HomeMy WebLinkAboutBaseline Ave- (Citrus Ave to Palmetto Ave)- Sewer Study Report.pdfC'�ty of
Fontana
Sewer Study Report
BaseHne
HNAL
CITY OF FONTANA
_ 6 -
CITRUS AVENUE TO PALMETTO AVENUE
Prepared by:
BUREAU VERITAS NORTH AMERICA, INC.
2001 East First Street
Santa Ana, CA 92705
'hone- 714/ 565-7300
Prepared Under the Supervision of:
i
Mohammed Rowth6r, P.E.
Date
QROFESS/p
Fo ��EB ky�l
No. 37127 m
W z�
clue- .��
December 21, 2006
Mr. Jim Robinson, PE
City of Fontana
Engineering Division
8285 Sierra Avenue, Ste 110
Fontana, California 92335
SUBJECT: Baseline Avenue Sewer Study Report (Citrus Avenue to City Limits)
Dear Mr. Robinson:
BVNA, Inc. (dba Berryman & Henigar, Inc.) is pleased to submit this Baseline Avenue Sewer
Study Report. This report will provide the City of Fontana with the necessary information to
make decisions on the installation of new sewer facilities as well as related sewer upgrades in
the subject area. If you have any questions regarding this sewer study, please feel free to call
me.
Sincerely,
Mohammed Rowther, P. E.
Cc: File/mr/tjm
tier i:1t13) <'ti t-�Clli�.tl, 1ii'.•
.l!.nn !-- I i) i68 - i110
hpil �. ii .t �ti.•.� lay J"1418t6 Y)06
Scope of Work
Berryman & Henigar has been retained by the City of Fontana (City) to evaluate the sewer
requirements for a 640 -acre tributary area to Baseline Avenue. The project area is bound by
Citrus Avenue and the City limits (Palmetto Avenue) in the east -west direction; and South
Highland and Baseline Avenues in the north -south direction.
The purpose of this study is to identify and propose new facilities in these streets based on
City's Sewer Master Plan flow projection rates at build -out. The City has also requested
Berryman & Henigar to determine whether the existing sewer facilities within the project limits
are able to accommodate sewer flows at build -out. Recommendations will be made to upgrade
the existing sewer system if necessary. This letter report will provide the information to allow the
City to make the necessary improvement decisions
Evaluation Criteria and Methodology
According to City's most recent land use designations, the project study area is comprised of
three land use (LU) categories, single-family residential (R -SF), general commercial (C -G), and
public facility (P -PF). The City's Master Sewer Plan Update (September 2000) designated
sewage flow generation factors in relation to all land use categories. Exhibit A presents the
City's Sewage Generation Factors in tabular format. Table 1 summarizes the relevant
generation rates corresponding to the project land use designations.
Tahle 1 - Sewaae Flow Generation Rates within Prniert I imits
Land Use
Equivalent DU/Acre Flow Per DU
Flow allons/da per Acre
R -SF
5.00 279
1395
C -G
5.38
_
1500
P -PF
_
5.38
1500
The proposed sewer main sizes were determined based on the City's peak daily flow (PDF)
calculation formula shown below:
PDF = 2.5(Qm9,)o '
Where Qmgd is the average daily flow (ADF) expressed in million gallons per day (mgd).
All proposed sewers presented in this report meet the City's design requirements in term of
1 Minimum pipe slope between manholes of one percent (1%)
2 Minimum pipe size of 8 inches
3. Minimum pipe depth of 8 feet
4. Minimum flow velocity of 2.5 feel per second (fps)
5. Maximum spacing between each manhole is 350 feet
6. Depth of flow to depth of pipe diameter ratio (D/d) must be less than 0.50 for main
diameters less than 12 inches; and 0.75 for pipe diameters greater than 12 inches
7. All sewer main will be vitrified clay pipe (VCP) using a Manning's 'N' value of 0.013
Sewer System Evaluation
The general flow pattern follows the natural drainage topography. The proposed system is
designed to direct flow towards the south/southwesterly corner of the project site. Drainage
basins are divided among streets aligned in the north/south direction. Once the flow reaches the
junctions at the southern limits, the flow continues westerly connecting into an existing 18 -inch
vitrified clay pipe (VCP) at the intersection of Citrus and Baseline Avenue. A tabular summary of
flow calculations based on land use is shown in Exhibit B. A graphical illustration of the
recommendation is shown in Exhibit C.
