HomeMy WebLinkAbout4862-1GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND
THE STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOKS ALL REFERENCE SPECIFICATIONS AND
STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
PRECEDENCE PROVISIONS IN THE "GREEN BOOK" THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY
ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING
DIVISION PRIOR THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO
THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF
CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC
ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL
DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN
DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFER:
8. THE WALLS AND FACES OF ALL EXCAVA77ONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF
THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE
STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPAR47E PERMIT FOR THAT
PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES,
AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND. SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS,
TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO
WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VAL VES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS
13. CURVE LATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE
WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND
CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR
NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENTS, MONUMENT TIES AND
BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL
BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE
WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL
BE MAINTAINED AT ALL TIME IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING AT ALL
TIME.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCA VA TED MA TER/AL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE
PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
RE -WORKING OF THE THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON
INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-EROOEABLE SWALES ENTERING OR LEAVING
IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL
CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATER.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS
DETERMINED BY SOIL TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A. C. PAVEMENT AN%R BASE COURSE MATERAL FOR STRUCTURAL STREET SECTIONS SHALL BE
RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF
ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR
UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC
CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER
35. CONTRACTOR SHALL RELOC47F AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO
THE SATISFAC77ON OF THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD
DRAWINGS TO THE CITY ENGINEER.
CITYOFFONTANA
RA NDA L L A VENUE A ND PEPPER S T
STREET IMPR 0 VEMEN T PLAN
EXIST ROW
EXIST SIDEWALK
r r.
EXIST C&G
LEGEND
EX/ST DRIVEWAY
PROP DRIVEWAY
00
Ln • �s
� . f 4 •4.
PEPPERST
60'1
�..fl
/ I I
I�
t
RIGHT OF WAY/ PROPERTY LINE
CENTERLINE
EXISTING CURB & GUTTER
X v FENCE
30'
i.
18' i
R4NDALL AVENUE
SCALE 1"=20'
20'0 20' 40' 60'
SCALE IN FEET
I I
I I
I
EXIST ROW
EXIST C&G
r
:k-::-EX1ST SIDEWALK
EXIST SIDEWALK
O�
a
THE \
�aRPQ�TED Jt�^
MERRILL AVE
W
PROJECT
W
R4NDALL A VE
W
W
W
Q
W
Q
Q
�
Z
W
SANBERNARD
OAVE
VICINITY MAP
NTS
CON45TRUCTIONNOTES
O\
1�-Tt
QUANTITIES
(DCOASTRUCT CURB RETURN ACCESS ROMP PER CITY OF FONTANA STD. PLAN N0. 1003 ..............1 fA
20 CONSTRUCT CURB RETURN ACCESS ROMP PER CITY OF FONTANA STD. PLAN N0. 1004
WITH RAMP LENGTH PER PLAN HEREON............................................................................................1 EA
03 SAWCUT HORIZONTALLY AND REMOVE EX/STING PCC CURB..............................................................1 LS
4Q CONSTRUCT 4' CONCRETE SIDEWALK PER CITY OF FONTANA STD. N0. 1006
ASSHOWN HEREON.......................................................................................................................429 SF
Q5 SAWCUT AND REMOVE EX/ST/NG PCC SIDEWALK ...............................................................................1 LS
OO PROTECT /N PLACEE............................................................................................................................ ---
REMOVE AND CONSTRUCT NEW FENCE TO NEW RIGHT OF WAY LINE AS SHOWN HEREON ......... 79 LF
BQ RELOCATE EX/ST/NG SIGN PER SIGNING AND STRIPING PLANS ........................................................ ___
Q9 REFER TO SIGN/NG AND STRIP/NG/SIGNAL PLANS FOR DETAlLS ..................................................... ---
@ RELOCATE EX/ST/NG MAILBOX............................................................................................................. 1 EA
11 M00/FY IRRIGATION LINES AND LANDSCAPING AS NEEDED ................................................................1 LS
Q2 M00/FY IRRIGATION LINES AND LANDSCAPING AS NEEDED (BY OTHERS) ........................................ ___
S:\DESIGN SECTION\CIP IMPROVEMENTS\Randall & Pepper Int\SHEET 1.dwg Aug 03, 10 - 5:08pm