INTRODUCTION
+� STUDY LOCATION:
The project is an existing 11.5 -acre Industrial Facility being used as overflow parking for
an auto auction business. It is located at the terminus end of Hemlock Avenue north of
Slover Street. The project may be accessed via Cherry Avenue off -ramp (South) from
Freeway 10, thence east to Slover Street, thence north to Hemlock Avenue to the project
site.
REPORT OBJECTIVE:
The existing facility has about 50% paved area and the remainder is paved with slag for
vehicle parking purposes. The whole facility will be upgraded in such a way that all
parking area will be paved and some landscaping and site lighting will be provided. The
objective of this report is to determine the basic hydrologic response of the proposed
—� parking lot addition to both onsite and offsite storm runoff and to established storm drain
facility design criteria for this localized unit for review by the City of Fontana.
HYDROLOGY:
The rational method hydrology system used on the analysis of the subject site is the San
Bernardino County Hydrology Manual dated August, 1986
SUMMARY:
+� The project study area is an existing overflow parking for an auto auction business with
about 50% paved and 50% covered with slag. The whole area will be upgraded to have
all the parking areas paved with asphalt concrete and provide landscaping and on -site
.. lighting.
�.
The project is bounded on the north and west by Southern Pacific Railway with an
existing block wall along the property line, on the east by Hemlock Avenue, on the south
by a residential building, construction yard, recycling yard and a commercial facility, the
properties to the south generally drains to the south and would have no significant impact
to the project.
This existing facility is surrounded by block walls around its perimeter, therefore the site
is already capsulized with a drain outlet thru the wall at the southeast and southwest
arr
corners.
s
The runoff study area is therefore limited only to the site. The grading plan is designed to
have the runoff collected from northwest side of the site to the southeast side by an
underground infiltration/storage system ( Stormtech system)
The calculated 100 -year runoff volume after development is 38.43 CFS and requires an
q4
underground storage volume of 24,600 CF. The designed Stormtech system has a
capacity of 57,272 C.F . with a factor of safety of 2.3
An under sidewalk drain that drains to Hemlock Street is also provided in the event of an
overflow. The storm run -off for a 25 -year event is 30.41 CFS. The size of the under
sidewalk drain is based on the 25 -year storm event with a capacity of 30.60 CFS to
mitigate outflow from downstream impacts.
.r
e
F
s
M
rr
d
+w
IM
ai
'�• 2
rr
F
E
8
w
to FREEWAY 10
SITE
BOYL E AVE.
� Q Q
Q Q
� W
U
SANTA ANA AVE.
VICIIVITY MA-P1
NOT TO SCALE
0
I i t! I A i A & A I I t 1 t 1 I l t 1 t I t I t 1 t I i 1 i 1! i t! I 1
ol p
o
6
,
(PAVED AR ) f z
•
/ (UNPA AREA)
+ / A2 -5.74 Ac. L ;
,
1
Al 5.76 Ac.
,
/
r r r J \ CITY OF FONTANA
HYDROLOGY s ruDy MAP
1
PRE - DEVELOPMENT a 1 ams
10400 HEMLOCK AVENUE FONTANA
SOU MERN CALFOM" AUTO AMM PUN No.
k A I
�.
�( � � �
i _,
..
.'�',.
'���►
.iii.
-
-�; mow•. "�
�
C���•.lFi.
3G��.,'
r 7 a �! ���'..� ,��RR1 -
SIDE
VALLEY AREA
REDUdED DRAWING i � IS.DHYCTALS R
C-4
SCALE MILES Y. - 10 YEAR I HOU
left
� � r�•i �
MW
WMI
IF
awl
Em
a I a A I A & A & I a I # I I I i I I I I I A I # I I I I I I I I I a I I I
SAN BERNARDINO COUNTY
HYDROLOGY MANUAL
1n 1
SdL GFOW aWWO
S-LE I —POO
SCALE REDUCED BY 1/2
r — 5-Q
'A
c.
