HomeMy WebLinkAbout4899-21.
2.
3.
4,
5.
6.
7,
1-0
SCALE: x:40
CITR V N
_SEX_- R/W ----
-------------------
-------------------- ---
----------------------- ------------
E X, R / W � �---- �---- - -
N L EX. AC BERM - r EX. AC BERM �*
i
� dO1S
ui
Z
uj
Q
LL- Vj I __ . - - - - I---- - -- -
�-, Q
29L - - - SD - - _ �D - - - - - SD - _ - - - �D ID - - - ,D _ - - SD
LIJ
= z G G --LG G G G G G G G G G G G / G J G G G G G G G G G G --G G G G G G-� G --I G G - G G G G G G G G G G G G G �\' G G AG G�� G G G G
I
-- - - - - -
w BERM
_EX.—A C—B�RM -
2 —/W�
EX, R PROP, SIDEWAL
21 ±440 L.F.
TRAFFIC SIGNAL INTERCONNECT/COMMUNICATION GENERAL NOTES
PROP. SIDEWALK -�-- EX, R/W
0
01 2 ±365 LF.
H
TRAFFIC SIGNAL INTERCONNECT SHALL CONFORM TO THESE PLANS, THE
9.
ALL PCC SIDEWALK DAMAGED BY THE CONTRACTORS OPERATIONS SHALL BE
STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTI❑N 86 AND STANDARD
SAWCUT, REMOVED, AND REPLACED TO EXISTING EXPANSION/SCRIBE JOINTS,
PLANS (DATED JULY 2006), AND THE SPECIAL PR❑VISI❑NS,
10.
L❑CATION OF ALL UNDERGROUND FACILITITES ARE APPROXIMATE. THE
ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY
CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT L❑CATIONS AND
OF FONTANA ENGINEERING DIVISI❑N PRIOR TO COMMENCENT OF WORK.
VERIFY ALL CONDITIONS ON THE JOB SITE, HAND DIG UNTIL CLEAR OF
THE CONTRACTOR SHALL REPAIR ALL DAMAGED LANDSCAPING AND IRRIGATION
OBSTRUCTIONS, PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600,
TO THE SATISFACTION OF THE ENGINEER,
TWO (2) WORKING DAYS BEFORE DIGGING, THE ENGINEER SHALL BE NOTIFIED
❑
F ANY DISCREPENCIES OR CONFLICTS PRIOR TO DOING STREET WORK,
CONDUIT SHALL NOT BE INSTALLED DIRECTLY OVER ANY UTILITY LINE
(PARALLEL WITH THE LINE). UTILITY LINE CROSSINGS ARE ALLOWED.
11,
THE CONTRACTOR SHALL LOCATE, PROTECT, SHORE, BRACE, SUPPORT, AND
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY ENGINEER FOR EXACT
MAINTAIN ALL EXISTING FACILITIES INCLUDING GAS, WATER, IRRIGATION,
EQUIPMENT LOCATIONS PRI❑R TO FINAL PLACEMENT,
SEWER, POWER, STREET LIGHTS, TELEPHONE AND OTHER CONSTRUCTION
WHICH MAY BE UNCOVERED OR OTHERWISE AFFECTED BY THE WORK.
PULL BOXES AND SPLICE VAULTS SHALL NOT BE LOCATED IN DRIVEWAYS OR
CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATI❑N AND PRESERVATI❑N
OTHER L❑CATIONS WHICH MAY INTERFERE WITH THE MOVEMENT OF PEOPLE
OF ALL SUCH FACILITIES IN THE AREA OF CONSTRUCTI❑N, AND SHALL
OR VEHICLES, PULL BOX LOCATI❑NS SHALL BE ADJUSTED AS NEEDED,
NOTIFY UTILITIES FORTY-EIGHT (48) HOURS IN ADVANCE OF ANY
C❑NSTRUCTI❑N,
ALL PULL BOXES SHALL BE No. 6E AND CONDUIT SHALL BE 2" GALVANIZED RIGID
METAL UNLESS OTHERWISE SHOWN. ALL SPLICE VAULTS SHALL BE TYPE P48
12.
ALL TRAFFIC CONTROL DEVICES SHALL BE IN PLACE BEFORE WORK IS
48.5"x30.5"x30" DEEP (INSIDE), FIBERGLASS, HAVE LOCKING LIDS, AND BE LABELED
STARTED, TRAFFIC CONTROL, WORK ZONES, AND LANE CLOSURES SHALL BE
"COMMUNICATIONS". PULL BOXES AND SPLICE VAULTS SHALL BE INSTALLED IN
COMPLETELY DELINEATED BY CHANNELIZATI❑N DEVICES AND SHIELDED BY
ACCORDANCE WITH THE PROJECT DETAILS FOR PULL BOX AND SPLICE VAULT
BARRIERS TO EXCLUDE VEHICLE AND/OR PEDESTRIAN TRAFFIC, CONTRACTOR
INSTALLATION.