Citrus Avenue
It is estimated the flow generated north of Highway 30/210 is approximately 6 mgd (See Exhibit
D). Part of the tributary flow from the north will be directed into a system on Citrus Avenue via
an existing 21" VCP At the intersection of Citrus and Los Cedros Avenue, the 21" VCP bends
and directs flow westerly. The proposed 8" VCP on Walnut Avenue, east of Citrus, will be
directed southward connecting into an existing 15 -inch VCP on Citrus Avenue. While the
existing 15" VCP on Citrus Avenue is over designed, it is not necessary to replace the existing
sewer system.
Oleander, Cypress, and Juniper Avenues
Based on review of the current system, the existing 8 -inch VCP system along Oleander Avenue
south of Walnut Street is able to accommodate the projected volume only if flow east of
Oleander is diverted into a new drainage basin on Cypress. It is recommended that the new
facilities on Cypress Avenue south of Walnut Street be 10 inches in diameter. Existing flow
generated along Sierra Avenue entering the Juniper basin will be directed into an existing 8 -inch
VCP south of Baseline Avenue. The proposed 8 -inch collection system on Juniper north of
Baseline will be conveyed westerly into the proposed 10 -inch VCP on Baseline Avenue.
Mango and Sierra Avenues
With the exception � of seven parcels east of Sierra and an approximate 147.5 AC west of
Palmetto Ave, all other residential discharge between Sierra and Mango Avenues will flow
easterly towards an existing 8 -inch VCP system on Mango Avenue. At build out, it is
recommended the existing 8 -inch VCP south of MiCallef Street be upgraded to a 12 -inch VCP.
The projected flow west of Sierra Avenue will require an 8 -inch VCP system to be installed
connecting into an existing 8 -inch main near the southern end of Sierra Avenue.
Baseline Avenue
As indicated in Exhibit C, 18 -inch, 15 -inch, and 10 -inch VCPs are recommended along Baseline
Avenue to convey flow westerly into an existing 18 -inch VCP at the intersection of Citrus and
Baseline Avenue. An 8 -inch VCP collecting flow between Sierra and Mango Avenues along
Baseline is recommended to direct flow easterly. For future development along the
northwestern side of Baseline and Palmetto Avenue, another 8 -inch VCP collecting flow
between Mango and Palmetto Avenues along Baseline is recommended to direct flow easterly
toward Palmetto Avenue. All flows currently flowing southerly past Baseline Avenue will be
diverted westerly towards Citrus Avenue.
Summary of Recommendations
Shown below is a summary of the improvements to be made on each street within the project
area:
♦ Citrus Avenue
o 1500 linear feel of 8 inch VCP
o 4 new manholes
♦ Oleander Avenue
c 600 linear feel of 8 inch VCP
o 2 new manholes
Cypress Avenue
600 linear feet of 8 inch VCP
0 2,650 linear feet of 10 inch VCP
o 9 new manholes
♦ Juniper Avenue
o 3,000 linear feet of 8 inch VCP
o 9 new manholes
• Sierra Avenue
o 3,200 linear feel of 8 inch VCP
o 11 new manholes
♦ Mango Avenue
0 1,300 linear feel of 12 inch VCP upgrade
♦ South Highland Avenue
0 2,450 linear feet of 8 inch VCP
0 7 new manholes
• Walnut Street
1,900 linear feet of 8 inch VCP
u Abandon 270 linear feet of 10" VCP
c, 6 new manholes
• Baseline Avenue
c 1500 linear feet of 8 inch VCP
0 1,320 linear feet of 10 inch VCP
0 1,320 linear feet of 15 inch VCP
n 1,400 linear feet of 18 inch VCP
o 18 new manholes
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Citrus Avenue (North of Walnut)-
'Based on City of Fontana's Sewer Master Plan (1998), Flow from Tributary Area North of Highland Avenue is Approximately 6 MGD.
