Loading...
HomeMy WebLinkAboutPiazza Apartments,-•rr rl■ �■ FBF CONSULTING 1■II PLANNING ■ RE51GN ■ CONSTRUCTION s a•II Piazza Apartment CUP 08-020/DR 08-010 .,, (C,9 -i I auN►fEK) Fontana .. San Bernardino County, California •� HYDROLOGY & HYDRAULICS REPORT Owner: Elderly Housing Development & Operations Corporation •• 1580 Sawgrass Corporate Parkway # 210 Fort Lauderdale, FL 33323-2859 Prepared For: TC Architect, Inc 755 White Pond Dr, Suite 401 Akron, OH 44320 Consultant: 40 RBF CONSULTING�oQRO ESS/ONq! 3300 East Guasti Road, Suite 100 Q C �• Ontario, CA 91761 (909) 974-4900 ,oto �. Contact: Matthew C. Hicks, PE, PLS ' r CIVIL AN FOF CAL,��e' qq At July 8, 2009 (Revision No. 1) JN 65-100519 Apr, O 12•ti-09 *� LIST OF EXHIBITS � Exhibit1 — Vicinity Map............................................................................................. 12 AN "M TECHNICAL APPENDICES to A. Rational Method (AES RatscX) Calculations: dill b. Existing Condition —100 -year Storm Event qq c. Proposed Condition — 25 -year Storm Event do B. Tributary Area Maps TABLE OF CONTENTS in b. Proposed Condition Ad C. Hydraulic Calculations q, HYDROLOGY STUDY .................... SECTION 1 - INTRODUCTION............................................................................................1-1 b. Calculations for under sidewalk drains do 1.1 Location and Setting1-1 1.2 Project Objectives........................................................................................................ 1-1 40 1.3 Pre -Developed Condition- SECTION2 - HYDROLOGY.................................................................................................2-3 2.1 Hydrology Methodology2-3 2.2 Hydrology Post -Developed Condition........................................................................... 2-3 2.3 Conclusions................................................................................................................... 2-3 *� LIST OF EXHIBITS � Exhibit1 — Vicinity Map............................................................................................. 12 AN "M TECHNICAL APPENDICES to a. 10 -year — 1 Hour Isoheytal Map b. 100 -year — 1 Hour Isoheytal Map c. 25 Yr. — 1 Hr. Rainfall Intensity Graph ** d. Hydrologic Soils Group Map I" All 9 A. Rational Method (AES RatscX) Calculations: a. Existing Condition — 25 -year Storm Event b. Existing Condition —100 -year Storm Event c. Proposed Condition — 25 -year Storm Event d. Proposed Condition —100 -year Storm Event B. Tributary Area Maps a. Existing Condition b. Proposed Condition C. Hydraulic Calculations a. Calculations for area drain sizing "r b. Calculations for under sidewalk drains c. Calculations for graded swale D. Reference Material a. 10 -year — 1 Hour Isoheytal Map b. 100 -year — 1 Hour Isoheytal Map c. 25 Yr. — 1 Hr. Rainfall Intensity Graph ** d. Hydrologic Soils Group Map I" All 9 0 ,., SECTION 1 - INTRODUCTION 1" 1.1 LOCATION AND SETTING 46 qW The proposed project will develop an existing parking area into a five story senior apartment complex south of the existing Dino Papavero apartments. The project site is located east of Juniper 40Avenue south of the intersection of Juniper Avenue and Marygold Avenue. Drainage current flows from north to south and is eventually transmitted to Juniper Avenue. Am 1.2 PROJECT OBJECTIVES The objectives of this study include the following: ❖ Prepare hydrologic analysis of the proposed condition watershed based on land uses, drainage patterns, ground slopes, and soil types to generate the 25 and 100 -year flood storm events as required by the City of Fontana. The hydrology computations are based on the San Bernardino County Flood Hydrology Manual Rational Method. '� ❖ Develop post -developed condition hydrology map identifying drainage boundaries, drainage patterns, and concentration points for onsite area. "' ❖ Design onsite storm drain system to transmit flows to Juniper Avenue r7 ❖ Size under sidewalk drains to transmit above ground drainage to Juniper Avenue. ,m 1.3 PRE -DEVELOPED CONDITION I" The majority of the project site is currently paved and functions as a parking area. A garage structure is located on the site and is currently utilized for storage for the Dino Papavero apartment complex. The project site is bounded by Juniper Avenue to the west an apartment complex to the south, a vacant field to the east, and the Dino Papavero Center to the north. The existing site drainage pattern is generally north to south and the site accepts run-off from the 10 Dino Papavero apartment complex and open space area to the east. A portion of the run-off 40 crossing the site continues southerly into a parking lot cross gutter in the adjacent apartment complex to the south and ultimately outlets in Juniper Avenue via surface drainage. The remainder of run-off crossing the site is transmitted westerly along a small retaining wall along the southerly property line and outlets in Juniper Avenue. A portion of this run-off may pass over the retaining wall into the adjacent apartment complex parking lot during larger storm events and pass through to Juniper via surface drainage. 