7 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH
WORK FOR TRENCH 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE
DIVISION OF INDUSTRIAL SAFETY.
8 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN
DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER
APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF
INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE
(5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT.
9 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY
WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE
INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO DETERMINE,IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF
ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID
DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES
INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER,
SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES
SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR
FACILITIES.
12 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN
VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL
COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION
AND WATER REQUIREMENTS.
13 CURVE DATA REFERS TO THE FACE OF CURB.
14 STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE
NOTED.
15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO
ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN
GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF
BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS MONUMENT
STREET IMPROVEMENT PLANS
FONTANA ..WATER COMPANY
N.W.C. OF ARROW ROUTE AND TOKAY AVENUE
1
ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA
SD
27
THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT
G
STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS
w
0
VICINITY MAP
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE
FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE
32
ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE
FIRE HYDRANT
NOT TO SCALE
SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS
>
TOP OF CURB
a
LA
OTHERWISE NOTED.
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT
MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE
05
2
WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS
31
RECOMMENDED BY A GEOTECHNICAL REPORT AN SUBMITTED TO THE
Q
O.C.
THAT CAN NOT B RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE
TF
CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH
AFTER COMPLETION OF ROUGH GRADING.
v
"GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO
TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR
GRADING.
LEGEND
R/W
THE CITY ENGINEER FOR RESOLUTION.
33
ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES
a
3
ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY
C
SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR
THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND
z
W
ENGINEER.
SHOULD RUN THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
UPON COMPLETION OF PAVING.
4
CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
34
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE
ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL
P.M.B. 200/8-9.IV
STEPHEN Wh
START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST
DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
CENTER LINE
FF
TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
35
CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING,
EX. GROUND
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
BENCHMARK
SPRINKLERS AND SIDEWALKS AFFECTED BY THE
ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND
5
THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS
FH
CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
VELOCITIES EXCEED 25 MILES PER HOUR.
AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC
36
AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO
z
CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE
THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD
FL
CITY TRAFFIC ENGINEER.
DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE
DRAWINGS TO THE CITY ENGINEER.
BACK OF WALK
6
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES,
RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
22
7 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH
WORK FOR TRENCH 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE
DIVISION OF INDUSTRIAL SAFETY.
8 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN
DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER
APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF
INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE
(5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT.
9 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY
WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE
INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO DETERMINE,IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF
ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID
DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES
INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER,
SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES
SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR
FACILITIES.
12 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN
VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL
COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION
AND WATER REQUIREMENTS.
13 CURVE DATA REFERS TO THE FACE OF CURB.
14 STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE
NOTED.
15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO
ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN
GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF
BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS MONUMENT
STREET IMPROVEMENT PLANS
FONTANA ..WATER COMPANY
N.W.C. OF ARROW ROUTE AND TOKAY AVENUE
-o LEAVING IMPROVEMENTS.
0 25 THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE
APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF
co
FONTANA STANDARD DETAILS.
26 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE COLOR AND FINISH
FS
TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
SD
27
THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT
G
17
w
0
VICINITY MAP
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE
GRADE BREAK
T
MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A
FIRE HYDRANT
NOT TO SCALE
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR
>
TOP OF CURB
a
LA
30
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT
FOOTHILL
05
BLV
LOW POINT
31
PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION
Q
O.C.
REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR
TF
ROUTE 66
AFTER COMPLETION OF ROUGH GRADING.
v
PROPERTY LINE
TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR
i
LEGEND
R/W
RIGHT OF WAY
245
LATER REPLACEMENT OF THE MONUMENT.
a
CONSTRUCT 4.5" MIN. A.C. OVER 12" MIN.
95% COMPACTED NATIVE SOIL.
C
18.
THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND
z
W
SHOULD RUN THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
E
Q
E-
- - —
Y
0
E/T
ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
SURVEY DATA BASED ON PARCEL MAP NO. 16005,
P.M.B. 200/8-9.IV
STEPHEN Wh
19
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST
-
CENTER LINE
FF
32
CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
EX. GROUND
Q
BENCHMARK
20
ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND
—160
U
FH
BM No. 7-15
BRASS DISK IN CONCRETE ABUTMENT OF P.E.R.R. BRIDGE���
VELOCITIES EXCEED 25 MILES PER HOUR.
