Loading...
HomeMy WebLinkAbout4877-1(SOUTH SIDE) C VIENNA L ,.,114EE Iric CITRUS )5k'E ImANDSCAPE STATION 70+85.00 TO SHADY TRAILS PLANS 99+84.50 0000, S 1 T S C �► P E S 00000 Landscape 3190 B2 Airport Loop Dr., (949) 644-9370 Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140 & Planlung Richard Polhamus, License # 2782 `�ENER`AL NOTES"i City Required Notes Inspections: 1.It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6632 . 2.Prior to the release of utilities or maintenance period commencement, the following inspections are required Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street Trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. 3.The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetsca es" shall p p p become a part of this docuinent. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90' day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS.. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. VICIN�T'vz MA -P U/ �;-......_....................... ...... a ... s � — ...... _.._.._._...... � / f, '�\ ;/ t • �� f..... V/ ........... - �� 0�" / P R®v DUCT ii - 1 SITE YJ - : ...�........................ 'I 1 , ;� ................ / W ......... .............. I ........................ . . .......... ...... . .......i wn� .................. .... ... .. ............. ................. .... ............. . ...1 ......... .... ................. ............ ....... .....I------------- @ RaSi2f Sik ...— .................� j}�ygja ii { i . / � . • Mrd >......:::. �..__.y • a7 t �/ • �~ •� /_ • w.��� ^.T».. ter' j13M. T� • , f j:.v ' \ ............. Y - -- z HIGHLAND AV N.T.S. �)"E `E� T K IEE-� Yo See Sheets L5, L7 & L20 's"O. ✓I is n » » » Jv » x is » » is „ 1 ✓ 7 r See Sheets L2, L1251 See Sheets L3, L13, L� L 17 & L22 L18 & L23 _ See Sheets L1, L11, L16 &L21 See Sheets L4, L6, L14, L19 & L19 N.T.S. '— T-1 square footage of planter area = TITLE SHEET L-1 Total CONSTRUCTION PLAN 17,425 S.F. (20 SCALE) L- 2 CONSTRUCTION PLAN S.F. Total (20 SCALE) L- 3 CONSTRUCTION PLAN (20 SCALE) L- 4 CONSTRUCTION PLAN VIENNA ENTRY @ 10 SCALE L- 5 CONSTRUCTION PLAN VESTA ENTRY @ 10 SCALE L- 6 VERTICAL CONTROL PLAN VIENNA ENTRY @ 10 SCALE L- 7 VERTICAL CONTROL PLAN VESTA ENTRY @ 10 SCALE L- 8 CONSTRUCTION DETAILS, NOTES & LEGEND L- 9 IRRIGATION DETAILS, NOTES & LEGEND L-10 IRRIGATION DETAILS L-11 IRRIGATION PLAN (20 SCALE) L-12 IRRIGATION PLAN (20 SCALE) L-13 IRRIGATION PLAN (20 SCALE) L-14 IRRIGATION PLAN VIENNA ENTRY @ 10 SCALE L-15 PLANTING DETAILS, NOTES & LEGEND L-16 PLANTING PLAN (20 SCALE) TREES & GROUNDCOVER L- 17 PLANTING PLAN (20 SCALE) TREES & GROUNDCOVER L-18 PLANTING PLAN (20 SCALE) TREES & GROUNDCOVER L-19 PLANTING PLAN - VIENNA @ 10 SCALE SHRUBS & VINES. L- 20 PLANTING PLAN - VESTA @ 10 SCALE SHRUBS & VINES L- 21 PLANTING PLAN (20 SCALE) SHRUBS & VINES L- 22 PLANTING PLAN (20 SCALE) SHRUBS & VINES L- 23 PLANTING PLAN (20 SCALE) SHRUBS & VINES L- 24 SPECIFICATIONS L- 25 IRRIGATION CALCULATIONS & SCHEDULE Total square footage of planter area = 75,760 S.F. Total square footage of turf area = 17,425 S.F. Total cobble stone area = 6,450 S.F. Total square footage of landscape area = 99,635 S.F. R E V 1 100' 10 NS00 Q9/30/10 Q Q 10/12/10 Q 10-14-10 -CITY &MWD PLAN CHECK A n U U JOB NO. <oo` LDI C,p� A• POLrl9 q,P� ®5—®19 2782 d' IL�r� w * DATE hP/o J,to Q- %� F DATE IaI 10- ` 0� r OF C..�� 9/7/10 A .r•7`iYi411C'�_,