as shown. The application of a tack coat will be required unless otherwise specified. It 7 shall be applied at the approximate total rate of 0.25 gallons per square yard of surface to be covered with asphalt paving. The contract unit price paid for this item shall be measured by weight/per ton of asphalt concrete pavement and shall include full compensation for tack coat, asphalt concrete pavement for furnishing all labor, materials, installation, equip- ment and incidentals involved and no separate payment will be made therefore. SECTION 10 - ADJUSTING SEWER AND STOR/~DRAIN FACILITIES TO GRADE The adjusting of sewer and storm drain facilities to grade shall conform to the provisions in Section 21 of the Standard Specifications. The contract unit price paid per sewer facility shall be per each and shall include full compensation for removals, forming, finish work, and all other labor, materials tools, equipment and incidentals involved in the performance of this work. SECTION 11 - ADJUSTMENT OF WATER VALVE COVERS AND VAULTS TO GRADE It will not be the Contractors responsibility to adjust water valve covers or utility vaults to grade; however, the Contractor will be responsible for contacting the appropriate utility before construction and to cooperate with the utility in the adjusting of their facilities. SECTION 12 - MEASUREMENT AND PAYMENT Your attention is directed to Section 9 of the City Standard Specifications. SECTION 13 - INSPECTIONS The Contractor shall make delivery of all A.C. job tickets to the Job Inspector. The Contractor shall allow the Job Inspector access to all work during the overlay. The Inspector shall insure that material and the workmenship are in acordance with the requirements and intentions of these specifications. Thus, all work done and all materials furnished shall be subject to his inspection. The asphalt paver shall operate the screens and adjust to the required section and thickness as directed by the Inspector. Any defective work shall be made good. Unsuitable material may be rejected, not withstanding the fact that such defective work and unsuitable materials have been previously overlooked by the engineer and accepted or estimated for payment. SECTION 14 - CLEAN-UP RESTORATION FOR FINAL ACCEPTANCE Upon completion of all work and before final inspection of this project site, all parts of the project shall be left in a neat and presentable condition. Final walk-through shall be done as joint inspection (City of Fontshe/Contractor), and shall be made to determine if the work has been done in accordance with this contract. Full compensation for final clean-up will be considered as included in the prices for various contract items of this project, and no separate payment will be made therefor. g CONTRACT PROPOSAL THE CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A.C. OVERLAY OF MONTGOMERY AVENUE 660' WEST OF OLEANDER AVENUE. To the City Council of the City of Fontaria: The undersigned as bidder declares that he has carefully examined the plans and specifications and read the accompanying instructions to bidders~ and hereby proposes and agrees, if this proposal is accepted, to furnish all materials and do all the work required to complete the said work in accordance with said plans and specifications in the time and manner therein prescribed, for the unit price set forth in the following schedule. In case of a discrepancy between words and figures, the words shall prevail. .APPROXIMATE . ITEM WITH UNIT PRICE ITEM ,. QUANTITY WRITTEN IN WORDS UNIT PRICE . TOTAL 1 2 Construct Manhole per City Std ~112 @ per each 2 480 L.F. Install 4" V.C.P. Sewer Lines per linear foot 3 568 L.F. Install 8" V.C.P. Sewer Lines @ per linear foot each Remodel Existing Manhole @ per lump sum 5 175 Tons Asphalt Concrete Pavement @ per ton Total Bid in Total Bid Words in Figures Accompanying this proposal is (Insert $ cash", 'cashierss check", "certified check", or "bidderss bond", as the case may be) in the amount equal to at least ten percent (10%) of the total bid. The undersigned further agrees that in case of default in executing the required contracts with necessary bonds, within eight (8) days, not including Sundays and legal holidays, after having received notice that the contract has been awarded and is ready for signature, the proceeds of the security accompanying his bid shall become the property of the City of Fontana, and this proposal and the acceptance thereof may be considered null and void. Licensed in accordance with an act providing for the registration of contractors, License No. Signature of bidder (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual copartners composing the firm. If a corporation, state legal name of corporation, also names of President, Secretary, Treasurer, and Manager thereof) Business Address Dated~ ~ 19__ l0 SUGGESTED BIDDERtS BOND TO ACCOMPANY PROPOSAL KNOWN ALLNEN BY THESE PRESENTSt That we, as Principal, and , as Surety, are held and firmly bound unto the City of Fontana in the sum of ($ ), to be paid to the said City or its certain attorneys, its successors and assigns; for the payment of which sum, well and truly made, we bind ourselves, our heirs, executors and administrators, successors or assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, That if the certain proposal of the above bounden to construct dated , 19__, is accepted by the City of Fontana, and if the above bounden , his heirs, executors, administrators~ successors and assigns, shall duly enter into and execute a contract for such construction, and shall execute and deliver the two bonds described within ten days (not including Sunday) from the date of the mailing of a notice to the above bounden by and from the said City of Fontana that said contract is ready for executions then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue. IN WITNESS WHEKEOF, we hereunto set our hands and seals this day of , 19__. 11 BIDDER' S WORK REFERENCE TO ACCOMPANY PROPOSAL Please list the last four jobs completed by your company as the principal contrac- tor. Please list job, contract amount, working days, contracting agency and telephone number. 1. The bidder shall list the names and addresses of each subcontractor to whom the bidder proposes to subcontract portions of the work. NAMES AND ADDRESSES= DESCRIPTION OF PORTION OF WORK TO BE SUBCONTRACTED= The General Contractor shall provide the City of Fontana with a 24-hour phone number for on-the-job emergencies that may arise. Your attention is directed to Section 7 (d). Area Code Phone Number Name= 12 AGREEMENT FOR SUBSTITUTION OF SECURITIES FOR RETENTION PAYMENTS THIS AGREEMENT between the City of Fontana, a municipal corporation, hereinafter referred to as "City*' and Construction Company, hereinafter referred to as "Contractor", is made and entered into this day of , 1984 and provides as follows~ THIS AGREEMENT is entered into with reference to the following facts= 1. On or about , 1984, the City and Contractor entered into a contract for performing works as follows= 2. The contract authorizes the City to retain certain sums from progress payments to be made to the Contractor. In accordance with this contract~ the City has retained to date the total sum of $ , said sum being hereinafter referred to as "retained sum". 3o The Contractor desires to obtain release of the retained sum under the applicable provisions of the Government Code Subsection 10261 and Subsection 14402.5. 4. The City is willing to release the retained sum if the Contractor executes this agreement and fully complies with all terms and conditions hereof. NOW, THEREFORE, the parties agree as follows~ 1. Contractor shall deliver to the Finance Director/City Clerk one or more bank or savings and loan certificates of deposit for a total sum of $ Title to said certificates of deposits shall be held as follows~ City of Fontand, California in trust for Construction Company. 2. Upon delivery of said certificates of deposits to the Finance Director/City Clerk, the City shall commence progress payment for total retained sum to the Contractor. 3. The City shall have a possessory security interest in the retained sum. 4. Contractor shall be the beneficial owner of said certificates of deposit and shall receive any interest thereon. 5. At the expiration of thirty-five (35) days from the date of acceptance of the work described in the Contract by the City, or as prescribed by law, the said certificates of deposit shall be released to the Contractor, except such amounts as are required by law to be withheld by properly executed and filed notices of stop payment, or as may be authorized by the contract to be further retained. 6, The City may pay or apply the sums represented by the certificates of deposit for the same purposes and to the same extent as the City might have applied the retained sum, but for this Agreement, and, in the event such payment or application is made, the City may then or at any time thereafter convert to cash, all or so many of the certificates of deposit as the City deems necessary, and any interest or other penalties resulting from such conversion shall be borne by the Contractor. 13 7. The Contractor shall pay all costs associated with the issuance of said certificates of deposit~ the holding of the same by the City, and the substitution of securities as hereinafter provided. 8. The Contractor shall pay all of the City's costs and reasonable attorney's fees in the event any legal action is commenced by the City, either against the Contractor or any bank or savings and loan association issuing said certificates of deposit, for the purpose of enforcing this Agreement or any provision of this Agreement. 9. While the contractor is not in default under the contract~ the Contractor may deposit substitute securities eligible for investment of the type described in Government Code Subsection 14402.5 for the certificates of deposit initially deposited with the City Finance Director/City Clerk~ provided however, that the aggregate value of the securities eligible for investment of deposit with the City hereunder shall not be reduced below $ 10. This Agreement shall be binding upon and shall insure to the benefit of the successors and assigns of each party provided, however, that the Contractor shall have no greater right to assign the benefits of this Agreement, or the securities held pursuant hereto, than the Contractor would have had to assign the retained sum but for this Agreement. IN WITNESS WHEREOF~ the parties have executed this Agreement on the day and year first about written. CITY OF FONTANA BY: Mayor of the City of Fontana ATTEST: City Clerk, City of Fontaria APPROVED: CONTRACTOR By: City Engineer, City of Fontana CONTRACT POE THE CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A.C. OVERLAY OF HONTGONERY AVENUE 660' WEST OF OLEANDER AVENUE. This agreement, made and concluded this day of ,19__, between the City of Fontana, party of the first part, and , Contractor, party of the second part. ARTICLE I. WITNESSETH, that for and in consideration of the paymentsand agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date with these presents, and hereunto annexed, said party of the second part agrees with the said party of the first part, at his own proper cost and expense to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by said party of the first part, necessary to construct and complete in a good workmanlike and substantial manner, the following: For the construction of sewer facility Improvements and A.C. overlay of Montgomery Avenue 660~ West of Oleander Avenue. in accordance with the Special Provisions, and also in accordance with the specifications entitled "City of Fontana, Public Works Department~ City Standard Specifications", which said special provisions and Standard Specifications are hereby specially referred to and by such reference made a part hereof. Said work to be done is shown on the following plans= Dr. No. 1257 Sheet 1 of 1. ARTICLE II: And the said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid, or from the acts of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Fontana and for all risks of every description connected with the work; also for all expense incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work~ and the whole thereof, in the manner and according to the plans and specifications and requirements under them, to wit= 15 .APPROXIMATE . ITEM WITH UNIT PRICE ITEM . QUANTITY WRITTEN IN WORDS UNIT PRICE . TOTAL 1 2 Construct Manhole per City Std #112 @ per each 2 480 L.F. lustall 4" V.C.P. Sewer Lines per linear foot 3 568 L.F. Install 8" V.C.P. Sewer Lines @ per linear foot each Remodel Existing Manhole @ per lump sum 5 175 Tons Asphalt Concrete Pavement per ton Total Contract Total Contract in Words in Figures 16 ARTICLE III. Said party of the first part hereby promises and agrees with said Contractor to employ, and does hereby employ said Contractor to providethe materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions above set forth~ and said parties for themselves, their heirs, executors, administrators, successors, and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there by any conflict between the terms of this instrument and the bid or proposal of said Contractor~ then this instrument shall control and nothing herein shall be considered as an acceptance of said terms of said proposal conflicting herewith. In Witness Whereof, the parties to these presents have hereunto set their hands the year and date first above written. CITY OF FONTANA BY= Mayor of the City of Fontana ATTEST: City Clerk, City of Fontana APPEOVED= CONTRACTOR City Engineer, City of Fontana BY: 17 -_"~'i' ~ /~ngineer's Estimate: $25,750 CITY OF FONTANA STATE OF CALIFORNIA NOTICE TO CONTRACTORS 1. SEALED PROPOSALS will be received at the office of the City Clerk, City Hall, 8353 Sierra Avenue, Fontaria, California, until 3:00 o'clock p.m. on June 24, 1985 at which time they will be publicly opened and read, for performing work as follows: THE CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A,C. OVERLAY OP MONTGOMERY AVENUE 660' WEST OF OLEANDER AVENUE. 2. BIDDING BOND: No bid will be considered unless it is made on a proposal form furnished by the City Engineer. Each bid must be accompanied by cash, certified or cashier~s check, or bidder~s bond made payable to the City of Pontana for an amount equal to at least ten (10) percent of the amount bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. Any bid received after the hour stated above for any reason whatsoever, will not be considered for any purpose but will be returned, unopened, to the bidder. If an award is made to a contractor in accordance with the terms of his bid, the contractor shall promptly secure workmens~ compensation insurance and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the contract and for payment of claims of material suppliers and laborers thereunder. Said bonds shall each be in an amount not less than fifty percent (50%) of the total amount of the bid price named in the contract. The payment bond shall not be less than fifty percent of the total of the contract amount. The City of Fontana reserves the right to reject any bond, if in the opinion of the City Engineer, the Sureryes acknowledgment is not in the form included in the contract documents or in another form substantially as prescribed by law. Contractors attention is directed to Sub-Section 7-1.09 of the City Standard Specifications, All bids are to be compared on the basis of the City Engineer's Estimate of the quantities of work to be done. No bid will be accepted from a contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division 3 of the Business and Professions Code. Plans and forms of proposal, bonds, contract, and special provisions may be ob- tained at the office of the City Engineer, 8353 Sierra Avenue, Fontana, California. The charge for plans and specifications is $6.50 or $8.00 if mailed out and the charge is nonrefundable. The City of Fontana reserves the right to reject any or all bids and to waive any irregularity or informality in any bid to the extent permitted by law. shall be applied at the approximate total rate of 0.25 gallons per square yard of surface to be covered with asphalt paving. The contract unit price paid for this item shall be measured by weight/per ton of asphalt concrete pavement and shall include full compensation for tack coat, asphalt concrete pavement for furnishing all labors materials, installation, equip- ment and incidentals involved and no separate payment will be made therefore. SECTION 10 - ADJUSTING SEWER AND STORM DRAIN FACILITIES TO GRADE The adjusting of sewer and storm drain facilities to Erade shall conform to the provisions in Section 21 of the Standard Specifications. The contract unit price paid per sewer facility shall be per each and shall include full compensation for removals, forming, finish work~ and all other labor, materials tools, equipment and incidentals involved in the performance of this work. SECTION 11 - ADJUSTMENT OF WATER VALVE COVERS AND VAULTS TO GRADE It will not be the Contractors responsibility to adjust water valve covers or utility vaults to grade~ however, the Contractor will be responsible for contacting the appropriate utility before construction and to cooperate with the utility in the adjusting of their facilities. SECTION 12 - MEASUREMENT AND PAYMENT Your attention is directed to Section 9 of the City Standard Specifications. SECTION 13 - INSPECTIONS The Contractor shall make delivery of all A.C. job tickets to the Job Inspector. The Contractor shall allow the Job Inspector access to all work during the overlay. The