Loading...
HomeMy WebLinkAboutRedwood Manufacturing Plant0 11 Drainage Study Door Components Redwood manufacturing Plant Drainage Report for Door Components Redwood Manufacturing Plant 7980 Redwood Avenue Fontana, CA 92336-1638 Grading Permit in Progress Located on the west side of Redwood Avenue, North of Foothill Blvd. and east of Cherry Avenue in the City of Fontana, CA. A.S.P.# 06-0015 hima�ouru� Prepared For: Door Components, Inc. 9271 Arrow Route Rancho Cucamonga, CA 91730 (909) 989-3667 Prepared By: Danjon Engineering, Inc. 895 E Yorba Linda Blvd, Suite 202 Placentia, CA 92870 Ph: (714) 572-6800 Fax (714) 572-6850 Revised March 11, 2008 Date Prepared June 12, 2007 Job Number: 07634 Danjon Engineering, Inc. F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc 3/11/2008 Page 1 of 47 Drainage Study Door Components Redwood manufacturing Plant �.� INDEX A. Introduction 1. Project description 2. Site description 3. Description of proposed on site -drainage B. Hydrology Calculations 1. Soil Map and Isohyetal Map 2. Rational Method Analysis a. 100 Year Storm Existing conditions b. 100 Year Storm Proposed conditions c. 25 Year Storm Existing conditions d. 25 Year Storm Proposed conditions 3. Hydrology Map Existing conditions 4. Hydrology Map Proposed conditions 5. CH1 Water Quality and Infiltration System Calculations a. Summary of results for Water Quality and Infiltration System b. CH1 Calculations for Water Quality and Infiltration System 6. Water Quality and Infiltration System design 7. Orifice sizing calculations 8. WSPG calculations (HGL calculations) a. Line Al b. Line A2 c. Line B 9. Catch basin sizing calculations Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 2 of 47 Drainage Study Door Components Redwood manufacturing Plant .�. A. INTRODUCTION DANJON ENGINEERING INC. has prepared this hydraulic analysis to determine and show 1) The pipe sizes needed to drain the site, 2) Protection of the structures for a 100 year storm event 3) The maximum available flow in the pipes based on hydraulic calculations. This analysis addresses the flow tributary to each point along the storm drain system of this development. The AES Rational Method Hydrology (Ver 13.1) Computer Program is used for calculation of a 100 year and 25 year event storm. Design on the detention system is for a 100 -year storm. 1. PROJECT DESCRIPTION A single 465 foot long by 200 ft wide, 92,000 square foot building with its narrow side facing onto Redwood Avenue a 35 foot wide dimension from the centerline of the street to the existing right of way (40 foot wide dimension to the ultimate right of way). The building rests 21 feet west of the street right of way. The west side (back end) of the building is 135 ft east of the west property line. Along this frontage is primarily landscape planted for esthetic purposes. This area must be constructed low of the curbs and surrounding areas to keep the irrigation water runoff minimal. 2. SITE DESCRIPTION The 4.4 acre property is located within the City of Fontana, in the southwestern portion of San Bernardino County, on the west side of Redwood Avenue, North of Foothill Blvd and East of Cherry Avenue. The 4.4 acre rectangular shaped parcel has an east to west direction with topography of the relatively level parcel descending gradually from northeast to southwest. The property is currently undeveloped land covered with a vegetation growth consisting of natural grasses, brush, and weeds. The site is generally flat, with little topographic relief. The site's elevation ranges from approximately 1,256 feet above mean sea level (MSL) in the northeast corner to approximately 1,245 feet above MSL in the southwest corner. 3. DESCRIPTION OF PROPOSED ON-SITE DRAINAGE Drainage for the site is primarily overland by way of pavement sheet flowing towards concrete v -gutters. The north half of the buildings roof water and the surface area water empty continuously along the north side of the building. A v -gutter runs from the north side of the building, along the northerly edge of the south row of parking and continues towards the west at various grades with 0.5% being the minimum. The v -gutter then turns Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 3 of 47 Drainage Study Door Components Redwood manufacturing Plant .. south as it nears the parking along the west side of the site. This continues the entire length of the parking until 14 feet north of the trash enclosure. At this location a catch basin sized for the 100 year storm flow collects the flows. This catch basin also collects the waters from the south of the development. Area 1 drains 4.4 acres of the site via sheet flow and v -gutters into a proposed catch basin (w=9.85'). The proposed catch basin is connected to a 24" H.D.P.E. storm drain system which connects to a proposed Water Quality and Infiltration System which will reduce the outflow from the proposed flow to the existing flow. Area 2 drains 0.3 acres of the site. A portion of this area drains the front of the property via swale into a 6" atrium grate drain which is connected to a proposed storm drain line that is connected to a proposed catch basin (w=2.95'). This basin also collects waters from a portion of the entrance onto the site. The basin is connected to a proposed 12" H.D.P.E. storm drain system which connects to the same proposed Water Quality and Infiltration System as area 1 which will reduce the outflow from the proposed flow to the existing flow. Water Quality and Infiltration System: The proposed Water Quality and Infiltration System is designed with two 60" diameter Hancor HDPE pipes with a rock base and filter fabric. The basin is designed to reduce the proposed onsite flows to not exceed the existing onsite flows. In this case the Water Quality and Infiltration System is designed to detain the difference of flows for a 100year storm event. The existing 100year storm event has a peak flow rate of 6.56cfs and the proposed 100year storm event has a peak flow rate of 16.25cfs; therefore, the proposed Water Quality and Infiltration System is design to detain the peak flow rate of the difference of the two flows which is 9.69 cfs and the allowed peak flow out of the basin is 6.56cfs. The outflow will be restricted by the use of an orifice constructed at the downstream end of the Water Quality and Infiltration System. A restrictor is used rather than smaller diameter pipe for design reasons. An orifice design can be cut to the exact dimensions needed for the condition, and if needs change in the future, it can be easily replaced and or maintained. With the use of a restrictor pipe, common pipe sizes limit the flows conditions and can cause substantial storage volume changes to accommodate the common pipe size. The water will then continue into a proposed 18" storm drain line connecting to the existing 42" storm drain line in Redwood Avenue (formally Colorado Avenue). See proposed hydrology map for locations of the existing and proposed storm drain lines, the underwater Water Quality and Infiltration System, the drainage areas, and the flow paths. Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 4 of 47 Drainage Study Door Components Redwood manufacturing Plant B. HYDROLOGY CALCULATIONS Danjon Engineering, Inc. F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc 3/11/2008 Page 5 of 47 11. 