SAN BERNARDINO COUNTY
HYDROLOGY MANUAL
1n 1
SdL GFOW aWWO
S-LE I —POO
SCALE REDUCED BY 1/2
r — 5-Q
w
w
*w
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
rr (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
* * * * * * * * * * * * * * * * * * * * * * * * ** DESCRIPTION OF STUDY * * * * * * * * * * * * * * * * * * * * * * * * **
+. * 25 -YEAR FREQUENCY
* SOUTHERN CALIFORNIA AUTOMOBILE AUCTION
* PRE - DEVELOPMENT
******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
FILE NAME: SCAA2.DAT
TIME /DATE OF STUDY: 20: 1 11/15/2010
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
rir
-- *TIME -OF- CONCENTRATION MODEL*- -
USER SPECIFIED STORM EVENT(YEAR) = 25.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
err SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE _ .50
*USER- DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
10 -YEAR STORM 60- MINUTE INTENSITY(INCH /HOUR) _ .930
100 -YEAR STORM 60- MINUTE INTENSITY(INCH /HOUR) = 1.350
rr COMPUTED RAINFALL INTENSITY DATA:
STORM EVENT = 25.00 1 -HOUR INTENSITY(INCH /HOUR) = 1.0757
SLOPE OF INTENSITY DURATION CURVE _ .6000
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
+.� ----------------------------------------------------------------------------
»» > RATIONAL METHOD INITIAL SUBAREA ANALYSIS «« <
ISO----- - - - - --
DEVELOPMENT IS COMMERCIAL
TC = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)] ** .20
�r INITIAL SUBAREA FLOW- LENGTH = 699.00
UPSTREAM ELEVATION = 1047.20
DOWNSTREAM ELEVATION = 1036.47
ELEVATION DIFFERENCE = 10.73
TC = .304 *[( 699.00 ** 3.00)/( 10.73)] ** .20 = 9.626
25 YEAR RAINFALL INTENSITY(INCH /HOUR) = 3.225
,. SOIL CLASSIFICATION IS "A"
, COMMERCIAL SUBAREA LOSS RATE, Fm(INCH /HR) _ .0970
SUBAREA RUNOFF(CFS) = 16.21
TOTAL AREA(ACRES) = 5.76 PEAK FLOW RATE(CFS) = 16.21
FLOW PROCESS FROM NODE 1.00 TO NODE 3.00 IS CODE = 2
----------------------------------------------------------------------------
>>>>> RATIONAL METHOD INITIAL SUBAREA ANALYSIS ««<
NATURAL POOR COVER
qm
TC = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)] ** .20
INITIAL SUBAREA FLOW - LENGTH = 889.00
UPSTREAM ELEVATION = 1047.20
�I DOWNSTREAM ELEVATION = 1034.00
ELEVATION DIFFERENCE = 13.20
TC = .525 *[( 889.00 ** 3.00)/( 13.20)] ** .20 = 18.424
25 YEAR RAINFALL INTENSITY(INCH /HOUR) = 2.184
SOIL CLASSIFICATION IS "A"
do NATURAL POOR COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH /HR) _ .4100
SUBAREA RUNOFF(CFS) = 9.17
TOTAL AREA(ACRES) = 5.74 PEAK FLOW RATE(CFS) = 9.17
ar END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 5.74
EFFECTIVE AREA(ACRES) = 5.74
PEAK FLOW RATE(CFS) = 9.17
on
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
rr (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
* * * * * * * * * * * * * * * * * * * * * * * * ** DESCRIPTION OF STUDY * * * * * * * * * * * * * * * * * * * * * * * * **
.. * 100 -YEAR FREQUENCY
* SOUTHERN CALIFORNIA AUTOMOBILE AUCTION
rr * PRE - DEVELOPMENT
******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
FILE NAME: SCAA3.DAT
TIME /DATE OF STUDY: 20:29 11/15/2010
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
+rr
-- *TIME -OF- CONCENTRATION MODEL*- -
USER SPECIFIED STORM EVENT(YEAR) = 100.00
rr SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = .50
*USER- DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
SLOPE OF INTENSITY DURATION CURVE = .6000
USER SPECIFIED 1 -HOUR INTENSITY(INCH /HOUR) = 1.3500
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
rr FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
----------------------------------------------------------------------------
,.� >>>>> RATIONAL METHOD INITIAL SUBAREA ANALYSIS <<<<<
DEVELOPMENT IS COMMERCIAL
'.. TC = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)] ** .20
INITIAL SUBAREA FLOW - LENGTH = 699.00
° UPSTREAM ELEVATION = 1047.20
DOWNSTREAM ELEVATION = 1036.47
ELEVATION DIFFERENCE = 10.73
TC = .304 *[( 699.00 ** 3.00)/( 10.73)] ** .20 = 9.626
100 YEAR RAINFALL INTENSITY(INCH /HOUR) = 4.047
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH /HR) = .0970
r SUBAREA RUNOFF(CFS) = 20.48