ELEVATION=1236.018
A T0,0A
z
THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR
RETAINING WALL
FL
w
>w
DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE
BW
BACK OF WALK
RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22
Q
C&G
CURB AND GUTTER
INSPECTOR.
CF
CURB FACE
23
A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE
z
>
Q
CL
CENTER LINE
OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
Q
>
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY
3
z
Q
Q
U
Q
J
w
w
Ld W
D
:a
-'
¢
w
m
Q
ARROW
ROUTE
D
S I TE
z
Q
of
z
N
Q
V)
w
J
VALENCIA
AVENUE
0
AVENUE
>
U
CERES
Q
Q
MERRILL
AVENUEo
-o LEAVING IMPROVEMENTS.
0 25 THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE
APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF
co
FONTANA STANDARD DETAILS.
26 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE COLOR AND FINISH
FS
TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
SD
27
THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT
G
17
REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY
0
VICINITY MAP
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE
GRADE BREAK
T
MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A
FIRE HYDRANT
NOT TO SCALE
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR
I
TOP OF CURB
REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS
LA
30
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT
v,
05
THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE
LOW POINT
31
PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION
06
O.C.
REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR
TF
TOP OF FOOTING
AFTER COMPLETION OF ROUGH GRADING.
v
PROPERTY LINE
TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR
i
LEGEND
R/W
RIGHT OF WAY
245
LATER REPLACEMENT OF THE MONUMENT.
i
CONSTRUCT 4.5" MIN. A.C. OVER 12" MIN.
95% COMPACTED NATIVE SOIL.
C
18.
THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND
v
a
SHOULD RUN THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
E
BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT
- - —
PROPERTY BOUNDARY LINE
E/T
ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
SURVEY DATA BASED ON PARCEL MAP NO. 16005,
P.M.B. 200/8-9.IV
STEPHEN Wh
19
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST
-
CENTER LINE
FF
32
CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
EX. GROUND
FG
BENCHMARK
20
ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND
—160
CONTOUR
FH
BM No. 7-15
BRASS DISK IN CONCRETE ABUTMENT OF P.E.R.R. BRIDGE���
VELOCITIES EXCEED 25 MILES PER HOUR.
ELEVATION=1236.018
A T0,0A
21
THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR
RETAINING WALL
FL
DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE
BW
BACK OF WALK
RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22
NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY
C&G
CURB AND GUTTER
INSPECTOR.
CF
CURB FACE
23
A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE
TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION
CL
CENTER LINE
OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY
3
ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR
-o LEAVING IMPROVEMENTS.
0 25 THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE
APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF
co
FONTANA STANDARD DETAILS.
26 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE COLOR AND FINISH
arz
v >,
v
cE
0 Q.
LL_o
FONTANA, CALIFORNIA
wl
z
w�
aI
a'
I
16 i
11=
C I�
SHEET INDEX MAP
SCALE: 1"=160'
ELECTRICAL
FS
TO MATCH EXISTING CONCRETE.
SD
27
THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT
G
GAS
THE LOCATION OF THE SEWER LATERAL.
0
28
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE
GRADE BREAK
T
BEEN PLACED, INSPECT AND APPROVED.
FIRE HYDRANT
29
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR
I
TOP OF CURB
TO PAVING OF STREETS.
LA
30
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT
v,
05
PRIOR TO PLACEMENT.
LOW POINT
31
PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION
06
O.C.
AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN
TF
TOP OF FOOTING
AFTER COMPLETION OF ROUGH GRADING.
v
PROPERTY LINE
--
i
O
R/W
RIGHT OF WAY
245
LF
i
CONSTRUCT 4.5" MIN. A.C. OVER 12" MIN.
95% COMPACTED NATIVE SOIL.
