Loading...
HomeMy WebLinkAboutCitrus Heights NorthCITRUS HEIGHTS N "PT O.L%..LH CITY OF FONTANA C -0 A DRAINAGE STUDY July 15, 2003 Reference 126-1770 PREPARED BY: Madole & Associates, Inc. 10601 Church Street, Suite 107 Rancho Cucmnonga, CA 91730 (909) 948-1311 Fax 948-8464 - 6�- 71—N go No. 083 7 57 Aaron T. S�&63 Date R.C.E. 62183 Exp. 9/30/05 0 -1 H, F, F-1 F4 CONTENTS SECTION TITLE A DISCUSSION u Vicinity Map Q1 00 RATIONAL METHOD HYDROLOGY UH Q100 UNIT HYDROGRAPH HYDROLOGYAND FLOOD ROUTING u Rainfall Intensity Data u Loss Rate and Fraction Calculations u Approximate Basin Geometry and Outlet Hydraulics u Q100 Unit Hydrographs (Easterly -North, Easterly -South, Westerly) u Basin Routing (Easterly / Westerly) R REFERENCES & MAPS u Soils Map (from San Bernardino County Hydrology Manual) u Isohyetal Map (from San Bernardino County Hydrology Manual) u Hydrology Map 0 -1 H, F, F-1 F4 DISCUSSION The purpose of this conceptual drainage study is to determine the approximate detention basin facility requirements for the proposed Citrus Heights North Planned Community in Fontana. Specifically, the subject project is located south of Duncan Canyon Road, west of Lytle Creek Road, north of Summit Avenue, and east of Citrus Avenue, in the City of Fontana, County of San Bernardino, California. The subject site will consist of approximately 1200 dwelling units, comprised of both single - and multi -family residences, with an approximate area of 190 acres. Proposed drainage is overland and by street flow in a generally southwesterly direction. Off-site tributary area has been neglected as off-site flows could effectively be routed around the project (to Lytle Creek Road and Citrus Avenue). The subject site lies entirely outside the 100 -year flood plane (FIRM designation "Zone V). The 100 -year storm event was modeled in the rational method hydrology and unit hydrograph calculations in this study. Other lesser return periods (storm events) necessary for the complete design of a detention basin system will be included in the final drainage study. An interim drainage condition was analyzed in this conceptual study. The condition analyzed assumes that the master plan facility ultimately available to serve the subject site, the Summit Avenue Storm Drain (MPD Line B), does not have an acceptable outlet, and therefore until there is an acceptable outlet, the site will drain to an existing facility. The existing facility is an open channel and a I Ox5 RCB currently crossing Interstate 15 north of Summit Avenue. Portions of the proposed Summit Avenue system may be used to convey runoff from the site's detention basins to the existing system, or to a proposed system by the Regency project by DRC located west of Lytle Creek Road (DRC has been asked to include an allowance of 200 efs for this project in their design). Two hypothetical detention basins were modeled: a 1.7 -acre basin (6 -feet deep) at the southern edge of the western portion of the project, and a 2 -acre basin (10 -feet deep) in the southwestern area of the eastern portion of the project. The cumulative discharge from these basins is 160 cfs. Note that this rate is below not only the capacity to be provided by the Regency project but also below the maximum allowable mitigation discharge rate as well (calculation not included herein, however 160 cfs over 190 acres+ will be well below 90% of undeveloped Q25). Once downstream facilities have been completed, detention would only be necessary for any runoff above that allowed by the master plan of drainage (which was sized for 5-7 units per acre) if any overage is realized. While the westerly basin would likely be retired and converted into residential lots, the easterly basin would remain, and due to the reduced runoff, the remaining basin could act as mitigation for other projects or issues as applicable. no do On bw OM #AW am No am low The rational method hydrologic and unit hydrograph models, as defined by Flood Control for San Bernardino County, were followed in the determination of storm runoffi AES software was utilized for hydrology calculations, and basin routing analyses. OM am OM on on No MM No on kv --In 96 0 0 OR ib OM IM bi SIERRA Ellc Jilin V) z !lIft iw / DUNCAN CANYON ROAD bw c� cr_ ct bw Lu CI TRUS SUMMIT HEIGHTS HEIGHTS Ljj CURTIS AVE. SUMMIT AVE. LAKES SIERRA LAKES PKWY NOT TO SCALE MADOLE & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS CITRUS HEIGHTS NORTH AND LAND PLANNERS 10601 CHURCH STREET. SUITE 107 RANCHO CUCAmoNGA. CA 91730 VICINITY MAP (909) 948-1311 J:\126-1770\storm\Prelim-Hyd-Map.dwg, 07/18/2003 12:07:55 PM, ats SIERRA Ellc LAKES SIERRA LAKES PKWY NOT TO SCALE MADOLE & ASSOCIATES, INC. CONSULTING CIVIL ENGINEERS CITRUS HEIGHTS NORTH AND LAND PLANNERS 10601 CHURCH STREET. SUITE 107 RANCHO CUCAmoNGA. CA 91730 VICINITY MAP (909) 948-1311 J:\126-1770\storm\Prelim-Hyd-Map.dwg, 07/18/2003 12:07:55 PM, ats 0 M im :I an Iow pa iso 9 OM im on I ho 040ml 4 on im 07/15/03 0 100 HYDROLOGY Q-1 M RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2002 Advanced Engineering Software (aes) Ver. 8.0 Release Date: 01/01/2002 License ID 1251 Analysis prepared by: MADOLE & ASSOCIATES, INC. 10601 CHURCH STREET SUITE 107 RANCHO CUCAMONGA CA 91730 909.948.1311 FAX -948.8464 madole@madolerc.com DESCRIPTION OF STUDY CITRUS HEIGHTS NORTH PRELIMINARY Q100 HYDROLOGY BASED ON T&B 4/l/03 LOTTING STUDY/CONCEPT oft FILE NAME: CHN.DAT TIME/DATE OF STUDY: 08:05 06/24/2003 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL* -- USER SPECIFIED STORM EVENT(YEAR) 100-00 SPECIFIED MINIMUM PIPE SIZE(INCH) 24.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* SLOPE OF INTENSITY DURATION CURVE(LOG(I;IN/HR) vs. LOG(Tc;MIN)) = 0.6000 USER SPECIFIED 1 -HOUR INTENSITY(INCH/HOUR) = 1.5700 *ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD - *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 o.ol8/0.018/0.020 0.67 2.00 0.0312 0.167 0.0150 ow GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000-00 ELEVATION DATA: UPSTREAM(FEET) = 1735.00 DOWNSTREAM(FEET) 1723.00 Tc = K*[(LENGTH** 3.00MELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 14.932 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.617 0 fm 07/15/03 ME m im SUBAREA Tc AND LOSS RATE DATA(AMC II): Ap SCS Tc DEVELOPMENT TYPE/ SCS SOIL AREA Fp (DECIMAL) CN (MIN.) LAND USE GROUP (ACRES) (INCH/HR) RESIDENTIAL 5 . .50 0.98 0.50 32 14.93 "5-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA RUNOFF(CFS) 15.49 15.49 TOTAL AREA(ACRES) = 5.50 PEAK FLOW RATE(CFS) FLOW PROCESS FROM NODE 2.00 TO NODE 3.00 IS CODE = 31 p" ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< .pm ELEVATION DATA: UPSTREAM(FEET) = 1717.00 DOWNSTREAM(FEET) 1699.00 FLOW LENGTH(FEET) = 1100-00 MANNING'S N = 0.013 ho ESTIMATED PIPE DIAMETER(INCH) INCREASED TO 24.000 DEPTH OF FLOW IN 24.0 INCH PIPE IS 12.7 INCHES "a PIPE -FLOW VELOCITY(FEETISEC.) = 9.19 ESTIMATED PIPE DIAMETER(INCH) = 24-00 NUMBER OF PIPES PIPE-FLOW(CFS) = 15.49 = 16.93 PIPE TRAVEL TIME(MIN.) = 2 . 00 Tc(MIN.) . 00 = 2100.00 FEET. LONGEST FLOWPATH FROM NODE 1.00 TO NODE 3 FLOW PROCESS FROM NODE 3.00 TO NODE 3.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 16.93 pm * loo YEAR RAINFALL INTENSITY(INCH/HR) = 3.355 60 SUBAREA LOSS RATE DATA(AMC II): Ap SCS DEVELOPMENT TYPE/ SCS SOIL AREA Fp (DECIMAL) CN LAND USE GROUP (ACRES) (INCH/HR) pm RESIDENTIAL 6.10 0.98 0.50 32 60 "5-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, AP = 0.50 "m SUBAREA AREA(ACRES) = 6.10 SUBAREA RUNOFF(CFS) 15.74 EFFECTIVE AREMACRES) 11.60 AREA -AVERAGED Fm(INCH/HR) 0.49 iw AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50 TOTAL AREMACRES) 11.60 PEAK FLOW RATE(CFS) 29.93 lko FLOW PROCESS FROM NODE 3.00 TO NODE 3.00 IS CODE 81 ---------- ----------------- ---------------------------------- -- ---- - >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 16.93 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.355 OR SUBAREA LOSS RATE DATA(AMC II): Ap SCS lb DEVELOPMENT TYPE/ SCS SOIL AREA Fp (DECIMAL) CN LAND USE GROUP (ACRES) (INCH/HR RESIDENTIAL 60 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A 17. = 0.97 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) W SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA AREA(ACRES) = 17.60 SUBAREA RUNOFF(CFS) 45.41 EFFECTIVE AREA(ACRES) 29.20 AREA -AVERAGED Fm(INCH/HR) = 0.49 AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50 TOTAL AREMACRES) 29.20 PEAK FLOW RATE(CFS) 75.35 pm 07/15/03 Q-3 0, FLOW PROCESS FROM NODE 3.00 TO NODE 4.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1699-00 DOWNSTREAM(FEET) 1647.00 FLOW LENGTH(FEET) = 2300.