Citrus Avenue (South of Walnut)
Flow/Ac
Average ow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
North of South Highland
10.9
C -G
1500
16,335
0 059
8
South of South Highland
8.1
C -G
1500
12,210
0.045
8
East of Citrus
9 2
C -G
1500
13,815
0.051
8
East of Citrus
16.3
R -SF
1395
22,739
0.080
8
East of Oleander
Total (mgd)
P -PF
1500
2.67
0 085
B
West of Oleander
Pipe Slope (fUft)
R -SF
1395
0.01
0.101
8
Walnut East of Oleander
VCP N -value
R -SF
1395
0.013
0 028
8
Walnut East of Oleander
Pipe Diameter (in)
P -PF
Existing VCP
21
0 094
8
Flow Depth (in)
11.68
Flow Velocity (fps)
6.88
Did (%)
56
'Based on City of Fontana's Sewer Master Plan (1998), Flow from Tributary Area North of Highland Avenue is Approximately 6 MGD.
Citrus Avenue (South of Walnut)
Oleander Avenue (North of Walnut)
FlowlAc
Average Flow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
East of Citrus
30 7
R -SF
1395
42,771
0 142
8
East of Citrus
2 2
C -G
1500
3,315
0.014
8
Walnut East of Citrus
5 1
R -SF
1395
7,156
0 028
8
East of Oleander
Total (mgd)
C -G
1500
0.053
0 018
8
East of Oleander
Pipe Slope (ft/ft)
P -PF
1500
0.01
0 085
B
West of Oleander
VCP N -value
R -SF
1395
0.013
0.101
8
Walnut East of Oleander
Pipe Diameter (in)
R -SF
1395
8
0 028
8
Walnut East of Oleander
Flow Depth (in)
P -PF
1500
1.41
0 094
8
Flow Velocity (fps)
1.98
Did (%)
18
Oleander Avenue (North of Walnut)
Exhibil B
020619 Fontana Sewer xis
01
Flow/Ac
Average Flow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
North of South Hi Mand
105
C -G
1500
15,750
0 057
8
South of South Hi hlan
4 6
C -G
1500
6.900
0 027
8
West of Oleander
4 7
C -G
1500
7.050
0 028
8
East of Oleander
2.9
C -G
1500
4,380
0 018
8
East of Oleander
161
P -PF
1500
24.210
0 085
B
West of Oleander
21 1
R -SF
1395
29,435
0.101
8
Walnut East of Oleander
51
R -SF
1395
7,170
0 028
8
Walnut East of Oleander
18.2
P -PF
1500
27.330
0 094
8
Total (mgd)
0.122
Pipe Slope (ft/ft)
0.02
VCP N -value
0.013
Pipe Diameter (in)
8
Flow Depth (in)
3.51
Flow Velocity (fps)
4.62
Did (%)
44%
Exhibil B
020619 Fontana Sewer xis
01
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Oleander Avenue (South of Walnut)
Description
Flow/Ac
Tributary Area (Ac) Land Use (gpad)
Average Flow
(gpd)
Proposed Sewer Main
Peak Flow (mgd) (in)
West of Oleander
3a 0 R -SF 1395
47,430
0 156 10
East of Oleander
32.5 R -SF 1395
45,296
0 150 12
Peak Flow (mgd)
Total (mgd)
0-093
9 4 T
CG
Pipe Slope (ft/ft)
0.02
0.052
8
VCP N -value
0.013
C G
1501
Pipe Diameter (in)
8
8
West of Cypress
Flow Depth (in)
2.88
1500
4,350
Flow Velocity (fps)
4.19
West of Cypress
162
Did (%)
36%
24,270
�'cr...�G�ii'��n '.ec,:'ter=".fL?d,'SY:Y�1Yr�ri'„2i-. a 3+�1:? r.r�ac't�t.'ttr-+:7:8'dixYYa`52+t�=.ti• a�.'.f •::resyi __ -„�.;. n,ws _
Cypress Avenue (No th of Walnut)
Cypress Avenue (South of Walnut)
Flow/Ac
F1owlAc
Average Flow
Proposed Sewer Main
Proposed Sewer Main
Description
Tributary Area (Ac) i
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
North of South Hr hland
9 4 T
CG
1500
14,100
0.052
8
South of South Highland
2 4
C G
1501
3,602
0.015
8
West of Cypress
2 9
C -G
1500
4,350
0.018
8
West of Cypress
162
P -PF
1500
24,270
0.085
8
East of Cypress
2 8
C -G
1500
4,230
0.017
8
East of Cypress
200
R -SF
1395
27,858
0.096
8
Walnut East of Cypress..