0 r- 4d Piazza Apartment — CUP 08-020/DR 08-010 Hydrology Study go rrr dd qq AN EXHIBIT 1 — VICINITY MAP w do qq Al "" SAN BERNARD I NO AVENUE ori I" VICINITY MAP 4I NOT TO SCALE THE THOMAS GUIDE 2006 "" SAN BERNARDINO COUNTY, PAGE 604, 40 COORDINATE J-6 I" At .q 46 M I" All Piazza Apartment - CUP 08-020/DR 08-010 Hydrology Study '� 1-2 w PROJECT SITE W r MALLORY DRIVE Q MARY OLD AVENUE w > � w Ld z > w a Q w 'Q z Q w VALLEY Q BOULEVARD � � o U w w a� WASHINGTON DRIVE 10 SAN BERNARDION FREEWAY 4d I" VICINITY MAP 4I NOT TO SCALE THE THOMAS GUIDE 2006 "" SAN BERNARDINO COUNTY, PAGE 604, 40 COORDINATE J-6 I" At .q 46 M I" All Piazza Apartment - CUP 08-020/DR 08-010 Hydrology Study '� 1-2 rrr SECTION 2 - HYDROLOGY 10 2.1 HYDROLOGY METHODOLOGY "o The Methodology presented in this study is in compliance with the San Bernardino Hydrology ME Manual (Reference 1, hereinafter referred to as the Manual). MODEL DESCRIPTIONS - The Integrated Rational Method Hydrology System Model (Reference 2) within the Advanced Engineering Systems Software (AES) was used to generate the peak 25 -year and 100 -year on-site flows. di SOIL TYPE - The Manual utilizes the Soil Conservation Service (SCS) soil classification system, which classifies soils into four (4) hydrological groups (HSG): A through D, with D being the least impervious. The soils map (Figure C-16 of the Manual) is included in Appendix A. According to this figure, this project lies within HSG "A". DEVELOPMENT TYPE - The development was based on the commercial land use type. INTENSITY - The intensity values (inches/hour) used in the rational models were obtained from Figure B-3, B-4, and Figure D-2 of the Manual. The 25 -year and 100 -year values for the entire site "I are .1.1"/hr and 1.4"/hr, respectively. Copies of the figures are included in the Appendix. DRAINAGE AREAS AND FLOWS PATTERNS - The drainage areas and flow patterns for pre -developed condition were determined using the existing topography (Cadd). The areas were measured using the computer capabilities of AutoCad. 2.2 HYDROLOGY POST -DEVELOPED CONDITION In the post developed condition storm water run-off will be split between a small area drain system north of the proposed building and an open channel (graded bio-swale) south of the proposed parking lot. Both drainage areas will transmit run-off westerly to Juniper Avenue via two under - sidewalk drains. The approximate 2.5 acres that previously drained southerly across the site +� through the adjacent apartment complex and into Juniper will be diverted westerly along the southerly property directly into Juniper. 49 2.3 CONCLUSIONS I" Based on the relatively minor change in impervious areas between pre- and post -developed conditions there is no significant increase in run-off values due to the proposed development. As notedpreviously, the proposed project will redevelop an existing parking lot and structure with a new apartment building and parking lot. The site has been designed to eliminate the existing cross -lot drainage that occurs between the project site and the southerly apartment complex by diverting run-off westerly along the southerly project boundary. This diversion accounts for an approximate 10 cfs increase of run-off (100 -yr) at the proposed southerly Juniper St. outlet. In the pre -developed condition this 10 cfs surface drains through the drive aisle in the adjacent apartment complex and outlets into Juniper approximately Piazza Apartment - CUP 08-020/DR 08-010 Hydrology Study 2-3 0 a F d 0 0 E 0 R d M w h' 5 0 r south of the proposed new outlet location. Based on the proximity of the pre- and post- developed outlet locations, impacts to Juniper Avenue street drainage capacity can be considered negligible. Piazza Apartment — CUP 08-020/DR 08-010 Hydrology Study 2-4 ■ I" i in s Technical Appendix A Rational Method (AES RatscX) Calculations I" 49 M M 0, L - A. Existing Condition - 25 -Yr. Storm Event B. Existing Condition - 100 -Yr. Storm Event C. Proposed Condition - 25 -Yr. Storm Event D. Proposed Condition - 100 -Yr. Storm Event Piazza Apartment - CUP 08-020/DR 08-010 Hydrology Study 2-5 ew r� A go di 40 A 4" di qq di in di qR a qI 49 A Existing Condition — 25 -Year Storm Event Piazza Apartment — CUP 08-020/DR 08-010 .4 Hydrology Study A 2-6 Date: 07/13/09 File name: 51925YR.RES Page 1 ..x+x................x+....x....*.***....*.....+.*...*.....**..xx*x*x. RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2006 Advanced Engineering Software (aes) Ver. 13.0 Release Date: 06/01/2006 License ID 1264 Analysis prepared by: RBF Consulting 14725 Alton Parkway Irvine, CA 92618 .......................... DESCRIPTION OF STUDY .......................... * Existing Condition (25 -Year Storm) * Piazza Apartments * Calc by: B.K. revised by L.J. for 25 -Year Storm FILE NAME: 51925YR.DAT TIME/DATE OF STUDY: 10:04 07/09/2009 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: ---------------------- ----------------------------------------------------- --*TIME-OF-CONCENTRATION MODEL* -- USER SPECIFIED STORM EVENT(YEAR) = 25.