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 33.0 INCH PIPE IS 26.3 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 14.87 PIPES ESTIMATED PIPE DIAMETER(INCH) = 33-00 NUMBER OF PIPE-FLOW(CFS) = 75.35 PIPE TRAVEL TIME(MIN.) = 2.58 Tc(MIN.) = 19.50 LONGEST FLOWPATH FROM NODE 1.00 TO NODE 4.00 = 4400.00 FEET. FLOW PROCESS FROM NODE 4.00 TO NODE 4.00 IS CODE = 81 ------------------- -------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 19-50 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.081 SUBAREA LOSS RATE DATA(AMC II): Fp Ap scs DEVELOPMENT TYPE/ SCS SOIL AREA (DECIMAL) CN LAND USE GROUP (ACRES) (INCH/HR) RESIDENTIAL 4.20 0.98 0.50 32 115-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTIONr Ap = 0.50 SUBAREA AREMACRES) = 4.20 SUBAREA RUNOFF(CFS) 9.80 EFFECTIVE AREMACRES) 33.40 AREA -AVERAGED Fm(INCH/HR) = 0.49 AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50 77.96 TOTAL AREMACRES) 33.40 PEAK FLOW RATE(CFS) FLOW PROCESS FROM NODE 4.00 TO NODE 4.00 IS CODE ---------- ----------------------------------------- --------------------- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< om TOTAL NUMBER OF STREAMS = 2 STREAM 1 ARE: CONFLUENCE VALUES USED FOR INDEPENDENT TIME OF CONCENTRATION(MIN.) = 19-50 im RAINFALL INTENSITY(INCH/HR) = 3.08 AREA -AVERAGED Fm(INCH/HR) = 0.49 AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50 EFFECTIVE STREAM AREMACRES) 33.40 TOTAL STREAM AREMACRES) = 33.40 77.96 PEAK FLOW RATE(CFS) AT CONFLUENCE FLOW PROCESS FROM NODE 4.10 TO NODE 4.20 IS CODE 21 ---------- >>>>>RATIONAL_METHOD_ INITIAL- SUBAREA- ANALYSIS<<<<< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000-00 ELEVATION DATA: UPSTREAM(FEET) = 1705.00 DOWNSTREAM(FEET) 1680.00 Tc = K*[(LENGTH** 3.00MELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 12.893 * loo YEAR RAINFALL INTENSITY(INCH/HR) = 3.950 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc 07/15/03 Q-4 wo 0, LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) RESIDENTIAL 8.80 0.98 0.50 32 12.89 "5-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.97 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA RUNOFF(CFS) 27.42 27.42 TOTAL AREA(ACRES) 8.80 PEAK FLOW RATE(CFS) FLOW PROCESS FROM NODE 4.20 TO NODE 4.30 IS CODE = 31 ------- -------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1674.00 DOWNSTREAM(FEET) 1671.00 FLOW LENGTH(FEET) = 650.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 33.0 INCH PIPE IS 22.0 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 6.52 ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES PIPE-FLOW(CFS) = 27.42 PIPE TRAVEL TIME(MIN.) = 1.66 Tc(MIN.) = 14.55 LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.30 = 1650.00 FEET. FLOW PROCESS FROM NODE 4.30 TO NODE 4.30 IS CODE = 81 ---------------------------------------------------------------------------- bw >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< pm MAINLINE Tc(MIN) = 14.55 im * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.673 SUBAREA LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS pm LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN RESIDENTIAL 6.50 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 pm SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 vw SUBAREA AREA(ACRES) = 6.50 SUBAREA RUNOFF(CFS) 18.63 0.49 EFFECTIVE AREA(ACRES) 15.30 AREA -AVERAGED Fm(INCH/HR) AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50 pm TOTAL AREA(ACRES) 15.30 PEAK FLOW RATE(CFS) 43.86 FLOW PROCESS FROM NODE 4.30 TO NODE 4.40 IS CODE = 31 ------ --------------------------------------------------------------------- l1w >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1671 . 00 DOWNSTREAM(FEET) 1664.00 FLOW LENGTH(FEET) = 710.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 33.0 INCH PIPE IS 23.5 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 9.69 OR ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES io PIPE-FLOW(CFS) = 43.86 PIPE TRAVEL TIME(MIN.) = 1.22 Tc(MIN.) = 15.78 0.00 FEET. LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.40 = 236 in FLOW PROCESS FROM NODE 4.40 TO NODE 4.40 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 15.78 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.499 07/15/03 Q-5 bw m SUBAREA LOSS RATE DATA(AMC II): Ap SCS DEVELOPMENT TYPE/ SCS SOIL AREA Fp LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN RESIDENTIAL 13.60 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.97 SUBAREA -AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 S) 36.87 SUBAREA AREMACRES) = 13.60 SUBAREA RUNOFF(CF 0.49 EFFECTIVE AREA(ACRES) = 28.90 AREA -AVERAGED Fm(INCH/HR) AREA -AVERAGED FP(INCH/HR) = 0.97 AREA -AVERAGED Ap = 0.50 TOTAL AREA(ACRES) 28.90 PEAK FLOW RATE(CFS) 78.34 pa IS CODE = 31 FLOW PROCESS FROM NODE 4.40 TO NODE 4.00 ------- -------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< p" >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1664.00 DOWNSTREAM(FEET) 1647.00 FLOW LENGTH(FEET) = 1200.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 39.0 INCH PIPE IS 26.8 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 12.88 NUMBER OF PIPES ESTIMATED PIPE DIAMETER(INCH) = 39.00 PIPE-FLOW(CFS) = 78.34 = 17.33 PIPE TRAVEL TIME(MIN.) = 1 . 55 Tc(MIN.) LONGEST FLOWPATH FROM NODE 4.10 TO NODE 4.00 = 3560.00 FEET. bw ipm FLOW PROCESS FROM NODE 4.00 TO NODE 4.00 IS CODE = 81 ------- -------------------------------------------------------------------- fAw >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< wo MAINLINE Tc(MIN) = 17.33 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.308 to SUBAREA LOSS RATE DATA(AMC II): Fp Ap SCS DEVELOPMENT TYPE/ SCS SOIL AREA (DECIMAL) CN LAND USE GROUP (ACRES) (INCH/HR) RESIDENTIAL 10 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A 12. SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA AREMACRES) = 12.10 SUBAREA RUNOFF(CFS) 30.71 0.49 EFFECTIVE AREMACRES) = 41.00 AREA -AVERAGED Fm(INCH/HR) = AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50- 04.07 TOTAL AREA(ACRES) 41.00 PEAK FLOW RATE(CFS) FLOW PROCESS FROM NODE 4.00 TO NODE 4.00 IS CODE ---------- -40 --------------------------------------------------------------- aw >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< OR TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 17.33 RAINFALL INTENSITY(INCH/HR) = 3.31 AREA -AVERAGED Fm(INCH/HR) = 0.49 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.50 EFFECTIVE STREAM AREA(ACRES) 41.00 TOTAL STREAM AREA(ACRES) = 41.00 104.07 PEAK FLOW RATE(CFS) AT CONFLUENCE CONFLUENCE DATA pm 07/15/03 Q-6 go Im STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 77.96 19.50 3.081 0.97( 0.49) 0.50 33.4 1.00 2 104.07 17.33 3.308 0.98( 0.49) 0.50 41.0 4.10 go RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO in CONFLUENCE FORMULA USED FOR 2 STREAMS. On ** PEAK FLOW RATE TABLE ** Ap Ae HEADWATER STREAM Q Tc Intensity Fp(Fm) us NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 179.39 17.33 3.308 0.98( 0.49) 0.50 70.7 4.10 2 173.67 19.50 3.081 0.97( 0.49) 0.50 74.4 1.00 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 179.39 Tc(MIN.) = 17.33 EFFECTIVE AREA(ACRES) 70.67 AREA -AVERAGED Fm(INCH/HR) = 0.49 -AVERAGED Ap = 0.50 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA TOTAL AREA(ACRES) = 74.40 1.00 TO NODE 4.00 = 4400.00 FEET. LONGEST FLOWPATH FROM NODE FLOW PROCESS FROM NODE 4.00 TO NODE 5.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< lAw ELEVATION DATA: UPSTREAM(FEET) = 1647.00 DOWNSTREAM(FEET) 1617.00 pm FLOW LENGTH(FEET) = 1000.00 MANNING'S N = 0.013 bw DEPTH OF FLOW IN 45.0 INCH PIPE IS 32.7 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 20.85 ESTIMATED PIPE DIAMETER(INCH) = 45.00 NUMBER OF PIPES on PIPE-FLOW(CFS) = 179.39 PIPE TRAVEL TIME(MIN.) = 0.80 Tc(MIN.) = 18.13 im LONGEST FLOWPATH FROM NODE 1.00 TO NODE 5.00 = 5400.00 FEET. pm FLOW PROCESS FROM NODE 5.00 TO NODE 5.00 IS CODE 81 ------------------ --------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 18.13 3.219 * 100 YEAR RAINFALL INTENSITY(INCH/HR) pm SUBAREA LOSS RATE DATA(AMC II): Fp Ap SCS DEVELOPMENT TYPE/ SCS SOIL AREA (DECIMAL) CN to LAND USE GROUP (ACRES) (INCH/HR RESIDENTIAL 2.00 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A A," PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 .92 SUBAREA AREA(ACRES) = 2.00 SUBAREA RUNOFF(CFS) 4 EFFECTIVE AREA(ACRES) 72.67 AREA -AVERAGED Fm(INCH/HR) = 0.49 AREA -AVERAGED Fp(INCH/HR) = 0.97 AREA -AVERAGED AP = 0.50 TOTAL AREA(ACRES) = 76.40 PEAK FLOW RATE(CFS) 179.39 NOTE: PEAK FLOW RATE DEFAULTED TO UPSTREAM VALUE FLOW PROCESS FROM NODE 5.00 TO NODE 5.00 IS CODE ---------- ----------------- --------------------------------- -- ---- - >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE: TIME OF CONCENTRATION(MIN.) = 18.13 om pm 07/15/03 Q-7 6w 0 an RAINFALL INTENSITY(INCH/HR) 3.22 ib AREA -AVERAGED Fm(INCH/HR) = 0.49 AREA -AVERAGED Fp(INCR/HR) = 0.97 AREA -AVERAGED Ap = 0.50 No EFFECTIVE STREAM AREA(ACRES) 72.67 to TOTAL STREAM AREA(ACRES) = 76.40 PEAK FLOW RATE(CFS) AT CONFLUENCE 179.39 FLOW PROCESS FROM NODE 5.10 TO NODE 5.20 IS CODE = 21 ------------------- -------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< pm >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< 6w INITIAL SUBAREA FLOW-LENGTH(FEET) 900.00 1660.00 ELEVATION DATA: UPSTREAM(FEET) 1683.00 DOWNSTREAM(FEET) ow Tc = K*[(LENGTH** 3.00MELEVATION CHANGE)]**0.20 aw SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 10.250 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.533 SUBAREA Tc AND LOSS RATE DATA(AMC II): Ap scs Tc to DEVELOPMENT TYPE/ SCS SOIL AREA Fp CN (MIN.) LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) po NATURAL FAIR COVER 0.86 1.00 46 22.34 "OPEN BRUSH" A 5.10 60 RESIDENTIAL 0.20 32 10.25 "11+ DWELLINGS/ACRE" A 10.50 0.98 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.89 pm SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.46 on SUBAREA RUNOFF(CFS) 57.85 57.85 TOTAL AREA(ACRES) 15.60 PEAK FLOW RATE(CFS) FLOW PROCESS FROM NODE 5.20 TO NODE 5.30 IS CODE 31 ---------- ------------------------------------------ ---- -- ---- - -- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1654.00 DOWNSTREAM(FEET) 1636.00 FLOW LENGTH(FEET) = 1350.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 33.0 INCH PIPE IS 26.2 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 11.42 ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER OF PIPES PIPE-FLOW(CFS) = 57.85 = 12.22 PIPE TRAVEL TIME(MIN.) = 1 . 