C
SF
ik QUANTITIES SHOWN ON THESE PLANS
v
a
SHOULD RUN THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
E
twimiIiiiii 4,4
0
U
BASIS OF BEARINGS
ESsfo���o
arz
v >,
v
cE
0 Q.
LL_o
FONTANA, CALIFORNIA
wl
z
w�
aI
a'
I
16 i
11=
C I�
SHEET INDEX MAP
SCALE: 1"=160'
ELECTRICAL
FS
FINISHED SURFACE
SD
STORM DRAIN
FINISHED FLOOR
G
GAS
SW
SEWER
FINISHED GRADE
GB
GRADE BREAK
T
TELEPHONE
FIRE HYDRANT
HP
HIGH POINT
TC
TOP OF CURB
FLOW LINE
LA
LANDSCAPE AREA
TG
TOP OF GRATE
05
LP
LOW POINT
TW
TOP OF WALL
06
O.C.
ON CURVE
TF
TOP OF FOOTING
O
IT-
PROPERTY LINE
--
--
O
R/W
RIGHT OF WAY
245
LF
R/W
11.5' 1 11.5'
XISTING
ROUND I
f2% VARIES I
=XfST- i EXISTING
=DGE OF EDGE OF
'AVEMENT� PAVEMENT
I
I
N
co I
I
0O 0) Underground Service Alert REV REVISION DESCRIPTION DATE ENGR CITY DATE
R/W
I
I
FINISHED
GROUND—
FUTURE
IMPROVEMENTS
I
I
25'
22'
f 5'
±17
9
2.6% MAX
1.0% MIN
CONSTRUCTION OF TM REQLWM hfiPROVEIuENrrS
N
o QEF ORE yoG NOT COMNEIVCE WtTf'�V TWO YEARS OF TM DATE OF
�� P,•. o o Call: TOLL FREE
APPROVAL SHOWN HUE014 AND CARRED FORTH N A
1-800
Z TFE CITY MAY RECAWE
DID-lll(227-2600 TO TFE PLANS TO BFUNG THEM NTO
co
3 .,..,
TWO WORKING DAYS CONFORMANIM WITH CONDnXM AND STANDARDS N EFFECT.
0 J
BEFORE YOU DIG _ _ a&. _
PROPOSED
EDGE OF
PAVEMENT
C/L
STREET CONSTRUCTION NOTES
ITEM I DESCRIPTION QUANTITY
01
CONSTRUCT 2' WIDE AC FEATHER
UTION:
ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,
UTHORIZED CHANGES OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST
N WRITINGAND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
FEBE
CONSTRUCT
1180
SF
02
REMOVE EXISTING AC BERM AND DISPOSE
OF OFF-SITE.
48
LF
O
CONSTRUCT COMMERCIAL CONC. DRIVEWAY
APPROACH PER CITY STD DWG 1002.
1
EA
NATIVE SOIL.
W=24'
04
REMOVE INTERFERING PORTIONS OF FENCE
FROM SIDEWALK
5
LF
05
REMOVE EXISTING EE. (AS NEEDED)
1
EA
06
CONSTRUCT CONC. SIDEWALK PER CITY OF
FONTANA STD DWG 1006.
50
SF
O
N/A
--
--
O
PROVIDE 10:1 TAPER.
245
LF
09
CONSTRUCT 4.5" MIN. A.C. OVER 12" MIN.
95% COMPACTED NATIVE SOIL.
3300
SF
ik QUANTITIES SHOWN ON THESE PLANS
ARE FOR ESTIMATING PURPOSES ONLY. CONTRACTOR
SHOULD RUN THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
twimiIiiiii 4,4
BASIS OF BEARINGS
ESsfo���o
:Y.%oV
SURVEY DATA BASED ON PARCEL MAP NO. 16005,
P.M.B. 200/8-9.IV
STEPHEN Wh
BASIS OF BEARINGS IS THE CENTERLINE OF ARROW ROUTE, BEING ��
N 89'41'29"E PER PARCEL MAP N0. 16005, P.M.B.
200/8-9. so
32
CIVIC.
BENCHMARK
�Q 6 -1 FO R'#P% F
BM No. 7-15
BRASS DISK IN CONCRETE ABUTMENT OF P.E.R.R. BRIDGE���
34' N/0 FOOTHILL BOULEVARD AND 131' W/O LIME AVENUE skw.
ELEVATION=1236.018
A T0,0A
160 1 GA R 170 2,
•24%A m W oV
, UX ra- nmLa ,,C Joe,
25'
EX.