TOTAL AREA(ACRES) = 5.76 PEAK FLOW RATE(CFS) = 20.48
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ar FLOW PROCESS FROM NODE 1.00 TO NODE 3.00 IS CODE = 2
----------------------------------------------------------------------------
,� >>>>> RATIONAL METHOD INITIAL SUBAREA ANALYSIS ««<
ar NATURAL POOR COVER
TC = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)] ** .20
INITIAL SUBAREA FLOW- LENGTH = 889.00
UPSTREAM ELEVATION = 1047.20
DOWNSTREAM ELEVATION = 1034.47
ELEVATION DIFFERENCE = 12.73
TC = .525*[( 889.00 ** 3.00)/( 12.73)] ** .20 = 18.558
100 YEAR RAINFALL INTENSITY(INCH /HOUR) = 2.730
SOIL CLASSIFICATION IS "A"
NATURAL POOR COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH /HR) _ .4100
SUBAREA RUNOFF(CFS) = 11.98
TOTAL AREA(ACRES) = 5.74 PEAK FLOW RATE(CFS) = 11.98
END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 5.74
EFFECTIVE AREA(ACRES) = 5.74
# PEAK FLOW RATE(CFS) = 11.98
"m
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
.�. RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
rir (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
* * * * * * * * * * * * * * * * * * * * * * * * ** DESCRIPTION OF STUDY * * * * * * * * * * * * * * * * * * * * * * * * **
*
.. * 25 -YEAR FREQUENCY
* SOUTHERN CALIFORNIA AUTOMOBILE AUCTION
*
"'r * POST DEVELOPMENT
******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
FILE NAME: SCAAI.DAT
TIME /DATE OF STUDY: 19:28 11/15/2010
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
" -- *TIME -OF- CONCENTRATION MODEL'
.. USER SPECIFIED STORM EVENT(YEAR) = 25.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = .50
*USER- DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
10 -YEAR STORM 60- MINUTE INTENSITY(INCH /HOUR) _ .930
.. 100 -YEAR STORM 60- MINUTE INTENSITY(INCH /HOUR) = 1.350
COMPUTED RAINFALL INTENSITY DATA:
.� STORM EVENT = 25.00 1 -HOUR INTENSITY(INCH /HOUR) = 1.0757
SLOPE OF INTENSITY DURATION CURVE = .6000
srr
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
----------------------------------------------------------------------------
"' >>>>> RATIONAL METHOD INITIAL SUBAREA ANALYSIS ««<
-------------------
rr DEVELOPMENT IS COMMERCIAL
"
TC = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)] ** .20
INITIAL SUBAREA FLOW- LENGTH = 766.00
,rr
UPSTREAM ELEVATION = 1045.00
DOWNSTREAM ELEVATION = 1036.47
...
ELEVATION DIFFERENCE = 8.53
TC = .304 *[( 766.00 ** 3.00)/( 8.53)]
** .20 = 10.647
AN
25 YEAR RAINFALL INTENSITY(INCH /HOUR) =
3.036
SOIL CLASSIFICATION IS "A"
w
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH /HR)
= .0970
a
SUBAREA RUNOFF(CFS) = 30.41
TOTAL AREA(ACRES) = 11.50 PEAK FLOW
RATE(CFS) = 30.41
s
-
END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 11.50
EFFECTIVE AREA(ACRES) = 11.50
a�
PEAK FLOW RATE(CFS) = 30.41
`
END OF RATIONAL METHOD ANALYSIS
Im
III
a
ar
,r
rn
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
* * * * * * * * * * * * * * * * * * * * * * * * ** DESCRIPTION OF STUDY * * * * * * * * * * * * * * * * * * * * * * * * **
* 100 -YEAR FREQUENCY
* SOUTHERN CALIFORNIA AUTOMOBILE AUCTION
* POST DEVELOPMENT
******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
s
r FILE NAME: SCAA.DAT
TIME /DATE OF STUDY: 20:50 7/ 6/2010
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
-- *TIME -OF- CONCENTRATION MODEL*- -
.w
USER SPECIFIED STORM EVENT(YEAR) = 100.00
" SPECIFIED MINIMUM PIPE SIZE(INCH) = 12.00
SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE _ .50
*USER- DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
SLOPE OF INTENSITY DURATION CURVE _ .6000
USER SPECIFIED 1 -HOUR INTENSITY(INCH /HOUR) = 1.3500
rr
a�
ar
********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
.r
----------------------------------------------------------------------------
>>>>> RATIONAL METHOD INITIAL SUBAREA ANALYSIS ««<
-------------------------------= ------------------- ----------------- --------
low ----------------------------------------------------------------------------
DEVELOPMENT IS COMMERCIAL
.r
TC = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)] ** .20
*.
