HomeMy WebLinkAbout4805-2GENERAL NOTES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA
STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS
AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS
THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE
"GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE
CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO START OF ANY WORK.
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR
TO THE START OF ANY WORK IN THE PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS.
CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND
PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS,
LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES,
DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OF TRENCH WORK
FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF
INDUSTRIAL SAFTY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN
DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE
GROUND OR OTHER EQUIVALENT MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS
THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR
GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY
WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10. LOCATIONS OF PUBLIC UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE
INFORMATION. HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION IN THE FIELD
OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTIONS TO AVOID
INJURY OR DAMAGE THERETO. CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFOR EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES
INCLUDING, BUT NOT LIMITED TO: GAS, TELEPHONE, ELECTRICAL, LIGHTING, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
STROM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN
TWO WORKING DAY NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES
WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH
THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE
NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE
THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONTRUCTION
CONTROL STAKING DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES
OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY
MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED
CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE
DESTROYED AS A RESULT OF THIS CONTRUCTION SHALL BE REPLACED. THE CONTRACTOR
SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES
AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES
IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST
CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES
EXCEED 25 MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS
TO BE DEPOSITED INTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY
DURNING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY
INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO
OBTAIN THE REQUIRED DENSITY SHALL REQURE RE -WORKING OF THAT PORTION OF
THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY
ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING
IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED
AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA
STANDARDS DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO
MATCH EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE
LOCATION OF THE SEWER LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE
BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR
TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR
TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND
APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTED TAKEN AFTER
COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF AC PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL
STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED
TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED
TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
Underground Service Alert
SECTION 4216/4217 OF THE GOVERNMENT
ORE y� CODE REQUIRES A DIG ALERT IDENTIFICATION
o NUMBER BE ISSUED BEFORE A PERMIT TO
EXCAVATE WILL BE VALID
FOR YOUR DIG ALERT I.D. NUMBER CALL
UNDERGROUND SERVICE ALERT
TOLL FREE 1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
TKE JOB �: 101-16
REV.
REVISION DESCRIPTION
GENERAL NOTES (CONT.):
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING,
BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY
TRAFFIC ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND
SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
36. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER
OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
LEGEND OF SYMBOLS AND ABBREVIATIONS:
O
EXISTING FIRE HYDRANT
®
EXISTING WATER VALVE
-OPP
EXISTING POWER POLE
MB 0
EXISTING MAILBOX
WM 0
EXISTING WATER METER
-�
EXISTING EDGE OF PAVEMENT
CF
EXISTING TREE
O
EXISTING SHRUB
ECR
EXISTING STREET LIGHT
EL
EXISTING LIGHT POLE
MHO
EXISTING MANHOLE
A
EXISTING SURVEY CONTROL
R/W - -
EXISTING RIGHT-OF-WAY
R/W®--®
PROPOSED RIGHT-OF-WAY
Q
UTILITY INTERFERENCE FLAG (APPROXIMATE
LF
LOCATION OF INTERFERENCE WITH TYPE OF
MH
UTILITY INDICATED BY: W -WATER; G -GAS;
PCC
T -TELEPHONE; SD -STORM DRAIN; S -SEWER;
PRC
E -ELECTRIC; TV -CABLE TELEVISION; IR -IRRIGATION
S
U -UNKNOWN UTILITY).
-
EXISTING CENTERLINE
TC
EXISTING CURB AND GUTTER
WM
EXISTING CURB OR AC BERM
PROPOSED CURB AND GUTTER
ASPHALT CONCRETE REMOVAL
®
UNDERLYING PCC CONCRETE REMOVAL
®
PROPOSED ASPHALT CONCRETE
PROPOSED ASPHALT CONCRETE OVERLAY
®
ASPHALT CONCRETE GRIND (VARIABLE
THICKNESS)
AB
ABANDON
AC
ASPHALT CONCRETE
AP
ANGLE POINT
BC
BEGINNING OF CURVE
BCR
BEGIN CURB RETURN
CL
CENTERIJNE
CF
CURB FACE
EC
END OF CURVE
ECR
END CURB RETURN
EL
ELEVATION
FH
FIRE H1fDRANT
FL
FLOW LINE
FS
FINISH ;SURFACE
GB
GRADE 'BREAK
INV
INVERT
LF
LINEAR FEET
MH
MANHOLE
PCC
PORTLAND CEMENT CONCRETE
PRC
POINT OF REVERSE CURVE
S
SLOPE
STA
STATION
TC
TOP OF CURB
WM
WATER METER
r•l IMM A Alf% ni 1TTC0
c/i
z
w�
o �zz
0
0 QJ
++ 3::z�
o Wi =
Q oF=(n
in 3::11 11
DRIVEWAY DETAIL
N.T.S.
PL R/W R/W
L 29' � Ei0' 60'
�t 5' VAR. 52' 52 8'
Iowl
� LEGEND:
I I 29 79 7, 2. I
EXISTING SIDEWALK
EXISTING AC PAVEMENT
41 I I
PROPOSED CURB
PROPOSED AC PAVEMENT
PROPOSED NATIVE GROUND
FOOTHILL BOULEVARD TYPICAL SECTION:
STA. 10+60t -STA. 21+84t
HORIZ. SCALE: 1"=10'
VERT. SCALE: 1"=2"
M • RFti
�a No.69984
kEvxp.9_-30-10,/ clV��- c
OF CA1-�F
EXPIRES: 9-30-10
Wc0wr)lmwwGS
SHOULD CONSTRUCTION OF THE
CITY OF FONTANA, CALIFORNIA
STREET IMPROVEMENT PLANS
STREET IMPROVEMENTS
FOOTHILL BOULEVARD
EAST AVENUE TO COTTONWOOD AVENUE
REQUIRED IMPROVEMENTS NOT COMMENCE
WITHIN TWO YEARS OF THE DATE OF
SHOWN HEREON AND CARRIED
FORTH IN A DILIGENT MANNER, THE CITY
ENGINEER MAY REQUIRE REVISIONS TO
THE PLANS TO BRING THEM INTO
DRAWN BY: FOOTHILL BOULEVARD -PHASE III ��'
SWIL � �O�
oEsa+m BY-... GENERA OTES AND LEGEND oar:
'fMli7 MAY 2009
CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
q{Eq(m BY: BY: DATE ow+►xr+c NO.: 2
�' 4gOS /
� CITY ENGIN R.C.E. No. 51152 5