1. SOIL MAP 10 Drainage Study Door Components Redwood manufacturing Plant Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 6 of 47 •\Azi■:4:1011Ilo1ZI101= �� c � c1j + - 17, r — L r a RIW RIE ° '".. � R2E t •5 y R 2 W 1 ----— — N 14 0 if 1.3 I —; - e 1 -_ - tiff • ; ~ sT' P' I - T�-}I.6 zt•RGt�r ` J f/ 7Ll TA I �• J1 IV t BALD IN L L. ARRO•IN 4, 2eV- • — — Al Y SII 1.et l' _ _ .ERw L — - - FA 134°15T2 N re 1 ua — -- I -- -- — — —� i 3 I _ • � r r _ I II; 'v I \ RIOA I I / �I"_ I ' ~ ""ING mll�� I 1. I tV I I i 1— 4 't EN -' -' -- y c•/u •"" �i _ 2r .—' — - I 7 ¢ .,. •_- -t" - T't .. _lir°,� f�Ats __ ..-`'�_ T. `v..i — :'�' » ?� ,`. «t•. i.:r .. ; � •1. .r.• -' � ..-- r � q� wARtoM 1 � I ; � \ I I � I IN T;- _ r a' ..' -T r - r- —.tom .—T� ` .— 4— —I L_ I L I — ` : I• C♦ i I I�0'•L I SAN I RNARl a' A• 1%. MASH •� Hao - � _ {- _ REDLANDS- tA C OAK 9K • 1.2 ..,ra K,. YUCAI►A7,4.45 1 I I R2 I' MN DUN _ �- - +3••00 IV4 SIDE . COUNT - o ••o �1 , - .- - _.-.ecoae ..t • R2W� D R3 SAN KRNARDINO COUWY =Q CONTROL DISIR T" VALLEY AREA REDUCED DRAWING WHYETALS SCALE I a = 4 MILES YIDD-100 YEAR 1, HOUR "so a+ UmIr: N k" Rus !, a" INTO COUNTY ,II�NOVFD sY f ILIAL °"� '� 1� >t ,� C8 ISOLINES PRECIPITATION (INCHES) 1•. �•f� 1 w.1.! B-12 FIGURE B-4 L6 L6 4 R8 s� I R7W R6W 4 T4N M[wl I 1 I I WEST SLX WT • _ I � � i I IY.L5tv A 4 I 5 o I — I I �[• j 17 I p�•` / t r T •\ B 9 IO I. 12 •• RRJpI i3 IT I 19 � 2 ^q„2� I 22 �• I I.i'• �a — — � 6 f y + • _. NT SAN T,'Mi10 ~ 09 I \ •r I N ` <f r r s wot' r --k - - �- - -� ii j.�i E4r 4•t5' Tj An —fir .3 \-LL Lll �.. I ..—.. TIN —,u---� =�--F-%--,"•\ t _ _ a\`,. ,. - -1 "r "AL . i I I UPL RIALTO_ \ ^TIS «s 0 N T A N - • '• •`I K2`w_r -- - — - — �; s •' [•.•tt.. ! � COLT N• ONTA lOr•• •, i�� L2 _ • ...k,�";, •' ': 8.1011[ .\3 I 11 c•' r' I _ - GRA" TIMMICE T% CHWO 3tr _ ERSIDE �• — -- � u• [. ..[ .-SER•• � .-- S�a � . � I ��•......• �+� -..• ..i -- fn-� —; _ ,•• • •.. • •pNaS \ � 'I•. ti Qu '• I Nuc R41h "- �-� • - 4- ' R5 I I • 1 aaADO I CONTnoI '~ . I 1.6 IANA - SAN BERN - ,,,1; •�:• 8 - - - -W-- - - W - -� HYDROLOGY I- I 4- 1�i2 WL R I W RIE R2E ,perI P I T–T —1 T- -4 J, N. "Ey KA T RA LE -SN o MIT" ;00 T I IN.7 -4 IT i __j -4. L ARROWNEA0 L 5EBI ALDWVIN ED . N L ED ...... .... .EARL -7 IN L -T34'-5T? N 1.4 I I J- 4� L RLOA9, 7' N + r L 7 7'1 lr -Y 9 1 N A 8 0 WASW As gi I REDLAND T— I A y — I t 7 —7 –4 — I saw ft -0 ItIv4stsim , —c RIE t RTE + oop C44 le I —iw S4 0 R3 R Rl I-*- REDUCED DRAWING 1%w SCALE I"= 4 MILES DINO COUNTY NUALL& "END, C-8 ISOLINES PRE-el-PTTATION (INCHES) 0-11 VALLEY AREA ISOHYETALS Ya - 10 YEAR I HOUR BASED ON U.SDIZ, NO." ATLAS 2, W3 Mom By F DATE scALa I FILE Na foRwr. jmA 1982 r -alk WRO-1 1 3 of 12 `61 W I I I R I I R6W I R5 i 4W T4N — — — earl uT•.30 I•°.� I I / j - ' Aa— -� — L i• — - �- I- �'- I - �'[�� - ' r ip • �� ` I Q I ` IwluT ••u•r \c9I s I 4@73 I z 04 A I I - • I I s. yrt` i UPL?1ND Illi. P nl� •w"•—•a°• \4 —I 1- ,UIIYIT — I—.. d{../ •le•1• — ,� T3N I• I _ �— .1j..6. l5 1.4 I -t ! I 1 f= 19 2 21 22 I I �* I y-41, ,` 29 , I 2 c•iroi- ^ ` �;•VIII � �y� I R ITA LTO_ � ; � � — � •o• o �• I —+• ��xr CEI � • I — , I I r ^l•• I Y I 32 1' 34 I 6 I (/C • • i• I • u / > I I I TONIO � i � s _ � I - •I 1— ... —I � �. e r � u�y�. •I. 0NT — ID .3 l T2N j — II I — — ?/ MIS. Foo YTL _ - "- - — Ott I114 I I c• MT 5,s I �; I '�• ` vLNVR• i' • 1; W �I I • f wr•• I N[AN� T[Rl T- + CHINO $° ,I •.• ,. � _1 d ,�Q,>•'' Ile -T1LE {M7f IY - • I I s. UPL?1ND .' •� , �* I• R ITA LTO_ -- -- - , ..• +-•• FON TA N - > TIS ••I .•'r• s .. •TONVS 0NT 109?"• C r _ - "- - — I I c• MT 5,s I �; I '�• ` vLNVR• i' • 1; W �I I • f wr•• I N[AN� T[Rl T- l;� I CHINO $° ,I •.• ,. � _1 d ,�Q,>•'' i \ � L t 3�. 4e I — ' -YY _.'- _ _ �. _ � — � _ •' °' I �-- + • PFJ/ � +•. f� I -� — I \ 3a • • 1 `I I ` i R4W I � . I. �N I I i j I I � •-,iii, rs• • t_ r..rt RSW. j I I PR. IF CONTROL' L SIN `__ 1 9 T _ 0AM111• .. �> 1 y• ,, __, t��- • • •• `��:. - - - -� _. _ SAN 6ERNAR — d I �8W I _ I ••••. �''�30 - J "'i`T-!4 I _ R7W R6 ............................. HYDROLOGY MA Drainage Study Door Components Redwood manufacturing Plant 2. RATIONAL METHOD ANALYSIS a. 100 Year Storm Existing Conditions **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2006 Advanced Engineering Software (aes) Ver. 13.1 Release Date: 06/15/2006 License ID 1444 Analysis prepared by: Danjon Engineering, Inc. 895 E Yorba Linda Blvd, Suite 202 Placentia, CA 92870 (714) 572-6800 ************************** DESCRIPTION OF STUDY ************************** * 100 YEAR EXISTING * * ************************************************************************** FILE NAME: 100YEARX.DAT TIME/DATE OF STUDY: 15:28 12/20/2007 --------------------------- USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL* -- USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* 10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980 100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.460 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 100.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.4600 SLOPE OF INTENSITY DURATION CURVE = 0.6000 *ANTECEDENT MOISTURE CONDITION (AMC) III ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 7 of 47 cm Drainage Study Door Components Redwood manufacturing Plant >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 673.00 ELEVATION DATA: UPSTREAM(FEET) = 1256.80 DOWNSTREAM(FEET) = 1245.50 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 28.642 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 2.275 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) NATURAL GOOD COVER "GRASS" A 4.70 0.72 1.000 58 28.64 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.72 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 1.000 SUBAREA RUNOFF(CFS) = 6.56 TOTAL AREA(ACRES) = 4.70 PEAK FLOW RATE(CFS) = 6.56 END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 4.7 TC(MIN.) = 28.64 EFFECTIVE AREA(ACRES) = 4.70 AREA -AVERAGED Fm(INCH/HR)= 0.72 AREA -AVERAGED Fp(INCH/HR) = 0.72 AREA -AVERAGED Ap = 1.000 PEAK FLOW RATE(CFS) = 6.56 END OF RATIONAL METHOD ANALYSIS Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 8 of 47 Drainage Study Door Components Redwood manufacturing Plant b. 100 Year Storm Proposed Conditions **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2006 Advanced Engineering Software (aes) Ver. 13.1 Release Date: 06/15/2006 License ID 1444 Analysis prepared by: Danjon Engineering, Inc. 895 E Yorba Linda Blvd, Suite 202 Placentia, CA 92870 (714) 572-6800 ************************** DESCRIPTION OF STUDY ************************** * 100 YEAR PROPOSED * * ************************************************************************** FILE NAME: 100YEAR.DAT TIME/DATE OF STUDY: 13:53 01/07/2008 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL* -- USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* 10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980 100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.460 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 100.