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 8.00 SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* SLOPE OF INTENSITY DURATION CURVE (LOG (I; IN/HR) vs. LOG(Tc;MIN)) = 0.7000 USER SPECIFIED 1 -HOUR INTENSITY(INCH/HOUR) = 1.1100 *ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) -------------- ----------------- ------ ---- ------ ---- ------- 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth) -(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ....................................... ..----------------------------------- »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS«« >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ---------------------------------------------------------------------------- - ----------------------------------------------------------------- INITIAL SUBAREA FLOW-LENGTH(FEET) = 690.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1129.00 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 10.936 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 3.655 Date: 07/13/09 File name: 51925YR.RES Page 2 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 2.50 0.98 0.200 32 10.94 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 7.78 TOTAL AREA(ACRES) = 2.50 PEAK FLOW RATE(CFS) = 7.78 FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE = 21 »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS««< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< INITIAL SUBAREA FLOW-LENGTH(FEET) = 400.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1126.80 To = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 7.843 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 4.612 SUBAREA To AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS To LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 1.30 0.98 0.200 32 7.84 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 5.17 TOTAL AREA(ACRES) = 1.30 PEAK FLOW RATE(CFS) = 5.17 ............. .««................. *........... *.......... *++++++...+......... FLOW PROCESS FROM NODE 300.00 TO NODE 301.00 IS CODE = 21 ---------------------------------------------------------------------- »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<— -USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA<< ------------------------------------------------------------------ INITIAL SUBAREA FLOW-LENGTH(FEET) = 145.00 ELEVATION DATA: UPSTREAM(FEET) = 1130.00 DOWNSTREAM(FEET) = 1126.90 To = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.145 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 5.471 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) RESIDENTIAL -5-7 DWELLINGS/ACRE" A 0.30 0.98 0.500 32 6.14 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.500 SUBAREA RUNOFF(CFS) = 1.35 TOTAL AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) = 1.35 «++«++++...........+..........+...+.............«+....«.««.«+..«.+........+. FLOW PROCESS FROM NODE 400.00 TO NODE 401.00 IS CODE = 21 ------------------ -......................................................... »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS««< -USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA« ---------------------------------------------------------------------------- INITIAL SUBAREA FLOW-LENGTH(FEET) = 90.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1131.50 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.000 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 6.320 L,. A L. A L A AL ■ L A 1. A L A L/ L A h i ! i 1t l L i L A L i L A L! L! ! 1 Date: 07/13/09 File name: 51925YR.RES Page 3 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.50 0.98 0.200 32 5.00 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 2.76 TOTAL AREA(ACRES) = 0.50 PEAK FLOW RATE(CFS) = 2.76 FLOW PROCESS FROM NODE 500.00 TO NODE 501.00 IS CODE = 21 ............................................................................ ——RATIONAL METHOD INITIAL SUBAREA ANALYSIS«« »USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA ­ INITIAL SUBAREA FLOW-LENGTH(FEET) = 190.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1133.50 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)] "0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.059 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 5.525 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.60 0.98 0.200 32 6.06 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 2.88 TOTAL AREA(ACRES) = 0.60 PEAK FLOW RATE(CFS) = 2.88 END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 0.60 TC(MIN.) = 6.06 EFFECTIVE AREA(ACRES) = 0.60 AREA -AVERAGED Fm(INCH/HR)= 0.20 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.200 PEAK FLOW RATE(CFS) = 2.88 END OF RATIONAL METHOD ANALYSIS Date: 07/13/09 File name: 51925YR.RES Page 4 40, do E N N e H 0 a Existing Condition —100 -Year Storm Event '0 0 E 0 d e 0 4" di Piazza Apartment — CUP 08-020/DR 08-090 Hydrology Study 2-7 ++xr!!kkl++xk«kkkkk*k+k+++!!+!l+kkkk*++++++kr+++*krt+++++x+++++++++++++++++++ RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2004 Advanced Engineering Software (aes) Ver. 10.0 Release Date: 01/01/2004 License ID 1264 Analysis prepared by: RBF Consulting 14725 Alton Parkway Irvine, California 92618 +++++++++kk+++++++x+++++++ DESCRIPTION OF STUDY *+++++++++++++++++++++++++ * Existing Condition (100yr/1hr event) * Piazza Apartment * Calc by: B.K. 3/30/2009 FILE NAME: 519100YR.DAT TIME/DATE OF STUDY: 12:39 03/26/2009 ------------------------------------------------------------------------ USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL* USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 8.