8 7
R -SF
1395
12,081
0.045
8
Walnut East of Cypress
2.8
R -SF
1395
3.948
0.016
8
Total (mgd)
0.094
Pipe Slope (ft/ft)
0.02
VCP N -value
0.013
Pipe Diameter (in)
8
Flow Depth (in)
3.07
Flow Velocity (fps)
4.32
Dld (%)
38%
Cypress Avenue (South of Walnut)
_xh+b+t B
)20619 Fontana Sewer As B-2
Flow/Ac
Average Flow
Proposed Sewer Main
Description
Tributary Area (Ac) Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in) _
West of Cypress
31.8 R-SF1395
44,305
0 147
a
East of Cypress
302 R -SF
1395
42,115
0.140
3
Total (mgd)
0.086
Pipe Slope (f /ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
10
Flow Depth (in)
3.36
Flow Velocity (fps)
3.20
D/d (%)
34%
_xh+b+t B
)20619 Fontana Sewer As B-2
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Juniper Avenue (North of Walnutl
Description
Tributary Area (Ac)
Land Use
Flow/Ac
(gpad)
Average Flow
(gpd)
Peak Flow (mgd)
Proposed Sewer Main
(in)
North of South Highland
2.8
R -SF
1395
3,906
0 016
8
North of South Highland
73
R -SF
1395
10,184
0 038
8
North of South Highland
4.3
C -G
1501
6,454
0 025
9
North of South Hi hiand
5 7
C -G
1500
8,565
0 033
8
South of South Ht hland
91
C -G
1500
13,620
0 050
8
Norah of South Hi hland
7 1
C -G
1500
10,620
0.040
8
North of South Highland
6.8
C -G
1500
10,200
0 039
8
West of Juniper
20
C -G
1501
3.002
0 013
8
west of -juniper
48
C -G
1500
7,155
0 028
8
West of -Juniper
143
R -SF
1395
19,949
0 071
8
East of Juniper
330
R -SF
1395
46,035
0 152
8
Walnut East of Juniper
70
R -SF
1395
9.793
0 037
8
Total (mgd)
Pipe Slope (ft/ft)
VCP N -value
Pipe Diameter (in)
Flow Depth (in)
Flow Velocity (fps)
Did (%)
0.149
0.02
0.013
10
3 55
4.63
36
Juniper Avenue (South of Walnut)
Sierra Avenue
ow cAverage
ow
Proposed Sewer MaTin
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
West of Juniper
27 3
R -SF
1395
38,097
0 128
8
East of Juniper
229
R -SF
1395
31,946
0 109
8
East of Juniper
9.1
C -G
1500
13.650
0 050
8
East of Sierra
Total (mgd)
R -SF
1395
0.084
0 022
8
East of Sierra
Pipe Slope (fVft)
R -SF 1
1396
0.01
0 005
9
East of Sierra
VCP N -value
R -SF
1395
0.013
0 021
8
Pipe Diameter (in)
8
Flow Depth (in)
3.36
Flow Velocity (fps)
3.20
Did (%)
1 42
Flow Depth (in)
2.95
Sierra Avenue
Exhibit B
020619 Fontana Sewer As 6
-3
Flow/Ac
Average ow
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (ingd)
West of Sierra
4.3
R -SF
1395
5.999
0 024
B
West of Sierra
22.9
RSF
1395
31.932
0 109
8
West of Sierra
8 1
C -G
1500
12.210
0 045
B
East of Sierra
4-0
R -SF
1395
5,580
0 022
8
East of Sierra
08
R -SF 1
1396
1,117
0 005
9
East of Sierra
3.7
R -SF
1395
5,217
0 021
8
Total (mgd)
0.062
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
e
Flow Depth (in)
2.95
Flow Velocity (fps)
3.00
Did (%)
37
Exhibit B
020619 Fontana Sewer As 6
-3
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
Baseline Avenue - Distinct Drainage Basins
Westerly Cross Street
Tributary Area (Ac)
Land Use
Flow/Ac
(gpad)
Average Flow
(gpd)
Peak Flow (mgd)
Citrus
9.3
C -G
1500
13,965
0 051
Citrus
3.0
R -SF
1395
4,185
0017
Oleander
5 1
R -SF
1395
7,142
0 026
Cypress
14 2
R -SF
1395
19,809
0 070
Sierra
12.6
R -SF
1 1395 1
17,577
0 063
Palmetto
90
R -SF
1395
12,499
0046
Mango Avenue
t
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CITRUS/BASELINE JUNCTION
t>en
Average Flow
Peak Flow
Flow/Ac
Average Flow
Flow Path