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.4600 SLOPE OF INTENSITY DURATION CURVE = 0.6000 *ANTECEDENT MOISTURE CONDITION (AMC) III ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ---------------------------------------------------------------------------- '""Uh. >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< %ft, >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 9 of 47 cm Drainage Study Door Components Redwood manufacturing Plant ----------------------- - INITIAL SUBAREA FLOW-LENGTH(FEET) 861.00 ELEVATION DATA: UPSTREAM(FEET) = 1254.43 DOWNSTREAM(FEET) = 1246.13 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 11.483 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.937 SUBAREA TC AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) COMMERCIAL A 4.40 0.80 0.100 52 11.48 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100 SUBAREA RUNOFF(CFS) = 15.28 TOTAL AREA(ACRES) = 4.40 PEAK FLOW RATE(CFS) = 15.28 **************************************************************************** FLOW PROCESS FROM NODE 101.00 TO NODE 102.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ------------------- ELEVATION DATA: UPSTREAM(FEET) = 1242.13 DOWNSTREAM(FEET) = 1241.15 FLOW LENGTH(FEET) = 470.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 30.0 INCH PIPE IS 21.0 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 4.16 ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBEROF PIPES = 1 PIPE-FLOW(CFS) = 15.28 PIPE TRAVEL TIME(MIN.) = 1.88 Tc(MIN.) = 13.36 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 102.00 = 1331.00 FEET. FLOW PROCESS FROM NODE 102.00 TO NODE 102.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<< TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 13.36 RAINFALL INTENSITY(INCH/HR) = 3.59 AREA -AVERAGED Fm(INCH/HR) = 0.08 AREA -AVERAGED Fp(INCH/HR) = 0.80 AREA -AVERAGED Ap = 0.10 EFFECTIVE STREAM AREA(ACRES) = 4.40 TOTAL STREAM AREA(ACRES) = 4.40 PEAK FLOW RATE(CFS) AT CONFLUENCE = 15.28 **************************************************************************** FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 214.00 ELEVATION DATA: UPSTREAM(FEET) = 1253.46 DOWNSTREAM(FEET) = 1250.12 TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.975 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.827 SUBAREA TC AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS TC 00"11" LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) *MW - COMMERCIAL A 0.30 0.80 0.100 52 5.98 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 10 of 47 Drainage Study Door Components Redwood manufacturing Plant SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100 SUBAREA RUNOFF(CFS) = 1.55 TOTAL AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) = 1.55 **************************************************************************** FLOW PROCESS FROM NODE 201.00 TO NODE 102.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >> >>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ------------------------------------- ELEVATION DATA: UPSTREAM(FEET) = 1246.62 DOWNSTREAM(FEET) = 1241.15 FLOW LENGTH(FEET) = 116.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 12.000 DEPTH OF FLOW IN 12.0 INCH PIPE IS 3.7 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 7.55 ESTIMATED PIPE DIAMETER(INCH) = 12.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 1.55 PIPE TRAVEL TIME(MIN.) = 0.26 Tc(MIN.) = 6.23 LONGEST FLOWPATH FROM NODE 200.00 TO NODE 102.00 = 330.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 102.00 TO NODE 102.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 6.23 RAINFALL INTENSITY(INCH/HR) = 5.68 s AREA -AVERAGED FM(INCH/HR) = 0.08 AREA -AVERAGED Fp(INCH/HR) = 0.80 AREA -AVERAGED Ap = 0.10 EFFECTIVE STREAM AREA(ACRES) = 0.30 TOTAL STREAM AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.55 ** CONFLUENCE DATA ** STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 15.28 13.36 3.595 0.80( 0.08) 0.10 4.4 100.00 2 1.55 6.23 5.682 0.80( 0.08) 0.10 0.3 200.00 RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 12.90 6.23 5.682 0.80( 0.08) 0.10 2.4 200.00 2 16.25 13.36 3.595 0.80( 0.08) 0.10 4.7 100.00 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 16.25 Tc(MIN.) = 13.36 EFFECTIVE AREA(ACRES) = 4.70 AREA -AVERAGED FM(INCH/HR) = 0.08 AREA -AVERAGED Fp(INCH/HR) = 0.80 AREA -AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.7 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 102.00 = 1331.00 FEET. END OF STUDY SUMMARY: ''M`' TOTAL AREA(ACRES) = 4.7 TC(MIN.) = 13.36 EFFECTIVE AREA(ACRES) = 4.70 AREA -AVERAGED FM(INCH/HR)= 0.08 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page I 1 of 47 ."-- c. 25 Year Storm Existing Conditions M Drainage Study Door Components Redwood manufacturing Plant **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2006 Advanced Engineering Software (aes) Ver. 13.1 Release Date: 06/15/2006 License ID 1444 Analysis prepared by: Danjon Engineering, Inc. 895 E Yorba Linda Blvd, Suite 202 Placentia, CA 92870 (714) 572-6800 ************************** DESCRIPTION OF STUDY ************************** * 25 YEAR EXISTING * * ************************************************************************** FILE NAME: 25YEARX.DAT TIME/DATE OF STUDY: 15:30 12/20/2007 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL*-- USER SPECIFIED STORM EVENT(YEAR) = 25.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* 10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980 100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.460 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 25.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.1481 SLOPE OF INTENSITY DURATION CURVE = 0.6000 *ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) -------------- ----------------- 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ww---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< '%..r >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 13 of 47 M 0 CM Drainage Study Door Components Redwood manufacturing Plant INITIAL SUBAREA FLOW-LENGTH(FEET) = 673.00 ELEVATION DATA: UPSTREAM(FEET) = 1256.80 DOWNSTREAM(FEET) = 1245.50 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 28.642 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 1.789 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) NATURAL GOOD COVER "GRASS" A 4.70 0.94 1.000 38 28.64 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.94 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 1.000 SUBAREA RUNOFF(CFS) = 3.61 TOTAL AREA(ACRES) = 4.70 PEAK FLOW RATE(CFS) = 3.61 END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 4.7 TC(MIN.) = 28.64 EFFECTIVE AREA(ACRES) = 4.70 AREA -AVERAGED FM(INCH/HR)= 0.94 AREA -AVERAGED Fp(INCH/HR) = 0.94 AREA -AVERAGED Ap = 1.000 PEAK FLOW RATE(CFS) = 3.61 END OF RATIONAL METHOD ANALYSIS Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 14 of 47 Drainage Study Door Components Redwood manufacturing Plant ., d. 25 Year Storm Proposed Conditions RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2006 Advanced Engineering Software (aes) Ver. 13.1 Release Date: 06/15/2006 License ID 1444 Analysis prepared by: Danjon Engineering, Inc. 895 E Yorba Linda Blvd, Suite 202 Placentia, CA 92870 (714) 572-6800 ************************** DESCRIPTION OF STUDY ************************** * 25 YEAR PROPOSED * * * ************************************************************************** FILE NAME: 25YEAR.DAT TIME/DATE OF STUDY: 14:27 01/07/2008 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ------------- --*TIME-OF-CONCENTRATION MODEL* -- USER SPECIFIED STORM EVENT(YEAR) = 25.