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* SLOPE OF INTENSITY DURATION CURVE (LOG (I; IN/HR) vs. LOG(TC;MIN)) = 0.7000 USER SPECIFIED 1 -HOUR INTENSITY(INCH/HOUR) = 1.4000 *ANTECEDENT MOISTURE CONDITION (AMC) III ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth) *(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED rt«#«#####rtkrtk«««4!!«!!l4++l4##4+##**kkkkkk«««««!!+!l+4+++*4!#4++***#*k*+«#+« FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 -------------------------------------------------------- - - -- - -- --------_ » —RATIONAL METHOD INITIAL SUBAREA ANALYSIS« << >>USE TIM£ -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA— --------------- "-------------------------------------______________________ INITIAL SUBAREA FLOW-LENGTH(FEET) = 690.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1129.00 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) - 10.936 * 100 YEAR RAINFALL INTENSITY(INCH/HR) - 4.609 SUBAREA TC AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 2.50 0.80 0.20 52 10.94 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) - 10.01 TOTAL AREA(ACRES) = 2.50 PEAK FLOW RATE(CFS) = 10.01 l4+44444#rtrt#4*444*#*krt#+*kk#««rt#k«kk««lrt+4!!!«4##k*kkrtk#4x4«!««k#rtrt«rt«!+lkx# FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE - 21 ---------------------------------------------------------------------------- » >RATIONAL METHOD INITIAL SUBAREA ANALYSIS« <<< -USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA ­ INITIAL SUBAREA FLOW-LENGTH(FEET) = 400.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1126.80 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 7.843 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 5.817 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 1.30 0.80 0.20 52 7.84 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 6.62 TOTAL AREA(ACRES) = 1.30 PEAK FLOW RATE(CFS) = 6.62 4**444++++«!+*++#+rt*4#+******4k*rt**k**444444444+444444+#44**+k#*******444444 FLOW PROCESS FROM NODE 300.00 TO NODE 301.00 IS CODE = 21 ------- — —RATIONAL METHOD INITIAL SUBAREA ANALYSIS«« »USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA— INITIAL SUBAREA FLOW-LENGTH(FEET) _ 145.00 ELEVATION DATA: UPSTREAM(FEET) = 1130.00 DOWNSTREAM(FEET) = 1126.90 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 6.145 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.901 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) RESIDENTIAL "5-7 DWELLINGS/ACRE" A 0.30 0.80 0.50 52 6.14 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA RUNOFF(CFS) = 1.76 TOTAL AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) = 1.76 FLOW PROCESS FROM NODE 400.00 TO NODE 401.00 IS CODE = 21 ____________________________________________________________________________ »> >RATIONAL METHOD INITIAL SUBAREA ANALYSIS «, c >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA« INITIAL SUBAREA FLOW-LENGTH(FEET) 90.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1131.50 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 5.000 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 7.972 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS TC LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.50 0.80 0.20 52 5.00 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 3.52 TOTAL AREA(ACRES) = 0.50 PEAK FLOW RATE(CFS) = 3.52 ######iii+i+#iti+fffkki+iittfffkkk+#i#ftif #fikk*+kt+fkkkk#kkk#itis+itkf4iffk FLOW PROCESS FROM NODE 500.00 TO NODE 501.00 IS CODE = 21 ----------------------------------------------------------------- » >>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS< « « »USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA - INITIAL SUBAREA FLOW-LENGTH(FEET) = 190.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1133.50 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 6.059 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.969 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.60 0.80 0.20 52 6.06 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 3.68 TOTAL AREA(ACRES) = 0.60 PEAK FLOW RATE(CFS) = 3.68 END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 0.60 TC(MIN.) = 6.06 EFFECTIVE AREA(ACRES) = 0.60 AREA -AVERAGED Fm(INCH/HR)= 0.16 AREA -AVERAGED Fp(INCH/HR) = 0.80 AREA -AVERAGED Ap = 0.20 PEAK FLOW RATE(CFS) = 3.68 END OF RATIONAL METHOD ANALYSIS E R P E R dig MM do Proposed Condition — 25 -Year Storm Event F 8 F 0 �r '0 r d 0 Piazza Apartment — CUP 08-020/DR 08-010 Hydrology Study � 2-8 & A & A & A k .A k i &/ k i & A k A i A ! A a/ & A & A & i k. ! & A a A a) Date- 07/13/09 File name: 519P25.RES Page 1 RATIONAL +METHOD *HYDROLOGY *COMPUTER *PROGRAM +PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2006 Advanced Engineering Software (aes) Ver. 13.0 Release Date: 06/01/2006 License ID 1264 Analysis prepared by: RBF Consulting 14725 Alton Parkway Irvine, CA 92618 ************************** DESCRIPTION OF STUDY * Proposed Condition (25 -Year Storm) * Piazza Apartments * Clac by: B.K. revised by L.J. for 25 -Year Storm FILE NAME: 519P25.DAT TIME/DATE OF STUDY: 11:51 07/09/2009 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL* -- USER SPECIFIED STORM EVENT(YEAR) = 25.