97 Tc(MIN.) 5.30 = 2250.00 FEET. LONGEST FLOWPATH FROM NODE 5.10 TO NODE 5.30 TO NODE 5.30 IS CODE = 81 FLOW PROCESS FROM NODE --------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 12.22 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.079 SUBAREA LOSS RATE DATA(AMC II): Ap SCS in DEVELOPMENT TYPE/ SCS SOIL AREA Fp CN LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL NATURAL FAIR COVER "OPEN BRUSH" A 7.90 0.86 1.00 46 RESIDENTIAL 13.00 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.91 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.69 SUBAREA AREA(ACRES) 20.90 SUBAREA RUNOFF(CFS) 64.90 07/15/03 Q-8 0 4" EFFECTIVE AREA(ACRES) = 36.50 AREA -AVERAGED Fm(INCH/HR) = 0.54 AREA -AVERAGED Fp(INCH/HR) = 0.91 AREA -AVERAGED Ap = 0.59 TOTAL AREA(ACRES) = 36.50 PEAK FLOW RATE(CFS) = 116.38 FLOW PROCESS FROM NODE 5.30 TO NODE 5.00 IS CODE 31 ------------------- ---- ---- -- ---- ---- -- ---- - -- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1636.00 DOWNSTREAM(FEET) 1619.00 FLOW LENGTH(FEET) = 900.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 42.0 INCH PIPE IS 30.1 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 15.76 ESTIMATED PIPE DIAMETER(INCH) = 42.00 NUMBER OF PIPES PIPE-FLOW(CFS) = 116.38 PIPE TRAVEL TIME(MIN.) = 0.95 Tc(MIN.) = 13.17 LONGEST FLOWPATH FROM NODE 5.10 TO NODE 5.00 = 3150.00 FEET. FLOW PROCESS FROM NODE 5.00 TO NODE 5.00 IS CODE = 81 ---------------------------------------------------------------- ----------- bw >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 13.17 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.899 bw SUBAREA LOSS RATE DATA(AMC II): Ap SCS DEVELOPMENT TYPE/ SCS SOIL AREA Fp LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN NATURAL FAIR COVER 0.86 1.00 46 "OPEN BRUSH" A 6.00 RESIDENTIAL 12.30 0.98 0.50 32 "5-7 DWELLINGS/ACRE" A 0.92 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.66 SUBAREA AREMACRES) = 18.30 SUBAREA RUNOFF(CFS) 54.18 EFFECTIVE AREA(ACRES) = 54.80 AREA -AVERAGED Fm(INCH/HR) = 0.56 AREA -AVERAGED Fp(INCH/HR) = 0.91 AREA -AVERAGED Ap = 0.62 164.67 TOTAL AREA(ACRES) 54.80 PEAK FLOW RATE(CFS) FLOW PROCESS FROM NODE 5.00 TO NODE 5.00 IS CODE bw >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<< >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<< TOTAL NUMBER OF STREAMS = 2 CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE: TIME OF CONCENTRATION(MIN.) = 13.17 RAINFALL INTENSITY(INCH/HR) = 3.90 AREA -AVERAGED Fm(INCH/HR) = 0.56 AREA -AVERAGED Fp(INCH/HR) = 0.91 AREA -AVERAGED Ap = 0.62 EFFECTIVE STREAM AREA(ACRES) 54.80 TOTAL STREAM AREMACRES) = 54.80 PEAK FLOW RATE(CFS) AT CONFLUENCE 164.67 40 CONFLUENCE DATA STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER 4w NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 4.10 1 179.39 18.13 3.219 0.97( 0.49) 0.50 72.7 im 1 173.67 20.31 3.007 0.97( 0.49) 0.50 76.4 1.00 2 164.67 13.17 3.899 0.91( 0.56) 0.62 54.8 5.10 4w &A pa 07/15/03 Q-9 imo RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO CONFLUENCE FORMULA USED FOR 2 STREAMS. ** PEAK FLOW RATE TABLE ** STREAM Q Tc Intensity Fp(Fm) Ap Ae HEADWATER NUMBER (CFS) (MIN.) (INCH/HR) (INCH/HR) (ACRES) NODE 1 327.45 13.17 3.899 0.94( 0.52) 0.56 107.6 5.10 2 310.52 18.13 3.219 0.94( 0.52) 0.55 127.5 4.10 an 3 294.34 20.31 3.007 0.94( 0.52) 0.55 131.2 1.00 COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS: PEAK FLOW RATE(CFS) = 327.45 Tc(MIN.) = 13.17 EFFECTIVE AREA(ACRES) 107.61 AREA -AVERAGED Fm(INCH/HR) = 0.52 AREA -AVERAGED Fp(INCH/HR) = 0.94 AREA -AVERAGED Ap = 0.56 TOTAL AREA(ACRES) = 131.20 LONGEST FLOWPATH FROM NODE 1.00 TO NODE 5.00 = 5400.00 FEET. FLOW PROCESS FROM NODE 5.00 TO NODE 5.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 13.17 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.899 SUBAREA LOSS RATE DATA(AMC II): . bw DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN PUBLIC PARK A 12.70 0.98 0.85 32 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.85 SUBAREA AREA(ACRES) = 12.70 SUBAREA RUNOFF(CFS) 35.10 EFFECTIVE AREA(ACRES) 120.31 AREA -AVERAGED Fm(INCH/HR) = 0.56 om AREA -AVERAGED Fp(INCH/HR) = 0.94 AREA -AVERAGED Ap = 0.59 TOTAL AREA(ACRES) = 143.90 PEAK FLOW RATE(CFS) = 361.92 ---------------------------------------------------------------------------- I END NORTHERN SYSTEM I BEGIN SOUTHERN SYSTEM ---------------------------------------------------------------------------- 60 oft 1w 40 Im FLOW PROCESS FROM NODE 6.10 TO NODE 6.20 IS CODE = 21 ---------------------------------------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000-00 1635.00 ELEVATION DATA: UPSTREAM(FEET) = 1657.00 DOWNSTREAM(FEET) TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 11.017 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.341 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp LAND USE GROUP (ACRES) (INCH/HR) RESIDENTIAL "11+ DWELLINGS/ACRE" A 10.30 0.98 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 38.43 Ap SCS Tc (DECIMAL) CN (MIN.) 0.97 TOTAL AREA(ACRES) = 10.30 PEAK FLOW RATE(CFS) = 07/15/03 Q-10 0.20 32 11.02 38.43 0 FLOW PROCESS FROM NODE 6.20 TO NODE 6.30 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1630-00 DOWNSTREAM(FEET) 1620.00 FLOW LENGTH(FEET) = 750.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 30.0 INCH PIPE IS 20.9 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 10.52 ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES PIPE-FLOW(CFS) 38.43 PIPE TRAVEL TIME(MIN.) = 1.19 Tc(MIN.) = 12.21 LONGEST FLOWPATH FROM NODE 6.10 TO NODE 6.30 = 1750.00 FEET. FLOW PROCESS FROM NODE 6.30 TO NODE 6.30 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 12.21 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.082 SUBAREA LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN VIM RESIDENTIAL "5-7 DWELLINGS/ACRE" A 13.00 0.98 0.50 32 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA AREA(ACRES) = 13.00 SUBAREA RUNOFF(CFS) 42.05 EFFECTIVE AREA(ACRES) = 23.30 AREA -AVERAGED Fm(INCH/HR) = 0.36 be AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.37 TOTAL AREA(ACRES) 23.30 PEAK FLOW RATE(CFS) 78.09 to FLOW PROCESS FROM NODE 6.30 TO NODE 6.40 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1620.00 DOWNSTREAM(FEET) 1609-00 FLOW LENGTH(FEET) = 750.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 36.0 INCH PIPE IS 29.2 INCHES imp PIPE -FLOW VELOCITY(FEET/SEC.) = 12.70 ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES PIPE-FLOW(CFS) = 78.09 PIPE TRAVEL TIME(MIN.) = 0.98 Tc(MIN.) = 13.19 LONGEST FLOWPATH FROM NODE 6.10 TO NODE 6.40 = 2500.00 FEET. FLOW PROCESS FROM NODE 6.40 TO NODE 6.40 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< MAINLINE Tc(MIN) = 13.19 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.896 SUBAREA LOSS RATE DATA(AMC II): SCS DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN RESIDENTIAL 11.00 0.98 0.20 "11+ DWELLINGS/ACRE" A 32 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.97 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA AREA(ACRES) = 11.00 SUBAREA RUNOFF(CFS) 36.64 4" EFFECTIVE AREA(ACRES) 34.30 AREA -AVERAGED F�n(INCH/HR) = 0.31 07/15/03 Q-11 4m im AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.31 TOTAL AREA(ACRES) 34.30 PEAK FLOW RATE(CFS) 110.84 FLOW PROCESS FROM NODE 6.40 TO NODE 6.00 IS CODE = 31 ---------------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1609.00 DOWNSTREAM(FEET) 1608.00 FLOW LENGTH(FEET) = 400.00 MANNING'S N = 0.013 DEPTH OF FLOW IN 60.0 INCH PIPE IS 43.4 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 7.29 ESTIMATED PIPE DIAMETER(INCH) = 60.00 NUMBER OF PIPES PIPE-FLOW(CFS) = 110.84 PIPE TRAVEL TIME(MIN.) = 0.92 Tc(MIN.) = 14.10 LONGEST FLOWPATH FROM NODE 6.10 TO NODE 6.00 = 2900.00 FEET. to---------------------------------------------------------------------------- END EASTERLY TWO SYSTEMS ("NORTH" AND "SOUTH") BEGIN WESTERLY SYSTEM ---------------------------------------------------------------------------- FLOW PROCESS FROM NODE 10.00 TO NODE 11.00 IS CODE = 21 bw---------------------------------------------- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< am >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 1000-00 ELEVATION DATA: UPSTREAM(FEET) 1675.00 DOWNSTREAM(FEET) 1650.00 Tc = K*[(LENGTH** 3.00MELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN-) = 13.656 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.816 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) RESIDENTIAL 4.00 0.98 0.60 32 13.66 "3-4 DWELLINGS/ACRE" A SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60 SUBAREA RUNOFF(CFS) 11.63 TOTAL AREA(ACRES) = 4.00 PEAK FLOW RATE(CFS) 11.63 FLOW PROCESS FROM NODE 11.00 TO NODE 12.00 IS CODE 61 ---- ------- ---- ---- ----- -- ---- ----- -- ---- - -- >>>>>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>(STANDARD CURB SECTION USED)<<<<< 4" UPSTREAM ELEVATION(FEET) = 1650.00 DOWNSTREAM ELEVATION(FEET) 1633.00 STREET LENGTH(FEET) 750.00 CURB HEIGHT(INCHES) = 6.0 STREET HALFWIDTH(FEET) = 20.