Inspector shall insure that material and the workmenship are in acordance with the requirements and intentions of these specifications. Thus~ all work done and all materials furnished shall be subject to his inspection. The asphalt Favor shall operate the screens and adjust to the required section and thickness as directed by the Inspector. Any defective work shall be made good. Unsuitable material may be rejected, not withstanding the fact that such defective work and unsuitable materials have been previously overlooked by the engineer and accepted or estimated for payment. SECTION 14 - CLEAN-UP RESTORATION FOR FINAL ACCEPTANCE Upon completion of all work and before final inspection of this project site, all parts of the project shall be left in a neat and presentable condition. Final walk-through shall be done as joint inspection (City of Fontand/Contractor), and shall be made to determine if the work has been done in accordance with this contract. Full compensation for final clean-up will be considered as included in the prices for various contract items of this project, and no separate payment will be made therefor. shall be applied at the approximate total rate of 0,25 gallons per square yard of surface to be covered with asphalt paving. The contract unit price paid for this item shall be measured by weight/per ton of asphalt concrete pavement and shall include full compensation for tack coat, asphalt concrete pavement for furnishing all labor, materials, installation, equip- ment and incidentals involved and no separate payment will be made therefore. SECTION 10 - ADJUSTING SEWER AND STORM DRAIN FACILITIES TO GRADE The adjusting of sewer and storm drain facilities to grade shall conform to the provisions in Section 21 of the Standard Specifications. The contract unit price paid per sewer facility shall be per each and shall include full compensation for removals, forming, finish work, and all other labor, materials tools, equipment and incidentals involved in the performance of this work. SECTION 11 - ADJUSTMENT OF WATER VALVE COVERS AND VAULTS TO GRADE It will not be the Contractors responsibility to adjust water valve covers o~ utility vaults to grade; however, the Contractor will be responsible for contacting the appropriate utility before construction and to cooperate with the utility in the adjusting of their facilities. SECTION 12 - MEASUREMENT AND PAYMENT Your attention is directed to Section 9 of the City Standard Specifications. SECTION 13 - INSPECTIONS The Contractor shall make delivery of all A.C. job tickets to the Job Inspector. The Contractor shall allow the Job Inspector access to all work during the overlay. The Inspector shall insure that material and the workmenship are in acordance with the requirements and intentions of these specifications. Thus, all work done and all materials furnished shall be subject to his inspection° The asphalt paver shall operate the screens and adjust to the required section and thickness as directed by the Inspector. Any defective work shall be made good. Unsuitable material may be rejected, not withstanding the fact that such defective work and unsuitable materials have been previously overlooked by the engineer and accepted or estimated for payment. SECTION 14 - CLEAN-UP t{ESTORATION FOR FINAL ACCEPTANCE Upon completion of all work and before final inspection of this project site, all parts of the project shall be left in a neat and presentable condition. Final walk-through shall be done as joint inspection (City of Fontana/Contractor), and shall be made to determine if the work has been done in accordance with this contract. Full compensation for final clean-up will be considered as included in the prices for various contract items of this project, and no separate payment will be made therefor. EM.neer's Estimate: $25,750 The Construction of Sewer Facility Improvements and A.C. Overlay of Montgomery Avenue 660' West of Oleander Avenue. Project!70-7221 (Oh. 27 ~220) Plans a Specs $6.50 ($8.00 if mailed) Bid Opening Date, June 24, 1985 1. City Clerk 2. F.W. Dodge, 202 E. Airport Drive., Suite 130, San Bernardino 92408 3. ACI Building News, 464 S. Sierra Way, San Bernardino 92408 4o Operation Second Chance, Inc., 341 W. 2nd St. Suite 1, San Bernardino 5. Public Works Inspector .. 16. BID SHEET TAB - CITY OF FONTAN~.~5 J~ 2~ ?~ 3: O| BID OPENING DATE: June 24, 1985 TIME: 3:00 P.M. LOCATION: City Ha]], 8353 Sierra Avenue, Fontana, CA. SUBJECT: SEWER FACILITY IMPROVEmeNTS ANI) A.C. OVERLAY OF MONTGOMERY AVE. NAME COMPANY ADDRESS & PHONE BOND INS. 1. J ~ ~ coNsTrucTioN co. P.o. ~ox 7~7y~ HIG~ND, CA 92346~ EQUIPMENT IE~TAL BLOO~INGTON~ 92316 RENTALS INC, . ............... ~Q.~T~IJ~..~- 9~lgj~. TE~LE CI~, 91780 6-41 + -. 7-24 + 44.39 x · 7'17 + 52- = 4-10 + 7-12 + 7.14 + 000 5.21 + 0.00 * 007 44-39 * Engineer's Estimate: $25,750 CITY OF FONTANA STATE OF CALIFORNIA NOTICE TO CONTRACTORS 1. SEALED PROPOSALS will be received at the office of the City Clerk, City Hall, 8353 Sierra Avenue, Fontsue, California, until 3:00 o'clock p.m. on June 24, 1985 at which time they will be publicly opened and read, for performing work as follows: THE CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A.C. OVERLAY OF MONTGOMERY AVENUE 660' WEST OF OLEANDER AVENUE. 2. BIDDING BOND: No bid will be considered unless it is made on a proposal form furnished by the City Engineer. Each bid must be accompanied by cash, certified or cashier's check, or bidder's bond made payable to the City Of Fontaria for an amount equal to at least ten (10) percent of the amount bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. Any bid received after the hour stated above for any reason whatsoever, will not be considered for any purpose but will be returned, unopened, to the bidder. If an award is made to a contractor in accordance with the terms of his bid, the contractor shall promptly secure workmens' compensation insurance and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the contract and for payment of claims of material suppliers and laborers thereunder. Said bonds shall each be in an amount not less than fifty percent (50%) of the total amount of the bid price named in the contract. The payment bond shall not be less than fifty percent of the total of the contract amount. The City of Forttans reserves the right to reject any bond, if in the opinion of the City Engineer, the Surety's acknowledgment is not in the form included in the contract documents or in another form substantially as prescribed by law. Contractors attention is directed to Sub-Section 7-1.09 of the City Standard Specifications. All bids are to be compared on the basis of the City Engineer's Estimate of the quantities of work to be done. No bid will be accepted from a contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division 3 of the Business and Professions Code. Plans and forms of proposal, bonds, contract, and special provisions may be ob- tained at the office of the City Engineer, 8353 Sierra Avenue, Fontaria, California. The charge for plans and specifications is $6.50 or $8.00 if mailed out and the charge is nonrefundable. The City of Fontana reserves the right to reject any or all bids and to waive any irregularity or i~ormality in any bid to the extent permitted by law. 3. GENERAL PREVAILING WAGE RATE: In accordance with the provisions of Sections 1770 to 1780 of the Labor Code of the State of California, the City Council has ascertained that the general prevailing rate of wages and employer payments for health and welfare, vacation~ pensions and similar purposes applicable to the locality in which the work is to be done is in accordance with the "General Prevailin8 Wage Rates" current at time of biddinE as published by the State of California Business and Transportation Agency, Department, of Public Works, Division of Highways, on file in the office of the City Clerk. Any contractor or any subcontractor who intends to use a craft or classification not shown on the general prevailing wage determinations may be required to pay the wage rate of that craft or classification most closely related to it as shown in the general determinations effective at the time of the call for bids. CITY OF FONTANA By: Robert Schoenborn City Engineer Dated: May 28, 1985 2 RESOLUTION NO. 85- 225 A RESOLUTION OY THE CITY COUNCIL OF TEE CITY OF FONTANA OVERRULING ALL PROTESTS, CONFIRMING TEE REPORT OF THE STREET SUPERINTENDENT ASSESSING THE COST OF SANITARY SEWER FACILITIES IN MONTGOMERY AVENUE FROM OLEANDER AVENUE TO 660 FEET WEST, WITHIN TRACT 4181. BE IT RESOLVED by the City Council of the City of Funtans as follows: SECTION 1. That all protests be overruled, the report of the Street Superintendent he donfirmed, and the co~ of construction of sanitary sewer facilities in MontSomeIy Avenue from Oleander Avenue to 660 feet west, within T~act 4181, he assessed upon the real property described in the report. SECTION 2. That the payments of such assessments of $50.00 or more he allowed to b~ made in ten (10) annual installments with interest at 6% per SECTION 3. That the Notice of Lien for work performed be delivered APPROVED AND ADOPTED this 19th day of November, 1985. /S/Nathan A. S~mon /s/Patricia M. Murray City Clerk /s/patr~c~a M. Murray .-,~ 85.00 ~'~,~75,00 83,00 L. Accepted bid of $24,189.50 and award a contract to Gosney Const- ACCPT. BID ruction Company for the construction of sewer facility improve- SEWER IMPR. & ments and A. C. overlay on Montgomery Avenue 660' west of A.C. OVER/AY ~/ 0leander Avenue,' in accordance with 'their proposal. ErK3ineer's MON~GDMERY AVE. estimate S25,750.00. Acct. No. 70-7221, Ch. 27 #220. MO 85-342 Motion carried by the following vote: 7.~ AYES: Mayor Simon, Councilmen Boyles, Day, Koehler, Kragness NOES: None ABSENT: None Stlte of Celticrole Department of industrial Relations Division of Apprentk:eshlp Sinde EXTRACT OF PUBLIC WORKS CONTRACT AWARD TO: California Depa~b~ent of Industrial Relations Division of Apprenticeship Standards DAS USE ONLY P.O. Box 603 P/W de Son Francisco, CA 94101 Log date N/C [] FROM: AWARDING AGENCY CTTY 0F FONTANA 8353 SIEI~A AVEIN'dE F01ffANA CA 92335 A CONTRACT TO PERFORM PUBLIC WORKS UNDER LABOR CODE SEC. 1777.5 HAS BEEN AWARDED TO: Name of General Contractor Contractor's Llncense Number Cosnay Construction' Mail Address (Street No. or P.O. Box) t City Zip Code I Telephone P.O. Box 381 Bloomington 92316 (714) 877-0200 Address or Ioeation of Public Works Site (include city and/or county) Montgomery Ave., 660' West of Oleander Ave,, ~ontana, CA Coct, o.P.o,.ct,,be, 70-7221 %""r::: Aug. 19. 19851;::::";ept. 13. 1985 iN.no, T pe of construction (Hi~itway, school, h~;~pilal, etc.) ~onstructfon of sewer facility improvements and New construction [] Alterations [] A.C. overlay Classification or type of workman (Cerianter, Plumber, etc.) Heavy Equipment Operators, Concrete Workers, Pipeline Workers, Paving Workers Is language included in the Contract Award to effectuate the provisions of Section 1777,5 as required by the Labor Code? ............................................................ YES [] NO [] Is language included in the Contract Award to effectuate the provisions of Section 1776. as required by the Labor Code? ............................................................ YES [] NO [] Signed by ~")~iA/'-. "~c~-t~ TitleDeputy Public Date7/3/85 Works Director Duplication of this form is permissible. DA5 !3 (Rv- 4/81) Ciiy of Fo:l tana CAI, I im O]R ~' July 3, ].985 File: Ch. 27 #220, Project 70-7221 ~ontgomery Avenue Sewer Installation Gosney Construction Company P.O. Box 381 Bloomington, CA 92316 Attention: John C. Gosney At their meeting of ~nly 2, 1985, the City Council awarded the contract for the Construction of Sewer Facility ImDrovements and A.C. Overlay ofMontgomery Avenue 660' West of Oleander Avenue to your company. Four copies of the contraet are enclosed for signature of the proper officials. Please return three copies tolus and keep one for your files. A fully executed copy will be sent to you at a later date. Please do not date the contract. Please supply us with the required contract bonds within eight days as required by the specifications. It is also requested that you furnish us with the following information: 1. The name of the sub-contractors, if any. 2. The name of the person authorized to sign contract change orders and similar contract documents. 3. The name of the Superintendent or other person who will be in charge. 4. An approximate schedule of the work. 5. Primary class and number of your State Contractor's license. 6. A copy of your insurance certificates. 7. Proof of a business license issuedby the City of Fontana. Please contact the Public Works Department as soon as possible to set up a pre- construction conference to ~o over the details of the project. Robert Schoenborn, P.E. Public Works Director By: Bob M, Porter Deputy Public Works Director RSrBMP:wp Enclosures CONTRACT FOR THE CONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A.C. OVERLAY OF MONTGOMERY AVENUE 660f WEST OF OLEANDER AVENUE. This agreement, made and concluded this day of ,19__, between the City of Fontand, party of the first parts and Coshey Construction , Contractor, party of the second part. ARTICLE I. WITNESSETH, that for and in consideration of the paymentsand agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date with these presents, and hereunto annexed, said party of the second part agrees with the said party of the first parts at his own proper cost and expense to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by said party of the first part, necessary to construct and complete in a good workmanlike and substantial manner, the following: For the construction of sewer facility Improvements and A.C. overlay of Montgomery Avenue 660~ West of Oleander Avenue. in accordance with the Special Provisions~ and also in accordance with the specifications entitled "City of Fontana, Public Works Department, City Standard Specifications", which said special provisions and Standard Specifications are hereby specially referred to and by such reference made a part hereof. Said work to be done is shown on the following plans= Dr. No. 1257 Sheet 1 of 1. ARTICLE II: And the said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid, or from the acts of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Fontaria and for all risks of every description connected with the work; also for all expense incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications and requirements under them, to wit: 15 .APPROXIMATE . ITEM WITH UNIT PRICE ITEM . QUANTITY WRITTEN IN WORDS UNIT PRICE . TOTAL 1 2 Construct Manhole per City Std ~112 ~ Nine }~undred Seventy-Five and no/100 Dollars $975.00 $ 1,950.00 per each 2 480 L.F. Install 4" V.G.P. Sewer Lines @ Ten and no/100 Dollars 10.00 4,800.00 per linear foot 3 568 L.F. install 8" V.C.P. Sewer Lines @ Fourteen and.no/100 Dollars 14.00 7,952.00 per linear foot 4 1 each Remodel Existing Manhole @ Three ~undred and no/100 Dollars 300.00 300.00 per lump sum 5 175 Tons Asphalt Concrete Pavement ~ Fifty. Two and 50/100 Dollars 52.50 9,187,50 per ton Total Contract Twenty-Four Thousand One Total Gontract $24,189.50 in Words Mundred Eighty-Nine and 50/100 in Figures Dollars 16 ARTICLE III. Said party of the first part her.eby promises and agrees with said Contractor to employ, and does hereby employ said Contractor to providethe materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions above set forth; and said parties for themselves, their heirs, executors, administrators, successors, and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there by any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of said terms of said proposal conflicting herewith. In Witness Whereof, the parties to these presents have hereunto set their hands the year and date first above written. CITY OF FONTANA BY= Mayor of the City of Fontana ATTEST= City Clerk, City of Fontana APPROVED: CONTRACTOR City Engineer, City of Fontana BY: 17 ISSUE DATE (MM/DD/YY) 7-R-85 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFOROED BY THE POLICIES BELOW. COMPANIES AFFORDING COVERAGE COMPANY LETTER T~nyal Tn~13~nc.e C. nmpany COMPANY LETTER INSURED Gosney Construction Backhoe & COMPANY LETTER Equipment and John C. Gosney Post Office Box 381 COMPANY LFRER Bloomington, CA 92316 COMPANY LETTER THIS iS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUEDTO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTV~ITRBTANOING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES OF. SCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS, AND COND.L TIONB OF SUCH POLICIES. POLICY EFFECTIVE POLICY EXPIPATION LIABILITY UMITS IN THOUSANDS CO TYPE OF INSURANCE POLICY NUMBER LTR BATE (MM/DB/Y~ DATE (MM/DDfiY) ,!~ EACH AGGREGATE OCCURRENCE GENERAL LIABILITY BODILY ._~ COMPREHENSIVE FORM INJURY $ $ 1( PREMISES/OPERAllONS PYA H5 28 62 11-22-8411-22-85 PROPE.TY UNDERGROUND DAMAGE $ $ __ EXPL~0N & COLLAPSE HAZARD 1( PRODUCTS/COMPLETED OPERAlIONS _,~ CO~%~UN, BI & PD CO.B,NEO $ 500 $ 500 ~ INDEPENDENT CONTRACTORS I.I BROAD FORM PROPERTY DAMAGE ,_~ PERSONAL INJURY PERSONAL INJURY $ 500 ~ RTna~ Fnrm Rndt. AUTOMOBILE LIAEILITY SCALY X_ ANYAUT0 PYA H5 28 62 ,, II I~RERSON) ALL OWNED AUTOS (PRIV. PASS.) SCALY Z AUTos i,. =., .3 HIRED AUTOS PROPERTY 3 NON*OWNEO AUTOS GARAGE LIABILtTY BI & PD -- CO~.,.EO $500 UMBRELLA FORM CU 3257 " '! COMBINED $11000 $1t, 000 OTHER THAN UMBRELLA FORM WORKERS' COMPENSATION (DISEASE-POLICY UMrD DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/SPECIAL ITEMS 8353 Sierra Ave.. D p rtm .nt uf Building Fontana, CA 92335 . . ........ ' ....................... ..... Endorsement effective 7-8-85 : , ~,: PYAH5 28 62 En~t, lsemenl Named Insured GOSNBY CONSTRUCTTON BACKHO'R , Additional Plem~um $ T · B · D · Cc. untersrgned by COr=;PREHENSWE CENERAL LIABILITY INSURANCE MANUFACTURERS AND CONTRACTORS LIABILITY INSURANCE ADDITIONAL INSURED (Owners or Contractors) Schedule Name of Person or 0I~anization (Additional Insured) Location of Coveted Operations City Of Fontana, Department of Building & Safety, 8353 Sierra Ave. Fontar~3~m~s92335 Rates AdvancePrem,um Boddy Injury Laabddy Cos( $]OO o! cost $ Property Damage llablbty Cost $)OO of cost $ Total Advance Pzemlum $ It is agreed that: bul only wdh respect to leabibty arising out of (1) o; crabon:, p~rfelmed for the add:l,onal insured by the named insured at Ihe leeabort designated above 2. None of the exclusions of the pobcy. except exclusions (a). (ok (f) (g). (0. (j) and (m), apply to this insurance 3. Additional Exclusions Th~s insurance does not apply. (a) to bodily injury or property damage occurnng after (1) all work on the pieloot (other tridn serwcc ma,nttnance or repasts) to be performed by or on behalf of the addd~onal msureO at ~n,, !, e~ the (2) that portion of the named insured's work out of ~,h,ch the ~nlury r' ~ ,ma~e arises has been put to ~ts rotended use by any poison (C) t3 property dsma~e Io GL 20 09 O] 73 Bond NUmber CA 104481 Premium: ~J~ 00 MERGHANTS BONDING GOMPANY 3110 tAMING DEt RiO SOUTH, SUITE 111, SAN DIEGO. CA 92~08 ~nd No. CA 104481 ~ ~ ~ BY ~E P~S~: ~t Gosney Construction Co. as Pr~i~, ~ ~c~ts ~Dd~ng ~y (~t~), ~ I~ ~ra~on au~oriz~ ~ ~te ~ ~ ~e S~ of ~lifo~a, ~ S~e~, ~e held ~ f~y b~ ~ City of Fontana ~ Oblige, ~ ~e ~ of ~enty Four Thousand One Hundred Eighty-Nine & 50/lC ~ll~s ($ ' 24,189.50 ) for ~ s~ ~ b~ ~selves, o~ he~s, ~rs, ~s~a~rs, su~s~ ~ assi~, jo~tly ~ s~ly by ~ ~ITI~ of ~e ~ obligati~ is su~ ~t, ~ ~e Pr~ci~ ~s ~t~ ~ a ~n~, ~ , 19 85 , ~ ~e Oblig~ ~ ~ ~ ~fom ~ foll~g ~rk ~t: Construction of sewer facility improvements and A. C. overlay of Montgomery Avenue 6~0' West of Oleander Avenue NGW, THEREFORE, if the said Principal shall well and truly perform the work contracted to be perfozmed under said contract, then this obligation shall be void; otherwise to remain in full force and effect. Signed and sealed this 15th day of July , 19 85. ING COMPANY B~fo~be~~znz~A t torney- in-Fact ATTORNEY IN FACT ACKNOWLEDGMENT STATE 'OF CALIFORNIA d ' County of San Bernar lno ~ ss. Onehis 15th ' dayof July ,intheyear 1985 ,beforeme, a Notary Public in and for said · San Bernardxno _County, StateofCalifornia, residing therein, duly commissioned and sworn, personally appeared Robert C · FraTt Z ~ personally known to me, [] proved to me on the basis of satisfactory evidence to bc the person whosc namc is subscribed to this instrumcnt as the attomey in fact of Merchants Bondinq Co. _{Mutual) and acknowledged to me that~3 he [] she subscribed the name of Merchants Bondinq Cg..,__JM_u..tual ) thereto as surety, and ['~his [] her own name as attorney in fact. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal, 1he day and year stated in this certificate above, ?~. ~ K.A. go,us~ /7~ ~ .................. ~ ~ i Notary Public SAN ~ ~ My commission expires ~ My Commiseion ExtiTe$ Dacetuber 1 S, 1987 MERCHANTS BONDING COMPANY 3110 CAMINO DEL R|O SOUTH, SUITH 11~. SAN DIEGO. CA 92108 Bond No. CA 104481 P~MENTBOND PUnT.TC ~ '~ KNOW ALL MEN BY THESE PRES~2S, that Gosney Construction Co. as Principal, and Merchants Bonding Cu~any (Mutual), an Ic~a corporation author- ized to execute bonds in the State of California, as Surety, are held and firmly bound unto City of Fontana as Obligee, in the s~n of Twenty Four Thousand One Hundred Eighty-Nine & 50/100 Dollars ($ 24,189.50 ) for which sun we bind ourselves, our heirs, executors, administrators, successors ar~ assigns, jointly and severally by these presents. · THE CC~DITION Of the above obligation is such that, .Whereas the Principal on the day of , 19 85 , entered into a contract with the Obligee for Construction of sewer facility improvements and A. C. overlay of Montgomery Avenue 660' West of Oleander Avenue NOW, THEREFORE, if the above-bounden Principal or his subcontractors fail to pay any of the persons named in Section 3181 of the Civil Code of the State of Calif- ornia, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such cla/mant, the Surety will pay for the same, in an amount not exceeding the sun specified in this bond, and also, in case suit is brought upDn this bend, a r~--onable attorney' s fee, to be fixed by the court. This bend shall inure to the benefit of any and all persons entitled to file claims under Section 3181 of the Civil Code of the State of California, so as to give a right of action to then or their assigns in any suit brought upon this bend. Signed and sealed this 15th day of July ,19 85 . Gosne c nstruction Co. ~BOB~3ING COMPANY (b~3TUAL) ~ ~ BY l i.il~ o anz rney in-Fact &' CC-12 "~:,1 ~.~:.,"" ATTORNEY IN FACT ACKNOWLEDGMENT STATE 'OF CALIFORNIA ~ County of '~a~ Bernardino ss. On this 15 th ' day of JulV , in the year 19 8 5 , before me, a Notary Public in and for said San Bernardino _County, StateofCalifornia, residing therein, duly commissioned and sworn, personally appeared Robe rt C. Franz [2 personally known to me, C] proved to me on. the basis of satisfactory evidence to be the person whose name is subscribed to this instrument as the attorney in fact of Merchant s Bonding Co. (Mu. tl.la'l ) atid acknowledged to me that]~] he f'l she subscribed the name of Mercharlts B0nd'incf Co. (M~ltu, a'l) theretoas surety, and I'Yhis f"l her own name as attorney in fact. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seat. the day and year stated in this certificate above. SAN BERNARDINO COUNTY ~ CALFORNIA '~ My commission expires ,,MyCommlsekmbmktmDecember15,1987'~ lVl P n rrs :Bo G Ce PAr Y DES MOINES, IOWA OF Know All Men By ~e~ ~n{s, lha~ ~he MERCHA~S BONDING COMPANY (Mutual). a corm{ion duly organized under C. Dean ~alker, Katherine Norris, Dana H. ~eaver, Gerald Y. Coleman, and Robert C. Franz of San Bernardtno ~d S,a,e of California its tree and lawful A/tomcy-in-Facl. wilh lull B}~cr Any and all bonds and undertakings in its normal course of business, provided no one bond or undertaking shall exceed the sum of ~o hundred fifty thousand and no/100 Dollars ($250,000.00) of the MERCHANTS BONDING COMPANY {MumalL A~csl: MERCHANTS BONDING C()MR~N~ {Mumah STATE OF IOWA COUNTY OF ~LK ~ (hi~ ' 12 th day of January . 19 83 . ~fo~ me Rodhey Bliss III and William W. Warner ~,~h, Whemof. I have hereunto set m) h~d and affixed my Official Seal. at the Cily of ~s Moines. Iowa the da> and year first / )>..........> .-~vI ~. Rodney B]~ss III, Vice President . Des ' i~A / ' ' this i5th d~> of July ~9. 85'~/~. / ~ '~i~ ~c, of ark,racy ~xpire~ ~.pon re vo c a t ion "' CONTRACT FOR THE GONSTRUCTION OF SEWER FACILITY IMPROVEMENTS AND A.C. OVERLAY MONTGOMERY AVENUE 660' WEST OF OLEANDER AVENUE. This agreement, made and concluded this 22nd day of July ,198_5_, between the City of Fontana, party of the first part, and Gosney Construction , Contractor, party of the second part. ARTICLE I. WITNESSETH, that for and in consideration of the paymentsand agreements hereinafter mentioned, to be made and performed by the said party of the first part, and under the conditions expressed in the two bonds, bearing even date with these presents, and hereunto annexed, said party of the second part agrees with the said party of the first part, at his own proper cost and expense to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by said party of the first part, necessary to construct and complete in a good workmanlike and substantial manner, the following: For the construction of sewer facility Improvements and A.C. overlay of Montgomery Avenue 660' West of Oleander Avenue. in accordance with the Special Provisions, and also in accordance with the specifications entitled "City of Fontana, Public Works Department, City Standard Specifications", which said special provisions and Standard Specifications are hereby specially referred to and by such reference made a part hereof. Said work to be done is shown on the following plans: Dr. No. 1257 Sheet 1 of 1. ARTICLE II: And the said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid~ or from the acts of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City of Fontana and for all risks of every description connected with the work; also for all expense incurred by or in consequence of the suspension or discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the plans and specifications and requirements under them, to wit: 15 .APPROXIMATE . ITEM WITH UNIT PRICE ITEM . QUANTITY WRITTEN IN WORDS UNIT PRICE . TOTAL 1 2 Construct Manhole per City Std ~112 @ Nine Hundred Seventy~Five ~nd no/100 Dollars $975,00 $ 1 ? 950.00 per each 2 480 L.F. Install 4" V.C.P. Sewer Lines @ Ten and no/100 Dollars 10.00 4,800.00 per linear foot 3 568 L.F. Install 8" V.C.P. Sewer Lines @ ?ourteen and,no/100 Dollars 14.00 7~952.00 per linear foot 4 1 each Remodel Existing Manhole @ Three Hundred and no/100 Dollars 300.00 300.00 per lump sum 5 175 Tons Asphalt Concrete Pavement @ Fifty-Two and 50/100 Dollars 52,50 9,187,50 per ton Total Contract Twenty-Four ThOusand One Total Contract $24,189.50 in Words Hundred Eighty~Nine and 50/100 in Figures Dollars 16 ARTICLE III. Said party of the first part hereby promises and agrees with said Contractor to employ, and does hereby employ said Contractor to providethe materials and to do the work according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at the time, in the manner, and upon the conditions above set forth; and said parties for themselves, their heirs, executors, administrators, successors, and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there by any conflict between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of said terms of said proposal conflicting herewith. In Witness Whereof, the parties to these presents have hereunto set their hands the year and date first above written. CI 0 FONT~A '~Fon~an yor the C' a ATTE · r , x n ana ~ ~PROVED: CONTRACTOR City Engineer, City of Fontana City of Fontana CALIFOIlNIA July 23, 1985 File: Ch. 27 ~';220 70-7221 Sewer Installation in Montgomery Avenue 660 ' West of Oleander Avenue Gosney Constrnction Company P.O. Box 389 Blo~ington, CA 92316 Attention: John C. Gosney Enclosed for your files ts a fully executed contract for the ConstructiOn of Sewer Facili~ Improv~ents and A,C. ~erlay ofMontgome~ A~enue 660~ West of Oleander Avenue. If you should have any questions regarding this project, please feel free to contact this office. Robert Schoenho~n, P.E. P~lic Worm DireCtor ~: Bob M. Porter ,' Depu~ Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE ( P.O. BOX 518) · FONTANA,CALIFORNIA 350-7612 City of Fontana CALIFORNIA MEMORANDUM TO: City Clerk File: Ch. 27 #220  70-7221 FROM: Public Works Department Sewer Installation in Montgomery Avenue SUBJECT: Release of Bid Bonds & Transmittal of Contract Documents DATE: July 23, 1985 At their meeting of July 2, 198~, the City Council awarded a contract to Gosney Construction Company for the Construction of Sewer Facility Improve- ments and A.C. Overlay of Montgomery Avenue 660' West of Oleander Avenue. We are hereby transmitting a copy of the fully executed contract for this job, the insurance certificate, Performance Bond in the amount of $24,189,50, and Labor and Material Bond in the amount o~ $24,189.50. Please release any bid bonds you may be holding on this project. Thank you. BMP:wp Attachments cc: Finance Director - Please release any cash bid bonds you may be holding on this project. OWNER OR PUBLIC~AOENCY'S COPY ~ ~ B/N FORM 105-B ~ OWNER OR PUBLIC AGENCY'S COPY · 0.~, RE CONSTRUCTION PROJECT: ~ ' PUBLIC or pRIVATE Cons~uc~!0~ E/ejects, ,~ · ' : :' I Filing Claim 0f Li Lega Notice Preuisite Toen And/Or Stop20 Day PreliminaW Notice ~C~PIS FROM SEC. 3097, CALIFORNIA CIVIL CORE 3~. "Preliminary 2~ay notice (private work)" means a stop notice, and is required to be given under the ~ TO: ~ 0~ (Or Reputed Owner) ~ PUBLIC AaaCY .~ apply b any pablic ~rk ~ich is ~b- validity of any claim of lien and of a notice to wlthhold, ~ ~W W * * * * W W t W W e W W * W W * * ~ .nd {b) ~al be given no .oar an aysa er e ~.~ 8353 ~bl[a A~ or materials furnished, or to be furnished, and if there m: . ~, ~ 9~3$ ~The name and address of such per~n urnishing such ~:~f labor ~ice equipment, or materials. ~TICE TO PROPER~ OWNER ~ TO: ORIGI~L ("General") CONTRACTOR (Or R~uted ~ntra~or) (If Any) If hills are not paid in full for ~e labor, sen- ices equipment or materials furnished or to be ~ C ~ ~rnlshea, a mechenlc's enending to the ass, ~ o ~rough ~ud ~reclosure proceedings, of all or ~U Name b~ ~ ~ of your pmpe~ being so improved mW be ~ ~,0, b 381 placed again~ ~e prope~ even though you ~ ~reet have paid your contN~or in full You may ~sh to protect yourself against ~is consequence by  Ci~ Bl__(~, ~ 92316 (1) requiring your cantoclot to furnish a signed release by ~e per~n or firm giving you this L ~ notice before making payment to your contrac- (~is Fo~ Is NOT A Mechanic's Liegerely A Legal Requiemeat To protect Lien Rights) pay supplementol fri~ge benefits into OR: ~ ~ Nine TOM MALLOy CO~, ~ -- 'obsite, Such ~rso~ shall however, be entitled to claim a Sired ]45P~ SO AVALON BL ~ ~ CALIFORNIA PRELIMINARY?NOTICE 1113033 INACCORD, A E WITH SECT ON 3097 AND 3098, CALIFO~ ACIVILCODE THIS IS NOT A LIEN, THIS IS NdT A REFLECTION ON THE INTEGRITY OF ANY CONTRACTOR OR SUBCONTRACTOR YOU ARE HEREBY NOTIFIED THAT... MISSION CLAY PRODUCTS CONSTRUCTION LENDER or Reputed Construction Lender, if any P ,O, BOX 391 f' '] WHITTIER, CA 90608 has furnished or will furnish labor, services, equipment, or materials ef the following general description: SEWER PIPE & FITTINGS t _J S for the building, structure or other work of improvement located a~MONTGOMERYJ. OF OLEANDER F_iOjN~!ANA, CA MJC The name of the person erfirm who contracted for the purchase of such labor, services, equipment or material is: P. O. BOX OWNER or PUBLIC AGENCY or Reputed Owner (on public work) BT,OOMTNGTON, CA Q23_L6 (on private work) An estimate of the total price of the labor, services, equipment or materials furnished or to be furnished is: CiTY OF FONTANA - optional as to owner or contractor) .. 3~53'SI~RRA AVENUE Trust Funds to which Supplemental Fringe Benefits are ',:'F'OI~1~'IA~ 'C~ 92335 Payable. (Material men not required tO furnish) NOTICE TO PROPERTY OWNER If bills are not paid in full for the labor, services. equip- ment, or materials furnished or to be furnished, a me- chanic's lien leading to the loss, through court fore* closure proceedings, of all or part of your property being ORIGINAL CONTRACTOR or so improved may be placed against ~e property eyed Reputed Contractor, if any though you have paid your contractor in full. You may wish to protect yourself against this consequence by (1) requiring your contractor to furnish a signed release by · e person Dr firm giving you ~is notice before making payment to your contractor or (Z) any other method Dated: _AUGUS~ 19~,lgJ~ P, O., .BOX 381 BLOOMINGTON, CA 92316 signat~/'re ~A 3 This form (No. 594 Revised 1/80) © Copyrighted by and distributed through BUILDING INDUSTRY CREDIT ASSOCIATION (213) 382-7151 I ~' DRIVERS COPY :~ ~,1 NA PLANT ~ ~8~,~'~. S, LIME FONTANA PAVING iNC. CORONA PLANT 14270 MAGNOLIA :)NTANA,CA. GENERAL ENGINEERING CONTRACTORS CORONA, CA. ,14) 350-3737 P.O. BOX 847 (714) 688-3737 (714) 350-8688 FONTANA, CALl F. 92335 (714) 737-8440 CONT. LIC. # 162709 A -- E252069 · DRIVERS COPY FONTANA PLANT FONTANA 'PAVING iNC, CORONA PLANT 8747 S. UME · 14270 MAGNOLIA F:ONTANA, CA, GENERAL ENGINEERING CONTRACTORS CORONA, CA, (714) 350-3737 P.O. BOX 847 (714) 686-3737 (714) 350-8688 FONTANA, CALIE. 92335 (714) 737-8440 CONT, LIC. ~ 162709 A ORDER NO. JOB NO, DATE~ ~' '/ 1~'~" L, ~DDRESS: .... ' ': ~: ~' ' .... ST~ ' / E252 40 DRIVERS COPY WEIGHMASTER~S CERTIFICATE OF WEIGHT AND MEASURE FONTANA PLANT FONTANA PAVING INC. CORONA PLANT 8747 8. IdME 14270 MAGNOLIA FONTANA, CA. GENERAL ENGINEERING CONTRACTORS CORONA, CA. (7,14) 350-3737 P.O. BOX 847 (714) 688-3737 (714) 350-8688 FONTANA, CALIF. 92335 (714) 737-8440 CONT. LIC. # 162709 A ORD[ER NO. JOB NO. OAT~' . / ' '" : M t i RA PLAN Received By E 252238 DRIVERS COPY WEIGHMASTER*S CERTIFICATE OF WEIGHT AND MEASURE 'fids ls tocerll;y thet ffie lofiowl~g descdbed merchandlse wes welghed masured oreounted by apr[vate we hmaster, an(~hls s nature ls a nlzed FONTANA PLANT FONTANA PAVING iNC. CORONA PLANT 8747 S. LIME 14270 MAGNOLIA FONTANA, CA. GENERAL ENGINEERING CONTRACTORS CORONA, CA. (714) 350-3737 P.O. BOX 847 (714) 688-3737 (714) 350-8688 FONTANA, CALl F. 92335 (714) 737-8440 CONT. UC. # 162709 A ORDER NO, ,- DATE( ADDRESS: ,/:2 [/=~//,G (:/" SUB HAUL EZ]" , i(/' '; f''' /'~ M ATE..AL: ,. T%0~ ' / / "'77/ cARRIERDR.vER FOmAh~A Avem -PRfvATE~ H~'AsTE/ Received By X E25~237 DRIVERS COPY WEIGHMASTER'S CERTIFICATE OF WEIGHT AND MEASURE FONTANA PLANT FONTANA PAVING iNC. CORONA PLANT 8747 S. LIME 14270 MAGNOLIA FONTANA, CA. GENERAL ENGINEERING CONTRACTORS CORONA, CA. (714) 350.3737 "P.O. BOX 847 (714) 688-3737 (714) 350-8688 FONTANA, CALl F. 92335 (714) 737-8440 CONT. LIC. # 162709 A ORDER NO. Joe NO. DATE (-~ (-~/,.I '1 leG: !: · / ADDRESS: /"q / /,,. S : ~ FONTANA ~ CORONA ON ~ OFF TARE TONS Received By X E252243 · DRIVERS COPY FONTANA PLANT FONTANA PAVING iNC. CORONA PLANT 8747 S, LiME 14270 MAGNOLIA EONTANA, CA. GENERAL ENGiNEERiNG CONTRACTORS CORONA~ CA. (714) 350-3737 P.O. BOX 847 (714) 688-3737 (714) 350-8688 FONTANA, CALIF. 