Loading...
HomeMy WebLinkAboutI-10 Channel Capacity Report Vol 2FINAL — Volume 2 of 4 Appendix B — Rational Method Hydrology Maps I -10 Channel Capacity Report 30% Design PREPARED FOR: City of Fontana 8353 Sierra Avenue Fontana, CA 92335 OWNER(S): California Department of Transportation City of Fontana District 8 8353 Sierra Avenue 464 W. Fourth Street Fontana, CA 92335 San Bernardino, CA 92401 Mr. Steve Nawar i Mr. Phillip Reynolds Project Manager Project Manager (909) 350 -6523 (909) 383 -4960 PROJECT SITE LOCATION: City of Fontana County of San Bernardino I -10 from San Sevaine/Etiwanda Channel to Sierra Avenue PREPARED BY: BOYLE ENGINEERING CORP. 1131 West Sixth Street, Suite 285 Ontario, CA 91762 (909) 933 -5225 Project Manager: Joseph F. Long, P.E. Project Engineer: Bill Flores Jr., P.E. PREPARED DATE: November 26, 2003 (OC -F60 -401) Appendix B Rational Method Hydrology Maps Volume 2 of 4 Table of Contents Index Map A Area Maps B Area Maps C Area Maps