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00 SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* SLOPE OF INTENSITY DURATION CURVE(LOG(I;IN/HR) vs. LOG(Tc;MIN)) = 0.7000 USER SPECIFIED 1 -HOUR INTENSITY(INCH/HOUR) = 1.1100 *ANTECEDENT MOISTURE CONDITION (AMC) II ASSUMED FOR RATIONAL METHOD- -USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) === --=- ------------------------- ====== ===== ------ ===== ======= 1 30.0 20.0 0.018/0.018/0.020 0.67 2.00 0.0313 0.157 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth)*(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.- -USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ............................................................................ --RATIONAL METHOD INITIAL SUBAREA ANALYSIS««< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA- ------ INITIAL SUBAREA FLOW-LENGTH(FEET) = 575.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1129.70 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 9.996 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 3.892 Date: 07/13/09 File name: 519P25.RES Page 2 SUBAREA To AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 2.40 0.98 0.200 32 10.00 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 7.98 TOTAL AREA(ACRES) = 2.40 PEAK FLOW RATE(CFS) = 7.98 ......................... +.... ***.... «.... *.... *..... **........ *...... +.+..+ FLOW PROCESS FROM NODE 101.00 TO NODE 102.00 IS CODE = 82 ---------------------------------------------------------------------------- »»>ADD SUBAREA RUNOFF TO MAINLINE, AT MAINLINE Tc, -<< << »»>(AND COMPUTE INITIAL SUBAREA RUNOFF)««< INITIAL SUBAREA FLOW-LENGTH(FEET) = 450.00 ELEVATION DATA: UPSTREAM(FEET) = 1129.70 DOWNSTREAM(FEET) = 1126.30 To = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 9.912 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 3.915 SUBAREA To AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 1.40 0.98 0.200 32 9.91 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA AREA(ACRES) = 1.40 INITIAL SUBAREA RUNOFF(CFS) = 4.69 ** ADD SUBAREA RUNOFF TO MAINLINE AT MAINLINE TC: MAINLINE Tc(MIN) = 10.00 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 3.892 SUBAREA AREA(ACRES) = 1.40 SUBAREA RUNOFF(CFS) = 4.66 EFFECTIVE AREA(ACRES) = 3.80 AREA -AVERAGED Fm(INCH/HR) = 0.20 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.20 TOTAL AREA(ACRES) = 3.80 PEAK FLOW RATE(CFS) = 12.64 FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE = 21 ............................................................................ »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS««< >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA ­ INITIAL SUBAREA FLOW-LENGTH(FEET) = 255.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1129.30 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.475 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 5.274 SUBAREA Tc AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS To LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.60 0.98 0.200 32 6.48 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 2.74 TOTAL AREA(ACRES) = 0.60 PEAK FLOW RATE(CFS) = 2.74 *k * ** FLOWPROCESS+FROM*NODE**300..`++ 00TONODE 301.00 IS CODE = 21 ------ - ------------------------ - ---------- - - »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS«« >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA- ------ it l & A k ! k i k A k 1 a A t o t i & A iA !A &/ i i a A a A a A a i t l Date: 07/13/09 File name: 519P25.RES Page 3 INITIAL SUBAREA FLOW-LENGTH(FEET) = 90.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1131.50 To = K*[(LENGTH'* 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.000 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 6.320 SUBAREA To AND LOSS RATE DATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS To LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.30 0.98 0.200 32 5.00 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 1.65 TOTAL AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) = 1.65 ...:......*.....*.*....****...*.*.....*..* .......... .........*.... FLOW PROCESS FROM NODE 400.00 TO NODE 401.00 IS CODE = ***..... *. 21 ...................... ........................ .............................. » >>RATIONAL METHOD INITIAL SUBAREA ANALYSIS««< -USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA ­ INITIAL SUBAREA FLOW-LENGTH(FEET) = 190.