92335 (714) 737-8440 CONT. UC. # 162709 A OROEER NO. JoB NO. ( . SATE /' '~..., V.t j // FONTANA ~ CORONA ~ ~ OFF TA~E MATERIAL: ~ / GROSS / TONS LVJEB r M G~IS r ~ AR ANTi M It i8 agreed~w 8yer d Iler t sa~e is eo um ated and title passed at the p~ant si~e. TEe price of this material has Received By X E2522 8 CALIFORNIA PRELIMINARY NOTICE 1239456 IN ACCORDANCE WI~ "~CTION 3097 AND ~098, CALIFORNIA CI""~CODE THIS IS N~O~T A LIEN, THIS IS NOT A REFLE-~ ~ ION ON THE INTEGRITY OF ANY CONTr r ,~fOR OR SUBCONTRACTOR YOU ARE HEREBY NOTIFIED THAT... 1 m EL10311 5981 Inland Concrete Entez~ise~. (name of person or firm furrushing labor, services, equip- ment or material) CONSTRUCTION LENDER or Reputed Construction Lender, if any 2b2Lh 1T~bidOusc Blvd, (address of person or firm furnishing labor, services, F' _] R~verside, CA. 92~O9 City of Fontann equipment or material) has furnished or will furnish labor, services, equipment, or --O- materials of the following general description: J~ manhole sub-contractor [general description of the labor, services, equipment or L J _ material furnlshed or to be furnished) for the building, struct re or other work of improvement Montgomery w?~f Oleande~ . ~ located at: Sewer Fs.oilitie~T~Im~provements (~; ~ FOLD HERE (address or description Of job site ~ ~OZlt~LTI~ sufficient for identification) The name of the person or firm who contracted for the ~ purchase of such labor, services, equipment or material is: C.o~ney Backhoe (name and address of person or firm) t P, O. Box 381 OWN or PUBLIC AGENCY or Reputed Owner (on pubficworkJ B1oomi~:rbO~l~ CA. 92316 (on private work) An estimate of the total price of the labor, setvices, equipment or materials furnished or to be furnished is: $1,800, O0 Ci4;~J· 0;~ ]1'~01~,'~I~*-T1-8, (Dollar amount must be furnished to construction bender ]Lpe Ci~, ~lo~ 518 ~ optional as to owner or contractor) ~'o~:t, av~, OA, 92335 Trust Funds to which Supplemental Fringe Benefits are Payable. (Material men not required to furnish) (name) (address) Construction loan no. (if known) (name) (address) FOLD HERE (nanle) (address) (nalne) [address) NOTICE TO PROPERTY OWNER If bills are not paid in fell for the labor, setvices, equip- ment, or materials furnished or to be furnished, a me- chanic's lien leading to the loss, through court fore- closure proceedings, of all or part of your property being ORIGINAL CONTRACTOR or so improved may be placed against ~e property even Reputed Contractor, if any though you have paid your contractor in full. You may wish to protect yourself against this consequence by (I) requiring your contractor to furnish a signed release by the person or firm giving you this notice before making payment to your contractor or (2) any other method or device which is appropriate under the circumstances. G0~rJe~' Bax3khOe Oted: k ._P, O, .Box° 810A 2 16 o ted~~SeC~ Bloomzr~ n3,· · 9 3 - t~a~or s~9 'ne] ~ , T~!s~fo~rm~ (NO. 594 Revised 1/80) © Copyrighted by and distributed through BUI LDI NG IN City of 7Fontann C A L 1 F' O ii N i A September 6, 1985 File: Ch, 27 #220 Installation of Sanitary Sewers in Nontgomery Avenue Occupant: Work is scheduled to start Monday, September 9, 1985 for street improvement on Nontgomery Avenue (repavingX Please have your vehicles off the street so that work can be started on the above date by the contractor, AAA Paving This scheduled starting date may be cancelled due to unfavorable working conditions. The Public Works Department, City of Fentans, th~ks you for your cooperation. Sincerely, Robert Schoenborn, P.E. Public Works Director By: Carlos Navarro Civil Engineering Assistant III CN :~ 350-i610 ' 532906 INDUSTRIAL A~pHALT :: NOTICE: P O. BOX ~607:.: 1. tt is egreed that ~11 rnateriai;~ale~ ~Sl!~rdered and manufactured, are consumated and tide passes at Van Nu,/s, CA ::91:409 ' the pla.t site and i~ subject to-sales tax. 8 ? 8/~81-608~ ~: u ~. Transportat on s ordered for ,th s' specf c de ve~; de ays w be subject to de ay char~ei~r Cornparty or Carrier assumes any responsibiliW for damages. No cJaims allowed unless made at time IB 4. TERMS: Ail a~ou~ts: are due and ~ayabl~ on lOth of the month follOwingdate;of deliver. ~:L~ ~,: ,~ Interest will be~charged on past due accounts at the highest rate permitted by, appiicabte taw. CUSTOMER ;N~::~5~B ADDRESS ; - ~, ~:~- ~U~ : F~TA~ :; .... : ~0~ ~ZGHT ~.43 L~D T~E ~ZtT ~O,3q TOT~ TONS ~ jOB 532'922 THIS 113 TO CERTIFY ha the oJ owing desc bed tomrood y waa ~eighed mea- of Food Ind ~;riculture. ~pHALT-' NOTICE: .... P.O BQ~;:~87:7~':~ 1, It is agreed that a" materialsales; . ordered and manufactured, are consumeted and Vah,N~s/C~/9q409~.- the plant site and, is subject to'sales tax~. 8~8/781-6080 . ?: ~ 2.. Transportation ~&,or~ered for this specific deliver; delays will be 13ubject to delay cha~,~ei~her point of origin or,terminal end at P.U .C. rates. ~ . 3. Carriers will endeavor _¢o delivep,and osace material where customer designates, but neither the HZ~ P~, Company or Carrier assumes any responsibgitv for damages. No claims allowed unless made at time of delivery. / / Interest WIll be ~harge~ o~ Dast Qua accounts ~t the highest rate permitted by applicable law. Buver wdl PaV attorney fees and other collection costs. F~T~NA -: ~TE 0~/~0t8~ TZ~ ~ZHD 9. qB ~ GROSS ~T ~,49 ~ LOAD N~R ; T~E ~Z~T qO,3q TOT~ T~S ON JOB , ~T ~T 15,18 T~B  CU~ER ~PY OR INSPE~R ~ INDUSTRIAL ~PHALT PRIVATE WEIGHMASTER ': ~' ~? mlntmleglbVtheDivisionofl~easuremil~t~:~ffils~dj'of~biCaliforniaDepar~ment INDUSTRIA,~-ASpH~LT::~. NOTICE: '~ ':Z :':~";~;%~,'- ' Buyer will payYt~r~ey' ee~ and ~the~ cofiection costs. TRUCKTJ~Eh "?~"::~'~DING/WORKING ' MATERIA~ R'EC~D"~Y" *'t:'~ TRK/TIME ACKNOWLEDGED '~':'~ N RI~R TRUC~,,99p~.:pq.~:~, O. TRK. L,C. NO. ~:~ ;~p~EE~',~gh:' ~T~,%~'9' ~9;.' ~ ' , :' ' HI~R~ PLANT, 2340 ~, HIG~D AVE ~N ~ER~DIN0 ,CA, ~40~ D~TE ~/tQI~5 TI~ ~IG~D ~ ~E~T ~5,59 L~ ~HBER 3 T~E HEZGHT ~Q.3~ T~AL TONS ON JOB ..... 45.58 ~T ~Z~T 15 ,E6 TONS DEPUTY INDUSTRIAL ASPHALT PRIVATE WEIGHMASTER 53 90"T INDUSTRIAL ASPHALT NOTICE: V~n'Nuys; CA 91409 the planz site and is subject m sales tax. 818/781-6080 2. Transportation is ordered for this specific delivery; delays will be subject tQ delay charges at either ' point of origin or terminal end at P.UC. rates. .... 3. Carriers will endeavor to deliver and place material where customer designates, but neither the HZG~ND PLANT of delivery. PHONE.,?~,(!875/5~eD 4. TERMS: All accounts are due and payable on 10th af the month following date of delivery, CUSTOMER NAME AND JOB ADDRESS 532907 (OqO~)'~: AA~ P~VZNG H~TGO~RY ~/O ~EANDER ~ H~UL ZONEs FONTANA 2 · 54 ~ --" TH~S:~ZDE ~ ~ :' 49 F'O AReODD 3/8" FiNE 5i003 ' ~0 B-~3 BYERS HI~LAND PLANT, ~340 W. HIGHLAND AVE SAN ~ERNARDINO ,CA. DATE 0~/10/65 TIME WEIGHED 7~46 GROB8 WEIGHT ~4.~8 LOAD NUHBER 1 TARE WEIGHT ~.73 TOTAL TONS ON JOB ....... 15.25 NET ~IGHT ~5.~5 TONS 3o23q D. OFIVERA INDUSTI~IAL ASPHALT NOTICE: ', ;P.O. BOX 7607 1. It is agreed that ag material sales, as ordered and manqfactured. are consumeted and title passes at VanNuys; CA 91409 the p~ant site and is subject to sales tax. 818/781-6060 ,~!i - : 2, Transportation is ~rdered for tl~s specific delivery; delays will be subiect to delay charges at either ' point of origin or terminal end at P.U.C. rates HI(3iHLAND PLANT oF d.u~.~v. P~N~t875/518D 4. TERMS: All accounts are due and payable an 10th of the month following d.te of delivery. . . CU$TOMER NAME AND JOB ADDRESS ~;~1 ~TGOHERY ~I0 OLEANDER ~ H~UL ZONE I ~Q~3. T~6, GUIDE ,. 14e 1 I :' :':;~:: ~' 4~ FD ARSDOQ ~/8" FiNE 5~a~ 9~ 9-1b4 HZ~ PL~T, ~340 W. HIGHLAND AVE SAN BERNARDINO ,CA. DATE Oq/~O/~5 TIME WEIGHED a: la GRQi8 WEIGHT 25. ~4 LOAD NUMBER TARE WEIGHT ~.~6 TOTAL TONS ON JOB ...... ~0.43 NET WEI6HT 15.1~ TONS D, OLIVERA DEPUTY CUSTOMER COPY INDUSTRIAL ASPHALT PRIVATE WEIGHMASTER * ' ' 532919 INDUSTRIAL ASPHALT NOTICE: VanNu,/~, CA 91409 the plant site and is suhiect to sales tax, 818/781-6080 ~ ,. 2. Transportation is ordered for this specd~c delivery; delays will be subject to delay charges at either point of Origin Or terlrlinal erld at P,U.C, rates, HZGHI.jeIND PLRNT of d~livery. PHONE 7'I4t875/5180 I I I 4. TERMS: All accounts are due and payable on 10th of the month following date of detivery:' / / biterest will be charged on past due accounts at the highest rate permitted by applicable law. CUSTOMER N~,ME,:ANO Joa ADDRESS 5;~'~t,V , (D'IQOO~)~'AAA PAVING HONTGOHER~, W,/,O OLEANDER HAUL ZONE = 3&Q~3 FONTANA ' ~, 2 .'L ,'~; 4~ FD ~R~OOO 318" FINE TRUCK'CO~ NO, TRUCK NO. TRK. LIC. NO. TRAILER NO, C. NO. HIG~D P~NT, ~340 W. HIGHLAND AVE SAN BERNARDINO ,CA. ~E~O6 ~ DATE ~* 09/~0/85 TIME WEIGHED ~088 WEIGHT E5.$3 LOAD NUMBER 'T~E WEIGHT ~0. ~e *TOTAL TONS ON JOB ~ ........ 45.57 NET WEIGHT ~5. ~4 TONS D. OLIVEHA DEPU,TY · CUSTOMER COPY INDUSTRIAL ASPHALT PRIVATE WEIGHMASTER I El Rev, 5/85 INDUSTRIAL ASPHALT NOTmE: 'r.P.O. BOX7607 *: 1. It is agreed that ag material sales, as ordered and manufactured, are consumated and title Passes Van NuyS; CA 91409 the plant site and is s~Sject to sales tax, 818/781-6080 ' ~': 2. Transportation is ordered for this specific delivery; delays will be subject to delay charg~ a~ eider c. .... 3. Carriers will endeavor to deliver and place material where customer designates, ~ut ~neither,~he HZG~RND PLANT o~ delivery, PHONE 714/875/~180 ';- / ,/ 4, TERMS: All accaunts are due and payable on 10th of the month fallawing date of delivery, TRUCK T~E STANDING/WORKING~ ATER~A CUSTOMER NAMS AND JOB ADDRESS ~ ~ .;' ~NT~ERY ~/0 OLEANDER HAUL ZONE= FONT~ t i 54 THOH~ffi.~DE ~4B1 ~ ~""' 4~ FD AR~DQQ 3/B" F~NE HZG~AND PLANTr ~340 W. HIGHLAND AVE SAN BERNARDINO ,CA. DA~ 0~/t0/85 TIME WEIGHED GROB8 ~EIGHT ~4.~ LOAD NUHBER TARE WEIGHT ~.e6 TOTAL TONS ON JOB ...... ~O · 60 NET WEIGHT ~5.03 TON8 D. OLIVERA CUSTOMER COPY DEPUTY 61B Rev, 5/85 INDUSTRIAL ASPHALT PRIVATE WEIGHMASTER IHISlSf0CERTFYIhattheft)llowingd )~(i ..... d v ...... ghed ..... ' , INDUSTRIAL ASPHALT NOTICE: ~,: 'P.O.,BOX,7607 1. h is agreed that all material sales, as ordered and manufactured, are CQnsumated and title V~d'Nuys, CA 91409 the plant site and is subject to sales tax. 818/781-6080 2. Transportation as ordered fur this specific delivery; de~eys will be sub oct to delay ch~rges, ql,e thor HZG~D PLANT of P~NE., 7~4/875t5180 ' ~ / · ~-. q. TERMS: All accounts are due and payable on 10th of the month fallowin9 date of delive~. ~ . USTOMER NAME AND JOB ADDRESS NTQO~RY ~/0 ~ERNDER HRUL ZONE~ qT~A l · 54 ~S GUIDE 1481 AND PLANT, ~40 W. HIGHLAND AVE ~AN BERNARDXNO ,CA. E QV/~O/85 TIME WEIGHED S8 WEIGHT ~5.54 LOAD NUMBER 5 E WEIdHT IO. le TOTAL TONS ON JOB ..... 75.~5 r WEIGHT 15.35 TONS D. OLIVERA CUSTOMER COPY INDUSTRIAL ASPHALT PRIVATE WEIGHMASTER ,uv. 5/85 INDUSTRIAL ASPHALT NOTICE: Van Nuys,' CA 91409 the plane st[e and ~s subject to sales tax. 818/781-6080 2 Transportation is ordered for this 5pecihc dehvery; cJei~y5 will be ~ubject ~o delay charges HZGHLAND PLANT ot P~E, 714/875t51~D 4. TERMS: All accounts are due and pay.hie on 10th of the month following date Of delNerV. CUSTOMER NAME AND JOB ADDRESS (0~0~3)> AA~ P~VZNG ITGOHERY ~/0 OLEANDER HAUL Z0~ T~MABLGUZDE 4481 2 '- ' '~ 4~ FD ARSOQD 3/8" FZNE soup 5t~3 9~ B-lb4 BYERS HI~L~D PLANT, ~340 W. HIGHLAND AVE 8AN BEeNASDiNO ,CA. DATE 0~/10/~5 TiME WEIGHED ~OSB WEIGHT ~5.09 LOAD NUMBER TARE NEZGHT ~,~b TOTAL TON~ ON JOB NET ~EZGHT 15.13 TON5 D. OLIVEHA DEPUTY CUSTOMER COPY INDUSTRIAL ASPHALT PRIVATE WEIGHMASTER 618 Bey. 5/85 · ' ) ) 532938 ]DUSTRIAL ASPHALT NOTICE: .Q, BOX 7607 1. It is agreed that all material sales, as ordered and manufac ured are consumated and title passes at /aft Nays, CA 91409 the plant site and is subject to sales tax, 818/Z81-6080 IZGHLAND PLANT C~mpany~rCarriera``~nesar~resp~nsibi~i~f(Jrdamage~N~c~airnsa~wedun~e~rnede~im~ ?HONlf CUSTOMER NAME AND JOB ADDRESS PIONT{~ONEIIy N/0 OLEANDER FONT~ ;":~ ~,,5~ HAUL ZONEI 360~3 TH0t~ 't~;~DE 14B'I B ~' :-" 4c/ FD AR8OO0 3/8" FINE TBUCK'C'Ob'~.~(~: TRUCK NO. TRK, LIC+ NO. TRAILER NO. ' L~.. Jw~.~ PLANT, .~340 IA, H.[GHL~ND AVE ~F. IN ~E NARDI'NO ,CA, · . ' ' 'i,. ' .~ ~ ' . ., i \' ,, :<'~/ . ,. ~ ~,,, ~/~ CUSTOMER COPY OR INSPECTOR COPY u~ UTY 6623 CALLE EVA MIRANDA, AZUSA. CALIFORNIA 91702 - Phone: (818) 969-7951 INDUSTRIAL ASPHALT ' 11,8 Dote of Notice ORIGINAL CONTRACTOR REPUTED ~e ~e ~ ~ CONTRACTOR Itf~: ~qt~ ~ Gentlemen: You ere hereby notified that the customer identified heroin has con- Cedified ~ i ~ ~ trotted with Industrial Asphalt for the purchase of labor. ,e~ices, Mall No. (For Private Work Only) equipment rental, aggregate end/Or asphalt~o pay ng materie s used, or to be used in the work of improvement at the Jobsite described heroin. NOTICE TO ~OPER~ OWNER This notice Is not intended to reflect in any way oh the credit reputation ~; of ~ur ~ustomer. However, in compliance with Section 3097 & 3098 of % the California CIvil Code, we advise you that, IF BILL~ ARE NOT PAID IN FULL FOR THE LABOR, SERVICES, EQUIPMENT OR MATER ALS FUR- OR NISHED OR TO BE FURNISHED, A MECHANIC'S LiEN LEADING TO THE REPUTED :}t ~e ~ J~t LOSS, THROUGH COURT FORECLOSURE PROCEEDINGS, OFALLOR OWNER ~I~ ~J PART O~ YOUR PROPERTY BEING eOIMPROVED, MAY BE PLACED AGAINST THE PROPERTY EVEN THOUGH YOU HAVE PAID YOUR CON- OR TRACTOR IN FULL. YOU MAY WISH TO PROTECT YOURSELF AGAINST PUBLIC THIS CONSEQUENCE BY (1) REQUIRING YOUR CONTRACTOR TO AGENCY FURNISH A SIGNED RELEASE BY THE PERSON OR FIRM GIVING YOU THIS NOTICE BEFORE MAKING PAYMENT TO YOUR CONTRACTOR OR Cedified (2) ANY OTHER METHOD OR DEVICE WHICH 16 APPROPRIATE UNDER Mail NO. (For Private Work Only) THE CIRCUMSTANCES. ~ 7T ................... Weth~nk~oufo~theprlvile~eof~upplyinga~ph~ltl~pavingmaterialsto Yours vow truly CONSTRUCTION r INDUSTRIAL ASPHALT OR REPUTED CONSTRUCTION LENDER Ceffified Mail NO. (For Private Work Onty) CUSTOME. F el DESCRIPTION FORM C209A-Rev. 5-85 OWNER COPY 3/465 Cam~no de1 Rio S,~ Suite 310 September 17, 1985 San Diego, CA 92108 City of Fontana P.O. Box 518 Fontana, CA 92335 Re: Gosney Construction ATTN: BOB M. Porter Bloomington, CA CA104481 $24,189.50 Dear Sirs. This was issued July 15, 1985 cove~ng Construction of sewer facility imporvements and A.C. overlay of Montgomery Avenue 660' west of Oleander Avenue W~II you be good enough to supply information requested below, in order that our Home Office records may be kept up to date? Merchants Bonding Company (Mutual) hereby releases the architect or engineer suppl ing the information contained on this form from any and all liability whatsoever which might in any way result ~r~m the accuracy or inaccuracy of the information requested and supplied by this form. Yours very truty, MERCHANTS BONDING COMPANY (MUTUAL) Executive Vice President 1. IF CONTRACT COMPLETED, PLEASE STATE: Approximate date of completion of work (or final delivery) ApprOximate acceptance date Final Contract Price $ 2, IF CONTRACT UNCOMPLETED, PLEASE STATE: Approximate percentage or dotlar amount of contract completed or delivered 3. DO you know of any unpaid bills for labor or material (Check) Yes No / 4. Remarks: (tf any) Signature PUBLIC WORKS DEPARTMENT CITY OF FONTANA, CALIFORNIA CONTRACT C11ANGE ORDER NO. ! 71-7221-Montgomery Ave. Date: 9-23-85 Sewer Project TO: GOSNEY CONSTRUCTION, P.O. Box 381, Bloomington, Ca. 92316 You are hereby directed to make the herein described changes from the plan~ and specifications or do the following described work not included in the plans and specifications or the contract. Increase Contract to include 21.33 additional tens of asphalt, Item #5, for a total increase of $1,119.83 (concrete pavement) $52.50 per ton We, the undersigned contractor, have given careful consideration Co the change proposed, and hereby agree, if this proposal is epproved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as · ull payment therefor the prices shown above. By reason of this proposed change, -0- days extension of time will be allowed. .October 11, 1985 3465 Camino del Rio S.~ Suite 310 San Diego, CA 92108 SECOND REQUEST City of Fontana P.O. Box 518 Fontana, CA 92335 Re: Gosney Construction ATTN: BOB M. PORTER Bloomington, CA CA104481 $24,189.50 Dear Sirs. This was issued July 15, 1985 covering Construction of sewer facility improvements and A.C. Overly of Montgomery Ave. 660' west of Oleander Ave. Will you be good enough to supply information requested below, in order that our Home Office records may be kept up to date? Merchants Bonding Company (Mutual) hereby releases the architect or engineer suppl ing the information contained on this form from any and all liability whatsoever which might in any way result ~r the · om accuracy or maccuracy of the information requested and supplied by this form, Yours very truly, MERCHANTS BONDING COMPANY (MUTUAL) Executive Vice President 1. IF CONTRACT COMPLETED, PLEASE STATE: Approximate date of completion of work (or final delivery) Approximate acceptance date Final Contract Price $ 2. IF CONTRACT UNCOMPLETED. PLEASE STATE: Approximate beroentage or dollar amount of contract completed or delivered ~'~ ~ 3. Co you know of any unpaid bills for labor or material (Check) Yes No V' 4. Remarks: (ff any) Dated at Signature ,,/"~'-~/~. City of Fontana C ,'%- L I F O B N I A November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-06 Billy O. Parsons 16258 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16258 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requested by the owners. If you want to pay the bill in installments, pleasesend us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P,O, BOX 518) FONTANA. CALIFORNIA 92335 (714) 350-7600 City of Fontana CAL1FOBN~/~ November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-07 Guadalupe A. & Trinidad M. Savala 16266 Montgomery Avehue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of phapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16266 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requested by tl~e owners. ~f you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the heraring, Robert Schoenborn, PoE. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:w~ Enclosure 8353 SIERRA AVENUE (P,O. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 City of Fontaria C .'\ L t F O B N ! A November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-08 Roberto B. & Margaret Baca 16276 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16276 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the city Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requested by t~e owners. If you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (PO. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 City of Fontana CALIFOBNtA November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-20 Buddy A. & Joyce A. Grimes 7412 Oleander Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 7412 Oleander Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by the owners. If you want to ~ay the bill in installments, pleasesend us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Work~ Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (PO. BOX 518) FONTANA. CALIFORNIA 92335 (714) 350-7600 City of Fontana C A L I F O 1{ N ! A November 8, 1985 F~ile: Chapter 27 #220 A.P.N. 241-152-06 Steve & Barbara J. Sundquist 1624 7 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16247 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by the owners. !f you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Publis Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92335 (714~ 350-7600 City of Fontana C A L I F O I{ N I /'~ November 8, 1985 F~le: Chapter 27 #220 A,P.N. 241-152-05 Phillip J, & Janis J, Meyers 16257 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16257 Montgomery Avenue. The cost of .the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by the owners. If you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P .E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (PO. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 City of Fontana C ..\ L I F O ,~ N r, A November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-152-04 John V. &MaryL. Martinez 16267 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16267 Montgomery Avanue, The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requested by t~e owners. If you want to pay the bill in installments, please-send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the heraring. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA. CALIFORNIA 92335 (714) 350-7600 City of Fontana C A L t F O R N ]/~ November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-152-03 Pablo & Maria M. Casterena 16277 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16277 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by tBe owners. you want to pay the Bill in installments, please'send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518] FONTANA. CALIFORNIA 92335 (714) 350~7600 City of Fontaria C .,\ L I F O B N I A November 8, 1985 Fkle: Chapter 27 #220 A.P.N. 241-152-02 R. J. & Minnie Faye Keen 7436 Oleander Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 7436 Oleander Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by t~e owners. If you want to pay the bill in installments, pleasesend us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA. CALIFORNIA 92335 (714) 350-7600 City of Fontana CALiFOBNIA November 8, 1985 Fkle: Chapter 27 #220 A.P.N. 241-151-01 Leora Croghan P.O. Box 565 Mr. Baldy, CA 91759 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16208 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requested by the owners. If you want to pay the b~ll in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing, Robert Schoenborn, P.E. Public Works DirectOr By: Bob M. Porter Deputy Public Works Director R8: BMP :wp Enclosure 8353 SIERRA AVENUE (P.O, BOX 518) FONTANA. CALIFORNIA 92335 (714} 350-7600 City of Fontana C A L I F O B N t /\ November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-02 Concepcion& Luz Macias 16218 Montgomery Avenue Fontaria, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16218 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requestedby the owners. you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the he~ring. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA. CALIFORNIA 92335 (714) 350-7600 City of Fontana CALIFORNIA November 8, 1985 Fkle: Chapter 27 #220 A.P.N. 241-151-03 Donald P. & Evelyn E. Arivett 16226 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16226.Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requestedby t~ owners. If you want to pay the Bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 5!81 FONTANA, CALIFORNIA 92335 (714) 350-7600 City of Fontana CALIFOBN]A November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-04 Leo B. & Norms M. Buffum 16236 Montgomery Avenue Fontana, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of th~ 1911 Act of the Streets and Highways Code in front of your property at 16236 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be p~id in ten annual installments when requestedby the owners. If you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the heraring. Robert Schoenborn, PoE. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 83,53 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 City of Fontana C ,'\ L I F O ]~ N ] /'~ November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-05 AllenD. & Rebecca S. French 4800'Coolidge Avenue. Culver City, CA 9D230 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16248 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it wilI become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the city Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by t~e owners. If you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the he~ring. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Work~ Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (PO, BOX 518) FONTANA, CALiFORNiA 92335 (714) 350-7600 City of Fontana C A L I F O B N I A November 8, 1985 Fkle: Chapter 27 #220 A.P.N. 241-152-07 Michael C. Bates 16235 Montgomery Avenue Fontaria, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16235 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requestedby tl~ owners. If you want to pay the bill in installments, please'send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing, Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (PO. BOX 518) FONTANA, CALIFORNIA 92335 (714) 3504600 City of Fontana CAL1FOflNI^ November 8, 1985 F~le: Chapter 27 #220 A.P.N. 24~-152-09 Donna L. Sirback 16217 Montgomery Avenue Fontaria, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16217 Montgomery Avenue, The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property, A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ult~mately be collected with property taxes. The amount of the cost is sho~n in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by the owners. If you want to pay the Bill in installments, pleasesend us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, F..E- Public Works Director By: Bob M. Porter Daputy Fublic Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA. CALIFORNIA 92335 (714) 350-7600 City of Fontana CALIFORNIA November 8, 1985 F~le: Chapter 27 #220 A.P.N. 241-151-05 Allen D. & Rebecca S. French 4800~Coolidge Avenue.:. Culver City, CA 90230 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16248 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice ~s enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will ~become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requested by t~e owners. you want to pay the bill in installments, pleasesend us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, F.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92335 {714) 350-7600 N TICE ST Pursuant to the provisions of Chapter 27 of the "improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN that the cost of constructing ................. linearfeet of curb and gutter, - .............. square feet of sidewalk7-=' ............ 'square f'eet of paving, and San'liar7 Sewer 1~ac111tles in front of your property, ~ocated at 16246 Montgomery Avenue (Assessor's Parcel No. 241~151-05) Fontana, California, was $ 892.39 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on ~,~v~m~,~ lq, lqg~, ~ 7:30 p.~. , a~-- in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIS NOTICE: IS YOUR mILL Superintendent of Streets, THE AMOUNT SHOWN ABOVE WILL BE DUE City of Fontana, California THE DAY AFTER THE HEARING AND DELIN- ~IJENT FIVE DAYS THEREAFTER, If further information is needed, p~ease phone [NTERE~ST AT 6% PER ANNUM WILL COM' City Hall, Public Works Dept, (714) 823-3411. MENCE 37 DAYS/ AFTER THE HEARING. Ch, 27 #220 French City of Fontana C A L 1 F 0 P. N ] November 8, 1985 Fkle: Chapter 27 #220 A.P.N. 241-152-08 Felipe R. & Rosa De La Cruz 16225 Montgomery Avenue Fontaria, CA 92335 Sanitary sewer facilities were constructed recently under the provisions of ~hapter 27 of the 1911 Act of the Streets and Highways Code in front of your property at 16225 Montgomery Avenue. The cost of the work is to be paid for by the property owner. A Notice of Cost is being posted on the property. A copy of the Notice is enclosed. The cost will be due and payable within the five days following the hearing which is provided for in the Notice. If not paid, it will become a lien against the property, will accrue interest at 6% per annum, and will ultimately be collected with property taxes. The amount of the cost is shown in the Notice. In the past, the City Council has allowed bills for Chapter 27 sewer facilities work to be paid in ten annual installments when requestedby the owners. you want to pay the bill in installments, please.send us a request in writing. If you have any questions about the cost of the work, please get in touch with us before the hearing. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure 8353 SIERRA AVENUE (P.O BOX 518) FONTANA. CALIFORNIA 92335 (714) 850-7600 ~QNTANA CALIFORNIA 92335 (714) 3504600 City of Fo 'ttana November 13, 1985 File~ Ch. 27 #220 71-7221 A.P.N. 241~152~02 R. J. & Minnie Faye Keen 7436 Oleander Avenue Fontana, CA 92335 In accordance with our conversation of this date~ I am sending you an amended Notice of Cost for tI~e installation of sanitary sewer facilities in Montgomery Avenue~ The crease in cost from $6'37,65 to $937,65 is necessitated by the inclusion of a lateral to your property. The City will have this lateral installed in the near future. If you should have any further questions reKarding this mat= ter, please contact this office, Robert Schoenborn, P~E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS: BMP: wp Enclosure e" \ Ci' of Fontann CAI, IiFOiR,XIA November 13, 1985 File: Ch. 27 J~220 71-7221 A.P.N. 241~152-02 R. J. & Minnie Faye Keen 7436 Oleander Avenue Fontana, CA 92335 In accordance with our conversation of this date, I am sending you an amended Notice of Cost fortes installation of sanitary sewer facilities in MontgumeryAvenue. Tihe in- crease in cast from $637.65 to $937.65 is necessitated by the inclusion of a lateral to your property. The City Will have this lateral installed tn the near future, If you should have any further questions re~arding this mot= ter, please contact this office. Robert Schoenborn, P.E. Public Works Director By: Bob M. Porter Deputy Public Works Director RS:BMP:wp Enclosure AMENDED N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN that the cost of constructing ................. linear feet of curb and gutterr ............. square feet of sidewalk, - ............. square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 7436 Oleander Avenue (Assessor's Parcel No. 241-152-02) Fontana, California, was $937.65 ~ , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985, at 7:30 p.m. , ~ in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by a'ny property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 13, 1985 *Cost increased by $300 to cover the inclusion of a lateral to this property, TH{5 [;OTTO','- :S YOUR B~LL Superintendent of Streets, ~,,.!ou~,,' :~-:::','~N ~,~ovE W~LL ~E DUE City Of Fontaria, California FIVE DAYS THEREAFTSR. If further information is needed, please phone ~:?E~SST ~r ~": pER .~NNUN WILL CCM- City Hall. Public Works Dept. (714) 823-3411. Ch. 27 ~220 _Keen NAME LIST FOR THE INSTALLATION OF SEWER MAINS AND LATERALS IN MONTGOMERY AVENUE FROM OLEANDER AVENUE TO 660 FEET WEST, WITHIN TRACT 41S1 Petition No. 1 Assessor's No. Owner & Mailing Address 241-151-01~f,~Leora Groghart (16208 Montgomery Avenue) ~, P.O. Box 565, Mt.Baldy, Ca. 91759 241-151-02 ~Ff~,~ D ~ ~/ 16218 Montgomery Avenue, Fontaria 241-151-03~fg=2,3gDonald P. & Evenly E. Arivett ~S/ 16226 Montgomery Avenue, Fontaria 241-151-04~ ~f~,~ Leo B. & Norma M. Buffum ~ ~/ 16236 Montgomery Avenue, Fontaria 241-151-05~F¢~.~ Allen D. ~ Rebecca S. Freneh (1624~?Montgomery Avenue) 4800 Coolidge Ave. Culver City, CA, 90230 f_/{ 8318 Maple, Fonta-na 241-151-07~F~, ~q Guadalupe A. & Trinidad M. Savala ~ 16266 Montgomery Avenue, Fontana 241-151-08S¢ Robefro B. M rgaret Bae 16276 Montgomery Avenue, Fontana 241-151-20 ~/~'~ Buddy A. & Joyce A. Grimes /~D~ 7412 Oleander Avenue, Fontana NAME LIST FOR THE INSTALLATION OF SEWER MAINS AND LATERALS IN MONTGOMERY AVENFUE FROM OLEANDER AVENUE TO 660 FEET WEST, WITHIN TRACT 4181 Petition No. 2 Assessor's No. Owner & Mailing Address 241-152-10 ~I~4~ Federal National Mortgage Assn.(16207 Montgomery Ave.) P.O. Box 11886, Santa Ana, CA. 92711 ~,gD 241-152-09 ~/~'&/ Donna L. Sirback 16217 Montgomery Avenue, Fontana ~q~ 241-152-08 ~/Q,~ Felipe R. & Rosa De La Cruz (~?l 16225 Montgomery Avenue, Fontana 152-07 ~ ~/~ Michael C. Bates ~ 241- 16235 Montgomery Avenue, Fontana ~=~ ~,~ ~ - · / .,L;<~.f;~'241- 16247 Montg?B~:rry Av 241-152-04t~/p'~! John V & Mary L, Martinez 16267 Montgomery Avenue, Fontana ~?J 241-152-03 ~/~,~1 Pablo& M.ria .. ca.terena (/7i 16277 Montgomery Avenue, Fontaria ~0738! 77~,6 PaGE Tri~A 0241 01 0 000 I 03 1985 i j MOYER, SHARON d 10~03 0241 ~5~ 01 0241 151 01 00~ ~ ~ T~ NO ~181 LOT 11 ~ 0Zkl 151 01 ~Y85 1428 ~876 65382 _~ ~ ~ ~ 9z~ < 16218 ~TG~ERY DR= R RFC= T q ~ TR NO ~181 LOT 12 ~ ; ~2~ ~, ~ , 0 03 0241 '51 03 . , ~2~ 5 A I ETT EVELYN E 0241 151 03 0 '~, ~ ~ ~ i FONT~A, CA 92335 EXE~ ~ j , ~ ~D~ 8UF~, HORH~ ~ 0~1 151 ~ 0 ~8?~ ~ 5 ~ ~ TR NO ~181 LOT 14 exen: O0 ,, D ~ 0241 151 04 BYT5 360~ 11832 7000 FRENCH REBECCA S , 0 000' 0241 152 05 0 000 19~5 MEYERS,PHILLIP J 10103 0241 152 05 MEYERS JANIS J 0241 152 05 0 000i 1625 ~ONT OM DR'- R ~F~ T ~ Y5 ~1~0 TR NO 4181 LOT 5 14280~ 5 BY8 AJ ' ~O~ 162~7 ~N~G~ERY AVE DR= R RFC= T FONTANA, CA 92335 EXEM= O0 ~R NO 4181 LOT 6 0241 152 ~ BYB~ 14000~ BATES, MICHAEL C 10103 0241 152 O? 0241 152 07 0 ~0 FONTANA~ CA 92335 EXEM= O0 T~ NO 41~1 LOT ? DE LA CRUZ, :ELIPE R AND ROSA 1010~ 02~1 152 ~ 0241 152 ~ 0 ~ TR N~ 4181'LOT B 02~1 152 08 BY75~ 3602 ~ 0 05 ' 16217 ~NTGOMERY AVE DR= R RFC= FONIANA, CA 92335 / EXEM= O0 TR NO 4181 LOT 9 02~1 152 ~ BY7~ 5145 3465 Camino del Rio S.~ Suite 310 San Diego, CA 92108 City of Fontana ATTN: BOB M. PORTER P.O. Box 518 Fontana, CA 92335 Gosney Construction Re: Bloomington, CA CA104481 $24,189.50 Dear Sirs. July 15, 1985 This was issued coredrig construction of sewer facility improvements and C.C. overlay of Mont~omer Ave. Will you be good enough to supply information requested below, in order that our Home Office records may be kept up to date? Merchants Bonding Company (Mutual) hereby releases the architect or engineer suppf ing the information contained on this form from any and all liability whatsoever which might in any way result ~r~rn the accuracy or inaccuracy of the information requested and supplied by this form, Yours very truly, MERCHANTS BONDING COMPANY (MUTUAL) Executive Vice President 1. IF CONTRACT COMPLETED, PLEASE STATE: Approximate date of completion of work (or final delivery) 11- 5- 85 Approximate acceptance date 11= 19-85 Final Contract Pdce $ 25,309.33 2. IF CONTRACT UNCOMPLETED, PLEASE STATE: Approximate percentage or dollar amount of contract completed or delivered 3. De you know of any unpaid bills for labor or material (Check) Yes No xx 4. Remarks: (If any) _~; AMENDE'D ~ Hearing Date: November 19, 1985 Chapter 27 #220 71-7221 SPECIAL ASSESS~NT-CHAPTER27 #220- ~PORT OF STREET SPERI~E~ENT ON WO~ DONE UNDER THE PROVISIONS OF CHAPTER 27 OF THE STREETS Am HIGHWAYS CODE. The work done includes the installation of sewer mains and laterals in Montgomery Avenue from Oleander Avenue tO 660 feet west within Tract 4181 at a total cost to the abutting owner of $15,902.40. Assessor's Amount of Number Owner and Mailing Address Assessment 241-151-01 Leora ~r6ghan (Re 16208 Montgomery Avenue) P.O. Box 565, M~, Baldy CA 91759 $888.44 241-151-02 Concepcion& Luz Macida 16218 Montgomery Avenue, Fontana 892.39 241-151-03 Donald Po & Evenly E. Arivett ~T~ .~1~.~i 16226 Montgomery Avenue, Fontand ~'. ? -~ 892.39 241-151-04 Leo B. & Norma M. Buffurn 16236 Montgomery Avenue, Fontana 892.39 241-151-05 Allen D. & Rebecca S. French (Re 16248 Montgomery) 4800 Coolidge Ave., Culver City, CA 90230 892.39 241-151-06 Billy O. Parsons 16258 Montgomery Ave., Fontana 892.39 241-151-07 Guadalupe A. & Trinidad M. Savala 16266 Montgomery Ave., Fontana 892.39 241-151-08 Roberto B. & Margaret Baca 16276 Montgomery Ave., Fontand 892.39 241-151-20 Buddy A. & Joyce A. Grimes 7412 Oleander Ave., Fontana 546.82 241-152-10 Federal National Mortgage Association P.O. Box 11886, Santa Ana, CA 92711 . 