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMICINTERPOLATIONUSED FOR RAINFALL - 10 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 0.980 100 -YEAR STORM 60 -MINUTE INTENSITY(INCH/HOUR) = 1.460 COMPUTED RAINFALL INTENSITY DATA: STORM EVENT = 25.00 1 -HOUR INTENSITY(INCH/HOUR) = 1.1481 SLOPE OF INTENSITY DURATION CURVE = 0.6000 *ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 0.018/0.018/0.020 0 67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 15 of 47 Drainage Study Door Components Redwood manufacturing Plant SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.100 SUBAREA RUNOFF(CFS) = 1.21 TOTAL AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) = 1.21 **************************************************************************** FLOW PROCESS FROM NODE 201.00 TO NODE 102.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >> >>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ------------------- ELEVATION DATA: UPSTREAM(FEET) = 1246.62 DOWNSTREAM(FEET) = 1241.15 FLOW LENGTH(FEET) = 116.00 MANNING'S N = 0.013 ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 12.000 DEPTH OF FLOW IN 12.0 INCH PIPE IS 3.2 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 7.05 ESTIMATED PIPE DIAMETER(INCH) = 12.00 NUMBER OF PIPES = 1 PIPE-FLOW(CFS) = 1.21 PIPE TRAVEL TIME(MIN.) = 0.27 Tc(MIN.) = 6.25 LONGEST FLOWPATH FROM NODE 200.00 TO NODE 102.00 = 330.00 FEET. **************************************************************************** FLOW PROCESS FROM NODE 102.00 TO NODE 102.00 IS CODE = 1 ---------------------------------------------------------------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE« <<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 6.25 RAINFALL INTENSITY(INCH/HR) = 4.46 AREA -AVERAGED Fm(INCH/HR) = 0.10 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.10 EFFECTIVE STREAM AREA(ACRES) = 0.30 TOTAL STREAM AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) AT CONFLUENCE = 1.21 ** CONFLUENCE DATA ** STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 11.88 13.49 2.811 0.97( 0.10) 0.10 4.4 100.00 2 1.21 6.25 4.460 0.98( 0.10) 0.10 0.3 200.00 RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 10.06 6.25 4.460 0.97( 0.10) 0.10 2.3 200.00 2 12.63 13.49 2.811 0.97( 0.10) 0.10 4.7 100.00 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 12.63 Tc(MIN.) = 13.49 EFFECTIVE AREA(ACRES) = 4.70 AREA -AVERAGED Fm(INCH/HR) = 0.10 AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.10 TOTAL AREA(ACRES) = 4.7 LONGEST FLOWPATH FROM NODE 100.00 TO NODE 102.00 = 1331.00 FEET. END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 4.7 TC(MIN.) = 13.49 EFFECTIVE AREA(ACRES) = 4.70 AREA -AVERAGED Fm(INCH/HR)= 0.10 AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.100 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 17 of 47 CM CM Drainage Study Door Components Redwood manufacturing Plant PEAK FLOW RATE(CFS) = 12.63 ** PEAK FLOW RATE TABLE ** STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 10.06 6.25 4.460 0.97( 0.10) 0.10 2.3 200.00 2 12.63 13.49 2.611 0.97( 0.10) 0.10 4.7 100.00 END OF RATIONAL METHOD ANALYSIS Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 18 of 47 Drainage Study Door Components Redwood manufacturing Plant ,.. 5. CH1 WATER QUALITY AND INFILTRATION SYSTEM CALCULATIONS a. Summary of results for Water Quality and Infiltration System Danjon used the CHI: Computational Hydraulics I program provided by AES to calculate the results for the peak flow rates through the proposed basin. This program utilizes the small -area unit hydrograph method per the San Bernardino Hydrology Manual for analysis of flow through the proposed Water Quality and Infiltration System. The output of the program shows the peak Q's going into the Water Quality and Infiltration System. For this study a 100 -year analysis was calculated for maximum capacity of the Water Quality and Infiltration System. The site is located on type A soil and for a 100 -year storm the isohyetal is approx. 1.46 inches. From this data and the area and length of the hydrologic boundary and flowline the Q for the 100 -year storm was calculated. For the proposed site a value of 16.25cfs was calculated for the site. For the existing site a value of 6.56cfs was calculated for the site. A CHI Water Quality and Infiltration System calculation was run for the proposed site using the computational hydraulics 1 program provided by AES. This calculation yields -- a result of 0.44 acre-feet for the total catchment runoff volume. The result is a Water Quality and Infiltration System of at least a volume of 19,167 CF to retain all the water on the site for a 100 -year storm. Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 21 of 47 Drainage Study Door Components Redwood manufacturing Plant �-- b. CH1 calculations for Water Quality and Infiltration System SMALL AREA UNIT HYDROGRAPH MODEL ---------------------------------- (C) Copyright 1989-2006 Advanced Engineering Software (aes) Ver. 13.0 Release Date: 06/01/2006 License ID 1444 Analysis prepared by: Danjon Engineering, Inc. 895 E Yorba Linda Blvd, Suite 202 Placentia, CA 92870 (714) 572-6800 RATIONAL METHOD CALIBRATION COEFFICIENT = 1.00 TOTAL CATCHMENT AREA(ACRES) = 4.70 SOIL -LOSS RATE, Fm,(INCH/HR) = 0.080 LOW LOSS FRACTION = 0.014 TIME OF CONCENTRATION(MIN.) = 13.36 SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED ,.... RETURN FREQUENCY(YEARS) = 100 5 -MINUTE POINT RAINFALL VALUE(INCHES) = 0.52 ..- 30 -MINUTE POINT RAINFALL VALUE(INCHES) = 1.09 1 -HOUR POINT RAINFALL VALUE(INCHES) = 1.45 3 -HOUR POINT RAINFALL VALUE(INCHES) = 2.43 6 -HOUR POINT RAINFALL VALUE(INCHES) = 3.36 24-HOUR POINT RAINFALL VALUE(INCHES) = 5.63 ---------------------------------------------------------------------------- TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 2.16 TOTAL CATCHMENT SOIL -LOSS VOLUME(ACRE-FEET) = 0.05 TIME VOLUME Q 0. 5.0 10.0 15.0 20.0 (HOURS) (AF) (CFS) ---------------------------------------------------------------------------- 0.19 0.0032 0.41 Q 0.41 0.0107 0.41 Q 0.64 0.0182 0.41 Q 0.86 0.0259 0.42 Q 1.08 0.0336 0.42 Q 1.30 0.0413 0.42 Q 1.53 0.0491 0.43 Q 1.75 0.0571 0.43 Q 1.97 0.0650 0.44 Q 2.19 0.0731 0.44 Q 2.42 0.0813 0.45 Q 2.64 0.0895 0.45 Q 2.86 0.0978 0.46 Q ,.., 3.09 0.1062 0.46 Q 3.31 0.1147 0.46 Q ,✓ 3.53 0.1233 0.47 Q Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 22 of 47 Drainage Study Door Components Redwood manufacturing Plant 3.75 0.1320 0.48 Q 3.98 0.1408 0.48 Q 4.20 0.1496 0.49 Q 4.42 0.1586 0.49 Q 4.64 0.1677 0.50 Q 4.87 0.1769 0.50 Q 5.09 0.1862 0.51 Q 5.31 0.1957 0.51 Q 5.53 0.2052 0.52 Q 5.76 0.2149 0.53 Q 5.98 0.2247 0.54 Q 6.20 0.2347 0.54 Q 6.43 0.2448 0.55 Q 6.65 0.2550 0.56 Q 6.87 0.2654 0.57 Q 7.09 0.2759 0.58 Q 7.32 0.2867 0.59 Q 7.54 0.2975 0.59 Q 7.76 0.3086 0.61 Q 7.98 0.3198 0.61 Q 8.21 0.3313 0.63 Q 8.43 0.3429 0.64 Q 8.65 0.3547 0.65 Q 8.87 0.3668 0.66 Q 9.10 0.3791 0.68 Q 9.32 0.3917 0.69 Q 9.54 0.4045 0.71 Q 9.77 0.4176 0.72 Q 9.99 0.4309 0.74 Q 10.21 0.4446 0.75 Q 10.43 0.4586 0.77 Q 10.66 0.4729 0.79 Q 10.88 0.4876 0. 