CROWN
i
12' 11.5' 1 11.5'
I EXISTING
(GROUND I
(f2%) VARIES I
-EX -EP i EX EDGE OF
1 I PAVEMENT
I
I I I
I
I
TOKAY AVENUE
STA 15+50.00
TI=6.5
QVFESS/p
�� zy
� �' No. 41308 a �
*. Exp. 3/31 /11
sj9T�, C/
\ OF
PRIVATE ENGINEER'S NOTICE TO CONTRACTOR
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON
THESE PLANS WERE OBTAINED BY SEARCH OF THE AVAILABLE RECORDS. THESE LOCATIONS ARE
APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR, SO THAT ANY NECESSARY
ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIRONARY MEASURES TO PROTECT ANY UTILITY
LINES SHOWN AND ANY OTHER LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
DEFEND, INDEMNIFY. AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL
PROJECTS EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
ENGINEER.
R/W
I
I
25'
22'
SHEET INDEX
SHEET #
UTION:
ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,
UTHORIZED CHANGES OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST
N WRITINGAND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
FEBE
CONSTRUCT
2' WIDE AC FEATHER
O
25'
EX.
CROWN
i
12' 11.5' 1 11.5'
I EXISTING
(GROUND I
(f2%) VARIES I
-EX -EP i EX EDGE OF
1 I PAVEMENT
I
I I I
I
I
TOKAY AVENUE
STA 15+50.00
TI=6.5
QVFESS/p
�� zy
� �' No. 41308 a �
*. Exp. 3/31 /11
sj9T�, C/
\ OF
PRIVATE ENGINEER'S NOTICE TO CONTRACTOR
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON
THESE PLANS WERE OBTAINED BY SEARCH OF THE AVAILABLE RECORDS. THESE LOCATIONS ARE
APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR, SO THAT ANY NECESSARY
ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIRONARY MEASURES TO PROTECT ANY UTILITY
LINES SHOWN AND ANY OTHER LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
DEFEND, INDEMNIFY. AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL
PROJECTS EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
ENGINEER.
R/W
I
I
25'
22'
SHEET INDEX
SHEET #
CONSTRUCT
2' WIDE AC FEATHER
O
2
\\
CONSTRUCT
4.5" MIN. A.C. OVER 12" MIN. 95%
COMPACTED
NATIVE SOIL.
25'
EX.
CROWN
i
12' 11.5' 1 11.5'
I EXISTING
(GROUND I
(f2%) VARIES I
-EX -EP i EX EDGE OF
1 I PAVEMENT
I
I I I
I
I
TOKAY AVENUE
STA 15+50.00
TI=6.5
QVFESS/p
�� zy
� �' No. 41308 a �
*. Exp. 3/31 /11
sj9T�, C/
\ OF
PRIVATE ENGINEER'S NOTICE TO CONTRACTOR
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON
THESE PLANS WERE OBTAINED BY SEARCH OF THE AVAILABLE RECORDS. THESE LOCATIONS ARE
APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR, SO THAT ANY NECESSARY
ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE
CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIRONARY MEASURES TO PROTECT ANY UTILITY
LINES SHOWN AND ANY OTHER LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
DEFEND, INDEMNIFY. AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL
PROJECTS EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
ENGINEER.
R/W
I
I
25'
22'
SHEET INDEX
SHEET #
DESCRIPTION
1
TITLE SHEET
2
PLAN AND PROFILE - TOKAY AVENUE
C/L
R/W
25'
i
I
I
2', 18.5' EX PAVEMENT
I EX EDGE OF
f2% VARIES I PAVEMENT
—t -
Development Resource Consultants, lie.
Civil Engineering • Land Surveying • Land Planning
N. RIVERVIEW DRIVE, SUITE 100, ANAHEIM, CA 92808
14) 685 -6860 -PH (714) 685 -6801 -FAX
Designed by.
�/10/
R.C.E. 4
Drawn by:
151(l,
DATE
Checked by:
U V vv r B.C.R.
i
TOKAY AVENUE
STA 16+34.61
TI=6.5
CITY OF FONTANA, CALIFORNIA
STREET IMPROVEMENT PLANS
°�.�. BY: TITL4 SHEET
A.P.N.: 0232-081-78
0[scxm ex: 70 TO 660'FEE�TiI' 0RTH OF ARROW ROUTE
�7
L.C.
CSECRMFD?f,::n CITY ENGINEER R.C£ 51152 DATEs
SCALE: AS SHOWN
DATE:
DR. N0.
4788 2