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 10-00 INSIDE STREET CROSSFALL(DECIMAL) 0.020 OUTSIDE STREET CROSSFALL(DECIMAL) 0.020 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 2 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb-to-curb) 0.0150 Manning's FRICTION FACTOR for Back -of -Walk Flow Section 0.0200 411 07/15/03 Q-12 **TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) 17.56 STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.41 HALFSTREET FLOOD WIDTH(FEET) = 14.18 AVERAGE FLOW VELOCITY(FEET/SEC.) = 4.12 PRODUCT OF DEPTH&VELOCITY(FT-FT/SEC.) 1.69 STREET FLOW TRAVEL TIME(MIN.) = 3.03 Tc(MIN.) = 16.69 * 100 YEAR RAINFALL INTENSITY(INCH/HR) 3.384 SUBAREA LOSS RATE DATA(AMC II): Ap scs DEVELOPMENT TYPE/ SCS SOIL AREA Fp LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN RESIDENTIAL 4.70 0.98 0.60 32 "3-4 DWELLINGS/ACRE" A 60 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60 SUBAREA AREA(ACRES) 4.70 SUBAREA RUNOFF(CFS) 11.84 EFFECTIVE AREA(ACRES) 8.70 AREA -AVERAGED Fm(INCH/HR) = 0.59 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.60 TOTAL AREA(ACRES) 8.70 PEAK FLOW RATE(CFS) 21.91 bw END OF SUBAREA STREET FLOW HYDRAULICS: 15.51 DEPTH(FEET) = 0.44 HALFSTREET FLOOD WIDTH(FEET) = 1.90 FLOW VELOCITY(FEET/SEC.) = 4.34 DEPTH*VELOCITY(FT*FT/SEC.) LONGEST FLOWPATH FROM NODE 10.00 TO NODE 12.00 = 1750.00 FEET. 60 FLOW PROCESS FROM NODE 12.00 TO NODE 12.00 IS CODE = 81 ---------------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< io MAINLINE Tc(MIN) = 16.69 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.384 SUBAREA LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap scs LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN RESIDENTIAL "3-4 DWELLINGS/ACRE" A 16.30 0.98 0.60 32 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.60 SUBAREA AREA(ACRES) = 16.30 SUBAREA RUNOFF(CFS) 41.05 1 bw EFFECTIVE AREA(ACRES) = 25.00 AREA -AVERAGED Fm(INCH/HR) = 0.59 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.60 TOTAL AREA(ACRES) 25.00 PEAK FLOW RATE(CFS) 62.97 OPP FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 31 ------ --------------------------------------------------------------------- >>>>>COMPUTE PIPE -FLOW TRAVEL TIME THRU SUBAREA<<<<< >>>>>USING COMPUTER -ESTIMATED PIPESIZE (NON -PRESSURE FLOW)<<<<< ELEVATION DATA: UPSTREAM(FEET) = 1626.00 DOWNSTREAM(FEET) 1620.00 40 FLOW LENGTH(FEET) 400.00 MANNING'S N = 0.013 �e, � DEPTH OF FLOW IN 33.0 INCH PIPE IS 27.0 INCHES PIPE -FLOW VELOCITY(FEET/SEC.) = 12.12 F PIPES ESTIMATED PIPE DIAMETER(INCH) = 33.00 NUMBER 0 PTPE-FLOW(CFS) 62.97 PIPE TRAVEL TIME(MIN.) 0.55 Tc(MIN.) = 17.24 LONGEST FLOWPATH FROM NODE 10.00 TO NODE 13.00 = 2150.00 FEET. FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 81 ----- ---------------------------------------------------------------------- >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< 07/15/03 Q-13 pm to am bi pm ow 0 _40 to 0 07/15/03 Q-14 MAINLINE Tc(MIN) = 17.24 to * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 3.318 SUBAREA LOSS RATE DATA(AMC II): am DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN RESIDENTIAL "3-4 DWELLINGS/ACRE" A 2.10 0.98 0.60 32 on PUBLIC PARK A 1.80 0.98 0.85 32 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 to SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.72 SUBAREA AREA(ACRES) = 3.90 SUBAREA RUNOFF(CFS) 9.20 EFFECTIVE AREA(ACRES) 28.90 AREA -AVERAGED Fm(INCH/HR) = 0.60 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.62 TOTAL AREA(ACRES) 28.90 PEAK FLOW RATE(CFS) 70.70 40 END OF STUDY SUMMARY: is TOTAL AREA(ACRES) 28.90 TC(MIN.) 17.24 EFFECTIVE AREA(ACRES) 28.90 AREA -AVERAGED FM(INCH/HR)= 0.60 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.62 00 PEAK FLOW RATE(CFS) 70.70 END OF RATIONAL METHOD ANALYSIS low pm to am bi pm ow 0 _40 to 0 07/15/03 Q-14 MADOLE & ASSOCIATES, INC. Job Citrus Heights North 126-1770 Civil Engineers -Land Surveyors -Planners t(t Sheet No. of 10601 Church Street Suite 107 Calculated by: Date 6/25/2003 Rancho Cucamonga, CA 91730 Checked by: Date (909)948-1311 fax948-8464 1.04 Scale nts I Rainfall Intensity Data I Slope of Intensity/Duration curve F-076-7 Duration Return Period (year) hr 2 5 10 25 100 1 0.87 1.04 1.32 1.57 3 1.43 11 1.71 1 1.9 2.17 2.58 6 1.95 2.57 3.04 3.66 24 3.8 5.37 6.56 8.13 Slope 0.45 (for hr) =values taken from Isohyetals, San Bernardino County Hydrology Manual All other values "interpolated" using logarithmic equations as follows: Exp( +/- Slope x Ln(T des) + Ln(ref 1) -/+ Slope x Ln(ref T)) 1100 - 110 / Ln(l 00/10) x Ln(des Period / 10) + 110 pm p" i ibm 4m 0 0 UH-INPUT-VALS.TXT CITRUS HEIGHTS NORTH PRELIMINARY DRAINAGE JN 126-1770 DATE: 6/25/03 ATS >> EASTERLY BASIN - NORTHERLY SYSTEM NON-HOMOGENEOUS WATERSHED AREA -AVERAGED LOSS RATE (FM) AND LOW LOSS FRACTION ESTIMATIONS FOR AMC III: TOTAL 24-HOUR DURATION RAINFALL DEPTH 10.50 (inches) SOIL -COVER AREA CAcres) PERCENT OF PERVIOUS AREA SCS CURVE LOSS RATE NUMBER FP(in./hr.) YIELD TYPE 1 101.90 50-00 32.(AMC 11) 0.742 0.489 2 10.30 20.00 32.(AMC 11) 0.742 0.782 3 12.70 85-00 32.(AMC 11) 0.742 0.147 4 19.00 100.00 46.(AMC 11) 0.547 0.000 TOTAL AREA (Acres) 143.90 AREA -AVERAGED LOSS RATE, FM (in./hr.) = 0.401 AREA -AVERAGED LOW LOSS FRACTION, Y = 0.585 >> EASTERLY BASIN - SOUTHERLY SYSTEM NON-HOMOGENEOUS WATERSHED AREA -AVERAGED LOSS RATE (FM) AND LOW LOSS FRACTION ESTIMATIONS FOR AMC III: TOTAL 24-HOUR DURATION RAINFALL DEPTH 10.50 (inches) SOIL -COVER AREA PERCENT OF SCS CURVE LOSS RATE NUMBER FP(in./hr.) YIELD TYPE (Acres) 1 13.00 PERVIOUS AREA 50-00 32.(AMC 11) 0.742 0.489 2 21.30 20-00 32.(AMC 11) 0.742 0.782 TOTAL AREA (Acres) 34.30 AREA -AVERAGED LOSS RATE, FM (in./hr.) = 0.233 AREA -AVERAGED LOW LOSS FRACTION, Y = 0.329 >> WESTERLY BASIN NON-HOMOGENEOUS WATERSHED AREA -AVERAGED LOSS RATE (Fm) AND LOW LOSS FRACTION ESTIMATIONS FOR AMC III: TOTAL 24-HOUR DURATION RAINFALL DEPTH 10.50 (inches) SOIL -COVER AREA PERCENT OF SCS CURVE LOSS RATE NUMBER FpCin./hr.) YIELD TYPE (Acres) 27.10 PERVIOUS AREA 60-00 32.(AMC 11) 0.742 0.391 1 2 1.80 85.00 32.(AMC 11) 0.742 0.147 Page 1 0 UH-INPUT-VALS.TXT TOTAL AREA (Acres) 28.90 AREA -AVERAGED LOSS RATE, FM (in./hr.) = 0.457 AREA -AVERAGED LOW LOSS FRACTION, y = 0.624 ---------- Page 2 0 PM ils PM kow P" Ow P. 410 PM wo PM 110 pw (am On 60 On im so dw 0 VO im Project: Citrus Heights North Date: . 6/25/2003 126-1770 Engineer: Aaron Skeers Notes: "Easterly Basin" - North Sys Set #1 1 st-24hr Design Storm yr 100 1 2 Catchment Lag time hrs 0.18 3 Catchment Area acres 143.9 4 Base flow cfs/sq mi 0 5 S -graph _1!��Ie 6 Maximum loss rate, Fm in/hr [see calc sheet] 7 Low loss fraction, Y -bar [see calc sheet] 8 Watershed area -averaged 5 -minute point rainfall inches 0.58 Watershed area -averaged 30 -minute point rainfall inches 1.19 Watershed area -averaged I -hour point rainfall inches 1.57 Watershed area -averaged 3 -hour point rainfall inches 3.03 Watershed area -averaged 6 -hour point rainfall inches 4.60 Watershed area -averaged 24 -hour point rainfall inches 10.50 9 24-hour storm unit interval minutes 5 Point rainfall unadjusted by depth -area factors 10 Depth -area adjustment factors 5 -min 0.99 (Fig E-4) 30 -min 0.99 1 -hr 0.99 3 -hr 1 6 -hr 1 24 -hr 1 7/15/2003 M Drainage-UHinput-sheet.xls IN 0 40 an OM 60 on ko PM wo OM am PM No on to F_ No Ow am Ow to 0 0 Project: Citrus Heights North Date: 6/25/2003 126-1770 Engineer: Aaron Skeers Notes: "Easterly Basin" - South Sys Set #2 1 st-24hr Design Storm yr 100 1 2 Catchment Lag time hrs 0.19 3 Catchment Area acres 34.3 4 Base flow cfs/sq mi 0 5 S -graph valley 6 Maximum loss rate, Frn in/hr Isee calc sheet] 7 Low loss fraction, Y -bar [see calc sheet'i 8 Watershed area -averaged 5 -minute point rainfall inches 0.58 Watershed area -averaged 30 -minute point rainfall inches 1.19 Watershed area -averaged 1 -hour point rainfall inches 1.57 Watershed area -averaged 3 -hour point rainfall inches 3.03 Watershed area -averaged 6 -hour point rainfall inches 4.60 Watershed area -averaged 24 -hour point rainfall inches 10.50 9 24-hour storm unit interval minutes 5 Point rainfall unadjusted by depth -area factors 10 Depth -area adjustment factors 5 -min 0.99 (Fig E-4) 30 -min 0.99 1 -hr 0.99 3 -hr 1 6 -hr 1 24 -hr 1 7/15/2003 Drainage-UHinput-sheet.xls IN OR to No so SM wo Ow 60 am Ibw Pw No Pon k" I= am Om im wn 11w M Project: Citrus Heights North Date: . 6/25/2003 126-1770 Engineer: Aaron Skeers Notes: "Westerly System" Set #3 1 st-24hr I Design Storm yr 100 2 Catchment Lag time hrs 0.23 3 Catchment Area acres 28.9 4 Base flow cfs/sq mi 0 5 S -graph - valley 6 Maximum loss rate, Fm in/hr [see calc sheet] 7 Low loss fraction, Y -bar Isee caic sheet] 8 Watershed area -averaged 5 -minute point rainfall inches 0.58 Watershed area -averaged 30 -minute point rainfall inches 1.19 Watershed area -averaged 1 -hour point rainfall inches 1.57 Watershed area -averaged 3 -hour point rainfall inches 3.03 Watershed area -averaged 6 -hour point rainfall inches 4.60 Watershed area -averaged 24 -hour point rainfall inches 10.50 9 24-hour storm unit interval minutes 5 Point rainfall unadjusted by depth -area factors 10 Depth -area adjustment factors 5 -min 0.99 (Fig E-4) 30 -min 0.99 1 -hr 0.99 3 -hr 1 6 -hr I 24 -hr I 7/15/2003 Drainage-UHinput-sheet.xls Detention Basin with Pipe outlet. Easterily System pw iia no Pipe Outlet Diameter 4 ft Length ft Slope ft/ft Upstream invert ft C 0.60 Note: V=Vertic al, H=Horiztontal outlet P" im PM %w ism FM DEPTH AREA VOLUME Head Q (weir) Q (orfic!�j st- Cf ac -ft ft cts o 57,600 U 0 0.0 0.00 0.0 1 60,516 1.36 1.0 37.70 -99999.0 2 1 63,504 121,068 2.78 2.0 6.63 0.0 3 66,564 186,102 i 4.Zf 3.0 60.5 4 69,696 254,232 1, 5.84 i 4.0 85.6 5 72900 325,b;3u 1.41 5.0 104.8 121.0 6 76,176 400,068 9.18 b.0 135.3 7 79524 477,918 10.97 -1-8.0 7.0 148.2 8 82,944 bbu,10z 1 160.1 9 1 86,436 643842 14.78 9.0 10 9- o-, o- u- o- 732,060 -1 U.0 60 [Dead St ae = 0 ac -ft am Bas*n InfiltraWn Fm(UH)= 0 in/hr Ap= CN-AMCII Figure C-6 Fp= A= 57,600 sf assume bottom area only V= O.00E+00 ft/sec convert Fm to ft/sec IN 0.00 CfS ise 25 ise 50 "Q4 U 'I . em GF= Ra M434-41.1al-.4-7-4 OM "C', from Eqn. 4.32 (converted to English units) King's (Handbook of Hydraulics), 7th Ed Drainage-UHinput-sheet.xis go 6/25/2003 io IM do Detention Basin with Pipe Outlet - Westerly System Pipe Outlel Diameter Length Slope Upstream invert r. Note: V=Vertic al, H=Horiztontal outlet On Ow too ro ow Own 1.5 ft ft ftIft ft 0.60 DEPTH 0 1 2 3- 4 5 6 AREA sf 56,496� 59,400 62,376 65,424 68,5,Vt J�1,iW 75,000 VOLUME Gf 0 57,94 1 118,836 182,736 249, 720 6-�7.34 �13 1 �9,8 6 393,228 ac -ft 0 1.33 2.73 4.20 5. 