81 Q 11.10 0.5027 0.83 Q 11.32 0.5183 0.86 Q 11.55 0.5342 0.88 Q 11.77 0.5507 0.91 Q 11.99 0.5677 0.93 Q 12.21 0.5874 1.21 Q 12.44 0.6101 1.25 Q 12.66 0.6336 1.31 Q 12.88 0.6579 1.34 Q 13.11 0.6831 1.40 Q 13.33 0.7093 1.44 Q 13.55 0.7366 1.53 Q 13.77 0.7652 1.58 Q 14.00 0.7952 1.69 Q 14.22 0.8269 1.76 Q 14.44 0.8608 1.92 Q 14.66 0.8970 2.01 Q 14.89 0.9363 2.25 Q 15.11 0.9792 2.41 Q 15.33 1.0275 2.84 Q 15.55 1.0809 2.97 Q 15.78 1.1444 3.93 Q 16.00 1.2302 5.39 Q 16.22 1.4292 16.25 4 16.45 1.6083 3.22 Q 16.67 1.6618 2.60 Q 16.89 1.7053 2.12 Q 17.11 1.7418 1.84 Q 17.34 1.7737 1.63 Q 17.56 1.8023 1.48 Q Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 23 of 47 Problem Descriptions: FLOW-THROUGH DETENTION BASIN MODEL SPECIFIED BASIN CONDITIONS ARE AS FOLLOWS: CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 13.360 DEAD STORAGE(AF) = 0.00 SPECIFIED DEAD STORAGE(AF) FILLED = 0.00 ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN = 0.00 INFLOW V _effective depth ------------- (and volume) detention V ............. basin outflow ------------- I I \ storage basin outlet V----------- OUTFLOW Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 24 of 47 Drainage Study Door Components Redwood manufacturing Plant 17.78 1.8285 1.37 Q 18.00 1.8529 1.28 Q 18.23 1.8734 0.95 Q 18.45 1.8904 0.89 Q 18.67 1.9064 0.84 .Q 18.89 1.9215 0.80 Q 19.12 1.9359 0.76 Q 19.34 1.9495 0.73 Q 19.56 1.9626 0.70 Q 19.79 1.9752 0.67 Q 20.01 1.9873 0.64 Q 20.23 1.9989 0.62 .Q 20.45 2.0101 0.60 Q 20.68 2.0210 0.58 .Q 20.90 2.0316 0.56 Q 21.12 2.0418 0.55 Q 21.34 2.0518 0.53 Q 21.57 2.0614 0.52 .Q 21.79 2.0709 0.51 Q 22.01 2.0801 0.49 Q 22.23 2.0891 0.48 Q 22.46 2.0979 0.47 Q 22.68 2.1064 0.46 Q 22.90 2.1148 0.45 Q 23.13 2.1231 0.44 Q 23.35 2.1311 0.43 Q 23.57 2.1391 0.43 Q 23.79 2.1468 0.42 Q 24.02 2.1544 0.41 Q 24.24 ---------------------------------------------------------------------------- 2.1582 0.00 Q Problem Descriptions: FLOW-THROUGH DETENTION BASIN MODEL SPECIFIED BASIN CONDITIONS ARE AS FOLLOWS: CONSTANT HYDROGRAPH TIME UNIT(MINUTES) = 13.360 DEAD STORAGE(AF) = 0.00 SPECIFIED DEAD STORAGE(AF) FILLED = 0.00 ASSUMED INITIAL DEPTH(FEET) IN STORAGE BASIN = 0.00 INFLOW V _effective depth ------------- (and volume) detention V ............. basin outflow ------------- I I \ storage basin outlet V----------- OUTFLOW Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 24 of 47 Drainage Study Door Components Redwood manufacturing Plant DEPTH -VS. -STORAGE AND DEPTH -VS. -DISCHARGE INFORMATION: TOTAL NUMBER OF BASIN DEPTH INFORMATION ENTRIES = 2 *BASIN -DEPTH STORAGE OUTFLOW **BASIN -DEPTH STORAGE OUTFLOW * (FEET) (ACRE-FEET) (CFS) ** (FEET) (ACRE-FEET) (CFS) * 0.000 0.000 0.000** 5.000 0.440 6.560* ---------------------------------------------------------------------------- BASIN STORAGE, OUTFLOW AND DEPTH ROUTING VALUES: INTERVAL DEPTH (S-0*DT/2) (S+0*DT/2) NUMBER (FEET) (ACRE-FEET) (ACRE-FEET) 1 0.00 0.00000 0.00000 2 5.00 0.37964 0.50036 WHERE S=STORAGE(AF);O=OUTFLOW(AF/MIN.);DT=UNIT INTERVAL(MIN.) ---------------------------------------------------------------------------- DETENTION BASIN ROUTING RESULTS: NOTE: COMPUTED BASIN DEPTH, OUTFLOW, AND STORAGE QUANTITIES OCCUR AT THE GIVEN TIME. BASIN INFLOW VALUES REPRESENT THE AVERAGE INFLOW DURING THE RECENT HYDROGRAPH UNIT INTERVAL. TIME DEAD -STORAGE INFLOW EFFECTIVE OUTFLOW EFFECTIVE (HRS) FILLED(AF) (CFS) DEPTH(FT) (CFS) VOLUME(AF) ---------------------------------------------------------------------------- 0.191 0.000 0.41 0.07 0.05 0.007 0.413 0.000 0.41 0.13 0.14 0.012 0.636 0.000 0.41 0.18 0.20 0.015 0.859 0.000 0.42 0.21 0.25 0.018 1.081 0.000 0.42 0.24 0.29 0.021 1.304 0.000 0.42 0.26 0.32 0.023 1.527 0.000 0.43 0.27 0.35 0.024 1.749 0.000 0.43 0.29 0.37 0.025 1.972 0.000 0.44 0.30 0.38 0.026 . 2.195 0.000 0.44 0.31 0.40 0.027 2.417 0.000 0.45 0.32 0.41 0.028 2.640 0.000 0.45 0.32 0.42 0.028 2.863 0.000 0.46 0.33 0.43 0.029 3.085 0.000 0.46 0.33 0.43 0.029 3.308 0.000 0.46 0.34 0.44 0.030 3.531 0.000 0.47 0.34 0.45 0.030 3.753 0.000 0.48 0.35 0.45 0.031 3.976 0.000 0.48 0.35 0.46 0.031 4.199 0.000 0.49 0.36 0.46 0.031 4.421 0.000 0.49 0.36 0.47 0.032 4.644 0.000 0.50 0.37 0.48 0.032 4.867 0.000 0.50 0.37 0.48 0.033 5.089 0.000 0.51 0.37 0.49 0.033 5.312 0.000 0.51 0.38 0.49 0.033 5.535 0.000 0.52 0.38 0.50 0.034 5.757 0.000 0.53 0.39 0.51 0.034 5.980 0.000 0.54 0.39 0.51 0.035 6.203 0.000 0.54 0.40 0.52 0.035 6.425 0.000 0.55 0.40 0.53 0.036 6.648 0.000 0.56 0.41 0.53 0.036 6.871 0.000 0.57 0.42 0.54 0.037 7.093 0.000 0.58 0.42 0.55 0.037 7.316 0.000 0.59 0.43 0.56 0.038 7.539 0.000 0.59 0.43 0.57 0.038 7.761 0.000 0.61 0.44 0.57 0.039 7.984 0.000 0.61 0.45 0.58 0.039 8.207 0.000 0.63 0.46 0.59 0.040 8.429 0.000 0.64 0.46 0.60 0.041 8.652 0.000 0.65 0.47 0.61 0.041 8.875 0.000 0.66 0.48 0.62 0.042 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 25 of 47 Drainage Study Door Components Redwood manufacturing Plant 9.097 0.000 0.68 0.49 0.63 0.043 40 9.320 0.000 0.69 0.50 0.65 0.044 9.543 0.000 0.71 0.51 0.66 0.045 9.765 0.000 0.72 0.52 0.67 0.045 9.988 0.000 0.74 0.53 0.68 0.046 10.211 0.000 0.75 0.54 0.70 0.047 10.433 0.000 0.77 0.55 0.71 0.048 10.656 0.000 0.79 0.56 0.73 0.049 10.879 0.000 0.81 0.58 0.75 0.051 11.101 0.000 0.83 0.59 0.76 0.052 11.324 0.000 0.86 0.60 0.78 0.053 11.547 0.000 0.88 0.62 0.80 0.055 11.769 0.000 0.91 0.64 0.83 0.056 11.992 0.000 0.93 0.66 0.85 0.058 12.215 0.000 1.21 0.72 0.90 0.063 12.437 0.000 1.25 0.78 0.98 0.068 12.660 0.000 1.31 0.83 1.05 0.073 12.883 0.000 1.34 0.87 1.12 0.077 13.105 0.000 1.40 0.92 1.18 0.081 13.328 0.000 1.44 0.96 1.24 0.085 13.551 0.000 1.53 1.01 1.30 0.089 13.773 0.000 1.58 1.06 1.36 0.093 13.996 0.000 1.69 1.11 1.42 0.098 14.219 0.000 1.76 1.17 1.50 0.103 14.441 0.000 1.92 1.24 1.58 0.109 14.664 0.000 2.01 1.31 1.67 0.115 14.887 0.000 2.25 1.41 1.78 0.124 15.109 0.000 2.41 1.51 1.92 0.133 15.332 0.000 2.84 1.67 2.09 0.147 15.555 0.000 2.97 1.81 2.28 0.160 15.777 0.000 3.93 2.10 2.57 0.185 16.000 0.000 5.39 2.58 3.07 0.227 16.223 0.000 16.25 4.95 4.94 0.435 16.445 0.000 3.22 4.35 6.10 0.382 16.668 0.000 2.60 3.77 5.33 0.332 16.891 0.000 2.12 3.25 4.61 0.286 17.113 0.000 1.84 2.81 3.98 0.247 17.336 0.000 1.63 2.43 3.44 0.214 17.559 0.000 1.48 2.12 2.98 0.186 17.781 0.000 1.37 1.86 2.61 0.163 18.004 0.000 1.28 1.64 2.30 0.145 18.227 0.000 0.95 1.42 2.01 0.125 18.449 0.000 0.89 1.24 1.75 0.109 18.672 0.000 0.84 1.10 1.54 0.097 18.895 0.000 0.80 0.98 1.36 0.086 19.117 0.000 0.76 0.88 1.22 0.078 19.340 0.000 0.73 0.80 1.11 0.071 19.563 0.000 0.70 0.74 1.01 0.065 19.785 0.000 0.67 0.68 0.93 0.060 20.008 0.000 0.64 0.64 0.87 0.056 20.231 0.000 0.62 0.60 0.81 0.053 20.453 0.000 0.60 0.56 0.76 0.050 20.676 0.000 0.58 0.53 0.72 0.047 20.899 0.000 0.56 0.51 0.68 0.045 21.121 0.000 0.55 0.49 0.65 0.043 21.344 0.000 0.53 0.47 0.63 0.041 21.567 0.000 0.52 0.45 0.60 0.040 21.789 0.000 0.51 0.43 0.58 0.038 22.012 0.000 0.49 0.42 0.56 0.037 22.235 0.000 0.48 0.41 0.54 0.036 22.457 0.000 0.47 0.40 0.53 0.035 ` 22.680 0.000 0.46 0.39 0.51 0.034 .; wkwl 22.903 0.000 0.45 0.38 0.50 0.033 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 26 of 47 Drainage Study Door Components Redwood manufacturing Plant 23.125 0.000 0.44 0.37 0.49 0.032 23.348 0.000 0.43 0.36 0.48 0.031 23.571 0.000 0.43 0.35 0.46 0.031 23.793 0.000 0.42 0.34 0.45 0.030 24.016 0.000 0.41 0.34 0.44 0.029 24.239 ---------------------------------------------------------------------------- 0.000 0.00 0.25 0.39 0.022 