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1133.50 To = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)] --0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.059 * 25 YEAR RAINFALL INTENSITY(INCH/HR) = 5.525 SUBAREA To AND LOSS RATE OATA(AMC II): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS To LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.60 0.98 0.200 32 6.06 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.98 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.200 SUBAREA RUNOFF(CFS) = 2.88 TOTAL AREA(ACRES) = 0.60 PEAK FLOW RATE(CFS) = 2.88 ---------------------------------------------------------------------------- ------------------------------------------------------------------------ END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 0.60 TC(MIN.) = 6.06 EFFECTIVE AREA(ACRES) = 0.60 AREA -AVERAGED Fm(INCH/HR)= 0.20 AREA -AVERAGED Fp(INCH/HR) = 0.98 AREA -AVERAGED Ap = 0.200 PEAK FLOW RATE(CFS) = 2.88 END OF RATIONAL METHOD ANALYSIS Date: 07/13/09 File name: 519P25.RES Page 4 E M 0 H E d d E E M E 0 F R r d Proposed Condition —100 -Year Storm Event Piazza Apartment — CUP 08-020/DR 08-010 Hydrology Study 2-9 RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2004 Advanced Engineering Software (sea) Ver. 10.0 Release Date: 01/01/2004 License ID 1264 Analysis prepared by: RBF Consulting 14725 Alton Parkway Irvine, California 92618 ««««+«+««««+«««««««««««««« DESCRIPTION OF STUDY * Proposed Condition (100yr/hr Event) * Piazza Apartment * Calc by: B.K. FILE NAME: 519P100.DAT TIME/DATE OF STUDY: 16:18 03/26/2009 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL* USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00 SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0.95 *USER -DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* SLOPE OF INTENSITY DURATION CURVE (LOG (I; IN/HR) vs. LOG(Tc;MIN)) = 0.7000 USER SPECIFIED 1 -HOUR INTENSITY(INCH/HOUR) = 1.4000 *ANTECEDENT MOISTURE CONDITION (AMC) III ASSUMED FOR RATIONAL METHOD* *USER -DEFINED STREET -SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER -GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT -/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 30.0 20.0 0.018/0.018/0.020 0 67 2.00 0.0313 0.167 0.0150 GLOBAL STREET FLOW -DEPTH CONSTRAINTS: 1. Relative Flow -Depth = 0.00 FEET as (Maximum Allowable Street Flow Depth) - (Top -of -Curb) 2. (Depth) -(Velocity) Constraint = 6.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED FLOW PROCESS FROM NODE 100.00 TO NODE 101.00 IS CODE = 21 ---------------------------------------------- -_--_-_---------------------- » »RATIONAL METHOD INITIAL SUBAREA ANALYSIS««. »USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA« ------------------------------------------------------------ ----- ----------'---'---- '------------------------------------- INITIAL SUBAREA FLOW-LENGTH(FEET) = 575.00 ELEVATION DATA: UPSTREAM(FEET) = 1136.50 DOWNSTREAM(FEET) = 1129.70 Tc - K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) - 9.996 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.908 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 2.40 0.80 0.20 52 10.00 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 10.26 TOTAL AREA(ACRES) - 2.40 PEAK FLOW RATE(CFS) - 10.26 FLOW PROCESS FROM NODE 101.00 TO NODE 102.00 IS CODE = 82 ------------- - - - --------------------- - ---- - - --------------------- »» ADD SUBAREA RUNOFF TO MAINLINE, AT MAINLINE Tc, « « < - --- » >>(AND COMPUTE INITIAL SUBAREA RUNOFF) -<, <, INITIAL SUBAREA FLOW-LENGTH(FEET) = 450.00 ELEVATION DATA: UPSTREAM(FEET) = 1129.70 DOWNSTREAM(FEET) = 1126.30 Tc = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 9.912 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.938 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 1.40 0.80 0.20 52 9.91 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA AREA(ACRES) = 1.40 INITIAL SUBAREA RUNOFF(CFS) = 6.02 ** ADD SUBAREA RUNOFF TO MAINLINE AT MAINLINE Tc: MAINLINE TC(MIN) = 10.00 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 4.908 SUBAREA AREA(ACRES) = 1.40 SUBAREA RUNOFF(CFS) = 5.98 EFFECTIVE AREA(ACRES) = 3.80 AREA -AVERAGED Pm(INCH/HR) = 0.16 AREA -AVERAGED Fp(INCH/HR) = 0.80 AREA -AVERAGED Ap = 0.20 TOTAL AREA(ACRES) = 3.80 PEAK FLOW RATE(CFS) = 16.24 FLOW PROCESS FROM NODE 200.00 TO NODE 201.00 IS CODE = 21 ---------------------------------------------------------------------------- »»>RATIONAL METHOD INITIAL SUBAREA ANALYSIS««. >>USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA« INITIAL SUBAREA FLOW-LENGTH(FEET) 255.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) = 1129.30 TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM TC(MIN.) = 6.475 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.652 SUBAREA TC AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA FP Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.60 0.80 0.20 52 6.48 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 3.51 TOTAL AREA(ACRES) = 0.60 PEAK FLOW RATE(CFS) = 3.51 FLOW PROCESS FROM NODE 300.00 TO NODE 301.00 IS CODE = 21 ---------------------------------------------------------------------------- »> >RATIONAL METHOD INITIAL SUBAREA ANALYSIS««. -USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA- INITIAL SUBAREA FLOW-LENGTH(FEET) = 90.00 ELEVATION DATA: UPSTREAM(FEET) = 1134.50 DOWNSTREAM(FEET) - 1131.50 Tc - K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 5.000 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 7.972 SUBAREA TC AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.30 0.80 0.20 52 5.00 