73 9.03 Head ft 0.0 1.0 14.14 2.0 3.0 1 4.0 5.0 b.0 a cfs 0.0 4.3 9.b 12.8 ! - �� 17.b 60 [Dead Storage = 0 ac -ft "a IN wo to w Figure C-6 assume bottom area only convert Fm to ft/sec ise 9 GF=-,Gf. MaRwal, Hydraulics), 7th Ed. "C" from Eqn. 4.32 (converted to English units) King's (Handbook of 6/25/2003 Drainage-UHinput-sheet.xls 0 F L 0 0 D R 0 U T I N G A N A L Y S I S USING COUNTY HYDROLOGY MANUAL OF SAN BERNARDINO(1986) (c) Copyright 1989-2002 Advanced Engineering Software (aes) Ver. 8.0 Release Date: 01/01/2002 License ID 1251 Analysis prepared by: im MADOLE & ASSOCIATES, INC. 10601 CHURCH STREET SUITE 107 go RANCHO CUCAMONGA CA 91730 to 909.948.1311 FAX -948.8464 madole@madolerc.com DESCRIPTION OF STUDY am • CITRUS HEIGHTS NORTH * PRELIMINARY DRAINAGE (EASTERLY AND WESTERLY) • FLOWTHROUGH BASIN ANALYSIS - 2 BASINS kw FILE NAME: CHN-UH.DAT TIME/DATE OF STUDY: 15:56 06/25/2003 On &W FLOW PROCESS FROM NODE 1.00 TO NODE 5.00 IS CODE -------- ------------------------------------------------------------------- >>>>>SUBAREA RUNOFF (UNIT-HYDROGRAPH ANALYSIS)<<<<< STREAM #1) "m (UNIT-HYDROGRAPH ADDED TO WATERSHED AREA = 143.900 ACRES BASEFLOW = 0.000 CFS/SQUARE-MILE *USER ENTERED "LAG" TIME = 0.180 HOURS CAUTION: LAG TIME IS LESS THAN 0.50 HOURS. THE 5 -MINUTE PERIOD UH MODEL (USED IN THIS COMPUTER PROGRAM) MAY BE TOO LARGE FOR PEAK FLOW ESTIMATES. VALLEY(DEVELOPED) S -GRAPH SELECTED MAXIMUM WATERSHED LOSS RATE(INCH/HOUR) = 0.400 am LOW LOSS FRACTION = 0.585 *HYDROGRAPH MODEL #1 SPECIFIED* oft SPECIFIED PEAK 5 -MINUTES RAINFALL(INCH)= 0.58 SPECIFIED PEAK 30 -MINUTES RAINFALL(INCH)= 1.19 SPECIFIED PEAK 1 -HOUR RAINFALL(INCH) = 1.57 SPECIFIED PEAK 3 -HOUR RAINFALL(INCH) = 3.03 SPECIFIED PEAK 6 -HOUR RAINFALL(INCH) = 4.60 SPECIFIED PEAK 24-HOUR RAINFALL(INCH) = 10 -SO *USER SPECIFIED PRECIPITATION DEPTH -AREA REDUCTION FACTORS: 5 -MINUTE FACTOR = 0.990 30 -MINUTE FACTOR = 0.990 1 -HOUR FACTOR = 0.990 3 -HOUR FACTOR = 1.000 6 -HOUR FACTOR = 1.000 di 24-HOUR FACTOR = 1.000 UNIT HYDROGRAPH TIME UNIT 5.000 MINUTES UNIT INTERVAL PERCENTAGE OF LAG -TIME = 46.296 4m RUNOFF HYDROGRAPH LISTING LIMITS: as ON 06/25/03 am UH -2 ,FAS"reF-LV 4,4!r(#j 1,0 kiw on to MODEL TIME(HOURS) FOR BEGINNING OF RESULTS = 12.00 MODEL TIME(HOURS) FOR END OF RESULTS = 20.00 UNIT HYDROGRAPH DETERMINATION INTERVAL "S" GRAPH UNIT HYDROGRAPH NUMBER MEAN VALUES ORDINATES(CFS) ---------------------------- ----------------------------------------------- 1 3.830 66.660 2 25.650 379.717 3 61.679 627.010 4 86.217 427.042 5 95.548 162.367 6 98.360 48.935 7 99.220 14.968 8 99.688 8.143 9 99.922 4.072 10 100.000 1.357 ---------------------------------------------------------------------------- TOTAL SOIL -LOSS VOLUME(ACRE-FEET) = 66.5716 TOTAL STORM RUNOFF VOLUME(ACRE-FEET) 59.3102 ---------------------------------------------------------------------------- 06/25/03 LJH-3 0 po to 2 4 - H 0 U R S T 0 R M R U N 0 F F H Y D R 0 G R A P H HYDROGRAPH IN FIVE-MINUTE UNIT INTERVALS(CFS) (Note: Time indicated is at END of Each Unit Intervals) ---------------------------------------------------------------------------- TIME(HRS) VOLUME(AF) Q(CFS) 0. 125.0 250.0 375.0 500.0 ---------------------------------------------------------------------------- 12.000 19.1088 26.78 Q V 12.083 19.2948 27.01 Q V 12.167 19.4828 27.30 Q V 12.250 19.6732 27.64 Q V 12.333 19.8657 27.96 Q V 12.417 20.0601 28.23 Q V No 12.500 20.2563 28.48 Q V 12.583 20.4542 28.74 Q V 12.667 20.6540 29.00 Q V 12.750 20.8556 29.28 Q V 12.833 21.0592 29.56 Q V 12.917 21.2648 29.85 Q V 13.000 21.4724 30.15 Q V 13.083 21.6823 30.47 Q V 13.167 21.8943 30.79 Q V 13.250 22.1087 31.13 Q V 13.333 22.3254 31.48 Q V 13.417 22.5447 31.84 Q V 13.500 22.7666 32.22 Q V 13.583 22.9912 32.62 Q V 13.667 23.2187 33.03 Q V 13.750 23.4492 33.46 Q V 13.833 23.6827 33.91 Q V 13.917 23.9196 34.39 Q V 14.000 24.1599 34.89 Q V 14.083 24.4039 35.43 Q V 14.167 24.6522 36.05 Q V 14.250 24.9053 36.76 Q V 14.333 25.1633 37.46 Q V 14.417 25.4260 36.15 Q V 14.500 25.6936 38.86 Q V 14.583 25.9666 39.64 Q V 14.667 26.2465 40.63 Q V 14.750 26.5359 42.02 Q V 14.833 26.8384 43.92 Q V 14.917 27.1568 46.24 Q V 15.000 27.4934 48.87 Q V 15.083 27.8501 51.79 Q V 15.167 28.2290 55.02 Q V. 15.250 28.6329 58.64 Q V. 15.333 29.0647 62.70 Q V. 15.417 29.5171 65.69 Q V. 15.500 29.9410 61.55 Q V 15.583 30.2972 51.72 Q V 15.667 30.6254 47.65 Q V 15.750 30.9867 52.46 Q V 15.833 31.4282 64.10 Q V 15.917 31.9992 82.91 Q V 16.000 32.7936 115.34 Q. V 16.083 34.1211 192.75 Q V 16.167 36.6078 361.07 V Q 16.250 39.7451 455.53 V Q PM 06/25/03 LJH-4 60 on io aw a% kow ow bw an im we on 16.333 41.9963 326.88 Q V . 16.417 43.1585 168.74 Q V. 16.500 43.8171 95.63 Q V. 16.583 44.3386 75.72 Q V. 16.667 44.8184 69.68 Q v 16.750 45.2445 61.86 Q v 16.833 45.6168 54.06 Q v 16.917 45.9456 47.73 Q v 17.000 46.2450 43.47 Q v 17.083 46.5250 40.66 Q v 17.167 46.7915 38.69 Q v 17.250 47.0470 37.10 Q v 17.333 47.2935 35.79 Q V 17.417 47.5323 34.68 Q v 17.500 47.7644 33.70 Q v 17.583 47.9904 32.83 Q v 17.667 48.2110 32.03 Q v 17.750 48.4266 31.30 Q v 17.833 48.6375 30.62 Q v 17.917 48.8440 30.00 Q v 18.000 49.0466 29.41 Q v 18.083 49.2453 28.85 Q v 18.167 49.4400 28.27 Q v 18.250 49.6306 27.68 Q v 18.333 49.8176 27.14 Q v 18.417 50.0013 26.68 Q v 18.500 50.1822 26.27 Q v 18.583 50.3604 25.88 Q v 18.667 50.5361 25.51 Q v 18.750 50.7094 25.16 Q v 18.833 50.8803 24.82 Q v 18.917 51.0491 24.50 Q v 19.000 51.2157 24.20 Q v 19.083 51.3804 23.91 Q v 19.167 51.5431 23.63 Q v 19.250 51.7039 23.36 Q v 19.333 51.8630 23.10 Q v 19.417 52.0203 22.85 Q v 19.500 52.1761 22.61 Q v 19.583 52.3302 22.38 Q v 19.667 52.4827 22.15 Q v 19.750 52.6338 21.94 Q v 19.833 52.7835 21.73 Q v 19.917 52.9317 21.53 Q v 20.000 53.0786 21.33 Q v FLOW PROCESS FROM NODE 6.10 TO NODE 6.00 IS CODE ---------------------------------------------------------------------------- A - >>>>>SUBAREA RUNOFF (UNIT-HYDROGRAPH ANALYSIS)<<<<< (UNIT-HYDROGRAPH ADDED Toa� WATERSHED AREA = 34.300 ACRES BASEFLOW = 0.000 CFS/SQUARE-MILE *USER ENTERED "LAG" TIME = 0.190 HOURS CAUTION: LAG TIME IS LESS THAN 0.50 HOURS. THE 5 -MINUTE PERIOD UH MODEL (USED IN THIS COMPUTER PROGRAM) MAY BE TOO LARGE FOR PEAK FLOW ESTIMATES. VALLEY(DEVELOPED) S -GRAPH SELECTED MAXIMUM WATERSHED LOSS RATE(INCH/HOUR) = 0.233 LOW LOSS FRACTION = 0.329 06/25/03 LTH -5 am *HYDROGRAPH MODEL #1 SPECIFIED* im SPECIFIED PEAK 5 -MINUTES RAINFALL(INCH)= 0.58 SPECIFIED PEAK 30 -MINUTES RAINFALL(INCH)= 1.19 SPECIFIED PEAK 1 -HOUR RAINFALL(INCH) = 1.57 SPECIFIED PEAK 3 -HOUR RAINFALL(INCH) = 3.03 SPECIFIED PEAK 6 -HOUR RAINFALL(INCH) = 4.60 SPECIFIED PEAK 24-HOUR RAINFALL(INCH) = 10.50 *USER SPECIFIED PRECIPITATION DEPTH -AREA REDUCTION FACTORS: 5 -MINUTE FACTOR = 0.990 30 -MINUTE FACTOR = 0.990 1 -HOUR FACTOR = 0.990 3 -HOUR FACTOR = 1.000 6 -HOUR FACTOR = 1.000 24-HOUR FACTOR = 1.000 60 UNIT HYDROGRAPH TIME UNIT 5.000 MINUTES UNIT INTERVAL PERCENTAGE OF LAG -TIME = 43.860 RUNOFF HYDROGRAPH LISTING LIMITS: MODEL TIME(HOURS) FOR BEGINNING OF RESULTS = 12.00 MODEL TIME(HOURS) FOR END OF RESULTS = 20.00 pa UNIT HYDROGRAPH DETERMINATION pm bw---------------------------------------------------------------------------- INTERVAL "S" GRAPH UNIT HYDROGRAPH NUMBER MEAN VALUES ORDINATES(CFS) rm I im ---------------------------------------------------------------------------- 1 3.451 14.314 2 23.188 81.872 3 56.968 140.125 MR 4 83.318 109.304 bo 5 94.150 44.933 6 97.949 15.760 7 98.939 4.107 pm 8 99.497 2.315 iw 9 99.799 1.252 10 99.950 0.626 11 100.000 0.209 ---------------------------------------------------------------------------- TOTAL SOIL -LOSS VOLUME(ACRE-FEET) = 8.9703 TOTAL STORM RUNOFF VOLUME(ACRE-FEET) 21.0314 ---------------------------------------------------------------------------- 0 0 06/25/03 LJI-1-6 '0 2 4 - H 0 U R S T 0 R M R U N 0 F F H Y D R 0 G R A P H HYDROGRAPH IN FIVE-MINUTE UNIT INTERVALS(CFS) (Note: Time indicated is at END of Each Unit Intervals) ---------------------------------------------------------------------------- TIME(HRS) VOLUME(AF) Q(CFS) 0. 50.0 100.0 150.0 200.0 On ---------------------------------------------------------------------------- 12.000 7.3553 10.31 Q V I im 12.083 7.4269 10.40 Q V 12.167 7.4993 10.51 Q V 12.250 7.5725 10.64 Q V 12.333 7.6466 10.76 Q V 12.417 7.7215 10.86 Q V 12.500 7.7970 10.96 Q V 12.583 7.8732 11.06 Q V 12.667 7.9501 11.17 Q V 12.750 8.0277 11.27 Q V 12.833 8.1060 11.38 Q V 12.917 8.1852 11.49 Q V 13.000 8.2651 11.61 Q V 13.083 8.3459 11.73 Q V 13.167 8.4275 11.85 Q V 13.250 8.5100 11.98 Q V 13.333 8.5934 12.11 Q V 13.417 8.6778 12.25 Q V 13.500 6.7632 12.40 Q V 13.583 8.8496 12.55 Q V 13.667 8.9371 12.71 Q V 13.750 9.0258 12.87 Q V 13.833 9.1157 13.05 Q V 13.917 9.2068 13.23 Q V 14.000 9.2992 13.42 Q V bw 14.083 9.3931 13.63 Q V 14.167 9.4886 13.87 Q V PM 14.250 9.5859 14.13 Q V 14.333 9.6851 14.40 Q V 60 14.417 9.7861 14.67 Q V 14.500 9.6890 14.94 Q V PM 14.583 9.9939 15.23 Q V. 14.667 10.1009 15.54 Q V. 60 14.750 10.2102 15.87 Q V. 14.833 10.3223 16.28 Q V. pq 14.917 10.4378 16.77 Q V. 15.000 10.5573 17.36 Q V 15.083 10.6815 18.03 Q V 15.167 10.8110 18.80 Q V 15.250 10.9462 19.64 Q V 15.333 11.0881 20.60 Q V 15.417 11.2350 21.32 Q V 15.500 11.3763 20.52 Q V 15.583 11.5030 18.40 Q V 15.667 11.6220 17.27 Q V 15.750 11.7473 18.19 Q V 15.833 11.8901 20.74 Q V 15.917 12.0623 25.01 Q V 16.000 12.2852 32.37 Q V 16.083 12.6268 49.59 Q. V 16.167 13.2261 87.03 Q V 16.250 13.9882 110.66 Q V pu 06/25/03 LJH-7 iw 16.333 14.5948 88.07 v 16.417 14.9389 49.97 v 16.500 15.1527 31.04 Q v 16.583 15.3194 24.20 Q V. 16.667 15.4756 22.69 Q V. 16.750 15.6193 20.85 Q V. 16.833 15.7504 19.04 Q V. 16.917 15.8708 17.48 Q v 17.000 15.9835 16.36 Q v 17.083 16.0908 15.58 Q v 17.167 16.1936 14.93 Q v 17.250 16.2924 14.35 Q v 17.333 16.3876 13.85 Q v 17.417 16.4802 13.42 Q v 17.500 16.5700 13.04 Q v 17.583 16.6574 12.70 Q v 17.667 16.7427 12.38 Q v 17.750 16.8261 12.10 Q v 17.833 16.9076 11.84 Q v 17.917 16.9874 11.59 Q v 18.000 17.0657 11.36 Q v 18.083 17.1425 11.15 Q v 