SHALL FOLLOW THE CALIFORNIA MANUAL ON UNIF❑RM TRAFFIC CONTROL
WHERE CONDUIT IS INSTALLED AND DISTURBS EXISTING STRIPING,
DEVICES (CALIFORNIA MUTCD DATED JANUARY, 2010) FOR CONSTRUCTION AND
CONTRACTOR SHALL ARRANGE AND PAY FOR STRIPING. SEE SPECIAL
MAINTENANCE WORK ZONES, CALTRANS STANDARD SPECIFICATI❑NS, AND
PR❑VISI❑NS FOR CONTRACTOR RESPONSIBILITY FOR TEMPORARY PAVEMENT
STANDARD PLANS, DATED 2006. EXACT LOCATION OF ALL TRAFFIC CONTROL
MARKINGS,
TO BE DETERMINED BY THE ENGINEER AND ADDITIONAL WARNING AND/OR
CONSTRUCTION SIGNING MAY BE REQUIRED, DEVICES NO LONGER REQUIRED
SHALL BE REMOVED AS SOON AS POSSIBLE, CONTRACTOR SHALL PROVIDE
TRAFFIC CONTROL PLANS TO ENGINEER FOR APPROVAL PRIOR TO
C❑NSTRUCTI❑N,
DIG�LE � T.
TOLL FREE -qqmmmw' 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
LO
co
(Q
V /
11
r�
I I . III 1
13. PEDESTRIAN TRAFFIC MUST BE MAINTAINED AT ALL TIMES, PEDESTRIANS MAY
BE RELOCATED ONTO PRIVATE PROPERTY WITH OWNERS PERMISSION ONLY,
14. NO EQUIPMENT OR MATERIALS SHALL BE STORED ON SIDEWALK AT ANY TIME,
15. A 12" VERTICAL SEPARATI❑N BETWEEN NEW CONDUITS AND OTHER UTILITIES
SHALL BE MAINTAINED AT CROSSINGS. A 3' MIN. HORIZONTAL SEPARATION
BETWEEN NEW CONDUITS AND POWER AND WATER UTILITIES THAT RUN
PARALLEL SHALL BE MAINTAINED, A 3' (EXCEPT WHERE NOTED) MINIMUM
SEPARATION BETWEEN CONDUIT AND SANITARY SEWER AND STORM DRAINS
THAT RUN PARALLEL SHALL BE MAINTAINED, UNLESS OTHERWISE APPROVED
BY THE ENGINEER, THE CONTRACTOR SHALL MAINTAIN A MINIMUM 3'
CLEARANCE FOR ALL OTHER FACILITIES,
16. TRAFFIC SIGNAL CIRCUITS AND INTERCONNECT CONDUITS MAY NOT BE SHOWN,
CONTRACTOR SHALL LOCATE ALL TRAFFIC SIGNAL CIRCUITS AND
INTERCONNECT CONDUITS PRIOR TO ANY TRENCHING OR BORING, ALL
TRAFFIC SIGNAL AND INTERCONNECT CONDUITS SHALL BE MAINTAINED AND
PROTECTED,
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING RECORD
DRAWINGS FOR ALL WORK THROUGHOUT THE COURSE OF CONSTRUCTION.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
EXISTING SURVEY MONUMENTS OR MARKERS DURING CONSTRUCTI❑N,
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
STANDARDS IN EFFECT.
No. C 40964
Exp. 3-31-13
CML
Alip
III
TRAFFIC SIGNAL INTERCONNECT/COMMUNICATION CONSTRUCTION NOTES
m FURNISH AND INSTALL TYPE P48 (SEE GENERAL NOTE #7) SPLICE BOX
FURNISH & INSTALL 6-1.5' SCHEDULE 40 HDPE CONDUITS PER DETAIL 'Co, THE
CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW, RED, BLACK, BLUE AND GREEN,
FURNISH AND INSTALL ONE PULL ROPE IN EACH CONDUIT FOR FUTURE CABLE, CONDUIT
SWEEPS SHALL BE INSTALLED WITH A MINIMUM 10 -FOOT RADIUS, FURNISH AND INSTALL
96 STRAND S,M,F,O, CABLE IN THE BLUE CONDUIT
Ifl NOT USED.
SEE DRAWING NO. 4873 SHEET 4/5 & DRAWING NO. 4873 SHEET 5/5 FOR CONDUIT
AND SPLICE BOX INSTALLATION DETAILS
Prepared Under The Supervision Of :
Date :
Felipe U. Molinos, R.C.E. 40964
ICITY OF FONTANA, CALIFORNIA I FIBER OPTIC INTERCONNECT PLAN
DRAWN BY:
DT CITRUS AVENUE 1:40
DESMED BY: DT 28+50.00 STA. 38+25.00 °ATEc 4.19.11
CHECKED BY: AP DRAWING NO.:'L
�Q MP C ENGINEER - R.C.E.51152 4899 2