INITIAL SUBAREA FLOW - LENGTH = 766.00
UPSTREAM ELEVATION = 1045.00
DOWNSTREAM ELEVATION = 1036.47
ELEVATION DIFFERENCE = 8.53
TC = .304 *[( 766.00 ** 3.00)/( 8.53)] ** .20 = 10.647
100 YEAR RAINFALL INTENSITY(INCH /HOUR) = 3.810
am
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH /HR) _ .0970
SUBAREA RUNOFF(CFS) = 38.43
TOTAL AREA(ACRES) = 11.50 PEAK FLOW RATE(CFS) = 38.43
a
END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 11.50
EFFECTIVE AREA(ACRES) = 11.50
PEAK FLOW RATE(CFS) = 38.43
in
END OF RATIONAL METHOD ANALYSIS
ild
a�
ar
a
40
. . . . . . . . . . .
. . . . . . . . . . . . .
HP Engineering, Inc.
. . . . . . . . . . .
Civil
Engineering and Land Surveying
,
1465 Crestview Road
as
Redlands, Ca. 92374
...
909 799 -6797
. . . .
. . . . . . . . . . .
ON
. . . . . . . . . . .
. . . . . . . . .
I<--- - - - - -( 6.60') ---------- >1
w
I
I
* *
* *
* ^^ ^Water
Surface ( 0.50')^ ^^*
* *
* *
r
* *
* *
* * *
* * * * * * * * * * * * *
* *
Rectangular Open Channel
------------------------
,s
Flowrate ..................
30.589
CFS
Velocity ..................
9.269
fps
4.
Depth of Flow .............
0.500
feet
,l
Critical Depth ............
0.874
feet
Total Depth ...............
0.500
feet
Base Width ................
6.600
feet
Slope of Channel
.......... 2.000
%
.r
X- Sectional Area
.......... 3.300
sq. ft.
Wetted Perimeter
.......... 7.600
feet
AR ^(2/3) ..................
1.892
Mannings 'n' ..............
0.013
a
i
X11
As
a
40
S STORMWATER RETENTION / DETENTION
RIND
PIPE SYSTEM SIZING WORKSHEET
THE MOST ADVANCED NAME IN DRAINAGE SYSTEMS
Version 6 0 Project Name: Southern California Automobile Auction
Location (City, State): Fontana
Prepared For: SCAA
Date Prepared: 6 - Jul - 10
SYSTEM Engineer: HP ENGINEERING, INC.
Joint Type Plain End ST .� Contractor:
Spacing Standard -1 Regional Engineer:
Design Storage Volume 57,100 Area Sales Representative:
Average Cover Height 3.00 FT Surface Application:
HEADER LATERALS BACKFILL
# of Sticks Approx. Length A non - perforated system has been selected
Lateral Lateral Number of / Lateral of End \Stick
Header Diameter 60 •1 Diameter Length Laterals
Number of Headers 2 71 Group 1 60 � 315 9 17 0.3 - ft
Perforate Headers? No ■I Group 2 30 ■ 0 0 0 0 - ft
include Header(s) in Yes Group 3 30 '} 0 0 - ft
Storage Volume?
Perforate Laterals? No
STORAGE VOLUME APPROXIMATE SYSTEM - EXCAVATION
COMPONENT SIZE Disturbed
Total Pipe Excav- Estimated
Product Stone ASV System Width Length Diameter Width Length Surface ation Backfill° ASV View Generic
Volume Area Layout Drawings !:
(CF) (CF) (CF) (CF) (FT) (FT) (IN) (FT) (FT) (SYD) (CYD) (CYD) (CYD)
Group 1 57,272 0 0 57,272 65.5 328.0 60 68.5 331.0 2520 7582 5461 0
Group 2 0 0 0 0 0.0 0.0 30 0.0 0.0 0 0 0 0
Group 3 0 0 0 0 0.0 0.0 30 _ 0.0 0.0 0 0 0 0
TOTALS 57,272 0 0 ;' % s %% !js `�t✓ F� , 'i, 2520 7582 5461 0
100.3% of the required storage
NOTES
1 - Full Stick: Assumed a standard lay length of 19' -8 ".
2 - Excavation: Based on manufacturer's recommended trench width and bedding depth. Estimated volumes assume a flat system based on the user - entered Average Cover Height.
3 - Backfill: Does not account for pipe corrugations - calculated for conservative quanitites. Not for use with take -offs or ordering purposes.
4 - Cover Height: For traffic installations, 1 -ft of minimum cover is required for diameters 12 -36", 2 -ft for 42 -60 ". Maximum cover shall not exceed 8 -ft.
This Excel spreadsheet isprovided for rough estimating purposes only. This tool is intended to assist the design engineer in sizing stormwater management systems using ADS pipe and
manifold components. As with any calculation aid, this tool should he used for estimating only, the engineer must verify the assumptions and methods to ensure they satisfy the project and
local design criteria
I 1 r