Loading...
HomeMy WebLinkAboutBaseline Ave- (Citrus Ave to Palmetto Ave)- Sewer Study Report.pdfC'�ty of Fontana Sewer Study Report BaseHne HNAL CITY OF FONTANA _ 6 - CITRUS AVENUE TO PALMETTO AVENUE Prepared by: BUREAU VERITAS NORTH AMERICA, INC. 2001 East First Street Santa Ana, CA 92705 'hone- 714/ 565-7300 Prepared Under the Supervision of: i Mohammed Rowth6r, P.E. Date QROFESS/p Fo ��EB ky�l No. 37127 m W z� clue- .�� December 21, 2006 Mr. Jim Robinson, PE City of Fontana Engineering Division 8285 Sierra Avenue, Ste 110 Fontana, California 92335 SUBJECT: Baseline Avenue Sewer Study Report (Citrus Avenue to City Limits) Dear Mr. Robinson: BVNA, Inc. (dba Berryman & Henigar, Inc.) is pleased to submit this Baseline Avenue Sewer Study Report. This report will provide the City of Fontana with the necessary information to make decisions on the installation of new sewer facilities as well as related sewer upgrades in the subject area. If you have any questions regarding this sewer study, please feel free to call me. Sincerely, Mohammed Rowther, P. E. Cc: File/mr/tjm tier i:1t13) <'ti t-�Clli�.tl, 1ii'.• .l!.nn !-- I i) i68 - i110 hpil �. ii .t �ti.•.� lay J"1418t6 Y)06 Scope of Work Berryman & Henigar has been retained by the City of Fontana (City) to evaluate the sewer requirements for a 640 -acre tributary area to Baseline Avenue. The project area is bound by Citrus Avenue and the City limits (Palmetto Avenue) in the east -west direction; and South Highland and Baseline Avenues in the north -south direction. The purpose of this study is to identify and propose new facilities in these streets based on City's Sewer Master Plan flow projection rates at build -out. The City has also requested Berryman & Henigar to determine whether the existing sewer facilities within the project limits are able to accommodate sewer flows at build -out. Recommendations will be made to upgrade the existing sewer system if necessary. This letter report will provide the information to allow the City to make the necessary improvement decisions Evaluation Criteria and Methodology According to City's most recent land use designations, the project study area is comprised of three land use (LU) categories, single-family residential (R -SF), general commercial (C -G), and public facility (P -PF). The City's Master Sewer Plan Update (September 2000) designated sewage flow generation factors in relation to all land use categories. Exhibit A presents the City's Sewage Generation Factors in tabular format. Table 1 summarizes the relevant generation rates corresponding to the project land use designations. Tahle 1 - Sewaae Flow Generation Rates within Prniert I imits Land Use Equivalent DU/Acre Flow Per DU Flow allons/da per Acre R -SF 5.00 279 1395 C -G 5.38 _ 1500 P -PF _ 5.38 1500 The proposed sewer main sizes were determined based on the City's peak daily flow (PDF) calculation formula shown below: PDF = 2.5(Qm9,)o ' Where Qmgd is the average daily flow (ADF) expressed in million gallons per day (mgd). All proposed sewers presented in this report meet the City's design requirements in term of 1 Minimum pipe slope between manholes of one percent (1%) 2 Minimum pipe size of 8 inches 3. Minimum pipe depth of 8 feet 4. Minimum flow velocity of 2.5 feel per second (fps) 5. Maximum spacing between each manhole is 350 feet 6. Depth of flow to depth of pipe diameter ratio (D/d) must be less than 0.50 for main diameters less than 12 inches; and 0.75 for pipe diameters greater than 12 inches 7. All sewer main will be vitrified clay pipe (VCP) using a Manning's 'N' value of 0.013 Sewer System Evaluation The general flow pattern follows the natural drainage topography. The proposed system is designed to direct flow towards the south/southwesterly corner of the project site. Drainage basins are divided among streets aligned in the north/south direction. Once the flow reaches the junctions at the southern limits, the flow continues westerly connecting into an existing 18 -inch vitrified clay pipe (VCP) at the intersection of Citrus and Baseline Avenue. A tabular summary of flow calculations based on land use is shown in Exhibit B. A graphical illustration of the recommendation is shown in Exhibit C. Citrus Avenue It is estimated the flow generated north of Highway 30/210 is approximately 6 mgd (See Exhibit D). Part of the tributary flow from the north will be directed into a system on Citrus Avenue via an existing 21" VCP At the intersection of Citrus and Los Cedros Avenue, the 21" VCP bends and directs flow westerly. The proposed 8" VCP on Walnut Avenue, east of Citrus, will be directed southward connecting into an existing 15 -inch VCP on Citrus Avenue. While the existing 15" VCP on Citrus Avenue is over designed, it is not necessary to replace the existing sewer system. Oleander, Cypress, and Juniper Avenues Based on review of the current system, the existing 8 -inch VCP system along Oleander Avenue south of Walnut Street is able to accommodate the projected volume only if flow east of Oleander is diverted into a new drainage basin on Cypress. It is recommended that the new facilities on Cypress Avenue south of Walnut Street be 10 inches in diameter. Existing flow generated along Sierra Avenue entering the Juniper basin will be directed into an existing 8 -inch VCP south of Baseline Avenue. The proposed 8 -inch collection system on Juniper north of Baseline will be conveyed westerly into the proposed 10 -inch VCP on Baseline Avenue. Mango and Sierra Avenues With the exception � of seven parcels east of Sierra and an approximate 147.5 AC west of Palmetto Ave, all other residential discharge between Sierra and Mango Avenues will flow easterly towards an existing 8 -inch VCP system on Mango Avenue. At build out, it is recommended the existing 8 -inch VCP south of MiCallef Street be upgraded to a 12 -inch VCP. The projected flow west of Sierra Avenue will require an 8 -inch VCP system to be installed connecting into an existing 8 -inch main near the southern end of Sierra Avenue. Baseline Avenue As indicated in Exhibit C, 18 -inch, 15 -inch, and 10 -inch VCPs are recommended along Baseline Avenue to convey flow westerly into an existing 18 -inch VCP at the intersection of Citrus and Baseline Avenue. An 8 -inch VCP collecting flow between Sierra and Mango Avenues along Baseline is recommended to direct flow easterly. For future development along the northwestern side of Baseline and Palmetto Avenue, another 8 -inch VCP collecting flow between Mango and Palmetto Avenues along Baseline is recommended to direct flow easterly toward Palmetto Avenue. All flows currently flowing southerly past Baseline Avenue will be diverted westerly towards Citrus Avenue. Summary of Recommendations Shown below is a summary of the improvements to be made on each street within the project area: ♦ Citrus Avenue o 1500 linear feel of 8 inch VCP o 4 new manholes ♦ Oleander Avenue c 600 linear feel of 8 inch VCP o 2 new manholes Cypress Avenue 600 linear feet of 8 inch VCP 0 2,650 linear feet of 10 inch VCP o 9 new manholes ♦ Juniper Avenue o 3,000 linear feet