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 27 of 47 Drainage Study Door Components Redwood manufacturing Plant WATER QUALITY AND INFILTRATION SYSTEM DESIGN The system is designed with two 60" diameter Hancor HDPE pipes with a rock. See the pipe details for more information. The Water Quality and Infiltration System will act as an underground basin to collect waters from the 100 -year storm event. To determine the length of the Water Quality and Infiltration System storage area needed, we will determine the volume of water per foot of pipe. Area for two 60" diameter pipe. Area = n r2 times 2 for two pipes Area = 3.14(6.25sf) = 19.63sf times two = 39.26sf One foot of pipe will hold 39.26 cu -ft of water Area of rock surrounding the pipe: 7.0 ft times 17.5 ft = 122.5sf 122.5 sf minus the area of the two pipes the outside diameter of the pipe is approximately 6 feet Area = II r2 times 2 for two pipes Area = 3.14(9.00sf) = 28.27sf times two = 56.54sf Area of rock = 122.5sf — 56.54sf = 65.96sf One foot of pipe has 65.96 cu -ft of rock Only 40 percent of the rock can be used for water storage 65.96 cu -ft (0.4) = 26.4 cu -ft of water. The total volume per foot that the system can hold in one day is the amount of water held in the pipes (39.26 cu -ft) + the water in the rock (26.4 cu -ft) 39.26 cu -ft + 26.4 cu -ft = 65.66 cu -ft per foot of storage. From the storage volume calculations the project needs 0.44 ac -ft of storage. 0.44 ac -ft = 19,167 cu -ft The length of the Water Quality and Infiltration System required is 19,167 cu -ft / 65.66 cu -ft per foot. 292 feet required. Length of the Water Quality and Infiltration System provided = 293 ft in length which is more than required to detain the waters for a 100 -year storm event. Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 28 of 47 HDPE TRENCH INSTALLATION DETAIL RANCOR HDPE PERFORATED PIPE GEOTEXiILE WW---, BACKFILL =��+p ter$♦ ��Z� RECOMMENDED MINIUM TRFNCH WIDTH PIPE DIAMETER IN. (MM) TRENCH WIDTH IN. (M) 4 - 8 (100-200) ' 10 (250) 24 (0.6) 12 (300) 28 (0.7) 15 (375) 35 (0.9) 18 (450) 43 (1.1) 24 (600) 56 (1.4) 30 (750) 60 (1.5) 36 (900) 65 (1.7) 42 (1050) 84 (2.1) 48 (1200) 91 (2.3) 54 (1350) 97 (2.5) 60 (1500) 103 (2.6) 17 12" MIN. COVER FOR GREATER THAN 48" DIA. - MAINTAIN UNIFORM TRENCH WIDTH I r TO MIN. 12" ABOVE TOP OF PIPE if MINIMUM BEDDING THICKNESS CONSMUCT 1/2" - 1 1/2" ROCKS NO FINES REFERENCE ASTM D2321. "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY -FLOW APPLICATIONS." FINDIAY, OHIO 45839 HDPE TRENCH INSTALLATION DETAIL SCALE NIS A904-0001 • USUALLY BASED ON SMALLEST BUCKET SIZE AVAILABLE DATE: 02-03-03 DRN BY. DJF 9M Drainage Study Door Components Redwood manufacturing Plant ORIFICE SIZING CALCULATIONS Hydraulics Outlet pipe: QDISCHARGE = 6.56 cfs for a 100 year storm Using Orifice formula from the Kings handbook (Fifth edition) Q=Ca(2gh)"' Where, Q = cfs exiting the storage tank C = 0.608 (from Kings handbook) g = 32.2 ft/S2 h = ws elevation at top of highest point at pipe in storage tank — ws elevation at middle of outlet pipe h = (1241.36inv + 5') — (1241.10inv + 0.438' for middle of orifice) h = (1246.36 —1241.538) h = 4.82' a = area of orifice opening (10.5" diameter opening) a = 3.14(0.438)2 a = 0.603 Q = (0.608)(0.603)[(2)(32.2)(4.82)]12 Q = 6.46 cfs Allowable out is 6.56 cfs Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 29 of 47 Drainage Study Door Components Redwood manufacturing Plant .00MW WSPG CALCULATIONS 0 T1 PROJ NO 07634 T2 LINE A FROM CONNECTION IN STREET TO WATER QUALITY AND INFILTRATION SYSTEM T3 12-19-07 SO 101.231240.93 18 1243.93 R 154.711240.98 18 .013 R 156.711240.99 18 .013 17. R 266.461241.10 18 .013 SH 18 CD 1 3 8.5 7.08 CD 2 4 5.0 CD 3 4 7.5 CD 4 4 3.75 CD 12 4 00 00. 1.0 000. 00. 00. 00. CD 18 4 00 00. 1.5 000. 00. 00. 00. CD 24 4 00 00. 2.0 000. 00. 00. 00. CD 30 4 00 00. 2.5 000. 00. 00. 00. CD 36 4 00 00. 3.0 000. 00. 00. 00. CD 42 4 00 00. 3.5 000. 00. 00. 00. CD 48 4 00 00. 4.0 000. 00. 00. 00. CD 54 4 00 00. 4.5 000. 00. 00. 00. CD 60 4 00 00. 5.0 000. 00. 00. 00. CD 66 4 00 00. 5.5 000. 00. 00. 00. CD 72 4 00 00. 6.0 000. 00. 00. 00. Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 30 of 47 Drainag Door Components Redwood manufacturing Plant DATE: 12/21/2007 TIME: 9:23 F0515P WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE 1 CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE ZL ZR INV Y(1) Y(2) Y(3) Y(4) Y(5) Y(6) Y(7) Y(8) Y(9) Y(10) CODE NO TYPE PIERS WIDTH DIAMETER WIDTH DROP CD 1 3 0 0.00 8.50 7.08 0.00 0.00 0.00 CD 2 4 5.00 CD 3 4 7.50 CD 4 4 3.75 CD 12 4 1.00 CD 18 4 1.50 CD 24 4 2.00 CD 30 4 2.50 CD 36 4 3.00 CD 42 4 3.50 CD 48 4 4.00 CD 54 4 4.50 CD 60 4 5.00 CD 66 4 5.50 CD 72 4 6.00 F 0 5 1 5 P WATER SURFACE PROFILE - TITLE CARD LISTING HEADING LINE NO 1 IS - PROJ NO 07634 HEADING LINE NO 2 IS - LINE A FROM CONNECTION IN STREET TO WATER QUALITY AND INFILTRATION SYSTEM HEADING LINE NO 3 IS - 12-19-07 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 31 of 47 PAGE NO 3 Drainag( _..) Door Components Redwood manufacturing Plant Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 32 of 47 F 0 5 1 5 P PAGE NO 2 WATER SURFACE PROFILE - ELEMENT CARD LISTING ELEMENT NO 1 IS A SYSTEM OUTLET U/S DATA STATION INVERT SECT W S ELEV 101.23 1240.93 18 1243.93 ELEMENT NO 2 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 154.71 1240.98 18 0.013 0.00 0.00 0.00 0 ELEMENT NO 3 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 156.71 1240.99 18 0.013 0.00 17.00 0.00 0 ELEMENT NO 4 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 266.46 1241.10 18 0.013 0.00 0.00 0.00 0 ELEMENT NO 5 IS A SYSTEM HEADWORKS U/S DATA STATION INVERT SECT W S ELEV 266.46 1241.10 18 0.00 NO EDIT ERRORS ENCOUNTERED -COMPUTATION IS NOW BEGINNING ** WARNING NO. 2 ** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV = INV + DC LICENSEE: DANJON ENGINEERING, INC. F0515P PAGE 1 WATER SURFACE PROFILE LISTING PROJ NO 07634 LINE A FROM CONNECTION IN STREET TO DETENTION SYSTEM 12-19-07 STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER CRITICAL HGT/ BASE/ ZL NO AVBPR ELEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH DIA ID NO. PIER L/ELEM SO SF AVE HF NORM DEPTH ZR 101.23 1240.93 3.000 1243.930 6.6 3.74 0.217 1244.147 0.00 0.994 1.50 0.00 0.00 0 0.00 53.48 0.00093 .003948 0.21 1.500 0.00 154.71 1240.98 3.161 1244.141 6.6 3.74 0.217 1244.358 0.00 0.994 1.50 0.00 0.00 0 0.00 2.00 0.00500 .003948 0.01 1.100 0.00 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 32 of 47 Drainag( -) Door Components Redwood manufacturing Plant 156.71 1240.99 3.178 1244.168 6.6 3.74 0.217 1244.385 0.00 0.994 1.50 0.00 0.00 0 0.00 109.75 0.00100 .003948 0.43 1.500 0.00 266.46 1241.10 3.501 1244.601 6.6 3.74 0.217 1244.818 0.00 0.994 1.50 0.00 0.00 0 0.00 PROJ NO 07634 LINE A FROM CONNECTION IN STREET TO DETENTION SYSTEM 12-19-07 101.23 I C H W E R 104.60 107.97 111.35 114.72 118.09 121.46 124.83 128.21 131.58 134.95 138.32 141.69 145.07 148.44 151.81 155.18 I C H W E R 158.55 I C H W E R 161.93 165.30 168.67 172.04 175.41 178.79 182.16 185.53 188.90 192.28 195.65 199.02 202.39 205.76 209.14 212.51 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 33 of 47 Drainaf -. Door Components Redwood manufacturing Plant 215.88 219.25 222.62 226.00 229.37 232.74 236.11 239.48 242.86 246.23 249.60 252.97 256.34 259.72 263.09 266.46 I C H W E R 1240.93 1241.32 1241.71 1242.10 1242.49 1242.87 1243.26 1243.65 1244.04 1244.43 1244.82 N O T E S 1. GLOSSARY I = INVERT ELEVATION C = CRITICAL DEPTH W = WATER SURFACE ELEVATION H = HEIGHT OF CHANNEL E = ENERGY GRADE LINE X = CURVES CROSSING OVER B = BRIDGE ENTRANCE OR EXIT Y = WALL ENTRANCE OR EXIT 2. STATIONS FOR POINTS AT A JUMP MAY NOT BE PLOTTED EXACTLY Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 34 of 47 Drainage Study Door Components Redwood manufacturing Plant 0 T1 PROJ NO 07634 T2 LINE A FROM WATER QUALITY AND INFILTRATION SYSTEM TO END OF LINE T3 12-19-07 SO 559.461241.36 24 1243.36 R 702.161241.53 24 .013 R 704.161241.54 24 .013 23. R 736.831241.57 24 .013 SH 24 CD 1 3 8.5 7.08 CD 2 4 5.0 CD 3 4 7.5 CD 4 4 3.75 CD 12 4 00 00. 