18.167 17.2177 10.93 Q v 18.250 17.2914 10.70 Q v 18.333 17.3636 10.49 Q v 18.417 17.4346 10.31 Q v 18.500 17.5044 10.14 Q v 18.583 17.5733 9.99 Q v 18.667 17.6411 9.85 Q v 18.750 17.7080 9.71 Q v 18.833 17.7740 9.58 Q v 18.917 17.8391 9.46 Q v 19.000 17.9035 9.34 Q v 19.083 17.9670 9.23 Q v 19.167 18.0298 9.12 Q v 19.250 18.0919 9.01 Q v 19.333 18.1533 8.91 Q v 19.417 18.2140 8.82 Q v 19.500 18.2741 8.73 Q v 19.583 18.3336 8.64 Q v 19.667 18.3925 8.55 Q v 19.750 18.4508 8.47 Q v 19.833 18.5085 8.38 Q v 19.917 18.5657 8.31 Q v 20.000 18.6224 8.23 Q v FLOW PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE 7 ---------------------------------------------------------------------------- >>>>>STREAM NUMBER 2 ADDED TO STREAM NUMBER 1<<<<< * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 1FArTFRL L FLOW PROCESS FROM NODE 6.00 TO NODE 6.00 IS CODE = 3.1 ------------------------------ --------------------------------------------- >>>>>FLOW-THROUGH DETENTION BASIN ROUTING MODEL APPLIED TO STREAM #1<<<<< INFLOW (STREAM 1) (4-v 06/25/03 UH -8 W V effective depth ----------- T_ (and volume) V........ detention 1<-->l outflow basin ........... ----------- I \ I dead I basin outlet V storage OUTFLOW --------- (STREAM 1) ROUTE RUNOFF HYDROGRAPH FROM STREAM NUMBER 1 THROUGH A FLOW-THROUGH DETENTION BASIN SPECIFIED BASIN CONDITIONS ARE AS FOLLOWS: DEAD STORAGE(AF) 0.000 SPECIFIED DEAD STORAGE(AF) FILLED 0.000 SPECIFIED EFFECTIVE VOLUME(AF) FILLED ABOVE OUTLET 0.000 DETENTION BASIN CONSTANT LOSS RATE(CFS) = 0.00 06/25/03 LTH -9 BASIN DEPTH VERSUS OUTFLOW AND STORAGE INFORMATION: INTERVAL DEPTH OUTFLOW STORAGE NUMBER (FT) (CFS) (AF) 1 0.00 0.00 0.000 2 1.00 25.00 1.360 3 2.00 50.00 2.780 4 3.00 60.50 4.270 5 4.00 85.60 5.840 6 5.00 104.80 7.470 7 6.00 121.00 9.180 8 7.00 135.30 10.970 9 8.00 148.20 12.840 10 9.00 160.10 14.780 11 10.00 171.10 16.810 MODIFIED -PULS BASIN ROUTING MODEL RESULTS(5-MINUTE COMPUTATION INTERVALS): (Note: Computed EFFECTIVE DEPTH and VOLUME are estimated at the clock time; MEAN OUTFLOW is the average value during the unit interval.) PM CLOCK MEAN TIME DEAD -STORAGE INFLOW LOSS EFFECTIVE OUTFLOW EFFECTIVE (HRS) FILLED(AF) (CFS) (CFS) DEPTH(FT) (CFS) VOLUME(AF) MR---------------------------------------------------- ----------------------- 12.083 0.000 37.41 0.00 1.42 35.3 1.954 12.167 0.000 37.81 0.00 1.43 35.6 1.969 12.250 0.000 38.28 0.00 1.44 35.9 1.986 12.333 0.000 38.71 0.00 1.45 36.2 2.003 12.417 0.000 39.09 0.00 1.47 36.5 2.021 12.500 0.000 39.45 0.00 1.48 36.8 2.039 12.583 0.000 39.80 0.00 1.49 37.1 2.058 12.667 0.000 40.17 0.00 1.50 37.4 2.077 12.750 0.000 40.55 0.00 1.52 37.8 2.096 12.833 0.000 40.94 0.00 1.53 38.1 2.115 12.917 0.000 41.34 0.00 1.55 38.5 2.135 0-0 13.000 0.000 41.76 0.00 1.56 38.8 2.155 13.083 0.000 42.19 0.00 1.57 39.2 2.176 13.167 0.000 42.64 0.00 1.59 39.5 2.197 13.250 0.000 43.10 0.00 1.60 39.9 2.219 06/25/03 LTH -9 13.333 0.000 43.59 0.00 1.62 40.3 40.7 2.241 2.265 13.417 0.000 44.09 0.00 1.64 1.65 41.1 2.289 13.500 0.000 44.62 0.00 1.67 41.6 2.313 13.583 0.000 45.1*7 0.00 0.00 1.69 42.0 2.339 pa 13.667 0.000 0.000 45.74 46.34 0.00 1.71 42.5 2.366 im 13.750 13.833 0.000 46.96 0.00 1.73 42.9 2.393 13.917 0.000 47.62 0.00 1.75 43.4 2.422 2.452 14.000 0.000 48.31 0.00 1.77 44.0 44.5 2.483 14.083 0.000 49.06 0.00 0.00 1.79 1.81 45.1 2.517 14.167 0.000 0.000 49.92 50.89 0.00 1.84 45.7 2.553 po 14.250 14.333 0.000 51.86 0.00 1.87 46.3 2.591 14.417 0.000 52.81 0.00 1.89 47.0 2.631 2.672 14.500 0.000 53.80 0.00 1.92 47.7 2.716 14.583 0.000 54.87 0.00 1.96 48.5 49.3 2.764 14.667 0.000 56.17 0.00 1.99 2.03 50.0 2.818 14.750 0.000 57.90 60.20 0.00 0.00 2.07 50.5 2.885 14.833 0.000 0.000 63.01 0.00 2.13 51.0 2.967 14.917 15.000 0.000 66.23 0.00 2.19 51.7 3.068 15.083 0.000 69.82 0.00 2.27 52.4 3.167 3.328 60 15.167 0.000 73.82 0.00 2.37 53.4 54.4 3.492 15.250 0.000 78.28 0.00 2.48 2.61 55.7 3.682 PM 15.333 0.000 83.30 0.00 0.00 2.74 57.1 3.889 vo 15.417 0.000 0.000 87.01 82.07 0.00 2.85 58.4 4.052 15.500 15.583 0.000 70.12 0.00 2.90 59.2 4.127 On 15.667 0.000 64.92 0.00 2.93 59.6 4.163 4.237 15.750 0.000 70.65 0.00 2.98 60.0 61.4 4.398 imm 15.833 0.000 84.84 0.00 3.08 3.27 64.9 4.694 15.917 0.000 107.92 0.00 0.00 3.60 71.5 5.219 16.000 0.000 147.71 0.00 4.29 83.4 6.314 16.083 0.000 0.000 242.34 448.10 0.00 5.71 103.7 6.685 16.167 16.250 0.000 566.19 0.00 7.39 128.3 11.701 16.333 0.000 414.95 0.00 8.37 146.4 13.550 13.996 60 16.417 0.000 218.72 0.00 8.60 8.50 153.9 154.7 13.803 16.500 0.000 126.67 0.00 0.00 8.31 153.0 13.438 P" 16.583 0.000 0.000 99.93 92.37 0.00 8.10 150.6 13.036 16.667 16.750 0.000 82.71 0.00 7.86 147.9 12.587 60 16.833 0.000 73.11 0.00 7.60 144.8 12.094 11.570 16.917 0.000 65.22 0.00 7.32 7.03 141.2 137.6 11.035 17.000 0.000 59.83 0.00 0.00 6.74 133.7 10.501 17.083 0.000 0.000 56.24 53.62 0.00 6.45 129.5 9.979 17.167 17.250 0.000 51.46 0.00 6.16 125.4 9.470 -40 17.333 0.000 49.64 0.00 5.88 121.2 8.977 8.504 W 17.417 0.000 48.09 0.00 5.60 5.34 116.8 112.5 8.051 17.500 0.000 46.74 0.00 0.00 5.09 108.3 7.619 40 17.583 0.000 0.000 45.52 44.41 0.00 4.84 104.0 7.209 io 17.667 17.750 0.000 43.40 0.00 4.60 99.5 6.823 6.461 17.833 0.000 42.46 0.00 4.38 4.17 95.0 90.9 6.121 17.917 0.000 41.59 0.00 0.00 3.98 87.0 5.803 om 18.000 0.000 40.78 0.00 3.79 82.7 5.509 18.083 0.000 40.00 39.20 0.00 3.62 78.2 5.241 18.167 0.000 0.000 38.37 0.00 3.46 74.1 4.995 18.250 0.000 37.63 0.00 3.32 70.3 4.770 18.333 18.417 0.000 36.99 0.00 3.19 66.9 63.7 4.564 4.376 18.500 0.000 36.41 0.00 3.07 2.95 61.1 4.203 18.583 0.000 35.87 0.00 UH -10 PM 06/25/03 *USER SPECIFIED PRECIPITATION DEPTH -AREA REDUCTION FACTORS: 5 -MINUTE FACTOR = 0.990 30 -MINUTE FACTOR = 0.990 J -HOUR FACTOR = 0.990 3 -HOUR FACTOR = 1.000 6 -HOUR FACTOR = 1.000 24-HOUR FACTOR = 1.000 UNIT HYDROGRAPH TIME UNIT 5.000 MINUTES UNIT INTERVAL PERCENTAGE OF LAG -TIME = 36-232 6 RUNOFF HYDROGRAPH LISTING LIMITS: MODEL TIME(HOURS) FOR BEGINNING OF RESULTS = 12.00 p" 06/25/03 LTH- 11 T 69 40 18.667 0.000 35.36 0.00 2.84 59.4 58.3 4.037 3.875 im 18.750 0.000 34.87 0.00 0.00 2.74 2.63 57.2 3.719 18.833 0.000 34.41 0.000 33.96 0.00 2.53 56.1 3.566 40 18.917 19.000 0.000 33.54 0.00 2.43 55.0 3.418 19.083 0.000 33.13 0.00 2.33 54.0 3.275 19.167 0.000 32.74 0.00 2.24 53.0 3.135 19.250 0.000 32.37 0.00 2.15 52.0 3.000 19.333 0.000 32.01 0.00 2.06 51.1 2.869 2.742 19.417 0.000 31.67 0.00 1.97 1.89 50.0 48.3 2.626 19.500 0.000 31.33 0.00 0.00 1.82 46.4 2.520 19.583 0.000 31.01 0.000 30.70 0.00 1.75 44.6 2.424 19.667 19.750 0.000 30.40 0.00 1.69 43.0 2.338 19.833 0.000 30.11 0.00 1.63 41.5 2.259 19.917 0.000 29.83 0.00 1.58 40.2 2.188 ---------------------------------------------------------------------------- PROCESS SUMMARY OF STORAGE: INFLOW VOLUME = 80.342 AF 0.000 AF (WITH AF INITIALLY FILLED) BASIN STORAGE = 0.000 OUTFLOW VOLUME = 80.342 AF LOSS VOLUME = 0.000 AF FLOW PROCESS FROM NODE 10.00 TO NODE 13.00 IS CODE -- -- ---- ----- -- ---- - ------------ ------------------------------ >>>>>SUBAREA RUNOFF (UNIT-HYDROGRAPH ANALYSIS)<<<<< (UNIT-HYDROGRAPH ADDED TO rSTR=EAM#3) WATERSHED AREA = 28.900 ACRES iw BASEFLOW = 0.000 CFS/SQUARE-MILE *USER ENTERED "LAG" TIME = 0.230 HOURS pa CAUTION: LAG TIME IS LESS THAN 0.50 HOURS. (USED IN THIS COMPUTER PROGRAM) THE 5 -MINUTE PERIOD UH MODEL iw MAY BE TOO LARGE FOR PEAK FLOW ESTIMATES. VALLEY(DEVELOPED) S -GRAPH SELECTED MAxIMUM WATERSHED LOSS RATE(INCH/HOUR) = 0.457 LOW LOSS FRACTION = 0.624 kw *HYDROGRAPH MODEL #1 SPECIFIED* SPECIFIED PEAK 5 -MINUTES RAINFALL(INCH)= 0.58 SPECIFIED PEAK 30 -MINUTES RAINFALL(INCH)= 1.19 SPECIFIED PEAK 1 -HOUR RAINFALL(INCH) = 1.57 SPECIFIED PEAK 3 -HOUR RAINFALL(INCH) = 3.03 SPECIFIED PEAK 6 -HOUR RAINFALL(INCH) = 4.60 SPECIFIED PEAK 24-HOUR RAINFALL(INCH) = 10-50 *USER SPECIFIED PRECIPITATION DEPTH -AREA REDUCTION FACTORS: 5 -MINUTE FACTOR = 0.990 30 -MINUTE FACTOR = 0.990 J -HOUR FACTOR = 0.990 3 -HOUR FACTOR = 1.000 6 -HOUR FACTOR = 1.000 24-HOUR FACTOR = 1.000 UNIT HYDROGRAPH TIME UNIT 5.000 MINUTES UNIT INTERVAL PERCENTAGE OF LAG -TIME = 36-232 6 RUNOFF HYDROGRAPH LISTING LIMITS: MODEL TIME(HOURS) FOR BEGINNING OF RESULTS = 12.00 p" 06/25/03 LTH- 11 T 69 06/25/03 LJH-12 MODEL TIME(HOURS) FOR END OF RESULTS = 20.00 UNIT HYDROGRAPH DETERMINATION -------------------------------------------- -------- ---------------------- INTERVAL "S" GRAPH UNIT HYDROGRAPH pis NUMBER MEAN VALUES ORDINATES(CFS) 60 ------------------------------- 1 -------------------------------------------- 2.466 8.619 2 16.085 47.601 !pm 3 41.283 88.067 4 69.788 99.630 60 5 86.806 59.478 6 94.520 26.962 7 97.754 11.304 8 98.689 3.267 9 99.338 2.268 10 99.735 1.389 fm 11 99.934 0.694 bw 12 100.000 0.231 PM------------------------------ --------------------------------------------- . &W TOTAL SOIL -LOSS VOLUME(ACRE-FEET) = 14.3992 TOTAL STORM RUNOFF VOLUME(ACRE-FEET) 10.8826 ---------------------- MR ------- --------------------------------------------- 60 pa 06/25/03 LJH-12 0 40 PM Pft bw 0 0 M M 2 4 - H 0 U R S T 0 R M R U N 0 F F H Y D R 0 G R A P H 06/25/03 UH -13 HYDROGRAPH IN FIVE-MINUTE UNIT INTERVALS(CFS) (Note: Time indicated is at END of Each Unit Intervals) ----------------------------------------------------------------- TIME(HRS) VOLUME(AF) Q(CFS) 0. 