908.49 (Re 16207 Montgomery Avenue) 241-152-09 Donna L. Sirback 16217 Montgomery Avenue, Fontana. 910.61 241-152-08 FeliDe R. & Rosa De La Cruz 16225 Montgomery Avenue, Fontana 910.61 241-152-07 Michael C. Bates //  910.61; ~ %1 ~ 16247 Montgomery Avenue, Fontana //D ~ Chapter 27 ~/220 71-7221 l~earing Date: November 19, 1985 REPORT OF STREET SUPERINTENDENT Assessor"s Amount of Number 0whet and Mailing Address Assessment 241-152-05 Phillip J. & Janis J. Meyers 16257 Montgomery Avenue, Fontana $910.61 241-152-04 John V. & Mary L. Martinez - 16267 Montgomery Avenue, Fontana 910 61 241-152-03 Pablo & Maria M. Casterena 1627~,.~Montgomery Avenue, Fontana 910.61 241-152-02 R.J. & Minnie Faye Keen PA F~2'/~YO 937.65,~~~?,~ 7436 Oleander Avenue, Fontana *Amount of assessment for R. J. & Minnie Faye Keen was increased from $637.65 $937.65 because Mr. Keen requested the inclusion of a let ~al to his property, F~ Consequently, total amount of cost to abutting owners increased from $i5,602.40 to $15,902,40 ...... ' ~ C_~' Z-3 NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HER EBY GIVEN that the cost of constructing ................. linear feet of curb and gutter, - ............. square feet of sidewalk, - ............. ~l'uare feet of paving, and Sanitary Sewer Services in front of your property, located at 16276 Montgomery Avenue (Assessor's Parcel No. 241-151-08) Fontana, California, was $ 8~?. ~q . and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontaria, California. NOTICE IS FURTHER GIVEN that on November 19, 1985. at 7:30 p.m. , EEt .... in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date Nvovember 8, 1985 THIS NOTICK IS YOUR BILL Superintendent of Streets, ,~,~o=~:~ ~..~o~,~, ~ov~ w,~L ~ Du~ City Of Fontana, California QUENT FIVE DAyS TI~ERI~AFI'ER, If further information is needed, please phone [NTEREST AT 6(1~, PER ANNUM WILL CONI- City Hall, Public Works Dept. (714) 823-3411. Ca. 27 #220 Baca NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing ................ linearfeetofcurb and gutter, - ............. -square feet of sidewalk, - .............. square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 7412 01e~nd~r AvPnn~ (Aq~Pqqn~lq P~Y~] Nn ?A1-1~-20) Fontana, California, was $ 546.82 and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on !~Tovember 19, 1985, at 7:30 p.m. , at in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior tO the time set for the hearing. Date November 8, 1985 THis NOTICE: IS YOUR BILL Superintendent of Streets, ~l~ou~,-c ~-~,ow~ ~,~ovz w,~ ~s DUE City Of Fontana, California QUENT FIVE DAYS THEREAFTER, If further information is needed, please phone INTEREST ""T 6(7~3 PER ANNUM WILL CQM* City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Grimes N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE ISHEREBYGIVENthatthecostofconstructing ................ linearfeetofcurb and gutter, - ............. square feet of sidewalk, ' ............. square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 16207 Montgomery Avenue (Assessorts Parcel No. 241~152-10) Fontana, California, was $908.49 and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on Nove~nber 19, 1985~ at 7:30 p.m. , in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 'FFHS NOTICe tS YOUR BILL Superintendent of Streets, THe: A,~¢~,~ sHOWN A~OV~ w,L~ .~ Du~ City Of Fontana, California ~UENT FIVE DAyS TH~REAFT=R. If further information is needed, please phone iNTEREST AT 6q~ pER ANNUM ~/ILL COM- City Hall, Public Works Dept. (714) 823-3411, Ch. 27 #220 Federai National MrS. Assn. NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE iS HEREBY GIVEN that the cost of constructing .................. linearfeet of curb and gutter, - ............ -square feet of sidewalk, - .............. ~quare feet of paving, and S~n~t~ry Sewer Facilities in front of your property, located at 16217 Montgomery Avenue (Assessor's Parcel No. 241-152-09) Fontana, California, was $ 9'in (;1 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontaria, California. NOTICE IS FURTHER GIVEN that on NoveraSer 19, 1985. at 7:30 p.m. ,'~r" in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. November 8, 1985 Date n-~.,s I-~OT,CE IS YOUR S,LL Superintendent Of Streets, THE ,',I.,O,J,-.T s~o,w~ ~-~ovs ,~,LL ~ .u~ City of Fontana, California OUENT FEV~ DAYS THEREAFTER. If further information is needed, please phone INTEREST AT Gc~, ~ER ANNUM WILL COM* City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Sirback N TICE OF ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing ................. linearfeetofcurb and gutter, - ............ square feet of sidewalk,- ............... square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 16225 Montgomery Avenue, (Assessorfs Parcel ~o. 241-152~08) Fontana, California, was $ ~n ~ , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on ~ovemSer 19, 1985, at 7:30 p~m. , in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIS NOTICE IS YOUR BILL Superintendent of Streets, THE AMOUI'~T ~'O~V,~ ~-~OVE 'V'~L ~ ~U~ City Of Fontaria, California QUENT FIVE DAYS THEREAFTER. If further information is needed. please phone MENC~ 31 DAyS AFTER THE HEARING, City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 De ~-~ Cruz NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing .............. linearfeetofcurb and gutter, ' ............ square feet of sidewalk, ' ............. .~7~re feet of paving, and Sanitary Sewer Facilities jR front of your property, located at 16235 'Montgomery Avenue (Assessor~'s Parcel No, 241-152-07) Fontana, California, was $ 910.61 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985, at 7:30 p.m. , a-t- in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November2, 1985 T;-]I5 :NOTICE ]B YOUR BILL Superintendent of Streets, "~:~ ~,~,~,-~ =,~ew~ ~,~ov~ W,LL ~E ~U~ City Of F0ntana, California QUKNT FiVE DAYS THEREAFTER, If further information is needed, please phone ;NTEREST AT 6(F"C, PER ANNUM WILL COM- City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Bates NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN that the cost of constructing .................. linearfeet of curb and gutter, - ............ square feet of sidewalk, - ............. square feet of paving, and Sanltarv Sewer ~acilities in front of your property, located at 16247 Montgomery Avenue (Assessorts Parcel No. 241-152-06) Fontana, California, was $ 910,~ , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 15}, 1985 at 7:30 p.m, in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIcj NOT~CE IS YOUR BILL Superintendent of Streets, ~H= ~.~,,ou.T ~.ow,. A.ow= W,LL ~= ~u~ City of Fontana, California QUENT FIVE DAYS THEREAFTER. If further information is needed, please phone ~NT_rREST AT 6c~r, PeR ANNUM '~VlLL COM City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Sundquist N TI ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEiSHEREBYGIVENthatthecostofconstructing ................. linearfeetofcurb and gutter, - ............ square feet of sidewalk, - ............ -square feet of paving, and SanlEery Sewer Serv'fces in front of your property, located at 16257 Montgomery Avenue (Assessor"$ Parcel No, 241~-152~05) Fontaria, California, was $ 910, 61 , and that a report by the Superintendent of Streets, pertaining thereto, has been flied with the City Clerk of the City of Fontaria, California. NOTICE IS FURTHER GIVEN that on November 19, 1985, at 7~30 p,m, ,~rt in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. November 8, 1985 Date i'~H~ NOTIC~ IS YOUR miLL Superintendent of Streets, ~,,~ ~,,ou~ ~.o,~ ..ov~ ~.~ .~ o~ City of Fontana, California QUENT FIVE DA~S TI-~BRE:AFTER, If further information is needed, please phone , City Hall, Public Works Oept. (714) 823-3411. Ch. 27 #220 Meyers N TI ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing ................ -tinearfeetofcurb and gutter, - ............ -square feet of sidewalk, - ............. square feet of paving, and Sar~:ttary Sewer Facil:ities in front of your property, located at 16267 Montgomery Avenue (Assessor's Parcel No. 241-152-04) Fontana, California, was $ 910.61 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985, at 7:30 p.m. , at- in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 T=,S NOT:C--' 'S YOUR C!'L Superintendent of Streets, ,-~,E .~,,,~,j~,= ~.o,v. A~ovE ,,',LL .= ~.E City Of Fontaria, California ClUENT F]VF~ DAYS THEREAFTER. If further information is needed, please phone i City Hall, Public Works Dept. (714) 823-3411 Ch. 27 #220 Martinez N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE ISHEREBYGIVENthatthecostofconstructing ................. linearfeetofcurb and gutter, - ............ square feet of sidewalk, - ............. 'square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 16277 Montgomery Avenue, Fontana Assessorts Parcel No. 241-152-03) Fontana, California, was $ ql 0.61 and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that On November 19, 1985 at 7:30 p,m, in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIS NOTIC.-" IS YOUR BILL Superintendent of Streets, ~.,~oi~T sHowl.~ A=ov~ W'LL :~ DUE City Of FOntana, California QUE~'JT FIVE DAYS THEREAFTER, If further information is needed, please phone INTEREST AT 6% PER ANNUM WILL COM' City Hall, Public Works Dept. (714) 823-3411. Ch. 27 ~'~220 Casterena N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN that the cost of constructing ................. linearfeet of curb and gutter, - ............ square feet of sidewalk, - ............ -square feet of paving, and Sanftary Sewer Facilities in front of your property, located at 7436 Oleander Avenue, (Assessorts Parcel No, 241-152-02) Fontana, California, was $ 6~7. ~s , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on NovemBer 19, 1985, at 7:30 p.m. , in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date NovemBer 8, 1985 1'HIS HOTIGE: :S YOUR D:LL Superintendent of Streets, 7HE ,:'.CU,<T ="OWN ~.~OVE W'LL "~ ~U~ City Of FOntana, California Q:JENT FIVE DAYS THEREAFTER, If further information is needed, please phone ;NTEREST AT 6% PER ANNUM WILL COM' City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Keen NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing ................ linearfeetofcurb and gutter, - ........... -square feet of sidewalk, - ............. square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 16208 Montgomery Avenue (Assessor's Parcel No, 241-151-01) Fontana, California, was $ 888.44 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985 at 7:30 p.m. , at in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 tHiS NOTICE ',S yOUR BILL Superintendent of Streets, T~ A,~ou~,'~ ~.o~,/~ A~OVE W,LL ~ DUE City Of Fontana, California QUE[1T FIVE DAYS THEREAFTER, If further information is needed, please phone ~ City Hall, Public Works Dept. (714) 823-3411. Ch, 27 # 220 Croghan N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing ................. linearfeetofcurb and gutter, - ............. 'square feet of sidewalk, ' .............. ~quare feet of paving, and .Sanitary Sewer l~acilities in front of your property, located at 16218 Montgomery Avenue (Assessor~s Parcel No. 241~151~02) Fontana, California, was $ 892.39 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985 at 7:30 p.m. , at in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed forthe cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. November 8, 1985 Date TH,S ~OTICS ~S YOUR SIL' Superintendent of Streets, :-,~E ~.,~ou,~ =.own A.ow w,~ ~ ~u~ City of Fontana, California QUENT FIVE DAYS THEREAFTEI:L if further information is needed, please phone o City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 ~acias NTI ST Pursuant to the provisions of Chapter 27of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN that the cost of constructing -~'--~- ........... linearfeet of curb and gutter, - ............. -square feet of sidewalk, - ............. ~uare feet of paving, and Sanitary Sewer Facilities in front of your property, located at 16226 Montgomery Avenue (Assessor's Parcel No. 241~t51~03) , Fontana, California, was $ 892.39 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on Novemberlg, 1985 at 7:30 p.m. , at- in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIS NOTfCS IS YOUR E~[L,L Superintendent of Streets, ,'~,~>,T SHOWN ~aovs ~,'I~L ~ ~u~ City Of Fontaria, California QUENT FIVE DAYS THJ~Ri~AFT~R. If further information is needed, please phone !r'ITEREST AT 6O/0 P~R ANNUM WILL COM- City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Arivett N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICEISHEREBYGIVENthatthecostofconstructing ................. linearfeetofcurb and gutter, - ............ square feet of sidewalk, - ............. 'square feet of paving, and sanitary sewer Facilities in front of your property, located at 16236 Montgomery Avenue (Assessorts Parcel No. 241-151-04) Fontana, California, was $ 892.39 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985 at 7:30 p;m, jar- in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIS ,',IOTICm IS YOUR SILL Superintendent of Streets, ~O~T .~,-~ow~ ~.~ow w,~ ~ ~ City of Fontana, California QUENT FIVE DAYS THEREAFTER. ~f further information is needed, please phone [NT~REBT AT 60~o PER/~NNUM WILL COM' City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Buffum N TICE ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS HEREBY GIVEN that the cost of constructing ................. linearfeet of curb and gutter, - .............. square feet of sidewalk;.-= ............. 'square feet of paving, and Sanitary Sewer ~acilities in front of your property, located at 16246 Montgomery Avenue (Assessor's Parcel No. 241-151-05) Fontana, California, was $ 892.39 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on ~n.,,.,.~,.~- lq, lqR5 At- 7:30 p.-m. , art-- in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8, 1985 THIS NOTICS IS YOUR ~ILL Superintendent of Streets, ~-~= A,,o~,~T ~Ho,'~ A=o~ ,',,,,.~_ ~. ~.. City of Fontana, California QUEr.]T FIV~ DAyS THEREAFTER, If further information is needed, please phone ~NTEREST AT 6o~ PER ANNUM WILL COM* MBNC~ 31 DAYS AFTER THE H~ARING, City Hall, Public WOrks Dept. (714) 823-3411. Ch. 27 #220 French ~. Z/~ZZO Parsons N TI ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS H EREBY GIVEN that the cost of constructing .................. linear feet of curb and gutter, - ........... -square feet of sidewalk, - ............ square feet of paving, and Sanitary Sewer Facilities in front of your property, located at 16258 Montgomery Avenue (Assessor~s Parcel No. 241-151-06) Fontana, California, was $ 892.39 , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontana, California. NOTICE IS FURTHER GIVEN that on November 19, 1985 at 7:30 p.m. , in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons· Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date November 8,~985 T:-aS NOT!CE ~S YOUR BILL Superintendent of Streets, 7,,~: A~o.I,~ s,~ow,~ A~o,.,E ,'.LL .~ DU~ City Of FOntaria, California QUSNT FIV= DAYS THEREAFTF_R. If further information is needed, please phone · ' City Hall, Public Works Dept. (714) 823-3411, Ch. 27 ~'~220 Parsons NTICE F ST Pursuant to the provisions of Chapter 27 of the "Improvement Act of 1911" of the State of California: NOTICE IS H EREBY GIVEN that the cost of constructing .................. linear feet of curb and gutter, - ............. square feet of sidewalk, - ............ -square feet of paving, and Sanitary Sewer Facilities iR front of your property, located at 16266 Montgomery Avenue (Assessor's Parcel No. 241-151-07) Fontana, California, was $ 89~ ~q , and that a report by the Superintendent of Streets, pertaining thereto, has been filed with the City Clerk of the City of Fontaria, California. NOTICE IS FURTHER GIVEN that on ~nve~,~.P~- 1% 1985 at 7:30 p.m. in the Council Chambers in the City of Fontana, California, the City Council will hear and pass upon said report by the Superintendent of Streets of the cost of the construction, together with any written or oral objections or protests, if any, which may be raised by any property owner liable to be assessed for the cost of such construction and any other interested persons. Written protests should be delivered to the City Clerk prior to the time set for the hearing. Date t~ovember 8, 1985 THfS NOTICE IS YOUR BILL Superintendent of Streets, ?~ A~oU~T s.ow~ ABOV= .