STATION 70+85.00 TO
SHADY TRAILS
PLANS
99+84.50
0000,
S 1 T S C �► P E S
00000
Landscape 3190 B2 Airport Loop Dr., (949) 644-9370
Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140
& Planlung Richard Polhamus, License # 2782
`�ENER`AL NOTES"i
City Required Notes
Inspections:
1.It is the Landscape Contractor's responsibility to contact the
Engineering Division's Landscape Inspector
48 hours prior to desired inspection of an item at (909) 350-6632 .
2.Prior to the release of utilities or maintenance period commencement,
the following inspections are required
Pre -construction meeting
Inspection of irrigation system in open trench condition (prior to backfill).
Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting.
Plant materials prior to planting.
Planting, including street Trees. Contact the Parks Planning and Landscape
Development section Engineering Division, for species and final locations.
Compliance with approved plans.
Final Inspection.
3.The Owner's representative and Landscape Contractor shall be present at each inspection.
The City of Fontana "Standard Landscape Specification Manual for Streetsca es" shall
p p p
become a part of this docuinent.
Maintenance Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of a minimum of three (3) month (90' day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering Division Landscape Inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS.. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
VICIN�T'vz MA -P
U/
�;-......_....................... ......
a ... s � — ...... _.._.._._...... � / f, '�\ ;/ t • ��
f.....
V/
........... - �� 0�"
/
P R®v DUCT ii
-
1
SITE YJ - : ...�........................ 'I
1 , ;� ................ / W ......... .............. I ........................
. . .......... ......
. .......i wn�
.................. .... ...
.. .............
................. .... ............. . ...1
......... .... ................. ............ ....... .....I-------------
@ RaSi2f
Sik ...— .................� j}�ygja ii { i
. / � . • Mrd >......:::.
�..__.y
• a7
t �/ • �~ •� /_ • w.��� ^.T».. ter' j13M.
T� • , f j:.v
' \ .............
Y -
--
z HIGHLAND AV
N.T.S.
�)"E `E� T K IEE-� Yo
See Sheets L5,
L7 & L20
's"O.
✓I
is n » » » Jv » x is » » is „ 1
✓ 7
r
See Sheets L2, L1251 See Sheets L3, L13,
L� L 17 & L22 L18 & L23
_ See Sheets L1, L11,
L16 &L21
See Sheets L4, L6,
L14, L19 & L19
N.T.S.
'—
T-1
square footage of planter area =
TITLE SHEET
L-1
Total
CONSTRUCTION PLAN
17,425
S.F.
(20 SCALE)
L- 2
CONSTRUCTION PLAN
S.F.
Total
(20 SCALE)
L-
3
CONSTRUCTION PLAN
(20 SCALE)
L-
4
CONSTRUCTION PLAN
VIENNA ENTRY @ 10 SCALE
L-
5
CONSTRUCTION PLAN
VESTA ENTRY @ 10 SCALE
L-
6
VERTICAL CONTROL PLAN
VIENNA ENTRY @ 10 SCALE
L-
7
VERTICAL CONTROL PLAN
VESTA ENTRY @ 10 SCALE
L- 8
CONSTRUCTION DETAILS, NOTES
& LEGEND
L- 9
IRRIGATION DETAILS, NOTES & LEGEND
L-10
IRRIGATION DETAILS
L-11
IRRIGATION PLAN
(20 SCALE)
L-12
IRRIGATION PLAN
(20 SCALE)
L-13
IRRIGATION PLAN
(20 SCALE)
L-14
IRRIGATION PLAN
VIENNA ENTRY @ 10 SCALE
L-15
PLANTING DETAILS, NOTES & LEGEND
L-16
PLANTING PLAN (20 SCALE)
TREES & GROUNDCOVER
L-
17
PLANTING PLAN (20 SCALE)
TREES & GROUNDCOVER
L-18
PLANTING PLAN (20 SCALE)
TREES & GROUNDCOVER
L-19
PLANTING PLAN - VIENNA @ 10 SCALE
SHRUBS & VINES.
L-
20
PLANTING PLAN - VESTA @ 10 SCALE
SHRUBS & VINES
L-
21
PLANTING PLAN (20 SCALE)
SHRUBS & VINES
L-
22
PLANTING PLAN (20 SCALE)
SHRUBS & VINES
L-
23
PLANTING PLAN (20 SCALE)
SHRUBS & VINES
L-
24
SPECIFICATIONS
L-
25
IRRIGATION CALCULATIONS & SCHEDULE
Total
square footage of planter area =
75,760
S.F.
Total
square footage of turf area =
17,425
S.F.
Total
cobble stone area =
6,450
S.F.
Total
square footage of landscape area
= 99,635
S.F.
R E V 1 100' 10 NS00
Q9/30/10 Q
Q 10/12/10
Q 10-14-10 -CITY &MWD
PLAN CHECK
A n
U U
JOB NO.
<oo`
LDI C,p�
A• POLrl9 q,P� ®5—®19
2782 d' IL�r�
w
* DATE
hP/o
J,to Q-
%� F DATE
IaI 10- ` 0�
r OF C..�� 9/7/10
A
.r•7`iYi411C'�_,