1.0 000. 00. 00. 00. CD 18 4 00 00. 1.5 000. 00. 00. 00. CD 24 4 00 00. 2.0 000. 00. 00. 00. CD 30 4 00 00. 2.5 000. 00. 00. 00. CD 36 4 00 00. 3.0 000. 00. 00. 00. CD 42 4 00 00. 3.5 000. 00. 00. 00. CD 48 4 00 00. 4.0 000. 00. 00. 00. -•CD 54 4 00 00. 4.5 000. 00. 00. 00. CD 60 4 00 00. 5.0 000. 00. 00. 00. CD 66 4 00 00. 5.5 000. 00. 00. 00. CD 72 4 00 00. 6.0 000. 00. 00. 00. Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 35 of 47 Drainage o. Door Components Redwood manufacturing Plant DATE: 12/21/2007 TIME: 9:26 F0515P WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE 1 CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE ZL ZR INV Y(1) Y(2) Y(3) Y(4) Y(5) Y(6) Y(7) Y(8) Y(9) Y(10) CODE NO TYPE PIERS WIDTH DIAMETER WIDTH DROP CD 1 3 0 0.00 8.50 7.08 0.00 0.00 0.00 CD 2 4 5.00 CD 3 4 7.50 CD 4 4 3.75 CD 12 4 1.00 CD 18 4 1.50 CD 24 4 2.00 CD 30 4 2.50 CD 36 4 3.00 CD 42 4 3.50 CD 48 4 4.00 CD 54 4 4.50 CD 60 4 5.00 CD 66 4 5.50 CD 72 4 6.00 F 0 5 1 5 P PAGE NO 3 WATER SURFACE PROFILE - TITLE CARD LISTING HEADING LINE NO 1 IS - PROJ NO 07634 HEADING LINE NO 2 IS - LINE A FROM WATER QUALITY AND INFILTRATION SYSTEM TO END OF LINE HEADING LINE NO 3 IS - 12-19-07 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 36 of 47 Drainag Door Components Redwood manufacturing Plant F 0 5 1 5 P PAGE NO 2 WATER SURFACE PROFILE - ELEMENT CARD LISTING ELEMENT NO 1 IS A SYSTEM OUTLET U/S DATA STATION INVERT SECT W S ELEV 559.46 1241.36 24 1243.36 ELEMENT NO 2 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 702.16 1241.53 24 0.013 0.00 0.00 0.00 0 ELEMENT NO 3 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 704.16 1241.54 24 0.013 0.00 23.00 0.00 0 ELEMENT NO 4 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 736.83 1241.57 24 0.013 0.00 0.00 0.00 0 ELEMENT NO 5 IS A SYSTEM HEADWORKS U/S DATA STATION INVERT SECT W S ELEV 736.83 1241.57 24 0.00 NO EDIT ERRORS ENCOUNTERED -COMPUTATION IS NOW BEGINNING ** WARNING NO. 2 ** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV = INV + DC LICENSEE: DANJON ENGINEERING, INC. F0515P PAGE 1 WATER SURFACE PROFILE LISTING PROJ NO 07634 LINE A FROM DETENTION BASIN TO END OF LINE 12-19-07 STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER CRITICAL HGT/ BASE/ ZL NO AVBPR ELEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH DIA ID NO. PIER L/ELEM SO SF AVE HF NORM DEPTH ZR *xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,txxxxxxxxxxxxxxxxxxxxxxx**xxxx,txxxxxx*xxxxx*x*xxx,txxxxxxxxxx*xxxxx*xxxxx*xxxxxxxxx*xxxxxxxx 559.46 1241.36 2.000 1243.360 15.3 4.87 0.368 1243.726 0.00 1.410 2.00 0.00 0.00 0 0.00 142.70 0.00119 .004574 0.65 2.000 0.00 702.16 1241.53 2.483 1244.013 15.3 4.87 0.368 1244.381 0.00 1.410 2.00 0.00 0.00 0 0.00 2.00 0.00500 .004574 0.01 1.570 0.00 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 37 of 47 559.46 I 563.08 566.70 570.32 573.94 577.56 581.18 584.80 588.42 592.04 595.66 599.28 602.90 606.52 610.14 613.76 617.38 621.00 624.62 628.24 631.86 635.48 639.10 642.72 646.34 649.95 653.57 657.19 660.81 664.43 668.05 671.67 675.29 678.91 C X E Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 38 of 47 R Drainag.,� Door Components Redwood manufacturing Plant 704.16 1241.54 2.519 1244.059 15.3 4.87 0.368 1244.427 0.00 1.410 2.00 0.00 0.00 0 0.00 32.67 0.00092 .004574 0.15 2.000 0.00 736.83 1241.57 2.639 1244.209 15.3 4.87 0.368 1244.577 0.00 1.410 2.00 0.00 0.00 0 0.00 PROJ NO 07634 LINE A FROM DETENTION BASIN TO END OF LINE 12-19-07 559.46 I 563.08 566.70 570.32 573.94 577.56 581.18 584.80 588.42 592.04 595.66 599.28 602.90 606.52 610.14 613.76 617.38 621.00 624.62 628.24 631.86 635.48 639.10 642.72 646.34 649.95 653.57 657.19 660.81 664.43 668.05 671.67 675.29 678.91 C X E Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 38 of 47 R Dramag Door Components Redwood manufacturing Plant 682.53 686.15 689.77 693.39 697.01 700.63 704.25 I C H W E R 707.87 I C H W E R 711.49 715.11 718.73 722.35 725.97 729.59 733.21 736.83 I C H W E R 1241.36 1241.68 1242.00 1242.32 1242.65 1242.97 1243.29 1243.61 1243.93 1244.25 1244.58 N O T E S 1. GLOSSARY I = INVERT ELEVATION C = CRITICAL DEPTH W = WATER SURFACE ELEVATION H = HEIGHT OF CHANNEL E = ENERGY GRADE LINE X = CURVES CROSSING OVER B = BRIDGE ENTRANCE OR EXIT Y = WALL ENTRANCE OR EXIT 2. STATIONS FOR POINTS AT A JUMP MAY NOT BE PLOTTED EXACTLY Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 39 of 47 L Drainage Study Door Components Redwood manufacturing Plant 0 T1 PROJ NO 07634 T2 LINE B T3 12-19-07 SO 100.001243.16 12 1244.16 R 189.331246.08 12 .013 R 191.331246.09 12 .013 45. R 215.821246.62 12 .013 SH 12 CD 1 3 8.5 7.08 CD 2 4 5.0 CD 3 4 7.5 CD 4 4 3.75 CD 12 4 00 00. 1.0 000. 00. 00. 00. CD 18 4 00 00. 1.5 000. 00. 00. 00. CD 24 4 00 00. 2.0 000. 00. 00. 00. CD 30 4 00 00. 2.5 000. 00. 00. 00. CD 36 4 00 00. 3.0 000. 00. 00. 00. CD 42 4 00 00. 3.5 000. 00. 00. 00. CD 48 4 00 00. 4.0 000. 00. 00. 00. CD 54 4 00 00. 4.5 000. 00. 00. 00. CD 60 4 00 00. 5.0 000. 00. 00. 00. CD 66 4 00 00. 5.5 000. 00. 00. 00. CD 72 4 00 00. 6.0 000. 00. 00. 00. Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 40 of 47 Drainag _ . Door Components Redwood manufacturing Plarre DATE: 1/ 7/2008 TIME: 14:43 F0515P WATER SURFACE PROFILE - CHANNEL DEFINITION LISTING PAGE 1 CARD SECT CHN NO OF AVE PIER HEIGHT 1 BASE ZL ZR INV Y(1) Y(2) Y(3) Y(4) Y(5) Y(6) Y(7) Y(8) Y(9) Y(10) CODE NO TYPE PIERS WIDTH DIAMETER WIDTH DROP CD 1 3 0 0.00 8.50 7.08 0.00 0.00 0.00 CD 2 4 5.00 CD 3 4 7.50 CD 4 4 3.75 CD 12 4 1.00 CD 18 4 1.50 CD 24 4 2.00 CD 30 4 2.50 CD 36 4 3.00 CD 42 4 3.50 CD 48 4 4.00 CD 54 4 4.50 CD 60 4 5.00 CD 66 4 5.50 CD 72 4 6.00 F 0 5 1 5 P PAGE NO 3 WATER SURFACE PROFILE - TITLE CARD LISTING HEADING LINE NO 1 IS - PROJ NO 07634 HEADING LINE NO 2 IS - LINE B HEADING LINE NO 3 IS - 12-19-07 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 41 of 47 Drainage Door Components Redwood manufacturing Plant F 0 5 1 5 P PAGE NO 2 WATER SURFACE PROFILE - ELEMENT CARD LISTING ELEMENT NO 1 IS A SYSTEM OUTLET U/S DATA STATION INVERT SECT W S ELEV 100.00 1243.16 12 1244.16 ELEMENT NO 2 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 189.33 1246.08 12 0.013 0.00 0.00 0.00 0 ELEMENT NO 3 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 191.33 1246.09 12 0.013 0.00 45.00 0.00 0 ELEMENT NO 4 IS A REACH U/S DATA STATION INVERT SECT N RADIUS ANGLE ANG PT MAN H 215.82 1246.62 12 0.013 0.00 0.00 0.00 0 ELEMENT NO 5 IS A SYSTEM HEADWORKS U/S DATA STATION INVERT SECT W S ELEV 215.82 1246.62 12 0.00 