~',L~_ =S DU~ City Of FOntana, California QU:~NT FiVE DAYS THEREAFTER. If further information is needed, please phone c, City Hall, Public Works Dept. (714) 823-3411. Ch. 27 #220 Savala When recorded AMENDED ~ Hearing Date: November 19, 1985 Chapter 27 ~220 71-7221 SPECIAL ASSESSMENT - CHAPTER 27 ~220 - IrEPORT OF STREET SUPERINTENDENT ON WORK DONE UNDER THE PROVISIONS OF CMAPTER 27 OF THE STREETS AND HIGHWAYS CODE. The work done includes the installation of sewer mains and laterals in Montgomery Avenue from Oleander Avenue tO 660 feet west within Tract 4181 at a total cost to the abutting owner of $15,902.40., Assessor's Amount of Number Owner and Mailing Address Assessment 241-151-01 Leora Groghan (Re 16208 Montgomery Avenue) P.O. Box 565, Mr, Baldy CA 91759 $888.44 241-151-02 Concepcion & Luz Mactas 16218 Montgomery Avenue, Fontana 892.39 241-151-03 Donald P, & Evenly E. Arivett 16226 Montgomery Avenue, Fontana 892.39 241-151-04 Leo B. & Norma M. Buffum 16236 Montgomery Avenue, Fontana 892.39 241-151-05 Allen D. & Rebecca S. French (Re 16248 Montgomery) 4800 Coolidge Ave., Culver City, CA 90230 892.39 241-151-06 Billy O. Parsons 16258 Montgomery Ave., Fontana 892.39 241-151-07 Guadalupe A. & Trinidad Mo Savala 16266 Montgomery Ave., Fontana 892.39 241-151-08 Roberto B. &Margaret Baca 16276 Montgomery Ave., Fontana 892.39 241-151-20 Buddy A. & Joyce A. Grimes 7412 Oleander Ave., Fontana 546.82 241-152-10 Federal National Mortgage Association P.O. Box 11886, Santa Ana, CA 92711 908.49 (Re 16207 Montgomery Avenue) 241-152-09 Donna L. Sirback 16217 Montgomery Avenue, Fontana 241-152-08 Felipe R. & Rosa De La Cruz 16225 Montgomery Avenue, Fontana 241-152-07 Michael C. Bates 16235 Montgomery Avenue, Fontana 241-152-06 Steve & Barbara J. Sundquist ' 16247 Montgomery Avenue, Fontana 910.61 Pa~e 2 Chapter 27 #220 71-7221 Hearing Date: November 19, 1985 REPORT OF STREET SUPERINTENDENT Assessor's Amount of Number Owner and Mailing Address Assessment 241-152-05 Phillip J. & Janis J. Meyers 16257 Montgomery Avenue, Fontana $910.61 241-152-04 John V. & Mary L. Martinez 16267 Montgomery Avenue, Fontana 910.61 241-152-03 Pablo & Maria M. Casterena 16277 Montgomery Avenue, Fontana 910.61 241-152-02 R.J. & Minnie Faye Keen 7436 Oleander Avenue, Fontana ~B7.65' * Amount of assessment for R. J. & Minnie Faye Keen was increased from $637.65 $937.65 because Mr. Keen requested the inclusion of a lateral to his property. Consequently, total amount of cost to abutting owners increased from $15,602.40 tO $15,902.40. Hearing Date: November 19, 1985 Chapter 27 ~220 71-7221 SPECIAL ASSESSMENT - CHAPTER 27 ~220 - REPORT OF STREET SUPERINTENDENT ON WORK DONE UNDER THE PROVISIONS OF CliAPTER 27 OF THE STREETS AND HIGHWAYS CODE. The work done includes the installation of sewer mains and laterals in Montgomery Avenue from Oleander Avenue to 660 feet west within Tract 4181 at a total cost to the abutting owner of $15,602.40. Assessor's Amount of Number Owner and Mailing Address Assessment 241-151-01 Leora Grogban (Re 16208 Montgomery Avenue) P.D. Box 565, Mr, Baldy CA 91759 $888.44 241-151-02 Concepcion & Luz Macias 16218 Montgomery Avenue, Fontana 892.39 241-151-03 Donald P, & Evenly E. Arivett 16226 Montgomery Avenue, Fontana 892.39 241-151-04 Leo B. & Norma M. Buffum 16236 Montgomery Avenue, Fontana 892.39 241-151-05 Allen D. & Rebecca S. French (Re 16248 Montgomery) 4800 Coolidge Ave., Culver City, CA 90230 892.39 241-151-06 Billy O. Parsons 16258 Montgomery Ave., Fontana 892.39 241-151-07 Guadalupe A. & Trinidad M. Savala 16266 Montgomery Ave., Fontana 892.39 241-151-08 Roberto B. &Margaret Baca 16276 Montgomery Ave., Fontana 892.39 241-151-20 Buddy A. & Joyce A. Grimes 7412 Oleander Ave., Pontana 54~.82 241-152-10 Federal National Mortgage Association P.O. Box 11886, Santa Ana, CA 92711 ~ 49 (Re 16207 Montgomery Avenue) 241-152~09 Donna L. Sirback · 16217 Montgomery Avenue, Fontana 910.61 241-152-08 Felipe R. & Rosa De La Cruz 16225 Montgomery Avenue, Fontana 910.61 241-152-07 Michael C. Bates 16235 Montgomery Avenue, Fontana 910.61 241-152-06 Steve & Barbara J. Sundquist 16247 Montgomery Avenue, Fontana 910.61 Page 2 Chapter 27 #220 71-7221 Hearing Date: November 19, 1985 REPORT OF STREET SUPERINTEndENT Assessor's Amount of Number Owner and Mailing Address Assessment 241-152-05 Phillip J. & Janis J. Meyers 16257 Montgomery Avenue, Fontana $~10.61 2411152-04 John V~ & Mary L. Martinez 16267 Montgomery Avenue, Fontana 910.61 241-152-03 Pablo & Maria M. Casterena 16277 Montgomery Avenue, ?ontana 910.61 241-152-02 R.J. & Minnie Faye Keen 7436 Oleander Avenue, Fontana 637.65 RESOLUTION NO. 85- 225 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FONT~NA OVERRULING ALL PROTESTS, CONFIRMING THE REPORT OF THE STREET SEPERINTENDENT ASSESSING THE COST OF SANITARY SEWER FACILITIES IN MONTGOMERY AVEN"jE FROM OLEANDER AVENUE TO 660 FEET ~FEST, WITHIN TRACT 4181. /'S/Natha. A. Simon CI?f OF FONT~NA CLAM FOP~M This claim form is to be used orLly Sen General Obligation checks are to be issued and normal purchase order and invoicing procedures cannot be followed. F~gular meetings of the City ODuncil for consideration of claims against the City of Fontana are held on the First and Third Tuesday of each month. CLAII~NT: G~ney Construction DATE: See Below ADDRESS: P-,~0. Box 381 CHECK NEEDED BY: 12-3-85 CITY: ~"foomington, CA 92316 DATE ~ ~ IlLMS .... I ~IOLrNT _~Release retentioa~ on Sewer Facility improvements of Montgomery 11-25-8~ A~., 660' West of Oleander Avenue. Accepted as complete by City Council on Nov. 5, 1985. Chapter 27, #220, 71-7221 $2,530.94 TOTAL The above is a true and ' FUND - FUNCTION . S $0 00~ 00 Correct claim against 33 the City of Fontarm and 71 _ 7221 , 94 no part of the same has heretofore been paid. SIGN: ' X ' Vendor ~ Date Invoice t; Total Amount FOR FIN~2~CE USE ONLY Pa)nnent Date CERTIFIED COF/{E CT: ~FPROVED: DEPT/DIV L.,. ~:' '~ . · ................................ CITY OF FONTANA BUSlNE~LICE~EGERTIFiCATE 85529 ~ CbNTRA'CTO ,, = ' ' JOHN' C, GO:SNEY ':~ 60SNEY CONS'TRU~T'zON~':E ~0 '~OX PO BOX ~81 '~' ~ ' BL:OONiNG~ON City of Fontana C A L I F O R N 1 A aa..ary 29, File: Montgomery Ave. Sewer Project #220 R.j. Keen Minnie Faye Keen 7436 Oleander Avenue Fontana, Ca. 92335 I am writing regarding the completion of the sewer lateral in front of your property at 7436 Oleander, Fontana, Ca. 92335. The work has now been completed and the $300.00 for the lateral is now due. Please remit payment to the Cityof Fontana, P.O. Box 518, Fontana, CA. 92334, Attn: Public Works Department. If you have any questions, please call me at 350-7610. Robert Schoenborn, P.E. Public Works Director Deputy Public Works Director RS:BMP:sm 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 ~,~o~,.~ =eq~...~ ~,, 068959 92335 ~ I ~ ,:0., CAL{F. OFFICt~L ~ECCROt' City O~ Fon~ana (Public Works Department) ~ ~A~ ~ ~ S: ~ 92335 Q~FIC!AI_ qECC~DS I~BS I~AR ~ 7 PM 3: ~ I City of Fontaria (Public Works DeDartment~ SAN BERNA[ID[~IO STATE O~ CALIFOI~IIA ) S8 ' 86 0689'71 ~CORDEDIN 92335 ~ SAt~ 5ERNARDINO [ ~'s~l h ~? . CO.. CALIF. Ch. 27 #220 De La Cruz l.lhea =eco~aed mail to: t~8~ MAR ;7 P~ 3:/II SAN BERI4ARDiNO ~;~;., =~,~o~,, ~~ 86-068969 Ch. 27 #220 Sirback REC3RDED fit i9B6 MAR 17 P'4 3: {+ I 9Z335 CO., CAtiF. ~ Cb. 27 #220 Federal National MtM. Assn. STATE OF CALII~0RNIA ) SS ' CA. 27 t;220 Grimes City of Fontana P. o. ~ox sls ~ SAN Fortran, California CO.. CALI~. Ch. 27 #220 Baca Recording requested by City of Fontana OFFICtAL city of Fontana (public Works ~ { CO., GAIjF. Ch. 27 #220 Savala x,. o. Box 518 .. ;~ i~cs t D.~ .~AI4 8ER~4/,RD['~IO Ch. 27 #220 Parsons Ci~y of Foncana F'.=CCi;3ED ObJ. igors| Allen D. & Rebecca S. French ,,,,,. ,,, .,,.,,o,,,., ,,, ,,.,,~i~__~.~_.~., :,. ,..,h .,,_,, Ch. 27 l~220 French ~'2 ~; CO., CAtIF. Ch. 27 f~220 Buffum OFFICIAL ~EC2~;S City o~ Fon~ana (Public Works Department) SAN ~~'~R~D RECCRDED IN When recorded mall co: OFFtC!AL RECORDS City of Fontana (Public Works Department) ~86 MAR 17 FM 3:40 , ,~z :Fi~ ~ cos SAN EERNARDINO Ch. 27 #220 Maclas 9573 Sierra Avenue, Suite A · Fontana, CA 92335 (714) 829-0668 · December 7, 1988 - , · City of~Fontana (Public Works Dept.) · P.O. Box 518 · Fontaria, CA 92335 Our Escrow No. 16l~ Case No. Judgment/Lien recorded March 17, 1986 Plaintiff: City of Fontana Defendant: Donald P. Arivett and Evelyn E. Arivett We are processing an escrow wherein we will be paying the above referenced Abstract of Judgment/Lien in full at the close of our above referenced escrow. Please provide us with your demand for payment in full along with a Satisfaction of Judgment/Release of Lien to be recorded only upon payment of your demand. In the event this Judgment/Lien has already been paid in full, please provide us with a Satisfaction or Release so that we may have it recorded. If you have any questions, please contact the undersigned. Thank you for your cooperation and assistance in this matter. Sincerely, Escrow 0ffi~er ,~,~ ENCLOSURE: COpy of recorded'Judgment/Lien City of Fontana C A L 1 F O g N ~ A April 30, 1986 File: Chapter 27 #220 Grimes Fidelity National Title Company 27215 Baseline Highland, CA Sanitary sewer.,faeilities wore constructed in front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Re- co~der's Office. The assessment has now been paid, and the lien can now bereteased. By recording the attached ,Releas~ at the County Recorder's Office, Hall of Records, 172 W, Third Street, San Bernardino, CA 92415, you will clear the records pertaining to th~ prop~rty.,.The recording fee is $9.00. pleaseTe~ord't~i~elease'~'~ienln'-order toelear the property. The additionaY ce~' is for ybur ~i't~s. Robert Schoenborn, ?.E. Maintenance/Engineering Ser~ces Agency Director RS:wp Enclosures 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 RELEASE OF LIEN The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in him by the Improvement Act of 1911 upon the real property here- lnafter described is hereby released, the claim hereunder having been fully paid I~,FASE OF LIEN Fontana, California Date April 30, 1986 TO PUBLIC WORKS DEPAR1MENT RECEIVED 0F Morris Plan Company $ 565.00 , in payment of Chapter 27 Lien. Parcel No. 241 ~ 151 - 20 , Project # 220 Principal $ 546.82 Interest $ 18.18 Please issue Release of Lien. Legal- Owner as listed on Lien: Buddy & Joyce Grimes ~~ 7412 Oleander Ave. . Fontana, Ca. 92335 SEND RELEASE TO: Fidelity National Title Company 27215 Baseline Highland, Ca. Title Order No. 6750810 , City of Fontana CALIFORNIA MEMORANDUM TO: Finance Director/Ed Luekemeyer FROM: Bob M. Porter/Engineering Services Director ~ SUBJECT:Distribution of Cost, Chapter 27 #220 (71-7221) DATE: 6-27-86 The construction of sewer facility improvements of Montgomery Avenue, 660' west of Oleander Avenue are now complete and your records should reflect the following: Payment to Coshey construction $25,309.33 Payment to Herald News 137.47 Actual charges to payroll .11 $528.00 .19 269.00 797.00 Charge for Eng. & Stking to be credited to 10-31607 936.25 Total Eng. & Staking cost 7,733.25 Total project cost $ 27,180.05 Property owner assessment: $15,902.40 Balance $11,377.65 Balance to be charged as follows: 10-4321-St repairs: $7,976.85 Sewer fund: 3,300.80 , City of Fontana CALIFORNIA MEMORANDUM TO: Ed Luekemeyer, Finance Director FROM: Bob Porter, Engineering Services Director,s~~ SUBJECT: Engineering and/or Engineering Staking Fee DATE: June 23, 1986 Per City Council Resolution 78-74 establishing engineering fees for City- funded projects, the following are projects ~at qualify for the engineering fees and are to be credited to account 10-31607. 1. 71-7229 $3,330.81 2. 10-6090 624.78 3. 10-6117 705.09 4. 71-7221 624.78 5. 38-7114 22,040.00 7. 38-7108 1,860.00 71-7215 1,650.00 8. 38-7112 2,427.02 71-7216 4,314.70 Total $ 37,577.18 a-9-, qz-r~ c 19a~3 ,c~- 3 7_ 5~7'7- 73 ..,,/J_~ ,~_.~ qq,~te.oc~ 2-3, 1777-73 - ,_, , ' ~. , ~ __'~Te_.__.L',1'~'~ '"" R~.FASE OF LIEN Sewer Fontana, California Date September 2, 1986 TO PUEZC WORKS DEPAR2MENT RECEIVED OF Transamerica/Donald Arivett $ 952.26 , in payment of Chapter 27 Lien. Parcel No. 241-151-03 , Project 220 Principal $ 892.39 Interest $ 59.87 PI~e issue Release of Lien. Legal 0wner as listed on Lien: Donald P. & Evelyn E. Arivett ~~ 16226 Montgomery Ave. Fontana, Ca. 92335 Finance Director PLEASE RELEASE LIEN TO: Transamerica Financial Services, Inc. 308 North Riverside Ave. Suite B Rialto, Ca. 92376 City of Fontana CALIFORNIA September 2, 1986 File: Ch. 27 #220 Transamerica Financial Services, Inc. 308 North Riverside Avenue, Suite B Rialto, CA 92376 Sanitary sewer facilities were constructed in front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the CoUnty Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA 92415, you will clear the records pertaining to the ~roperty. The recording fee is $9.00 Please record this Release of Lien in order to clear the property. The carbon copy is for your files."' Robert Schoenborn, P.E. Maintenance/Engineering Services Agency Director Attachments 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, GALIFORNIA 92~35 (714) 350.-7600 Da~a~/~hyis 2n~ day of September , 1986 City of Fontana CALIFORNIA October 8,1986 File: Chapter 27 #220 Montgomery Sewers Leora Croghan P.O. Box 565 Mr. Baldy, Ca. 91759 Re: Sanitary Sewers -Montgomery Ave.-APN 241-151-01; 16208 Montgomery Ave. Per our phone conversation and your request of today, I am sending copies of the following documents; Resolution 85-225 showing the period of time and interest rate charged on the lien for this property, "Notice of Lien" showing the date and amount of the lien. Also a copy of the "Notice of Cost" which was mailed to your address and also posted on the property. If you should have further questions, please call my office at 350-7610 or contact Irene Brunson in our Finance dept. at 350-7669. Robert Schoenborn, P.E. Maintenance/Engineering Services Agency Director ~cClellan Account Clerk II RS:sm Attachments 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92335 (714) 350-7600 RELEASE OF LIEN SEWER LIEN Fontana, California Date: November 3, 1986 To: Public Works Received of Felipe R. & Rosa De La Cruz $910.61, in payment Of Chapter 27 lien. Parcel: #235-142-08 Project: #220 Principal: $910.61 Legal owner as listed on lien: Felipe R. & Rosa De La Cruz 16225 Montgomery Please issue release of lien to: Felipe R. & Rosa De La Cruz 16225 Montgomery Fontana, C~eO Finance Department City of Fontana CALIFORNIA NoVember 4, 1986 File: Ch. 27 ~220 Fidelity National Title Insurance Company P.O. Box 1110 Highland, CA 92346 Sanitary sewer facilities were constructed in front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and lien was filed in the County Recorder's Office. The assessment has now been paid, and the lien can be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino CA 92415, you will clear the records pertaining to the property. The re- cording fee,is $9.00, Please record this Release of Lien in order to clear your property. The copy is for your files. Robert Schoenborn, P.E. Maintenance/Engineering Services Agency Director RS:wp Attachments 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 923;~5 (714) 350-7600 I~.FASE OF LIEN Sewer Fontaria, California - Date _[November 3, 1986 TO PUBLIC WORKS DEPAKIMENT RECEIVED OF Fidelity National Title Ins. Co. $ 971.70 , in payment of Chapter 27 Lien. Parcel No. 241-152-08 , Project 220 Principal $ 910.61 Interest $ 61.09 Please issue Rel~e of Lien. Legal Owner as listed on Lien: Felipe & Rosa DeLaCruz 16225 Montgcmery Ave. Edwin E. Lu~k~m~yer Fontaria, Ca. 92335 Finance Director RELEASE LIt~ TO: FIDELITY NATIONAL.~ TITLE INSURANCE CO. P. O. BOX 1110 HIGHLAND, CA. 92346 SECURED PROPERTY TAX BILL FOR ALL PUBLIC AGENCIES OF SERVICE AGENC~ JOE BELL, CO X COLLECTOR GENERA .~AX LEVY 5~I. 0] ~FONTAHA - SELCER MAIHT THIS STATEMENT WNEN PROPERLY S'rAMpEO pA~D B~COM~S A R~CE~P~ FOR PAyMeNT OF TAX~S SCHOOL BONDS ~ . 5 ] ~v',eo ~o~ T.s ~,sc~ ~ sT~eo ss~ow C~T~ ~O SPeC,~ O,Sm,C~ ~XSS O. ~SSe~S~TS SCHOOL STATE REPAYMENT i. CHIN0 BSN WTR BRIG D SVC PROPER~ ADDREBB 1620B MONTGOMERY AVE FON OWNER(B) OF RECORD AS OF LIEN DATE MAR 01, 1986 MOYER, SHARON J CORTAC 0O0~6~G 5116000 0~09~57792 IMS0127 ~ '~,"' 02~llSl010000 001010S 86017619g 5 ANNUAL TAX BILL 1. 030600 353.50 555 .~ ASSESSED VALUES TOTAL ~o 1~566 706 %~t~T~TR' AMOUNT DUE DELINQUEN~ AFTER ..... ~ ........... 12-10-86 5 CNTL-OZlG55S 0q-10-87 City of Fontana CALIFORNIA October 8,1986 File: Chapter 27 #220 Montgomery Sewers Leora Croghan P.O. Box 565 "'"""'""""' . rs o p of the following docnments~ ~esolnt~on 85-~5 showlug the period of time and ~nterest rate charged on the ~ien for this property, "Notice of ~en" showing the date and amount of the lien. Also a copy of the "Notice of Cost" which was mailed to your address and also posted on the property. If you should have further questions, please call my office at 350-7610 or contact Irene Brunson in our Finance dept. at350-7669. Robert Schoenborn, P.E. Maintenance/Engineering Services Agency Director By: ~cClella Account Clerk II RS:sm Attachments 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, (;ALIFORNIA 92335 (714) 350-7600 City of Fontana CALIFORNIA May 27, 1987 File: Ch. 27 #220 APN 241-151-04 Burrum R F S Escrow, Inc. 300 E. State St., Suite 10~ Redlands, CA 92373 Attention: Bennit M. Hodges. CEO Escrow Officer Sanitary sewer facilities were constructed in front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was, filed in the County Recorder's . office. The assessment has now been paid,, and the lien can now hereleased. By recording the attached Release atthe County Recorder's Office, Hall of Records, 172 West Third Street, San Bernardino, CA 92415, you will clear the records pertaining to the property. The recording fee is $9.00. Please record this Relea~eof Lieninorder to Clear this. property. The additional copy is for your files. Robert Schoenborn, P.E. Engineering/Maintenance ServiCes Agency Director RS:wp Enclosures 8353 SIERRA AVENUE (P-O. BOX 518) FONTANA, GALIFORNtA 92335 (714) 350-7600 /~ R~.~ASE OF LIEN Sewer Fontarm, California · Date TO FOE,~C WORKS DEPAKIMENT RECEIVED OF RFS ESCROW, INC./LEO BUFFUM $ 8~6.84 , in payment of Chapter 27 Lion. Parcel No. 241-151-04 , Project 220 Principal $ 802.39 Interest $ 93.56 Please issue Release of Lira. Legal Owner as listed on Lien: Leo B. Buffum 16236 Montgomery Ave. Fontana, Ca. 92335 ~~tar~ Ass't. Finance Director PLEASE RELEiSE LIEN TO: · R F S ESCROW, INC. 300 E. State St., Suite 101 Redlands, Ca. 92373 City of Fontana Escrow No.: 2101 P.O. Box 518 Assessor's Fontana, CA 92334 Parcel No : 241-151-04 Re: Leo Boyd Buffum, 16236 Montgomery Ave., Fontana, CA. Gentlemen: Enclosed is our check number 12414, in the amount of $836.84, in payment of your lien against the above referenced property. Please send us your release for this lien as soon as possible so that we may have it recorded. Bonnie M. Hodges, CEO Escrow Officer BMH/Je. Encl/1 PHONE (714) 798-4514 300 E. STATE STREET * SUITE 101 · REDLAND~: ~A 92373 .... R~ ~ASE OF LIEN SEWER Fort=area, California DaEe August 18, 1988 ~D Public Works Department RECEIVED OF Allen D. & Rebecca S.. French-.. $ 951.41 , in paF~c of Chapter 27 Lien. Paxcel No. 241-151-05 , Project #220 ~tephen C. Dunn -:Acting Finance Director r '/ =ITY OF FONTANAO,e · ~'-~' ,~9 '~3724 ~ ~ ~-151-~ , ~,~% ~ ~,%~ ,,Cash ?