of 8 inch VCP o 9 new manholes • Sierra Avenue o 3,200 linear feel of 8 inch VCP o 11 new manholes ♦ Mango Avenue 0 1,300 linear feel of 12 inch VCP upgrade ♦ South Highland Avenue 0 2,450 linear feet of 8 inch VCP 0 7 new manholes • Walnut Street 1,900 linear feet of 8 inch VCP u Abandon 270 linear feet of 10" VCP c, 6 new manholes • Baseline Avenue c 1500 linear feet of 8 inch VCP 0 1,320 linear feet of 10 inch VCP 0 1,320 linear feet of 15 inch VCP n 1,400 linear feet of 18 inch VCP o 18 new manholes Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS) Citrus Avenue (North of Walnut)- 'Based on City of Fontana's Sewer Master Plan (1998), Flow from Tributary Area North of Highland Avenue is Approximately 6 MGD. Citrus Avenue (South of Walnut) Flow/Ac Average ow Proposed Sewer Main Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (mgd) (in) North of South Highland 10.9 C -G 1500 16,335 0 059 8 South of South Highland 8.1 C -G 1500 12,210 0.045 8 East of Citrus 9 2 C -G 1500 13,815 0.051 8 East of Citrus 16.3 R -SF 1395 22,739 0.080 8 East of Oleander Total (mgd) P -PF 1500 2.67 0 085 B West of Oleander Pipe Slope (fUft) R -SF 1395 0.01 0.101 8 Walnut East of Oleander VCP N -value R -SF 1395 0.013 0 028 8 Walnut East of Oleander Pipe Diameter (in) P -PF Existing VCP 21 0 094 8 Flow Depth (in) 11.68 Flow Velocity (fps) 6.88 Did (%) 56 'Based on City of Fontana's Sewer Master Plan (1998), Flow from Tributary Area North of Highland Avenue is Approximately 6 MGD. Citrus Avenue (South of Walnut) Oleander Avenue (North of Walnut) FlowlAc Average Flow Proposed Sewer Main Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (mgd) (in) East of Citrus 30 7 R -SF 1395 42,771 0 142 8 East of Citrus 2 2 C -G 1500 3,315 0.014 8 Walnut East of Citrus 5 1 R -SF 1395 7,156 0 028 8 East of Oleander Total (mgd) C -G 1500 0.053 0 018 8 East of Oleander Pipe Slope (ft/ft) P -PF 1500 0.01 0 085 B West of Oleander VCP N -value R -SF 1395 0.013 0.101 8 Walnut East of Oleander Pipe Diameter (in) R -SF 1395 8 0 028 8 Walnut East of Oleander Flow Depth (in) P -PF 1500 1.41 0 094 8 Flow Velocity (fps) 1.98 Did (%) 18 Oleander Avenue (North of Walnut) Exhibil B 020619 Fontana Sewer xis 01 Flow/Ac Average Flow Proposed Sewer Main Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (mgd) (in) North of South Hi Mand 105 C -G 1500 15,750 0 057 8 South of South Hi hlan 4 6 C -G 1500 6.900 0 027 8 West of Oleander 4 7 C -G 1500 7.050 0 028 8 East of Oleander 2.9 C -G 1500 4,380 0 018 8 East of Oleander 161 P -PF 1500 24.210 0 085 B West of Oleander 21 1 R -SF 1395 29,435 0.101 8 Walnut East of Oleander 51 R -SF 1395 7,170 0 028 8 Walnut East of Oleander 18.2 P -PF 1500 27.330 0 094 8 Total (mgd) 0.122 Pipe Slope (ft/ft) 0.02 VCP N -value 0.013 Pipe Diameter (in) 8 Flow Depth (in) 3.51 Flow Velocity (fps) 4.62 Did (%) 44% Exhibil B 020619 Fontana Sewer xis 01 Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS) Oleander Avenue (South of Walnut) Description Flow/Ac Tributary Area (Ac) Land Use (gpad) Average Flow (gpd) Proposed Sewer Main Peak Flow (mgd) (in) West of Oleander 3a 0 R -SF 1395 47,430 0 156 10 East of Oleander 32.5 R -SF 1395 45,296 0 150 12 Peak Flow (mgd) Total (mgd) 0-093 9 4 T CG Pipe Slope (ft/ft) 0.02 0.052 8 VCP N -value 0.013 C G 1501 Pipe Diameter (in) 8 8 West of Cypress Flow Depth (in) 2.88 1500 4,350 Flow Velocity (fps) 4.19 West of Cypress 162 Did (%) 36% 24,270 �'cr...�G�ii'��n '.ec,:'ter=".fL?d,'SY:Y�1Yr�ri'„2i-. a 3+�1:? r.r�ac't�t.'ttr-+:7:8'dixYYa`52+t�=.ti• a�.'