20.0 40.0 60.0 80.0 ---------------------------------------------------------------------------- 12.000 3.4557 4.85 Q V 12.083 3.4894 4.89 Q V 12.167 3.5234 4.94 Q V 12.250 3.5578 4.99 Q V 12.333 3.5926 5.05 Q V 12.417 3.6277 5.10 Q V 12.500 3.6632 5.15 Q V 12.583 3.6990 5.20 Q V 12.667 3.7352 5.25 Q V 12.750 3.7716 5.30 Q V 12.833 3.8084 5.35 Q V 12.917 3.8456 5.40 Q V 13.000 3.8832 5.45 Q V 13.083 3.9211 5.51 Q V 13.167 3.9594 5.57 Q V 13.250 3.9982 5.63 Q V 13.333 4.0373 5.69 Q V 13.417 4.0770 5.75 Q V 13.500 4.1170 5.82 Q V 13.583 4.1576 5.89 Q V 13.667 4.1987 5.96 Q V 13.750 4.2403 6.04 Q V 13.833 4.2824 6.12 Q V 13.917 4.3251 6.20 Q V 14.000 4.3685 6.29 Q V 14.083 4.4124 6.39 Q V 14.167 4.4572 6.49 Q V 14.250 4.5027 6.61 Q V 14.333 4.5491 6.74 Q V 14.417 4.5963 6.86 Q V 14.500 4.6445 6.99 Q V 14.583 4.6935 7.12 Q V 14.667 4.7435 7.26 Q V 14.750 4.7946 7.41 Q V 14.833 4.8468 7.58 Q V 14.917 4.9004 7.78 Q V 15.000 4.9560 8.08 Q V 15.083 5.0145 8.49 Q V 15.167 5.0768 9.05 Q V 15.250 5.1436 9.69 Q V 15.333 5.2155 10.45 Q V. 15.417 5.2921 11.11 Q V. 15.500 5.3682 11.05 Q V. 15.583 5.4380 10.14 Q V. 15.667 5.5004 9.05 Q V 15.750 5.5625 9.02 Q V 15.833 5.6337 10.34 Q V 15.917 5.7238 13.08 Q V 16.000 5.8491 18.18 Q. V 16.083 6.0525 29.54 Q V 16.167 6.4217 53.60 V Q 16.250 6.9271 73.36 V Q 06/25/03 UH -13 16.333 7.4352 73.78 V 16.417 7.7725 48.97 Q V 16.500 7.9698 28.65 V. 16.583 8.0972 18.49 Q V. 16.667 8.1921 13.79 Q V 16.750 8.2765 12.25 Q V 16.833 8.3499 10.66 Q V 16.917 8.4139 9.29 Q V 17.000 8.4708 8.26 Q V 17.083 8.5233 7.62 Q V 17.167 8.5732 7.25 Q V 17.250 8.6210 6.94 Q V OR 17.333 8.6670 6.68 Q V 17.417 8.7114 6.45 Q V 17.500 8.7544 6.25 Q V 17.583 8.7963 6.08 Q V 17.667 8.8371 5.93 Q V 17.750 8.8770 5.78 Q V 17.833 8.9159 5.65 Q V 17.917 8.9540 5.53 Q V 18.000 8.9914 5.42 Q V VW 18.083 9.0280 5.32 Q V 18.167 9.0639 5.21 Q V 18.250 9.0990 5.11 Q V �00 18.333 9.1335 5.00 Q V 18.417 9.1673 4.91 Q V 18.500 9.2006 4.83 Q V 18.583 9.2333 4.76 Q V 18.667 9.2656 4.69 Q V 18.750 9.2974 4.62 Q V 18.633 9.3288 4.56 Q V 18.917 9.3598 4.50 Q V 00 19.000 9.3903 4.44 Q V ikw 19.083 9.4205 4.38 Q V 19.167 9.4504 4.33 Q V 19.250 9.4799 4.28 Q V 19.333 9.5090 4.23 Q V 19.417 9.5378 4.19 Q V 19.500 9.5664 4.14 Q V 19.583 9.5946 4.10 Q V 19.667 9.6225 4.06 Q V 19.750 9.6502 4.02 Q V 19.833 9.6776 3.98 Q V 19.917 9.7047 3.94 Q V 20.000 9.7316 3.90 Q V FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE 3.1 WC ----------------- --------- ----- ------- ----- ------- -- ------ ------- >>>>>FLOW-THROUGH DETENTION BASIN ROUTING MODEL APPLIED TO STREAM #3<<<<< INFLOW (STREAM 3) V depth ----------- -effective (and volume) V........ detention 1<-->l outflow basin I I ........... ----------- a* 06/25/03 UH -14 0 I I dead basin outlet V storage OUTFLOW --------- (STREAM 3) 4" 1w ROUTE RUNOFF HYDROGRAPH FROM STREAM NUMBER 3 NO THROUGH A FLOW-THROUGH DETENTION BASIN SPECIFIED BASIN CONDITIONS ARE AS FOLLOWS: DEAD STORAGE(AF) = 0.000 SPECIFIED DEAD STORAGE(AF) FILLED 0.000 SPECIFIED EFFECTIVE VOLUME(AF) FILLED ABOVE OUTLET 0.000 DETENTION BASIN CONSTANT LOSS RATE(CFS) 0.00 &M an BASIN DEPTH VERSUS OUTFLOW AND STORAGE INFORMATION: to INTERVAL DEPTH OUTFLOW STORAGE DEAD -STORAGE NUMBER (FT) (CFS) (AF) PM 1 0.00 0.00 0.000 (Aw 2 1.00 4.00 1.330 12.250 3 2.00 4.60 2.700 0.000 4 3.00 6.00 4.200 fm 5 4.00 7.00 5.700 iw 6 5.00 8.00 7.340 12.667 7 6.00 8.90 9.030 On bw OM %w -MR am MODIFIED -PULS BASIN ROUTING MODEL RESULTS(S-MINUTE COMPUTATION INTERVALS): (Note: Computed EFFECTIVE DEPTH and VOLUME are estimated at the clock time; MEAN OUTFLOW is the average value during the unit interval.) CLOCK MEAN EFFECTIVE TIME DEAD -STORAGE INFLOW LOSS (HRS) FILLED(AF) (CFS) (CFS) ----------------------------------------------- 12.083 0.000 4.89 0.00 12.167 0.000 4.94 0.00 12.250 0.000 4.99 0.00 12.333 0.000 5.05 0.00 12.417 0.000 5.10 0.00 12.500 0.000 5.15 0.00 12.583 0.000 5.20 0.00 12.667 0.000 5.25 0.00 12.750 0.000 5.30 0.00 12.833 0.000 5.35 0.00 12.917 0.000 5.40 0.00 13.000 0.000 5.45 0.00 13.083 0.000 5.51 0.00 13.167 0.000 5.57 0.00 13.250 0.000 5.63 0.00 13.333 0.000 5.69 0.00 13.417 0.000 5.75 0.00 13.500 0.000 5.82 0.00 13.583 0.000 5.89 0.00 13.667 0.000 5.96 0.00 13.750 0.000 6.04 0.00 13.833 0.000 6.12 0.00 13.917 0.000 6.20 0.00 14.000 0.000 6.29 0.00 14.083 0.000 6.39 0.00 14.167 0.000 6.49 0.00 06/25/03 LJH- 15 MEAN EFFECTIVE OUTFLOW EFFECTIVE DEPTH(FT) (CFS) VOLUME(AF) ---------------------------- 0.95 3.8 1.261 0.95 3.8 1.269 0.96 3.8 1.277 0.97 3.9 1.285 0.9 7 3.9 1.294 0.98 3.9 1.302 0.99 3.9 1.311 0.99 4.0 1.320 1.00 4.0 1.329 1.01 4.0 1.338 1.01 4.0 1.348 1.02 4.0 1.356 1.03 4.0 1.368 1.04 4.0 1.379 1.04 4.0 1.390 1.05 4.0 1.401 1.06 4.0 1.413 1.07 4.0 1.425 1.08 4.0 1.438 1.09 4.1 1.451 1.10 4.1 1.465 1.11 4.1 1.479 1.12 4.1 1.494 1.13 4.1 1.509 1.14 4.1 1.525 1.15 4.1 1.541 06/25/03 LJH- 15 4w di No 14.250 0.000 6.61 0.00 1.17 4.1 1.559 im 14.333 0.000 6.74 0.00 1.18 4.1 1.577 14.417 0.000 6.86 0.00 1.19 4.1 1.596 14.500 0.000 6.99 0.00 1.21 4.1 1.615 ow 14.583 0.000 7.12 0.00 1.22 4.1 1.636 14.667 0.000 7.26 0.00 1.24 4.1 1.658 to 14.750 0.000 7.41 0.00 1.26 4.1 1.680 14.833 0.000 7.58 0.00 1.27 4.2 1.704 OM 14.917 0.000 7.78 0.00 1.29 4.2 1.729 15.000 0.000 8.08 0.00 1.31 4.2 1.755 60 15.083 0.000 8.49 0.00 1.33 4.2 1.785 15.167 0.000 9.05 0.00 1.36 4.2 1.818 fpm 15.250 0.000 9.69 0.00 1.38 4.2 1.856 taw 15.333 0.000 10.45 0.00 1.42 4.2 1.899 15.417 0.000 11.11 0.00 1.45 4.3 1.946 15.500 0.000 11.05 0.00 1.48 4.3 1.993 OM 15.583 0.000 10.14 0.00 1.51 4.3 2.033 15.667 0.000 9.05 0.00 1.54 4.3 2.065 law 15.750 0.000 9.02 0.00 1.56 4.3 2.098 15.633 0.000 10.34 0.00 1.59 4.3 2.139 oft 15.917 0.000 13.08 0.00 1.63 4.4 2.199 im 16.000 0.000 18.18 0.00 1.70 4.4 2.294 16.083 0.000 29.54 0.00 1.83 4.5 2.467 16.167 0.000 53.60 0.00 2.07 4.6 2.804 om 16.250 0.000 73.38 0.00 2.38 4.9 3.276 aw 16.333 0.000 73.78 0.00 2.70 5.4 3.747 16.417 0.000 48.97 0.00 2.90 5.7 4.045 16.500 0.000 28.65 0.00 3.00 5.9 4.201 16.583 0.000 18.49 0.00 3.06 6.0 4.287 kAw 16.667 0.000 13.79 0.00 3.09 6.1 4.340 16.750 0.000 12.25 0.00 3.12 6.1 4.383 16.833 0.000 10.66 0.00 3.14 6.1 4.414 am 16.917 0.000 9.29 0.00 3.16 6.1 4.435 60 17.000 0.000 8.26 0.00 3.17 6.2 4.450 17.083 0.000 7.62 0.00 3.17 6.2 4.460 17.167 0.000 7.25 0,00 3.18 6.2 4.467 po 17.250 0.000 6.94 0.00 3.18 6.2 4.473 17.333 0.000 6.68 0.00 3.18 6.2 4.476 17.417 0.000 6.45 0.00 3.19 6.2 4.478 17.500 0.000 6.25 0.00 3.19 6.2 4.478 17.583 0.000 6.08 0.00 3.19 6.2 4.478 17.667 0.000 5.93 0.00 3.18 6.2 4.476 17.750 0.000 5.78 0.00 3.18 6.2 4.473 17.833 0.000 5.65 0.00 3.18 6.2 4.469 17.917 0.000 5.53 0.00 3.18 6.2 4.465 18.000 0.000 5.42 0.00 3.17 6.2 4.460 18.083 0.000 5.32 0.00 3.17 6.2 4.454 18.167 0.000 5.21 0.00 3.16 6.2 4.447 18.250 0.000 5.11 0.00 3.16 6.2 4.440 18.333 0.000 5.00 0.00 3.15 6.2 4.432 18.417 0.000 4.91 0.00 3.15 6.2 4.423 18.500 0.000 4.83 0.00 3.14 6.1 4.414 18.583 0.000 4.76 0.00 3.14 6.1 4.405 18.667 0.000 4.69 0.00 3.13 6.1 4.395 18.750 0.000 4.62 0.00 3.12 6.1 4.385 40 18.833 0.000 4.56 0.00 3.12 6.1 4.374 18.917 0.000 4.50 0.00 3.11 6.1 4.363 di 19.000 0.000 4.44 0.00 3.10 6.1 4.351 19.083 0.000 4.38 0.00 3.09 6.1 4.339 40 19.167 0.000 4.33 0.00 3.08 6.1 4.327 19.250 0.000 4.28 0.00 3.08 6.1 4.315 19.333 0.000 4.23 0.00 3.07 6.1 4.302 19.417 0.000 4.19 0.00 3.06 6.1 4.289 19.500 0.000 4.14 0.00 3.05 6.1 4.276 06/25/03 UH -16 is wev Ljc.rrG A4 r -A 0 M SK(A15- 19.583 0.000 4.10 0.00 3.04 6.0 4.263 6.0 4.249 19.667 0.000 4.06 0.00 3.03 0.00 3.02 6.0 4.235 19.750 0.000 0.000 4.02 3.98 0.00 3.01 6.0 4.221 40 19.833 19.917 0.000 3.94 0.00 3.00 6.0 4.207 -------------------------------- to------------------------------------------- PROCESS SUMMARY OF STORAGE: INFLOW VOLUME = 10.883 AF 0.000 AF INITIALLY FILLED) AF (WITH 40 BASIN STORAGE = 0.000 OUTFLOW VOLUME = 10.883 AF LOSS VOLUME = 0.000 AF FLOW PROCESS FROM NODE 13.00 TO NODE 6.00 IS CODE 7 -------- ------------------------------------------------------------------- >>>>>STREAM NUMBER 3 ADDED TO STREAM NUMBER 1<<<<< FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE ------------ - -- ------------------------------------------ ---- -- ---- >>>>>VIEW STREAM NUMBER 1 HYDROGRAPH<<<<< STREAM HYDROGRAPH IN FIVE-MINUTE UNIT INTERVALS(CFS) (Note: Time indicated is at END of Each Unit Intervals) ------------- -- - -- --- -- ---- ---- ---------- -------- -------------------- TIME(HRS) VOLUME(AF) Q(CFS) 0. 50.0 100.0 150.0 200.0 - ---------------------- ----------------------------------------------------- 12.000 26.7269 38.84 Q V 60 12.083 26.9963 39.11 Q V 12.167 27.2676 39.39 Q V 12.250 27.5410 39.70 Q V 12.333 27.8166 40.02 Q V 12.417 28.0945 40.36 Q V 12.500 28.3749 40.70 Q V 12.583 28.6576 41.05 Q V bw 12.667 28.9428 41.41 Q V 12.750 29.2304 41.77 Q V 12.833 29.5205 42.12 Q V 12.917 29.8130 42.47 Q V 13.000 30.1080 42.83 Q V 13.083 30.4054 43.19 Q V 13.167 30.7055 43.57 Q V 13.250 31.0082 43.95 Q V 13.333 31.3136 44.35 Q V 13.417 31.6219 44.76 Q V 13.500 31.9330 45.18 Q. V __40 13.583 32.2471 45.61 Q. V 60 13.667 32.5643 46.06 Q V 13.750 32.8848 46.53 Q V 13.833 33.2085 47.01 Q V 13.917 33.5358 47.51 Q V 14.000 33.8666 48.04 Q V 14.083 34.2012 48.58 Q. V 14.167 34.5398 49.16 Q V 14.250 34.8826 49.78 Q V 14.333 35.2299 50.44 Q V 14.417 35.5821 51.13 Q V 14.500 35.9392 51.86 Q V 14.583 36.3016 52.62 Q V 14.667 36.6696 53.43 Q V 14.750 37.0425 54.14 Q V 14.833 37.4190 S4.66 Q V UH -17 06/25/03 is wev Ljc.rrG A4 r -A 0 M SK(A15- 40 40 a 14.917 15.000 15.083 15.167 15.250 15.333 15.417 15.500 15.583 15.667 15.750 15.833 15.917 16.000 16.083 16.167 16.250 16.333 16.417 16.500 37.7991 38.1838 38.5739 38.9704 39.3744 39.7871 40.2096 40.6412 41.0787 41.5190 41.9621 42.4149 42.8921 43.4147 44.0200 44.7661 45.6838 46.7293 47.8287 48.9350 55.20 55.85 56.64 57.57 58.66 59.93 61.35 62.67 63.53 63.93 64.34 65.75 69.28 75.88 87.89 108.34 133.24 151.81 159 1160. 