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) - 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 2.11 TOTAL AREA(ACRES) = 0.30 PEAK FLOW RATE(CFS) = 2.11 FLOW PROCESS FROM NODE 400.00 TO NODE 401.00 IS CODE = 21 -------------------------- > -RATIONAL METHOD INITIAL SUBAREA ANALYSIS-<< -USE TIME -OF -CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA - INITIAL SUBAREA FLOW-LENGTH(FEET) = 190.00 ELEVATION DATA: UPSTREAM(FEET) - 1136.50 DOWNSTREAM(FEET) = 1133.50 Tc = K*[(LENGTH** 3.00)/ (ELEVATION CHANGE)]**0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 6.059 * 100 YEAR RAINFALL INTENSITY(INCH/HR) = 6.969 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH/HR) (DECIMAL) CN (MIN.) APARTMENTS A 0.60 0.80 0.20 52 6.06 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH/HR) = 0.80 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.20 SUBAREA RUNOFF(CFS) = 3.68 TOTAL AREA(ACRES) = 0.60 PEAK FLOW RATE(CFS) = 3.68 -------------------------------------------------------- END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 0.60 TC(MIN.) = 6.06 EFFECTIVE AREA(ACRES) = 0.60 AREA -AVERAGED Fm(INCH/HR)= 0.16 AREA -AVERAGED Fp(INCH/HR) = 0.80 AREA -AVERAGED Ap = 0.20 PEAK FLOW RATE(CFS) = 3.68 END OF RATIONAL METHOD ANALYSIS a OR tv MR do 0 F e h d F r F a d a I" dd MR AN Technical Appendix B Tributary Area Maps A. Existing Condition B. Proposed Condition a dw Piazza Apartment — CUP 08-020/DR 08-010 „R Hydrology Study IN 2-10 .� 131.5 '\ 30 ........ _ t' HYDROLOGY SUMMARY TABLE JUNIPER AVENUE .. - .............. - ................ . , < NODE FROM TO AREA LABEL AREA AC Q25 CFS Tc MIN Q100 CFS Tc MIN 100 101 Al 2.5 7.8 10.9 10.0 10.9 200 201 B1 1.3 5.2 7.8 6.6 7.8 300 301 Cl 0.3 1.4 6.1 1.8 6.1 400 401 D1 0.5 2.8 5.0 3.5 5.0 500 501 E1 0.6 2.9 6.1 3.7 6.1 SCALE: 1"=60' SAN BERNARDINO (AVENUE RY DRIVE 'a w � w a � U w an� VALLEY WASHINGTON DRIVE PROJECT SITE I UUULD AVENUE Ld z a < BOULEVARD SAN BERNARDION FREEWAY VICINITY MAP NOT TO SCALE THE THOMAS GUIDE 2006 SAN BERNARDINO COUNTY, PAGE 604, COORDINATE J-6 LEGEND Al SUB AREA NAME 1.3 AC — SUB AREA 100 NODE NUMBER 660 NODE ELEVATION L=793 LF FLOW LENGTH —� - - — FLOW LINE HYDROLOGY BOUNDARY PROPERTY LINE NODE FROM TO I }� AREA AC Q25 CFS Tc MIN SAN BERNARDINO AVENUE 100 101 Al 2.4 8.0 10.0 10.3 10.0 101 102 .+..� ..�, .� ...1• 1.4 4.7 w PROJECT SITE Al & A2 3.8 �. \ '.•� _w MALLORY DRIVE a MARYGOLD AVENUE 0.6 w w 3.5 6.5 300 301 Cl 1 .... � 5.0 2.1 5.0 400 401 D1 1 0.6 2.9 w 3.7 6.1 W w a VALLEY a BOULEVARD NODE FROM TO AREA LABEL AREA AC Q25 CFS Tc MIN Q100 CFS Tc MIN 100 101 Al 2.4 8.0 10.0 10.3 10.0 101 102 A2 1.4 4.7 9.9 6.0 9.9 Al & A2 3.8 12.7 10.0 16.2 10.0 200 201 B1 1 0.6 2.7 6.5 3.5 6.5 300 301 Cl 1 0.3 1.7 5.0 2.1 5.0 400 401 D1 1 0.6 2.9 6.1 3.7 6.1 SCALE: 1 "=60' PLANNING ■ DESIGN ■ CONSTRUCTION D(HIgR g HYDROLOGY MAP 3300 EAST GAUSTI ROAD, SUITE 100 PROPOSED CONDITION ONTARIO, CALIFORNIA 91761.8656 CONSULTING 909.974A900 • FAX 909.974.4904 • www.RBF.00m PLAZZq APARTMENTS 0 N w F E R y 0 d V. io .. 4N I" A E •A 49 a N E' 0 Technical Appendix C Hydraulic Calculations A. Calculations for area drain sizing B. Calculations for under sidewalk drains C. Calculations for graded swale Piazza Apartment — CUP 08-020/DR 08-010 Hydrology Study 2-11 rrri Area Drain Sizing Assumptions 1 n= 0.010 2 D/d=0.80 2.0% Q 0.34 1.01 2.17 6.40 11.60 18.86 28.45 40.62 Amax (ac) 0.09 0.25 0.54 1.60 2.90 4.72 7.11 10.16 Amax(sf) 3722 10973 23631 69673 126326 205420 309861 442397 2.5% Q 0.38 1.13 2.43 7.15 12.97 21.09 31.81 45.41 Amax (ac) 0.10 0.28 0.61 1.79 3.24 5.27 7.95 11.35 Amex(sf) 4161 12268 26421 77897 141237 229666 346435 494615 3.0% Q 0.42 1.23 2.66 7.84 14.21 23.10 34.85 49./5 Amax (ac) 0.10 0.31 0.66 1.96 3.55 5.78 8.71 12.44 Amax(sf) 4558 13439 28942 85332 154717 251587 379501 541823 3 Q/A= 4.00 cfs/ac 4 Area drain inlet calculation per orifice equation with 80% of area free from clogging. on 5 Orifice Coefficient =0.6 Inlet Type 1212 CB 1218 CB 1818 CB 2424 CB ADS 8" ADS 10" ADS 12" ADS 15" ADS 18" ADS 24" '" 6 Net area for inlet by ADS per ADS chart. 129.6 194.4 345.6 20.3 29.7 62.7 do 7 Net area for inlet by Brooke assuming 60% clear opening. Depth (in) A 1 Q 0.67 1.00 1.50 2.67 Area Drain Pipes 0.23 0.48 0.71 0.76 1.25 Diameter (in) 4 6 8 12 15 18 21 24 0.18 Slope (%) 0.31 Amax(sf) 7266 10898 16348 29062 1707 2498 0.5% Q 0.17 0.50 1.09 3.20 5.80 9.43 14.23 20.31 Amax (ac) 0.04 0.13 0.27 0.80 1.45 2.36 3.56 5.08 1.73 2.60 Amax(sf) 1861 5486 11816 34837 63163 102710 154931 221198 Amax (ac) 1.0% Q 0.24 0.71 1.53 4.52 8.20 13.34 20.12 28.73 R" Amax (ac) 0.06 0.18 0.38 1.13 2.05 3.33 5.03 7.18 14376 23508 Amax (so 2632 7759 16710 49266 89326 145254 219105 312822 6 Q 1.63 2.45 3.68 6.54 0.38 1.5% Q 0.30 0.87 1.88 5.54 10.05 16.34 24.64 35.18 0.92 1.63 Amax (ac) 0.07 0.22 0.47 1.39 2.51 4.08 6.16 8.80 17797 26696 Amax(sf) 3223 9503 20465 60339 109401 177899 268348 383127 8 Q 1.89 2.83 4.25 7.55 0.44 0.65 1.37 2.02 2.16 2.0% Q 0.34 1.01 2.17 6.40 11.60 18.86 28.45 40.62 Amax (ac) 0.09 0.25 0.54 1.60 2.90 4.72 7.11 10.16 Amax(sf) 3722 10973 23631 69673 126326 205420 309861 442397 2.5% Q 0.38 1.13 2.43 7.15 12.97 21.09 31.81 45.41 Amax (ac) 0.10 