NO EDIT ERRORS ENCOUNTERED -COMPUTATION IS NOW BEGINNING ** WARNING NO. 2 ** - WATER SURFACE ELEVATION GIVEN IS LESS THAN OR EQUALS INVERT ELEVATION IN HDWKDS, W.S.ELEV = INV + DC LICENSEE: DANJON ENGINEERING, INC. F0515P PAGE 1 WATER SURFACE PROFILE LISTING PROJ NO 07634 LINE B 12-19-07 STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER CRITICAL HGT/ BASE/ ZL NO AVBPR ELEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH DIA ID NO. PIER L/ELEM SO SF AVE HF NORM DEPTH ZR *********************************************************************************************************************************** 100.00 1243.16 1.000 1244.160 1.6 2.04 0.065 1244.225 0.00 0.537 1.00 0.00 0.00 0 0.00 0.00 0.03269 .001990 0.00 0.330 0.00 100.00 1243.16 1.000 1244.160 1.6 2.04 0.065 1244.225 0.00 0.537 1.00 0.00 0.00 0 0.00 2.77 0.03269 .001863 0.01 0.330 0.00 Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 42 of 47 Drainage oi� Door Components Redwood manufacturing Plant 102.77 1243.25 0.907 1244.158 1.6 2.14 0.071 1244.229 0.00 0.537 1.00 1.52 0.03269 0 0.00 .001825 0.00 1.00 0.33C 104.29 1243.30 0.853 1244.153 1.6 2.24 0.078 1244.231 0.00 0.537 0.00 0.89 0.03269 0.00 .001976 0.00 0.00 0.00 0.33C 105.18 1243.33 0.809 1244.138 1.6 2.35 0.086 1244.224 0.00 0.537 0.00 HYDRAULIC JUMP 0.00 1.00 0.00 0.00 0 0.00 105.18 1243.33 0.337 1243.666 1.6 6.87 0.732 1244.398 0.00 0.537 62.22 0.03269 1.00 0.00 0.00 .031835 1.98 0.33( 167.40 1245.36 0.347 1245.710 1.6 6.61 0.679 1246.389 0.00 0.537 10.89 0.03269 .028144 0.31 0.33( 178.29 1245.72 0.359 1246.078 1.6 6.30 0.616 1246.694 0.00 0.537 5.35 0.03269 .024666 0.13 0.33( 183.64 1245.89 0.372 1246.266 1.6 5.99 0.558 1246.824 0.00 0.537 3.33 0.03269 .021648 0.07 0.33C 186.97 1246.00 0.386 1246.389 1.6 5.71 0.507 1246.896 0.00 0.537 2.36 0.03269 .019003 0.04 0.33( 189.33 1246.08 0.400 1246.460 1.6 5.46 0.463 1246.943 0.00 0.537 9. nn n_nnsnn .018834 0.04 0.57( 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 1.00 0.00 0.00 0 0.00 0.00 WATER SURFACE PROFILE LISTING PROJ NO 07634 LINE B 12-19-07 STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER CRITICAL HGT/ BASE/ ZL NO AVBPR ELEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH DIA ID NO. PIER L/ELEM SO SF AVE HF NORM DEPTH ZR ****t****r***a***,t*«***x�*,t*r*r****x«x***r***w*+**�***rt*«***xrwrr«r+++t�,t*,t,t,t,t�*,t,r***«a*w�,r«**f,t**r,t,t**t,t*,e***,t ,t***,t ,t*�*,t ,trr,t *,r ,t«**• Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 43 of 47 Drainag( -') Door Components Redwood manufacturing Pl- 191.33 1246.09 0.388 1246.478 1.6 5.69 0.503 1246.981 0.00 0.537 1.00 0.00 0.00 0 0.00 9.78 0.02164 .018877 0.18 0.370 0.00 201.11 1246.30 0.399 1246.701 1.6 5.46 0.463 1247.164 0.00 0.537 1.00 0.00 0.00 0 0.00 5.75 0.02164 .016747 0.10 0.370 0.00 206.86 1246.43 0.413 1246.839 1.6 5.21 0.422 1247.261 0.00 0.537 1.00 0.00 0.00 0 0.00 3.22 0.02164 .014708 0.05 0.370 0.00 210.08 1246.50 0.429 1246.925 1.6 4.97 0.383 1247.308 0.00 0.537 1.00 0.00 0.00 0 0.00 2.28 0.02164 .012921 0.03 0.370 0.00 212.36 1246.55 0.444 1246.989 1.6 4.73 0.348 1247.337 0.00 0.537 1.00 0.00 0.00 0 0.00 1.42 0.02164 .011351 0.02 0.370 0.00 213.78 1246.58 0.461 1247.037 1.6 4.52 0.317 1247.354 0.00 0.537 1.00 0.00 0.00 0 0.00 1.01 0.02164 .009984 0.01 0.370 0.00 214.79 1246.60 0.478 1247.076 1.6 4.30 0.287 1247.363 0.00 0.537 1.00 0.00 0.00 0 0.00 0.64 0.02164 .008781 0.01 0.370 0.00 215.43 1246.61 0.496 1247.108 1.6 4.10 0.261 1247.369 0.00 0.537 1.00 0.00 0.00 0 0.00 0.27 0.02164 .007737 0.00 0.370 0.00 215.70 1246.62 0.516 1247.133 1.6 3.91 0.238 1247.371 0.00 0.537 1.00 0.00 0.00 0 0.00 0.12 0.02164 .006805 0.00 0.370 0.00 215.82 1246.62 0.537 1247.157 1.6 3.72 0.215 1247.372 0.00 0.537 1.00 0.00 0.00 0 0.00 PROJ NO 07634 LINE B 12-19-07 100.00 I C XE R 102.36 I C XE R Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\14ydro\DRAINAGE STUDY.doc Page 44 of 47 104.73 107.09 109.45 111.82 114.18 116.55 118.91 121.27 123.64 126.00 128.36 130.73 133.09 135.46 137.82 140.18 142.55 144.91 147.27 149.64 152.00 154.36 156.73 159.09 161.46 163.82 166.18 168.55 170.91 173.27 175.64 178.00 180.36 182.73 185.09 187.46 189.82 192.18 194.55 196.91 199.27 201.64 204.00 206.37 208.73 211.09 213.46 Drainage oi. Door Components Redwood manufacturing Plant I C WEH R I C W EH R I C W E H R I W C HE R I W C HE R I W C X R I W C EH R I W C E H R I W C E H R I W C E H R I W C E H R I W C E H R I W C E H R I W C E H R Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 45 of 47 Drainage J! Door Components Redwood manufacturing Plant 215.82 I W C E H. R 1243.16 1243.61 1244.05 1244.50 1244.94 1245.39 1245.84 1246.28 1246.73 1247.17 1247.62 N O T E S 1. GLOSSARY I = INVERT ELEVATION C = CRITICAL DEPTH W = WATER SURFACE ELEVATION H = HEIGHT OF CHANNEL E = ENERGY GRADE LINE X = CURVES CROSSING OVER B = BRIDGE ENTRANCE OR EXIT Y = WALL ENTRANCE OR EXIT 2. STATIONS FOR POINTS AT A JUMP MAY NOT BE PLOTTED EXACTLY Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 46 of 47 Drainage Study Door Components Redwood manufacturing Plant Catch basin sizing calculations Using Bureau of Public Road Q/P = 3.0113/1 P= perimeter of basin H= depth of flow --0.35' Q = flow in cfs.=7.2 cfs W=width of grate openings , A= with of opening area B= length of opening area Dimensions of a single basin _ A=34.3"=2.85 ft B= 24.25"=2.02 ft W=0.75"=0.0625ft 2.85' 2.85' For 2 basins 2.02' Direction of flow 2.85' 2.85' 10", For 2 basins P=4x2.85ft +2.02 ft (2 basins in series) P=16.2 ft Calculating for the perimeter required for the flow depth approaching the basins. 7.2/P=3.0(0.35)3/2 P=7.2/3.0(0.35)3/1 P=11.6 required < 16.2 available- therefore more than required. Use 2 basins in series For this project, with 100 year flows in higher quantities. An assumption of 0.4 ft depth of flow for basins Q/P = 3.0(0.4)... Q=0.75P Basin perimeters assuming water approaching from 3 sides: 1 grate = 7.7 If 2 grates = 13.4 If 3 grates= 21.1 If 4 grates = 24.8 if for nodes Q100 length of perimeter # grates needed #grates used 101 15.3 cfs 20.4 If 3 grates 4 grates 101 1.6 cfs 2.13 If 1 grate 1 grate Danjon Engineering, Inc. 3/11/2008 F:\job\2007\07634\Hydro\DRAINAGE STUDY.doc Page 47 of 47 ti GRAPHIC SCALE 20 0 10 20 40 IN FEET I inch = .20 ft. 80 r7 W .43)-1252—' .......... ...... 41 :01 r�1%w 41 OAR A'r)kMV ]NV -429' SID 252 — 1250— ................. 12 ................................. . .. . . 1249 20 1 MY — - 125,.12 FL E 124 .62 INV LINE Al \ __ _. Y i uj D R wV PEA 0 ptoTTED I _DRI AY- �: ED MA"R 11 PB ps P3 — LEE 4r DAMON ENGINEERING, ING. HYDROLOGY PLAN PROPOSED CONDITIONS ANJON NG ING- MERIDI•INC. 895 E. Yorba Linda nda Blvd.,* Ste 202 Placentia, CA 92870 (714)572-6800 FAX(714)572-6850 DESIGNED BY DRAWN BY CHECKED BY NO. DATE DESCRIPTION BY RCE DATE L ���� 11254 ! C C C W .43)-1252—' .......... ...... 41 :01 r�1%w 41 OAR A'r)kMV ]NV -429' SID 252 — 1250— ................. 12 ................................. . .. . . 1249 20 1 MY — - 125,.12 FL E 124 .62 INV LINE Al \ __ _. Y i uj D R wV PEA 0 ptoTTED I _DRI AY- �: ED MA"R 11 PB ps P3 — LEE 4r DAMON ENGINEERING, ING. HYDROLOGY PLAN PROPOSED CONDITIONS ANJON NG ING- MERIDI•INC. 895 E. Yorba Linda nda Blvd.,* Ste 202 Placentia, CA 92870 (714)572-6800 FAX(714)572-6850 DESIGNED BY DRAWN BY CHECKED BY NO. DATE DESCRIPTION BY RCE DATE L