~///~°~'~' Money Or~r ~ oxl,5 - o~c~ 66 4 s7 prepred By Cashier 21.33 52.50= 1,119o8 0.00 ~L~I 17,332.48~+ ~ 7,976.85 City of Fontana CALIFORNIA August 30, 1988 File: Chapter 27 #220 California Title Reporting Service 600 S. Spring Stl, Suite t700 Los Angleles, CA 90014 Sanitary sewer facilities were constructed in front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Re- corderrs office. The assessment has now been paid, and ~he lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA 92415, you will clear the records pertaining to the property. The recording fee is $9.00. Please record this Release of Lien in order to clear your property. The carbon copy is for your files. Acting Public Works Director GC:do Attachments 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92334-0518 (714) 350-7600 City of Fontana CALIFORNIA December 13, 1988 File: Ch. 27 #220 Mountain View Escrow Corporation 9573 Sierra Avenue, Suite A Fontana, CA 92335 Sanitary sewer facilities were constructed in front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA 92415, you will clear the records pertaining to the property. The recording fee is $9.00 Please record this Release of Lien inorder to clear the property. James Mocalis Acting Public Works Director JM:ll Attachment 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92334-0518 (714) 350-7600 City of Fontana CALIFORNIA January 8, 1989 File: Chapter 27 #220 - Montgomery Avenue Sewer Installation Stewart Title Company 1585 So. "O" Street San Bernardino, CA 92408 Sanitary sewer facilities were constructed in front of the property located at 16207 Montgomery Avenue, Fontaria, California, {APN 241-152-10) under the provisions of Chapter 27 of the lgll Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA 92415, you will clear the records pertaining to the property. The recording fee is $9.00. Please record this Release of Lien in order to clear this property. ACB:wp Enclosure 8353 SIERRAAVENUE(P.O. BOX518) · FONTANA, CALIFORNIA92334-0518 · (714)350-7600 SISTER CITY -- KAMLOOPS, B.C. CANADA Recording Requested By: When Recorded Mail To: Stewart Title Company 1585 So. "0" Street San Bernardino. CA 92408 RELEASE OF LIEN The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in her by the Improvement Act of 1911 upon the real property hereinafter described is hereby released, the claim hereunder having been fully paid and satisfied, and that certain Notice of Lien recorded as Instrument No. 86-068968 on March 17, 1986 Official Records of San Bernardino County, California, naming Federal National Mortqaqe Association as obliqor. is hereby satisfied and discharqed. The real property herinbefore mentioned and upon which a lien is claimed, is that certain piece or parcel of land lying and being in the City of Fontana, County of San Bernardino, State of California, and particularly described as follows, to wit: Assessor's Parcel No. 241-152-10 Obligors: Federal National Mortgaqe Association Dated this 8th day of Oanuary , 1990 An vor Superintendent of Streets, City of Fontaria STATE OF CALIFORNIA )SS COUNTY OF SAN BERNARDINO) On January 8, 1990 , before me, Wilma Pinsak, a Notary Public in and for said County and State, personally appeared Annivory C. Beard, known to me to be the Superintendent of Streets of the City of Fontana, a municipal corporation, and known to me to be the person whose name is subscribed to the within instrument and acknowledged that she executed the same on behalf of said municipal corporation. WITNESS my hand and official seal. Ch. 27 #220 - Federal National Mortgage Association City of Fontana CALIFORNIA January 8, 1989 File: Chapter 27 #220 -Montgomery Avenue Sewer Installation Ameron Federal Credit Union 4635 Fi restone Boulevard South Gate, CA 90280 Sanitary sewer facil i ties were constructed in front of the property located at 16247 Montgomery Avenue, Fontana, California, (APN 241-152-06) under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA 92415, you will clear the records pertaining to the property. The recording fee is $9.00. Please record this Release of Lien in order to clear your property. Si ncerel yours, An ' ACB: wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA92334-0518 · (714) 350-7600 SISTER CITY -- KAMLOOPS, B.C. CANADA Recording Requested By: When Recorded Hail To: Ameron Federal Credit Union 4635 Firestone Blvd. South Gate. CA g0280 IUELEASE OF LXIEN The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in her by the Improvement Act of 1911 upon the real property hereinafter described is hereby released, the claim hereunder having been fully paid and satisfied, and that certain Notice qf Lien recorded as Instrument No. 86-068972 on March 17. 1986 Official Records of San Bernardino County, California, naming Steve and Barbara O. Sundquist as obliqors, is hereby satisfied and discharqed. The real property herinbefore mentioned and upon which a lien is claimed, is that certain piece or parcel of land lying and being in the City of Fontana, County of San Bernardino, State of California, and particularly described as follows, to wit: Assessor's Parcel No. 241-152-06 Obligors: Steve and Barbara O. Sundquist Dated this 8th day of January , 1990 Superintendent of Streets, City of Fontana STATE OF CALIFORNIA )SS COUNTY OF SAN BERNARDINO) On January 8. 1990 , before me, t~ilma Pinsak, a Notary Public in and for said County and State, personally appeared Annivory C. Beard, known to me to be the Superintendent of Streets of the City of Fontana, a municipal corporation, and known to me to be the person whose name is subscribed to the within instrument and acknowledged that she executed the same on behalf of said municipal corporation. ~IITNESS mY hand and official seal. ~ · WILMA RNSAK i,' Ch. 27 #220 - Sundquist RELEASE OF LIEN SEWER LIEN Fontana, California Date: November 28, 1989 To: Public Works Received of Stewart Title Co. $603.20, in payment of Chapter 27 lien. Parcel: #241-152-10 Project: ##220 Principal: $908.49 Legal owner as listed on lien: Federal National Mortgage Assoc. Please issue release of lien to: Stewart Title Co. 1585 S "D" St San Bernardino, CA 92408 Finance Department RELEASE OF LIEN SEWER LIEN Fontana, California Date: October 20, 1989 To: Public Works Received of First American Title Co. $589,92, in payment of Chapter 27 lien. Parcel: #241-151-02 Project: ##220 Principal: $892.39 Legal owner as listed on lien: Luz & Conception Macias Please issue release of lien to: First American Title Co. 323 Court St San Bernardxno ~l 92412 George Finance Department City of Fontana CALIFORNIA October 20, 1989 First American Title Company 323 Court Street San Bernardino, CA 92412 Dear Sirs: Sanitary sewer facilities were constructed ~n front of the property described on the attached form under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was fried in the County Recorder's office. The assessment has now been pMd, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 N. Third Street, San Bernard~no, CA 92415, you w~11 clear the records pertMn~ng to the property. The recording fee is $9.00. Please record th~s Release of Lien tn order to clear the property. Sincerely ours, AC:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) FONTANA, CALIFORNIA 92334-0518 (714) 350-7600 Recording Requested By: ~/hen Recorded Mail To: First American Title Company 323 Court Street San Bernardino, CA 92412 RELEASE OF LIB The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in him by the improvement Act of 1911 upon the real property hereinafter described is hereby released, the claim hereunder having been fully paid and satisfied, and that certain Notice of Lien recorded as Znstrument No.86-068960 on March 17, 1986, 0fficial Records of San Bernardino County, California, naming ConceDcion and Luz Macias as obliQors, is hereby satisfied and discharged. The real property herinbefore mentioned and upon which a lien is claimed, is that certain piece or parcel of land lying and being in the City of Fontana, County of San Bernardino, State of California, and particularly described as follows, to wit: Assessor's Parcel No. 241-151-02 Obligors: Conceoc~on and Luz Nacias Dated this 20th day of October , 1989 STATE OF CALZFORNIA )SS COUNTY OF SAN BERNARDZNO) On October 20. 1989 , before me, Wilma Pinsak, a Notary Public in and for said County and State, personally appeared Annivory Calvert, known to me to be the Superintendent of Streets of the City of Fontana, a municipal corporation, and known to me to be the person whose name is subscribed to the within instrument and acknowledged that she executed the same on behalf of said municipal corporation. WITNESS my hand and official seal. o ~ , Ch. 27 #220 Naclas RELEASE OF LIEN SEWER LIEN Fontana, California Date: January 5, 1990 To: Public Works Received of Ameron Federal Credit Union $Pd 12-5-83, in payment of ~a~ter 27 lien. Parcel: #241-152-06 Project: ##220 Principal: $910.61 Legal owner as listed on lien: Steve & Barbara Sundquist Please issue release of lien to: Ameron Federal Credit Union 4635 Firestone B1 South Gate, CA 90280 George Pirsko Finance Department RELEASE OF LIEN SEWER LIEN Fontana, California Date: February 19, 1991 To: Public Works Received of Billy Parsons $399.87, in payment of Chapter 27 lien. Parcel: #241-151-06 Project: #220 Principal: $892.39 Legal owner as listed on lien: Billy Parsons 16258 Montgomery Please issue release of lien to: Billy Parsons 16258 Montgomery Fontana, CA 92336 Geor~ Finance Department .-~..: Recording Requested By: When Recorded Mail To: Billy O. Parsons 16258 Montqomery Fontaria, CA 92336 RELEkSE OF LIEN The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in her by the Improvement Act of 1911 upon the real property hereinafter described is hereby released, the claim hereunder having been fully paid and satisfied, and that certain Notice of Lien recorded asf Instrument No. 86~068964 on March 17, 1986 Official Records of San Bernardino County, California, naming Billy O. Parsons as obliqors, is hereby satisfied and discharged. The real property herinbefore mentioned and upon which a lien is claimed, is that certain piece or parcel of land lying and being in the City of Fontaria, County of San Bernardino, State of California, and particularly described as follows, to wit: Assessor's Parcel No. 241-151-06 Obligors: Billy O. Parsons Dated this 12th .day of March , 1991 Clyde E. Sweet Or., P.E. Acting Deputy Public Works Director/Traffic Engineer STATE OF CALIFORNIA )SS COUNTY OF SAN BERNARDINO) On March 12. lggl , before me, Wilma Pinsak, a Notary Public in and for said County and State, personally appeared Clyde E. Sweet, Or., P.E., known to me to be the Acting Deputy Public Works Director/Traffic Engineer of Fontaria, a municipal corporation, and known to me to be the person whose name is subscribed to the within instrument and acknowledged that he executed the same on behalf of said municipal corporation. WITNESS my hand and official seal. ~ '~'.a~I . - ^ '~ul~o..~ ~'~ WILMA PINSAK Oh. 27 #220 - Parsons City of Fontana CALIFORNIA llarch 12, lggl File: Chapter 27 #220 - Parsons Billy O. Parsons 16258 Hontgomery Fontaria, CA g2336 Dear Nr. Parsons: Sanitary sewer facilities were constructed in front of the property located at, 16258 Hontgomery, Fontana, California, {APN 241-151-06) under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA g2415, you will clear the records pertaining to the property. The recording fee is $9.00. Please record this Release of Lien in order to clear this property. Sincerely yours,, Clyde E. Swee~, Or., P.~.~' Acting Deputy Public Works Director/Traffic Engineer CES:wp Enclosure 8353 StERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA92334-0518 · (714) 350-7600 SISTER CITY -- KAMLOOPS, E).C. CANADA RELEASE OF LIEN SEWER LIEN Fontana, California Date: March 27, 1991 TO: Public Works Received of World Title Company $399.87, in payment of Chapter 27 lien. Parcel: #241-151-07 Project: #220 Principal: $892.39 Legal owner as listed on lien: Trinidad Savala 16266 Montgomery Please issue release of lien to: World Title Company 320 N "E" St #100 San Bernardino, CA 92401 Geo Finance Department City of Fontana CALIFORNIA March 27, 1991 File: Chapter 27 #220 - Installation of Montgomery Avenue Sewers World Title Company 320 North "E" Street, #100 San Bernardino, CA 92401 Sanitary sewer facilities were constructed in front of the property located at 16266 Montgomery, Fontana, California, {APN 241-151-07} under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed in the County Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Third Street, San Bernardino, CA g2415, you will clear the records pertaining to the property. The recording fee is $9.00. Please record this Release of Lien in order to clear this property. Sincerely yours, Cl ,e E. S,eet, Jr., P Acting Deputy Public Works Director/Traffic Engineer CES:wp Enclosure 8353 SIERRAAVENUE(P.O. BOX518) · FONTANA, CALIFORNIA92334-0518 · (714) 350-7600 SISTER CiTY -- KAMLOOPS, B.C, CANADA Recording Requested By: When Recorded Mail To: World Title Company 320 North "E" Street, #100 San Bernardino. CA 92401 RELFJ~SE OF LIB The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in her by the Improvement Act of 1911 upon the real property hereinafter described is hereby released, the claim hereunder having been fully paid and satisfied, and that certain Notice of Lien recorded as Instrument No. 86-068965 on March 17. 1986 Official Records of San Bernardino County, California, naming Guadalupe A. & Trinidad M. Savala as obliqors. is hereby satisfied and discharged. The real property herinbefore mentioned and upon which a lien is claimed, is that certain piece or parcel of land lying and being in the City of Fontaria, County of San Bernardino, State of California, and particularly described as follows, to wit: Assessor's Parcel No. 241-151-07 Obligors: Guadaluoe A. & Trinidad M. Savala Dated this 27th day of March , 1991 Acting Oeputy Public Works Director/Traffic Engineer STATE OF CALIFORNIA )SS COUNTY OF SAN BERNARDINO) On March 27. lggl , before me, Wilma Pinsak, a Notary Public in and for said County and State, personally appeared Clyde E. Sweet, Or., P.E., known to me to be the Acting Deputy Public Works Director/Traffic Engineer of Fontana, a municipal corporation, and known to me to be the person whose name is subscribed to the within instrument and acknowledged that he executed the same on behalf of said municipal corporation. WITNESS my hand and official seal. WILMA RNS ' Ch. 27 #220 - Saval a City of Fontana CALIFORNIA November 13, 1991 F~le: Chapter 27 #220 - De La Cruz Sewer Instel 1 ati ons - Montgomery Feltpe R. & Rosa De La Cruz 16225 Nontgomery Avenue Fontana, CA 92336 $anftary sewer faciliths were constructed in front of the property located at 16225 Nontgomery Avenue, Fontaria, California, (APN 235-142-08) under the provisions of Chapter 27 of the 1911 Act of the Streets and Highways Code. The assessment for the work was not paid, and a lien was filed tn the County Recorder's office. The assessment has now been paid, and the lien can now be released. By recording the attached Release at the County Recorder's Office, Hall of Records, 172 W. Thtrd Street, San Bernardtno, CA 92415, you w~11 clear the records pertaining to the property. The recording fee ~s $9.00. Please record this Release of Lten in order to clear this property, S~ncerely yours, CONNUN/TY DEVELOPNENT DEPARTNENT Engineering Divtston Robert W. Neddle, P.E. City Engineer RW:wp Enclosure 8353 SIERRA AVENUE (P.O. BOX 518) · FONTANA, CALIFORNIA 92334-O518 · (714) 350-7600 SISTER CITY- KAMLOOPS, B,C, CANADA Recording Requested By: Nhen Recorded Mat1 FeliDe R, & RoSa De La Cruz 16225 Montqomery Avenue Fontaria, CA 92336 RELEASE OF LIB The lien claimed by the Superintendent of Streets in the City of Fontana under authority vested in htm by the Improvement Act of 1911 upon the real property hereinafter described ls hereby released, the claim hereunder having been fully paid and satisfied, and that certain Notice of Lien recorded as Instrument No. 86-068970 on March 17. 1986 Official Records of San Bernardino County, California, naming Felipe R. & Rosa De La Cruz as obligors. is hereby satisfied and discharqed. The real property hertnbefore mentioned and upon which a 1ten is claimed, is that certain piece or parcel of land lying and being tn the C~ty of Fontana, County of San Bernardtno, State of California, and particularly described as follows, to Assessor's Parcel No. 235-142-08 Obligors: FeliDe R, & Rosa De La Cruz Dated this 13th day of November , 1991 Robert W. Weddle, P.E. City Engineer STATE OF CALIFORNIA )SS COUNTY OF SAN BERILARDINO) On November 13, 1991 , before me, Wilma Pinsak, a Notary Public in and for said County and State, personally appeared Robert W. Weddle, P.E., known to me to be the City Engineer of the City of Fontana, a municipal corporation, and known to me to be the person whose name is subscribed to the within instrument and acknowledged that he executed the same on behalf of said municipal WITNESS my hand and official seal. / o ~ ~ ~ NO?ARY PUBLIC. CALiFQ~IA Ch. 27 #220 - De La Cruz