3 Q v Q v Q v Q v Q v Q v Q v Q v Q v Q v Q v Q v Q v Q V. Q V. V.Q v v v v Q Q Q Q 16.583----S =-1 'T59 -U2 v Q 16.667 51.1094 156.71 v Q 16.750 52.1703 154.04 v Q 16.833 53.2094 150.89 v Q 16.917 54.2246 147.40 v Q. 17.000 55.2146 143.75 v Q 17.083 56.1776 139.82 V Q 17.167 57.1118 135.65 V Q 17.250 58.0176 131.53 VQ 17.333 58.8949 127.38 Q 17.417 59.7422 123.02 Q V 17.500 60.5592 118.64 Q V 17.583 61.3474 114.45 Q v 17.667 62.1061 110.15 Q v v 17.750 62.8336 105.64 Q 17.833 63.5308 101.23 Q v 17.917 64.1994 97.09 Q. v imp 18.000 64.8408 93.14 Q v v 18.083 65.4526 88.83 Q v 18.167 66.0334 84.33 Q V. 18.250 66.5859 80.22 Q V. bw 18.333 6-7.1124 76.45 Q V. 18.417 67.6152 73.00 Q V. 18.500 68.0963 69.85 Q v om 18.583 68.5595 67.25 Q v 18.667 69.0111 65.57 Q v 18.750 69.4547 64.41 Q v 18.833 69.8906 63.29 Q v 18.917 70.3189 62.19 Q v 19.000 70.7399 61.13 Q v 19.083 71.1537 60.09 Q v M 19.167 71.5606 59-08 Q v 19.250 71.9608 58.11 Q v 0 19.333 72.3545 57.16 Q v 19.417 72.7405 56.05 Q v 40 19.500 73.1149 54.36 Q v 19.583 73.4757 52.40 Q v iw 19.667 73.8243 50.62 Q v 19.750 74.1618 49.00 Q. v W 19.833 74.4892 47.54 Q. v 19.917 74.8075 46.21 Q. v 20.000 75.1174 45.00 Q END OF FLOODSCX ROUTING ANALYSIS UH -18 06/25/03 P64 r- 0%ATFL-0k-- Ftar**' 8,D'rff &4ftAJ.S' V'v NV No "'A 1, '1 Z_ Mail mail ) , - -- �n� - I �_, . . 1.1, N" eA% + J, ai 7 1 1. ------- - --- Y-f rj .V r um 4" 5", K P. T 4 T 1 1.+ 44� It Di _�u Jr, 4 `7 1577 A A, A A Lz lu L I I r A" ILI I'll I LI_ --- - --- 16 ra I 77--, L> Is ------- 1 .42 IJ Al if !4 W_ ILI =p '14 11 4 A , f%V SAN BERNARDINO COUNTY HYDROLOGY MANUAL INDEX MAP I OIL !'A JV - :-7; A Aln IT ------------ z, A A J 7* A - t7 - ­�-` V LEGEND SOIL GROUP BOUNDARY A SOIL GROUP DESIGNATION SCALE 1,48POO BOUNDARY OF INDICATED SOURCE SCALE REDUCED BY 1/2 Hyn ni o ir -qt-)ii _q n, OH MAP FOR SOUTHWEST -A AREA C-1 C-2 SAN BERNARDINO COUNTY c C-4 INDEX MAP I OIL !'A JV - :-7; A Aln IT ------------ z, A A J 7* A - t7 - ­�-` V LEGEND SOIL GROUP BOUNDARY A SOIL GROUP DESIGNATION SCALE 1,48POO BOUNDARY OF INDICATED SOURCE SCALE REDUCED BY 1/2 Hyn ni o ir -qt-)ii _q n, OH MAP FOR SOUTHWEST -A AREA WILLA R2E R7W 4w 1142W _a1w RIE T T,-1 T_ _T A- 1- 4-- - 'EST MIT Q, 01, T_ f—f 9 .0 z - RAT', ESN' -6 15 /,00" 1.2 T 3? .9 2 _2 " T 4 54 f I_ '2.2 4 A 4 L RDI 1) 4 E111.1i T L 34.,ST -4 1A IRE 2.6 i -V -4 Ot 4— _4 j "y Al Jr DAM 7 1 N 2.0 1.0 Tj (IV -It L AOL A Nil T k. zf'l AN IMA P 61 N D NT _77— FONTANA— LAA_-F-J-�;o_l A 1. 10 TIS s REDLANDS 24 D' ILI AS YUCA P, 611"T TIFITIE CHINO UNIT 21 RIE R2E + RIVINSID9 4m T2S ERSI E t R3 2w I w R W SAN KRNAMNO CONTY I -j I— t OL OISTRICT F T -R5W 0 IFLOOD OfiTROL,' REDUCED DRAWING VALLEY AREA SAI 111IONYETALS �,s T SCALE 1" 4 MILES X, - 2 YEAR 6 HOUR IASUI ON IJADJI:� KGAA ffLAS 2. WS C A -4 SAN BERNARDINO COUNTY Appr4mm w FLOOD cammoff nmmm R7W- R6W HYDROLOGY MANUAL 0 ISOLINES PRECIPITATION (INCHES) mu I OL 0_1 R2E RIE 4N ­NNI6.1 7.0, W -_ R! +- f 4 w 4- R I W T _T i L IL 41 _14 r __r r _r" �14 MIT SAN TONIO' 12 4 st ol-4- 7.0 -I LITT �Allllllla 07.11 -f ItNL IN L —1 wr N 4 3 'r A. 5.? T_ F_ 7 --j �14 2 L I I I \4 R2E RIE 4N ­NNI6.1 7.0, If IL 41 _14 4' MIT SAN TONIO' 4 ol-4- 7.0 -f ItNL IN L —1 wr N A. 5.? --j �14 -4- — -4 - 4, XI -4 4-- - c TIN 0 J 4.5 soft or IN -4- - S P LA NO 11� N RIAL r + 4---- FONTANA— TIS TAIl COLT 7,*T I -AL Zg� RIDLANDS '\I. a zi� r All Till c TUC .0 7T— CHINO 4* I I E R2E Ill 1, coufq -Do T2S d- 2.5 I s -4- J 4- t, Z.0 �rw IRI 3.0 In R R2w SAN BERNARDINO C t f t -! -- I FLOOD CONTE L 0136 T I - 5W REDUCED DRAWING VALLEY AREA ADD IFIL a CONTIOL SCALE Ill= 4 MILES NIOHYETAL3 DAM COUNTY 2 YEAR 24 HOUR 9ASM ON Ul M" WL" a. W& s AN BERNARDINO -4. C A 30 :7 Pum I R8W R6 i HYDROLOGY MANUAL .0 ISOLINES PRECIPITATION (INCHES) Wal I m 200 a 0 — I r% 9-11-1 IrI � I , � 1 __t, + _4 W 5W Il< w RIE R2E I R6 4 W 5" k R W�: R R2 RIW 30 T4N HE T T T _T -T.3 T,— 7 4- -4 0% rI.4 I WEST IT -S: T—, T_ —;o 12 p LESN 7_17- 4— T-- Tk T T3N —I — — — — --- I/T .9 k (4 L -i 41 eL 4- 4 V, ;7,N.O f T \� - *, t F 4 L. ....-MEAD V� 1.0 R —4 tt -44 — T2N — V TL L M L IN -jr34 s-*,5T?N 4- 0 L LA99 14 14. 14 IT N -4 L4, LQ FLXT TA L 7"y z ON L T —1 7 DA. I N .9 L I -4� SLITS' _j 0 N RNAF LOW 'Pt, 2, SAN 71 6PL;kND 4, E kAD 4 - RIALTO —7 _4- FONT ..S.\ I RGON,O !CUrAM "A _94 AL I -IS 0 e� TIS ....... TON L01i 'INGA T At, CRE t - Soo, ow y IPA T, SNANP TEATS I RIVER lk, T r C141NO 4, KIE 45 SAN 1 BERN R7E 1.'I 34-00 A� - t I A ....... a RIV4PSIDE, COUNIT f X/ T2S I R S I D E /R I ....... R4W R 3 R2W SAN BERNARDINO COL14TY t t t FLOOD CONTROL DISTRICT R5w- VALLEY ARFA ADO IF CONTROL REDUCED DRAWING ASIN .-' '__ 11"= 4 MILES ISONYETALS T3S SCALE Yio 10 YEAR I HOUR �Z_ �_kwi I R w T 4 IS—.' IT N' M DAUM ON U.&OZ., NOAAL ArLAS 2, W3 YA .150 SAN BERNARDINO COUNTY JW*fv4w NY Luvu Ijun I KUL r crVIVINCILM " d� OAS A In -.., HYDROLOGY MANUAL NO. I%R 8 W I R7W A R 6 ISOLINES PRECIPITATION (INCHES) DATE WALE I FLE ............................. 1962 r-211111. 11"1100*1 IM3 of 12 FIrvI1RF R—A L4 1.6 4 1. R8 R7W �6%f R5W nw- I 4W T4N RIW RIE R2E f T4N T .2- o/ of 4- t T T o 7-- t A, I LD IN Y) 4' 7' U 32w L 13-*,sT?N L + I. ... mr L 16T T —L KK AKE Is -4 1.4 -'T- I -IT 1-4 L' T" -4 e i_�j A 7-- 4 1 — — w. F.- *t- IF Lxfs L -T I N 'FOP DAM T TF -i 14 - A-, A _T 0 t -T —4 4_ i SAN RNAR ro T UPL PIN I 461110 L' 17 -4 + INAS. ONTANX 4—r F, S O�L fII TnIj III I A I REDLA ji s TT T_ A2 A":" 1 4 —1.2 a" an 4 ORA" TERRICE CH;40 -7 4- 45 0000,11r,", ------------ -0 T2S 10 f3l*oo I ERSIDE T 4 ....... R4W R3 R2 SAN KR INO COLWY "TOWL DISTRICT FLOOO CON �A R5 00 VALLEYAREA A I IF 0 CONTROL S'N REDUCED DRAWING T3S 1110HYETALS D. SCALE I"= 4 MILES -1100 YEAR I HOUR lljt. Ywo J# SAM 0#4 UADf- KOAA. ArUIIS a. On A Approm sy A.* SAN BERNARDINO COUNTY T A 8 w w HYDROLOGY MANUAL JVIKAL As .............................. C, 18 ISOLINFES PRECIPITATION (INCHES) WE I. WAS Ir !a I OWL on low r -am B-12 FIGURE B-4 R R2E 45 VWW R7W !W I T4N -T T . . ....... 3.0 T 2 7- \N. -I 4 -1 .91 9. 64MAINII—I 777"77IT"i 1 4.0 T- -5.0 -45 7-!� -T- —1 —4 ;�� —! -T T-- \ MAT' E f-71 -4 1- -6.5 2. T 2 �1,21 1 22 4.5. T 6. 1 0 - 4- /L 90 6.5 DFIN L INI) ENWI ?N 2N 7 (CUCAMONGA I— A --4 A a i . - I &A � P i — 10 .1 7— + 4 45 4 + 71 .4 IFLAIS A F &W r I!T A AL TA SAM RNAROlro 7-T 1 1`1 ..... AI, I I �L%ND; -T ---- T- ir — --t + : — - A 11- FON Tki �;-- WASH 4- 4- L TIS t TARM:;l DLANDS -4 J v df 1 7 1 1000 SPAIII TEAT :4 CHINO T- 2 E 4 1 �E, milmoloir C"T T2S f E I ER ID -T- R4W R2... 0 SAN KRNARDINO COA" t f t -1 1-7 -T -f I- t FLOOO CONTROL DISTRICT -R5W MACKI VALLEY AREA LOCO CONTROL REDUCED D SIN RAWING WHYETALS T3S T CALE I"= 4 MILES X3 - 100 YEAR 6 HOUR r A. 'T S SON ON IWASIC, MAIL ALM t. WrX SAN BERNARDINO COUNTY C IIA 1, 1130 . onom w -4 RSW R R6W i HYDROLOGY MANUAL C4-0 ISMINES PIMCIPITATION (10CHU) DIM I WALK UK pkgms B-13 FirollPF R- .......... .... %ALLEY f I OLi f I I I I I R w R7 1�� ­ 1 R5 4W 4 W 17115 1 4 O� R1W 2 E T4N -A 5 A—A X- >R T 4.o L 7- ST 4,5+ 6.0 h T- F- F 5.0 - -0" - --+. 1-2 RAVLESTE 1 0 I ' T -k-- 14 -a - .-e .9 .0 T 4-1 4 ro IL T —i 1 0 SAN N ce 1A. L. ANNO L WirN L.. M'PrC LYTL ENW1 134*f5T?N K ONE TUNE L PE BMW IVILN LAN f 4i I A� 1. - 0 A 4— Q 44.0 Z cl w -j 71 DA I N -T L =S—,—! AL At L011TM All SAN �b RNARDI UPL%ND T CLANINNINIT —1. RrA L1 a 1 .1 --t —, — — - — + i4 A F TANA-S. 0, L I TIS K� 0 TA . ..... '-eo gI ISO . ........ IS/ REDLANDS 0 ex Jo /L A ONE L" 'T IEN c GRA A L7.0 ICNINO —T --z u"11Y o T-1 R + RIVERSIDE . COUNY j– no f-00 i R IDE 7- R W RA 4 A2W 'R I J SAN KRNARDINO COUNTY -T FLOOD CONTROL DISTRICT �ADO 0NTROL, 4.0 R 5w/ REDUCED DRAWING VALLEY AREA T3 !F1000 SCAL E ["=4 MILES X., JC�SOHYETALS YEAR 24 HOUR SAN BERNARDINO COUNTY &AS= ON U.10it, NOAA. AWLAS 2. W3 c A I,. -4 mmwm BY I R 8 w 10.0--1 R6W HYDROLO GY MANUAL 4LUAL., 0 ISOLINES PRECIPITATION (11CHES) iRw P EMPREff— WALK, FILE f'.2ka WRO"I". 6 of ... .. .. ..... S 73 ...1 5. IRK X.- 1 INITIAL. 4: e I V, 4 dw IM 0� 4m no r 77 rr?.. n wt tY ..... tl oo :t, -0 w. Z' W 1:7 o a -IT :%o, w.. ........ IN . . ..... .... ...... .. .... ... . � :". ", � ;: - li, .1 V% 1t; R :t V! U_ a 4: TV ...... wn01 ......... . IT. zt!, -17 ....... INV 7 . ......... �Q TOO lb.. Ix ....... ... ... . Mfj r I C.— - 0, a AN IT-1; ...... zt :0 ........... !6:` W.Z' % Alf": 13 n Z. - N .2 t ..... .. .... `7 77 p P, 4z a. -Z "T. 0. �Jait" . .., I- .. . ". - , , . , "t.. 'I tl it 1 9 675' x. FS 1. W d B, uG:-- L,*, 'INV Q 7 21 J_ ...... .. INITIA %I A 0, w , 4. Z_ It /ub' Kb IINIV 7 4mk 4mw 77 ­ b - CAS '42Z te' - 4-1.,14. i ­z!., w Ti .... .. ..... I Itt ti t it - % ... ....... NG P1w. Olt i . ., . ,.-. - �, r�, - tai "i --tr -tf .:.' . -.1., 1, ­�,'jj'- - - ,);- —Y'- I _ ; v: . ......... t IZ, "J W4 J�, 0 N -!otl F :lo. d ... ...... .. V 7 lit, ..... .. .... toz­ j V X ;,AT :j 41 ot, T. - -4:R k.�4;l%-- tmi # �`2 ... 1. t Zt�`;o 16 8 (on).:, Z! t'lq, 7 4- t V r ....... -17 Try'. IYA L It ... . .... ... ....... .... INV 6.8.3 V N - F 0100. NITIZ: ... .. . ..... 4 4 T, Jtr T, :hL E t _ A ZIR 'T t to Tt% ...... ... ............... . 4 zt:!. n. a z0_1 Pr M 77 7 7 ;F� ft. Aw j p- -:-0 1'620 im V: I,, Li L N 17-, ........... -­­-,---Ilt�� i 6 ... .. ....... ­ixf 'oy t: k4p� ;�l -7 --F C­­ lww. ti It -�T _ttt� Q WRAP` I YN S. !:4 A P It. w w ti 71 rO F S`� - .2 m5g :_F. ;. .... r.: ggr M3� ...... T", R Ex. A 1657 INV a I T. C, 7777 01 - T 13 71. N 5-1 M." ttv­ �M Mir= f -.11. %t t N V; wqo N, :;j r % n W,_ :o 7?7 .4 q_ Itt w f w.. w -lA 757 J X tZ "71 0 IT 7 V '7 RI URN F . , - " . _ ..:: , - Nv I w f",f V to T,635 1wt m :77 , 1. %; 'T 7 j tJA 0: � - dlit COMBINED OU)FLOW FROM C. A- 7 -.7t. i,t�­ v;l ­I1.I_-,-.:1 -tt INV .... . ... m -aft t 0 1100. 16 -4l': 7. 77,�� 77..777`-- 77 rjI"! t,:o: 1:7. .... .. .. ...... -7 ----------- 7-7- __J 7 tl— q. . . .......... 0 0 LLJ C) SCALE I N FEET 200 400 600 c_ -fLc�� ��, �_,c � A4- 44 o, C.) . ( 9-V C) ---> ID P. I /_\ = r__ ALL SOILS GROUP "A" EXCEPT AS DELINEATED GROUP B Vr,v xx FS XX NODE DESCRIPTION 1114v xx Q100= xx SUBAREA DESCRIPTION DENSITY LENGTH BETWEEN NODES FLOW ARROW DRAINAGE BOUNDARY '001 JA1 26-1770\storm\Prelim-Hyd-Map.dwg, U //1 8/ZUU3 11:46: 1 b AIVI, 0 _j 0 ry z cr_ 0 71' V) I