.f •::resyi __ -„�.;. n,ws _ Cypress Avenue (No th of Walnut) Cypress Avenue (South of Walnut) Flow/Ac F1owlAc Average Flow Proposed Sewer Main Proposed Sewer Main Description Tributary Area (Ac) i Land Use (gpad) (gpd) Peak Flow (mgd) (in) North of South Hr hland 9 4 T CG 1500 14,100 0.052 8 South of South Highland 2 4 C G 1501 3,602 0.015 8 West of Cypress 2 9 C -G 1500 4,350 0.018 8 West of Cypress 162 P -PF 1500 24,270 0.085 8 East of Cypress 2 8 C -G 1500 4,230 0.017 8 East of Cypress 200 R -SF 1395 27,858 0.096 8 Walnut East of Cypress.. 8 7 R -SF 1395 12,081 0.045 8 Walnut East of Cypress 2.8 R -SF 1395 3.948 0.016 8 Total (mgd) 0.094 Pipe Slope (ft/ft) 0.02 VCP N -value 0.013 Pipe Diameter (in) 8 Flow Depth (in) 3.07 Flow Velocity (fps) 4.32 Dld (%) 38% Cypress Avenue (South of Walnut) _xh+b+t B )20619 Fontana Sewer As B-2 Flow/Ac Average Flow Proposed Sewer Main Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (mgd) (in) _ West of Cypress 31.8 R-SF1395 44,305 0 147 a East of Cypress 302 R -SF 1395 42,115 0.140 3 Total (mgd) 0.086 Pipe Slope (f /ft) 0.01 VCP N -value 0.013 Pipe Diameter (in) 10 Flow Depth (in) 3.36 Flow Velocity (fps) 3.20 D/d (%) 34% _xh+b+t B )20619 Fontana Sewer As B-2 Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS) Juniper Avenue (North of Walnutl Description Tributary Area (Ac) Land Use Flow/Ac (gpad) Average Flow (gpd) Peak Flow (mgd) Proposed Sewer Main (in) North of South Highland 2.8 R -SF 1395 3,906 0 016 8 North of South Highland 73 R -SF 1395 10,184 0 038 8 North of South Highland 4.3 C -G 1501 6,454 0 025 9 North of South Hi hiand 5 7 C -G 1500 8,565 0 033 8 South of South Ht hland 91 C -G 1500 13,620 0 050 8 Norah of South Hi hland 7 1 C -G 1500 10,620 0.040 8 North of South Highland 6.8 C -G 1500 10,200 0 039 8 West of Juniper 20 C -G 1501 3.002 0 013 8 west of -juniper 48 C -G 1500 7,155 0 028 8 West of -Juniper 143 R -SF 1395 19,949 0 071 8 East of Juniper 330 R -SF 1395 46,035 0 152 8 Walnut East of Juniper 70 R -SF 1395 9.793 0 037 8 Total (mgd) Pipe Slope (ft/ft) VCP N -value Pipe Diameter (in) Flow Depth (in) Flow Velocity (fps) Did (%) 0.149 0.02 0.013 10 3 55 4.63 36 Juniper Avenue (South of Walnut) Sierra Avenue ow cAverage ow Proposed Sewer MaTin Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (mgd) (in) West of Juniper 27 3 R -SF 1395 38,097 0 128 8 East of Juniper 229 R -SF 1395 31,946 0 109 8 East of Juniper 9.1 C -G 1500 13.650 0 050 8 East of Sierra Total (mgd) R -SF 1395 0.084 0 022 8 East of Sierra Pipe Slope (fVft) R -SF 1 1396 0.01 0 005 9 East of Sierra VCP N -value R -SF 1395 0.013 0 021 8 Pipe Diameter (in) 8 Flow Depth (in) 3.36 Flow Velocity (fps) 3.20 Did (%) 1 42 Flow Depth (in) 2.95 Sierra Avenue Exhibit B 020619 Fontana Sewer As 6 -3 Flow/Ac Average ow Proposed Sewer Main Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (ingd) West of Sierra 4.3 R -SF 1395 5.999 0 024 B West of Sierra 22.9 RSF 1395 31.932 0 109 8 West of Sierra 8 1 C -G 1500 12.210 0 045 B East of Sierra 4-0 R -SF 1395 5,580 0 022 8 East of Sierra 08 R -SF 1 1396 1,117 0 005 9 East of Sierra 3.7 R -SF 1395 5,217 0 021 8 Total (mgd) 0.062 Pipe Slope (ft/ft) 0.01 VCP N -value 0.013 Pipe Diameter (in) e Flow Depth (in) 2.95 Flow Velocity (fps) 3.00 Did (%) 37 Exhibit B 020619 Fontana Sewer As 6 -3 Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS) Baseline Avenue - Distinct Drainage Basins Westerly Cross Street Tributary Area (Ac) Land Use Flow/Ac (gpad) Average Flow (gpd) Peak Flow (mgd) Citrus 9.3 C -G 1500 13,965 0 051 Citrus 3.0 R -SF 1395 4,185 0017 Oleander 5 1 R -SF 1395 