0.28 0.61 1.79 3.24 5.27 7.95 11.35 Amex(sf) 4161 12268 26421 77897 141237 229666 346435 494615 3.0% Q 0.42 1.23 2.66 7.84 14.21 23.10 34.85 49./5 Amax (ac) 0.10 0.31 0.66 1.96 3.55 5.78 8.71 12.44 Amax(sf) 4558 13439 28942 85332 154717 251587 379501 541823 Area Drain Inlets Inlet Type 1212 CB 1218 CB 1818 CB 2424 CB ADS 8" ADS 10" ADS 12" ADS 15" ADS 18" ADS 24" '" Area (sq. in.) 86.4 129.6 194.4 345.6 20.3 29.7 62.7 92.5 98.7 161.4 Depth (in) A 1 Q 0.67 1.00 1.50 2.67 0.16 0.23 0.48 0.71 0.76 1.25 Amax (ac) 0.17 0.25 0.38 0.67 0.04 0.06 0.12 0.18 0.19 0.31 Amax(sf) 7266 10898 16348 29062 1707 2498 5273 7779 8300 13573 MR 3 Q 1.16 1.73 2.60 4.62 0.27 0.40 0.84 1.24 1.32 2.16 Amax (ac) 0.29 0.43 0.65 1.16 0.07 0.10 0.21 0.31 0.33 0.54 Amax(sf) 12584 18877 28315 50338 2957 4326 9132 13473 14376 23508 6 Q 1.63 2.45 3.68 6.54 0.38 0.56 1.19 1.75 1.87 3.05 Amax (ac) 0.41 0.61 0.92 1.63 0.10 0.14 0.30 0.44 0.47 0.76 Amax(sf) 17797 26696 40043 71188 4181 6118 12915 19054 20331 33246 8 Q 1.89 2.83 4.25 7.55 0.44 0.65 1.37 2.02 2.16 3.53 Amax (ac) 0.47 0.71 1.06 1.89 0.11 0.16 0.34 0.51 0.54 0.88 Amax(sf) 20550 30825 46238 82201 4828 7064 14913 22001 23476 38389 10 Q 2.11 3.16 4.75 8.44 0.50 0.73 1.53 2.26 2.41 3.94 Amax (ac) 0.53 0.79 1.19 2.11 0.12 0.18 0.38 0.56 0.60 0.99 Amax(sf) 22976 34464 51696 91904 5398 7898 16673 24598 26247 42920 a� Calculation Performed by: Ejaz Mohammad MIR i in H:\Pdata\65100519\Calcs\Hydraulic Calculations\AreaDrainWorksheet.xls 7/14/2009: RBF Consulting A -W 0 N .� Undersidewalk Drain at Node 102 *# Do _ pbts ► Friction Method Manning Formula Solve For Discharge Roughness Coefficient 0.013 .rr Channel Slope 0.02800 ft/ft .. Normal Depth 0.33 ft Bottom Width 5.00 ft arlt Discharge 13.87 fN/s> )2.1 CYS ✓ iltl Flow Area 1.65 ft' Wetted Perimeter 5.66 ft Top Width 5.00 ft Critical Depth 0.62 ft Critical Slope 0.00388 ft/ft Velocity 8.41 ft/s Velocity Head 1.10 ft Specific Energy 1.43 ft Froude Number 2.58 Flow Type Supercritical Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity fUs Normal Depth 0.33 ft Critical Depth 0.62 ft 411 Channel Slope 0.02800 ft/ft Critical Slope 0.00388 ft/ft 40 IN 9� Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 9/14/2009 6:15:06 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 11 of 1 0 ZJ Undersidewalk Drain at Node 201 Friction Method Manning Formula Solve For Discharge y 0-1 j` ?.�: �r=-tea 3saK'-.,�•w:tt: :•:.«AC�:� .�c .,..� ;f"; n 5. .. Roughness Coefficient 0.013 Channel Slope 0.01000 fttft Normal Depth 0.33 ft Bottom Width 2.00 ft 2.98 ft3/s� Z G �5 ✓OIL Discharge .') Flow Area 0.66 ft' Wetted Perimeter 2.66 ft Top Width 2.00 ft Critical Depth 0.41 ft Critical Slope 0.00524 fttft Velocity 4.51 fits tie Velocity Head 0.32 ft Specific Energy 0.65 ft Froude Number 1.39 Flow Type Supercritical . ,� .,fir.. �:-�:,�r.- :�`r�;:a � � .:zc, . Fai°, •;gi�� <,:,.s,.,:>'ac, 'r'� 1W Downstream Depth 0.00 ft Length 0.00 ft MIN 0 Number Of Steps ., �... 3��,Rli1' <�:.: `'.'f'_'. :.. ;y.,?s:Rc.i `/`<'`Y 4�:`.. !` (4,:;,,""''x_ ,`.Y+: ..(_....`rt-f.M..•-- (u Upstream Depth 0.00 ft 'o Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.33 ft ' Critical Depth 0.41 ft Channel Slope 0.01000 ft/ft Critical Slope 0.00524 fttft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.001 9/14/2009 5:14:46 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755.1666 Page 1 of 1 +�A ZJ L-1 0 4m e A d y F do R d E E N R 0 0 Channel Capacity For., Graded Swale @ Southerly Property Line 1.49 A(A)2/3 (s)112 Slope Q cfs 1.QQ°4 1:4.40 1.25% 16.10 1.50% 17.63 1.75% 19.05 2.00% 20.36 2.25% 21.60 2.50% 22.77 2.75% 23.88 3.00% 24.94 3.25% 25.96 3.50% 26.94 3.75% 27.88 4.00% 28.80 4.25% 29.68 4.50% 30.54 4.75% 31.38 5.00%1 32.20 5.25%1 32.99 5.50% 33.77 5.75% 34.53 6.00% 35.27 6.25% 36.00 6.50% 36.71 6.75% 37.41 7.00% 38.09 7.25% 38.77 7.50% 39.43 7.75% 40.08 A= 2(W H) W= 5.5 ft H= 1.1 ft A= 3.025 ft2 P= 5.924 ft A/P= 0.511 ft n= 0.02 soil Q= rrr R R �i M E I" 40 I" 40 4. qq 40 F P P 0 a �I E Technical Appendix D Reference Material A. 10 Yr. —1 Hr. Isohyetal Map B. 100 Yr. —1 Hr. Isohyetal Map C. 25 Yr. — 1 Hr. Rainfall Intensity Graph D. Hydrologic Soils Group Map Piazza Apartment — CUP 08-020/DR 08-010 Hydrology Study 2-12 I A a A & A & A t A & A a A AL A a A I I i A a A & A i A h A k A a A k A a A R.6W R5 14W -4 RIW T4N R2E L • � E- 7 -T -4 • T3N 7-1 1 L( 'F lif T2N i.I—T2N . . . . . . -T —'r 77F — L -7 LN }-'-T:— UPLANDA ._4 TIS 101 EWLANus 0 ............. RIE R E�l T2S L- I RSIDE I R 4 W 3 b R 2 W I w t iFLOOD SAN BERNARDINO COLNTY CONTROL DISTRICT T3S — R 5w:- REDUCED DRAWING VALLEY AREA Uo SCALEI ISOHY ALE "= 4 MILES Y. - 10 YEAR TA 11 HOUR 7sEC SAN BERNARDINO COUNTY DN USGL, IaOYI BLAS 2, BIS i•JR W R7W• RG HYDROLOGY MANUAL L.EGENDIL LM C0NTR6L SEI .............................. 2.. PRECIPITATION (INCHES I I «o -I 3 f �12 Ilk EMIR _— P/iat�polioa ■����JP/1�r/L �■f,f ■Cfai i FiI'm �\�C®"2���� WAVOMIM +� �PENN BIW •S2i y � ��L.^� 4 ON do 40 Am 0- 0 e qm do 8 r 0 E P d IN 410 I" Id e a IN 41i r D-7 rluurzr_ WI I I a I a I 11 a I i I i I k a I I k I k A k, A k A li A k A k- A a A k A & A SAN BERNARDINO COUNTY HYDROLOGY MANUAL SCALE REDUCED BY 1/2