Proposed Sewer Main
Description
Tributary Area (Ac)
Land Use
(gpad)
(gpd)
Peak Flow (mgd)
(in)
8
Meander and Baseline Junctic
0.718
1 849
2.023
15
8" begmnmg South o
East of Mango
903
R -SF
1395
125.927
0 379
Highland Ave to north o
2.016
Pipe Slope (ft/ft)
MiCallef
East of Mango
11
R -SF
1395
15,387
0 056
12" beginning at MiCallef
West of Mango
120
P, -SF
1395
167,400
0 492
12" beginning at MiCallef
5.50
Total (mgd)
0.309
0.858
D/d (%)
Pipe Slope (ft/ft)
31 "/,
0.01
VCP N -value
0.013
Pipe Diameter (in)
12
Flow Depth (in)
5.81
Flow Velocity (fps)
4.47
D/d 1[%
48
t
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CITRUS/BASELINE JUNCTION
t>en
Exhibit 8
020619 Fontana Sewer xis B-4
Average Flow
Peak Flow
Cumulative Total
Proposed Sewer
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Citrus (South of Walnul)
0 053
0 173
0 173
8
Meander and Baseline Junctic
0.718
1 849
2.023
15
Baseline (Citrus to Oleander)
0 018
0 065
2016
8
Total (mgd)
0.789
2.016
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Oleander (South
of Baseline)
18
Flow Depth (in)
5.50
Flow Velocity (fps)
4.68
D/d (%)
31 "/,
Exhibit 8
020619 Fontana Sewer xis B-4
I
Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS)
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT OLEANDER/BASELINE JUNCTION
Average Flow
Peak Flow
Cumulative Total
Proposed Sewer
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Oleander (North of Walnut)
0 122
0 369
0 369
8
Oleander (South of Walnut)
0 093
0 287
0.656
10
Cypress and Baseline Junctjoi
0 007
0 028
0 684
15
Baseline (Oleander to Cypress
0 496
1 321
1 849
15
Total (mgd)
0.718
1.849
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Oleander (South of Baseline)
15
Flow Depth (in)
7.00
Flow Velocity (fps)
5.1047%Did
Mamma
[%)
ONSM
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CYPRESS/BASELINE JUNCTION
Average Flow
I Peak Flow
Cumulative Total
Proposed Sewer
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Juniper (North of Walnut)
0 149
0 443
0 443
10
Cypress (North of Walnut)
0 094
0 292
—6692
8
Cypress (South of Walnut)
0 086
0 269
0 912
8
Baseline (Cypress to Juniper
0 020
0 070
0 962
8
Juniper and Baseline Junctto
0 146
0 433
1 321
Total (mgd)
0.496
1-321
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Baseline (Oleander to Cypress)
15
Flow Depth (in)
5.80
Flow Velocity (fps)
4.67
Did (%)
39%
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT JUNIPER/BASELINE JUNCTION
Cumulative .ta
,.pose ewer
verage Flow
Peak Flow
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Sierra (non -tributary)
0 062
0 199
0 199
8
Baseline (Juniper to Serra)
0 000
0 000
0 199
8
Juniper (South of Walnut)
0 084
0 262
0 433
8
Total (mgd)
0.146
0.433
Pipe Slope (ft/ft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
Exist VCP
8
I Flow Depth (in)
2.74
Flow Velocity (fps)
2.89
Did (%)
34%
CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT
MANGO/BASELINE JUNCTION
Average ow
ea ow
umu attve ota
,.pose eA of
Flow Path
(mgd)
(mgd)
(mgd)
Main (in)
Mango (S Highland to Baselin
0 309
0 858
0.858
8
Baseline (East of Siena)
0 018
0.063
0.902
8
Total (mgd)
0.326
0.902
Pipe Slope (fUft)
0.01
VCP N -value
0.013
Pipe Diameter (in)
12" beginning at MiCallef
12
Flow Depth (in)
5.22
Flow Velocity (fps)
4.26
D/d (off)
44%
Exhibd B
020619 Fontana Sewer xts B•5