7,142 0 026 Cypress 14 2 R -SF 1395 19,809 0 070 Sierra 12.6 R -SF 1 1395 1 17,577 0 063 Palmetto 90 R -SF 1395 12,499 0046 Mango Avenue t CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CITRUS/BASELINE JUNCTION t>en Average Flow Peak Flow Flow/Ac Average Flow Flow Path Proposed Sewer Main Description Tributary Area (Ac) Land Use (gpad) (gpd) Peak Flow (mgd) (in) 8 Meander and Baseline Junctic 0.718 1 849 2.023 15 8" begmnmg South o East of Mango 903 R -SF 1395 125.927 0 379 Highland Ave to north o 2.016 Pipe Slope (ft/ft) MiCallef East of Mango 11 R -SF 1395 15,387 0 056 12" beginning at MiCallef West of Mango 120 P, -SF 1395 167,400 0 492 12" beginning at MiCallef 5.50 Total (mgd) 0.309 0.858 D/d (%) Pipe Slope (ft/ft) 31 "/, 0.01 VCP N -value 0.013 Pipe Diameter (in) 12 Flow Depth (in) 5.81 Flow Velocity (fps) 4.47 D/d 1[% 48 t CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CITRUS/BASELINE JUNCTION t>en Exhibit 8 020619 Fontana Sewer xis B-4 Average Flow Peak Flow Cumulative Total Proposed Sewer Flow Path (mgd) (mgd) (mgd) Main (in) Citrus (South of Walnul) 0 053 0 173 0 173 8 Meander and Baseline Junctic 0.718 1 849 2.023 15 Baseline (Citrus to Oleander) 0 018 0 065 2016 8 Total (mgd) 0.789 2.016 Pipe Slope (ft/ft) 0.01 VCP N -value 0.013 Pipe Diameter (in) Oleander (South of Baseline) 18 Flow Depth (in) 5.50 Flow Velocity (fps) 4.68 D/d (%) 31 "/, Exhibit 8 020619 Fontana Sewer xis B-4 I Exhibit B - BASELINE AVENUE SEWER STUDY (CITRUS TO CITY LIMITS) CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT OLEANDER/BASELINE JUNCTION Average Flow Peak Flow Cumulative Total Proposed Sewer Flow Path (mgd) (mgd) (mgd) Main (in) Oleander (North of Walnut) 0 122 0 369 0 369 8 Oleander (South of Walnut) 0 093 0 287 0.656 10 Cypress and Baseline Junctjoi 0 007 0 028 0 684 15 Baseline (Oleander to Cypress 0 496 1 321 1 849 15 Total (mgd) 0.718 1.849 Pipe Slope (ft/ft) 0.01 VCP N -value 0.013 Pipe Diameter (in) Oleander (South of Baseline) 15 Flow Depth (in) 7.00 Flow Velocity (fps) 5.1047%Did Mamma [%) ONSM CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT CYPRESS/BASELINE JUNCTION Average Flow I Peak Flow Cumulative Total Proposed Sewer Flow Path (mgd) (mgd) (mgd) Main (in) Juniper (North of Walnut) 0 149 0 443 0 443 10 Cypress (North of Walnut) 0 094 0 292 —6692 8 Cypress (South of Walnut) 0 086 0 269 0 912 8 Baseline (Cypress to Juniper 0 020 0 070 0 962 8 Juniper and Baseline Junctto 0 146 0 433 1 321 Total (mgd) 0.496 1-321 Pipe Slope (ft/ft) 0.01 VCP N -value 0.013 Pipe Diameter (in) Baseline (Oleander to Cypress) 15 Flow Depth (in) 5.80 Flow Velocity (fps) 4.67 Did (%) 39% CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT JUNIPER/BASELINE JUNCTION Cumulative .ta ,.pose ewer verage Flow Peak Flow Flow Path (mgd) (mgd) (mgd) Main (in) Sierra (non -tributary) 0 062 0 199 0 199 8 Baseline (Juniper to Serra) 0 000 0 000 0 199 8 Juniper (South of Walnut) 0 084 0 262 0 433 8 Total (mgd) 0.146 0.433 Pipe Slope (ft/ft) 0.01 VCP N -value 0.013 Pipe Diameter (in) Exist VCP 8 I Flow Depth (in) 2.74 Flow Velocity (fps) 2.89 Did (%) 34% CUMULATIVE FLOW SUMMARY OF SYSTEM ENDING AT MANGO/BASELINE JUNCTION Average ow ea ow umu attve ota ,.pose eA of Flow Path (mgd) (mgd) (mgd) Main (in) Mango (S Highland to Baselin 0 309 0 858 0.858 8 Baseline (East of Siena) 0 018 0.063 0.902 8 Total (mgd) 0.326 0.902 Pipe Slope (fUft) 0.01 VCP N -value 0.013 Pipe Diameter (in) 12" beginning at MiCallef 12 Flow Depth (in) 5.22 Flow Velocity (fps) 4.26 D/d (off) 44% Exhibd B 020619 Fontana Sewer xts B•5